Commissioning Director - Environment. Officer Contact Details Jane Shipman;

Similar documents
Commissioning Director - Environment

Finchley and Golders Green Area Committee 27 April 2017

Date 24/10/2011. Date 04/11/2011. Date 25/10/2011. Date 10/11/2011. Date 25/10/2011. Date 25/10/2011. Date 10/11/2011.

All reports. 1. Governance Service receive draft report Name of GSO DPR

West London Economic Prosperity Board. 21 March Summary. Title Orbital Rail in West London

Environment Committee 24 September 2015

Report of Commissioning Director, Growth and Development. Wards Child s Hill, Golders Green and West Hendon. Summary

Wolverhampton City Council

Open Report on behalf of Richard Wills, Executive Director for Environment and Economy

PERTH AND KINROSS COUNCIL. Housing and Health Committee. 25 May Perth and Kinross Local Housing Strategy

Report of the Strategic Director of Place to the meeting of Executive to be held on 11 September 2018

Queen s Circus Roundabout

West Sussex Local Authority Parking Enforcement Agreement

Arrangements for the delivery of minor highway maintenance services by Town and Parish Councils

Finchley and Golders Green Area Committee. Referrals from Finchley & Golders Green Residents Forum

FOR CONSIDERATION BY The Executive on 30 October Angus Ross, Executive Member for Environment

Decisions To authorise revised costings of the existing Design Services Agreement between the Council and Network Rail, from 921,100 to 1,340,642.

Strategic Director for Environment. Underhill and High Barnet. Summary

BLAIRGOWRIE COMMON GOOD FUND COMMITTEE. 1 May 2013 QUEEN ELIZABETH II FIELDS 2012 CHALLENGE IN PERTH AND KINROSS

BOROUGH OF POOLE TRANSPORTATION ADVISORY GROUP 16 MARCH 2017

Regulatory Committee

Movement Strategy. November On behalf of Barton Oxford LLP

London Borough of Barnet Traffic & Development Design Team

Subject: B579 Luton Road, Chalton

Summary of Decisions Taken Under Delegated Powers January 2015

Clyde Waterfront and Renfrew Riverside Project Glasgow Airport Investment Area Project

PERTH AND KINROSS COUNCIL. 22 June 2016 DEVELOPING THE CULTURAL OFFER IN PERTH AND KINROSS UPDATE AND NEXT STEPS

Calderdale MBC. Wards Affected: Town. Economy and Investment Panel: 20 October Halifax Station Gateway Masterplan

Pre-application submission for Committee: Phase 4 development at West Hendon

HERNE BAY AREA MEMBER PANEL 16 TH JANUARY This report is open to the public.

Consultation on Draft Airports National Policy Statement: new runway capacity and infrastructure at airports in the South East of England

John Betts School Crossing Review

HIGHCLIFFE CENTRE PARTNERSHIP NOTES OF THE EIGHTH MEETING HELD ON 9 TH OCTOBER 2014 TO DISCUSS THE HIGHCLIFFE SHOPPING CENTRE

Item 1. Leadership Board. On: 1 April Report by: Director of Development and Housing Services. Heading: Update on City Deal. 1.

9. The above process has been checked and verified by Director, Head of Service or Deputy (report author to complete) Name of DSO Jonathan Regal

THE WOODBERRY GP PRACTICE THE WOODBERRY PRACTICE, 1 WOODBERRY AVENUE, LONDON, N21 3LE TRANSPORT STATEMENT. August 2017

SUBJECT: Integration of Health & Social Care Update from H&SC North Lanarkshire

Response to the London Heathrow Airport Expansion Public Consultation

TRANSPORT FOR GREATER MANCHESTER COMMITTEE REPORT FOR RESOLUTION

Business Case Approved. Under Construction. Business Case Approved. Under Construction

NOT PROTECTIVELY MARKED. Scottish Police Authority 26 June :00 to 16:00 Public Session Lockerbie Town Hall, High Street, Lockerbie

Decisions of the Barnet Partnership Board. 8 November Members Present:- Councillor Richard Cornelius (Chairman)

Roundhouse Way Transport Interchange (Part of NATS City Centre Package)

Ryeish Green and Grays Fruit Farm Sports Hub Projects. Shinfield South and Wokingham Without. Heather Thwaites, Director of Environment

1. To inform members of the views of the West of England Joint Scrutiny Committee (JSC) following a meeting held on Wednesday 5 th March 2014

2.2 For these reasons the provision of tourist signing will only be considered:

City Deal City Centre Enabling Infrastructure Public Realm. Derek Dunsire PRINCIPAL OFFICER: DRS CITY CENTRE REGENERATION / CITY DEAL

A140 study and Major Road Network

Monthly Table List of Actions Taken Under Summary DPRs

SOUTH HAYLING BEACH MANAGEMENT PLAN Executive Head Of Planning & Built Environment

IRISH PARKING ASSOCIATION. The use of Pay and Display in Traffic Management in Kilkenny City

Strategic Transport Forum 21 st September 2018

Ian Saxon Assistant Executive Director, Environmental Services

Date: 22 September Grove Vale parking consultation. East Dulwich, South Camberwell. Head of Public Realm

Cllrs C I Black, K H Hudson (Chairman), Mrs G A Lucas-Gill, T E Mountain, and M J Steptoe

Isleworth & Brentford Area Forum Action Plan

1 SUBWAY EXTENSION TO VAUGHAN CORPORATE CENTRE - OPERATING AGREEMENT UPDATE

Review of Highcliffe Shopping Centre

12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization

Councillors Noble (Chair), Gollick and Worton. There were no declarations of pecuniary or non-pecuniary interests.

Board meeting

Sky Temporary Car Park Transport Statement

MALDON DISTRICT LOCAL HIGHWAY PANEL Approved Works Programme June 2018 Update

East Lancashire Highways and Transport Masterplan East Lancashire Rail Connectivity Study Conditional Output Statement (Appendix 'A' refers)

ROCHFORD LOCAL HIGHWAYS PANEL MINUTES 21 JUNE 2018 AT 2.00 PM COMMITTEE ROOM 4, CIVIC SUITE, RAYLEIGH Civic Suite, 2 Hockley Road, Rayleigh, SS6 8EB

Seek the Board s approval for the Donald Place kerb and channel renewal to progress to final design, tender and construction; and

Agenda Item 5: Rail East Midlands Rail Franchise Consultation

Economic Development Sub- Committee

Report of the Strategic Director Place to the meeting of Bradford East Area Committee to be held on 11 July 2017.

Report to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub

PERTH AND KINROSS COUNCIL. Enterprise and Infrastructure Committee 4 November 2009

(Also known as the Den-Ice Agreements Program) Evaluation & Advisory Services. Transport Canada

ANGLIAN WATER GREEN BOND

The Strategic Commercial and Procurement Manager

Appendix C Stage 1 Road Safety Audit

Non-technical summary

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Executive Director / Senior Planning Policy Officer

The decision on whether to take enforcement action falls outside the scope of delegated powers.

LYNDHURST NEW URBAN DEVELOPMENT AREA STRUCTURE PLAN. Lyndhurst New Urban Development Area Structure Plan OUTCOMES AND PERFORMANCE STANDARDS

CHELMSFORD CITY LOCAL HIGHWAYS PANEL MINUTES 21 JUNE 2017 at 13:00 at the Civic Centre, Chelmsford

Report to COMMUNITY DEVELOPMENT & SERVICES Committee for

NOTICE OF INDIVIDUAL EXECUTIVE MEMBER DECISION

YORKSHIRE DALES NATIONAL PARK AUTHORITY ITEM 10 CHARGING FOR THE USE OF AUTHORITY OWNED PUBLIC TOILETS

Item No Halifax Regional Council July 18, 2017

Smarter Travel Sutton

7 June 2016 Corporate Report Format. To the Chair and Members of the Chair and Members of the Cabinet

Rushmoor Local Plan 6 July 2017 Louise Piper Planning Policy & Conservation Manager Richard Ward Environment & Airport Monitoring Officer

STRATEGIC INVESTMENT IN MANCHESTER AIRPORT

MALDON DISTRICT LOCAL HIGHWAY PANEL Approved Works Programme September 2018 Update

SUBMISSION FROM RENFREWSHIRE COUNCIL

MEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM

A Response to: Belfast On The Move Transport Masterplan for Belfast City Centre, Sustainable Transport Enabling Measures

2nd March, 2017 Corporate Report Format. Conisbrough Mexborough Sprotbrough

LHNCC 144/9 Commercial Street Edinburgh EH6 6LB. Mob: March 2018

Proposals for the Harrogate Road / New Line Junction Improvement Scheme. August / September Supported by:

3. Coach Supporting Statement

1.1. The purpose of this report is to seek approval for the adoption and publication of the Sports Pitches Strategy for East Dunbartonshire.

Phase 1A North, Brent Cross Cricklewood Regeneration Area, London NW2

Corporate Report Format 28 February 2017

COLCHESTER LOCAL HIGHWAYS PANEL MINUTES 13 December GRAND JURY ROOM, TOWN HALL, HIGH STREET, COLCHESTER, CO1 1PJ

Transcription:

Chipping Barnet Area Committee 6 July 2016 Title Report of Wards Status Urgent Key Enclosures The Avenue Zebra crossing and pedestrian improvements Commissioning Director - Environment Chipping Barnet Public No No Appendix A Drawing C2015_BC/000539_03-100-01 Appendix B Drawing C2015_BC/000539_03-100-03 Officer Contact Details Jane Shipman; jane.shipman@barnet.gov.uk; 020 8359 3555 Summary The report identifies a proposal for a zebra crossing and associated pedestrian improvements for The Avenue, Barnet and asks the committee to agree that work on delivering this proceeds, and to decide whether to include an extension of a 20mph speed limit in the scheme. Recommendations 1. That the Committee instruct the Commissioning Director Environment to proceed with detailed design and consultation for a zebra crossing and associated pedestrian improvements as identified on drawing C2015_BC/000539_03-100-01 with a view to implementation subject to consideration of consultation responses. 2. That the Committee decide whether they would wish extension of the 20mph speed limit to cover part of The Avenue and Alston Road as identified on drawing C2015_BC/000539_03-100-03 to be included as part of the proposal.

1. WHY THIS REPORT IS NEEDED 1.1 A report to Chipping Barnet Area Committee on 21 October 2015 identified that the introduction of a pelican crossing at a location in The Avenue was not possible and proposed alternative pedestrian improvements. The Committee rejected the alternative proposal. Following further discussion with a ward member (Cllr Longstaff) it was identified that the impact of the constraints affecting a pelican crossing might be less for a zebra crossing, and this could address the local needs. Further work has been undertaken and an initial safety audit undertaken on the proposal shown on drawing C2015_BC/000539_03-100-01. 1.2 An improvement to the kerb-line near Wentworth Road and introduction of a pedestrian refuge at the mouth of that road has also been identified when considering the crossing options in the local area and this is also included as part of the recommended scheme on drawing C2015_BC/000539_03-100-01. 1.3 It had initially been thought that introduction of a 20mph speed limit would be necessary to support the crossing because of limited visibility, but it has been possible to achieve adequate visibility without this. Nevertheless extending the existing 20mph limit in Wentworth Road and Byng Road to include a stretch of The Avenue/Alston Road on the bend between The Drive and Sebright Road could be included as an enhancement and the proposed extents of this are shown on drawing C2015_BC/000539_03-100-03 2. REASONS FOR RECOMMENDATIONS 2.1 The zebra crossing would provide a crossing at or near the location that has been consistently requested by ward members. 2.2 The ancillary proposals at the junction of Wentworth Road would reduce the crossing distance and for pedestrians crossing Wentworth Road and also those crossing to the existing refuge improving the ease and safety with which these movements can be carried out. 2.3 Extending the 20mph speed limit could highlight the area around the bend and new crossing as being of a different nature and this may be considered beneficial in an area where many children will be crossing to access schools via Wentworth Road. On its own this measure is not likely to have a significant impact on actual speeds since speeds are already relatively low and the introduction of a zebra crossing may result in some reduction in any case. Wentworth Road and Byng Road are already subject to a 20mph restriction and the proposal would link with this. No additional measures (beyond signage) would be needed to permit this. 3. ALTERNATIVE OPTIONS CONSIDERED AND NOT RECOMMENDED Various alternative proposals have previously been considered and rejected by ward members or the committee as not delivering the required pedestrian improvement.

4. POST DECISION IMPLEMENTATION 4.1 Following the committee s agreement, consultation with residents in the vicinity of the proposed zebra crossing location would be undertaken and detailed design of the proposal would be completed, with a view to implementing the proposal during the 2016/17 financial year. 5. IMPLICATIONS OF DECISION 5.1 Corporate Priorities and Performance 5.1.1 The proposals here will particularly help to address the Corporate Plan delivery objectives of a clean and attractive environment, with wellmaintained roads and pavements, flowing traffic and a responsible approach to regeneration, with thousands of new homes built by helping residents and particularly school children to feel confident moving around their local area on foot, and contribute to reduced congestion. 5.1.2 Improvements that encourage walking or other active travel will help to deliver the active travel and recreation opportunities identified in the Health and Wellbeing Strategy for children and the population generally. The proposed location is also considered to be effective in terms of prevention of potential Road traffic accidents. 5.1.3 The measures also dovetail with School Travel Plan initiatives that Barnet support in order to create an environment that encourages an active lifestyle and reduces obesity by promoting walking and other sustainable modes of school travel. 5.2 Resources (Finance & Value for Money, Procurement, Staffing, IT, Property, Sustainability) 5.2.1 TfL provide core funding for implementation of a borough Local Implementation Plan (LIP) including a Corridors, Neighbourhoods and Supporting Measures programme for addressing a range of transport issues. 5.2.2 The Avenue proposal would be introduced using funding from this source identified for School Travel Plan schemes. 5.2.3 The estimated costs to complete the work are: Detailed Design 4,800 Safety audit, surveys etc 2,000 Consultation 4,200 Construction (works cost) 20,000 Implementation, supervision and post 2,800 implementation costs Sub-total 33,800 Contingency* 5,000 Total 38,800 * potential utility diversions, accommodation works etc

5.2.4 If the 20mph speed limit were extended then much of the work associated with this could be undertaken alongside the provision of the crossing at minimal additional cost, but some additional costs of around 2000 could be expected. 5.3 Social Value Not applicable in the context of this report. 5.4 Legal and Constitutional References 5.4.1 The Council s Constitution (Responsibility for Functions, Annex A) provides that in the area covered by the committee and within the budget and policy framework discharge functions including those related to local highways and safety schemes. 5.5 Risk Management 5.5.1 There would be a risk associated with the construction risks of introducing the crossing, which would require management throughout the detailed design, implementation and construction work, assessed as low. Not introducing measures in the area would involve a medium risk in relation to potential future road traffic accidents, although the introduction of a zebra crossing can also increase the risk of accidents at that particular location. 5.6 Equalities and Diversity 5.6.1 With regard to the council s public sector equality duty under section 149 of the Equality Act 2010, it is not considered that the proposal in this report will have any adverse impacts on any of the protected groups. It is considered that introduction of the measures outlined in the report would benefit pedestrians generally, but in particular children travelling to and from school and those escorting them. 5.7 Consultation and Engagement 5.7.1 Consultation with residents in the vicinity of the proposed works is planned. Engagement with local schools regarding the crossing will also take place. 5.8 Insight 5.8.1 Not applicable in the context of this report. 6. BACKGROUND PAPERS 6.1 On 13 March 2013 the former Chipping Barnet Area Environment Committee approved the introduction of a Pelican crossing being progressed on The Avenue at the predetermined location and instructed the then Director for Place to proceed to a detailed design and public consultation with a view to implementation. Papers and decision are available at item 7 via this link. http://barnet.moderngov.co.uk/ielistdocuments.aspx?cid=155&mid=6667 6.2 On 21 October 2015 having considered a report on possible alternative measures refused the item and the Officers recommendations as the location of the two crossing points were not considered appropriate. The Committee requested the Officers to meet with Ward Members to consider further options. Papers and decision are available at item 12 via this link.

http://barnet.moderngov.co.uk/ielistdocuments.aspx?cid=711&mid=8314&v er=4