Content: 1. Brief overview of CSI Ingenieros, and the water area Our clients Know how and solutions The team

Similar documents
Colombia (South America) Water use and drainage in Colombia. Case Study: The Stormwater Challenge in Barranquilla. Humberto Avila.

Some Historical Aspects of Urban Water Systems

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE March 2009 Report No.: AB4607 Project Name

Public Works Research Institute

Introduction. The System. Model Limitations, Assumptions, and Parameters. Optional Services Tech Memo

INDEX. ARCHITECTURE Formosa

URBAN FLOODS IN SOUTH AMERICA

UNOPS IN THE CARIBBEAN

Presentation Outline

INDUSTRY EXPERTISE - Real Estate & Hospitality

The Problem.. SuDS: Controlling the Flow. LANDF RM Technical delivery of SuDS 15/10/2013. Bridget Woods Ballard HR Wallingford 1.

Project Management, Environmental Assessment, Stormwater Management. Hydrologic Modelling. Natural Heritage. Fluvial Geomorphology

Welcome to the. EBC Breakfast Meeting. The CSO Program Update Frederick A. Laskey Executive Director Massachusetts Water Resources Authority

City of Peoria Clean Water Efforts. Governor s s Conference on the Management of the Illinois River October 4, 2007

Corregidora, Querétaro.

Agenda Report. Spruce Street Outlet Drainage Improvements Tower Road Relief Sewer

Servicios de Agua y Drenaje de Monterrey, I.P.D. Proyecto Monterrey VI 1

NZWG-ICAZ Third Academic Meeting

Maputo improving resilience by implementing Cities and Climate Change Initiative. By: Raul Chilaule (Head of the Environmental Department of MMC)

PPCR/SC.4/5 October 9, Meeting of the PPCR Sub-Committee Washington, D.C. October 28, REVIEW OF ON-GOING WORK OF THE MDBs IN DJIBOUTI

Investigation of River Stage Simulation Before and After Bengoh Dam Construction: Case Study of Sarawak River Basin Malaysia

Via Only. In reply refer to/attn: Place ID:794813:ERyan

Striving for resilience in the face of climate change

What is the British Prosperity Fund

MANAGING FRESHWATER INFLOWS TO ESTUARIES

Multi stakeholders interactions in resource allocation in arid and semi-arid areas

Dr. Christopher Brown New Mexico State University GEF Project Rio Meeting Ciudad Juárez, México 3-5 October 2006

Brevard County Utility Services Department

TRANSPORTATION: Airports and Aviation Services

Natural and man-made flooding hazards at the torrents in the town of Thessaloniki

Initial OPW Designation APSR AFRR IRR Co-ordinates Easting: Northing: River / Catchment / Sub-catchment Type of Flooding / Flood Risk

DIRECT PUBLIC INVESTMENT

Welcome KROSNO CREEK DIVERSION PROJECT CLASS ENVIRONMENTAL ASSESSMENT

INFORMATION PAPER TO THE STRATEGIC DEVELOPMENT COMMITTEE

Watershed: Natural Scene for Integrated Water Resource Management in the jurisdiction of Corantioquia Antioquia, Colombia. SA

MARM ACTIVITIES ON WATER IN IBERO-AMERICA

About Romipack 5 ABOUT ROMIPACK

Atlantic Surveying, P.A. Professional Land Surveyors

Historical analysis of water flows in the Río Dulce catchment, Argentina

FLORIDA DIVISION OF EMERGENCY MANAGEMENT STATE WATCH OFFICE DAILY INCIDENT REPORT

Successful Experiences in Rio Grande/Rio Bravo Watershed Management

TECHNOLOGY MEETS March Trade Fair and Congress for Water Management. wasser-berlin.com

Waukegan & Calumet Rivers. All Hands Meeting

CONSTRUCTION SERVICES FOR MINING

Lake Manitoba Lake St. Martin

Argentina Country Case Study

The Isonzo/Soca river basin

BRAZIL - Activity Report 2012 ARGENTINA ACTIVITY REPORT 2014

3.3 COST ESTIMATION OF THE MAIN PROJECTS. (1) Main projects. 1) Improvement of export corridor

Planning Resilient Transmission Networks in Chile

William Delgado. C E 394K Dr. David R. Maidment Dr. David G. Tarboton December 2, 2016

CITY OF LYNDEN STORMWATER MANAGEMENT PROGRAM REPORT MARCH 1, 2016

Xaman-Ha city, an answer to the poor growth and spread population

Transforming a City People Health Environment Governance

Estuaries of South America

Flood History. Floodplain Descriptions

RIO VISTA MUNICIPAL AIRPORT

During Construction. Full Resident and Non-Resident Services. Contract Administration and Construction Supervision of Groundside and Airside Projects

THE ICs INTERNATIONAL BRISBANE AREA AQUA PARK PROPOSAL

MANUAL OF SUSTAINABILITY POLICIES. Hotel Lomas del Volcán 2018

Welcome Land Use Element... LU-1

1 Bicentenario Centrality Convention Center of the Metropolitan District of Quito

ACTION PLAN FOR THE PERIOD concerning the STRATEGY ON IMPLEMENTATION OF THE FRAMEWORK AGREEMENT ON THE SAVA RIVER BASIN

CHESTER COUNTY HEALTH DEPARTMENT 402. CONTROL OF SANITATION IN ORGANIZED CAMPS AND CAMPGROUNDS.

Aviation and Associated Sector

Key Projects Carmichael Rail Line (CRL)

GILBERT & WEST TOWN INTERCOUNTY DRAIN Windsor Township, Eaton County and City of Lansing, Delhi Township, Ingham County, Michigan

Water resources for Botswana

The combined Planning and Zoning and Council Meeting was called to order at 7:00 p.m.

Curriculum Vitae Craig Waters

Action Recommendation: Budget Impact:

WATER CORPORATE TRANSPORTATION WATER ENGINEERING MECANOCONCEPT

Federal Gas Tax Fund-Strategic Priorities Approved and Conditionally Approved Projects 2017 Intake

Jefatura de Gabinete de Ministros. Unidad Plan Belgrano

2. Flood Hazard Assessment

Pond Decant Kit KIT INCLUDES

Effluent Guidelines for Airport Deicing Discharges

Infrastructure in Mexico

@CZFSantiago

Meeting of. Rio de. Janeiro, Brazil. the Integration. System (CMS) Continuous. 3, 4 and 5. obstacles and

Integrated Planning Project

GOOSENECK SWAMP INFORMATION DAY - Saturday 14 th December 2013

PERMANENT MISSION OF BELIZE TO THE UNITED NATIONS

Population Composition, Geographic Distribution, and Natural Hazards: Vulnerability in the Coastal Regions of Puerto Rico

NATIONWIDE PERMIT ACTIONS APRIL - JUNE 2014

Successes and Failures of the Policies of Water Supply and Wastewater Services in Argentina

GEOGRAPHICAL LOCATION OF colombia

URUGUAY. Centenary of Death of General Artigas M 10C 14C 20C 50C 1P

Long term morphological analysis and simulations

SUTTER COUNTY. General Plan Update Technical Background Report

AGAWAM CONSERVATION COMMISSION April 26, 2018

Regulated businesses Suez Environnement December 15,

EUROPEAN UNION AND MERCOSUR: REGIONALISM AND COOPERATIVES

COMMUNITY PLANNING ACTION REFLECTION G-8. Private, Non-Profit

How to develop resilient infrastructure (Global SDG9)

Socio-economic impact of hazards in the Caribbean: Framing action for the social worker Jeremy Collymore Coordinator, CDERA

"Transboundary coordination according to the FD Directive in the shared river basins of Greece

Appendix E. System Issues

Watershed Runoff Analysis

FLOOD FORECASTING AND EARLY WARNING SYSTEMS (EWS) IN URUGUAY:

Transcription:

1

DIFFERENT CASES APPLIED IN Content: 1. Brief overview of CSI Ingenieros, and the water area Our clients Know how and solutions The team 2. Different Stormwater projects URUGUAY 3. Carrasco Hydrodynamic Model Montevideo Master Plan 1

UNIDAD AGUA Y SANEAMIENTO 1 - Brief overview of CSI, and the water area 3

CSI Ingenieros CSI is a worldwide service and consulting engineering company which is focused on emerging countries Since 1980, CSI participated in more than 800 projects for governments, international organizations and public and private sector enterprises in more than 20 countries. Mission Improve quality of living in communities we work for Over the years the firm developed a wide range of capacities on different engineering and architectural disciplines, some o f them are: WATER AND WASTEWATER TRANSPORT PORTS AND WATERWAYS ENVIRONMENT INDUSTRIAL URBAN DEVELOPEMENT CIVIL ENGINEERING ENERGY 2

WATER AND WASTEWATER Water is one of the most precious resources of our planet. Since the mid-eighties, we have worked with our customers to provide safe, reliable and sustainable: water, sanitation and storm systems. Customers of public and private trust us to improve their systems and operations. Combining experience with technology, our team achieved economic and sustainable solutions.

Water and Wastewater Our clients belongs to the public and private sector, as well as well as international organizations 5

Water and Wastewater With more than 30 years of experience we are capable of providing international class solutions in order to preserve the hydric resource and promote resilient and sustainable cities taking into account social, technical, economic and financial aspects. Preliminary Studies Strategic Planning Design Procurement Know How Drinking Water production and distribution Domestic Wastewater collection, transport and treatment Storm Water systems Flooding control Hydraulic Works Industrial wastewater collecting and treatment Solutions Feasibility studies Master Plans Preliminary Studies Detailed Designs Tender Documents Technical assistance at works Socio economic and financial assistance 6

UNIDAD AGUA Y SANEAMIENTO 2 Different Stormwater projects 8

CSI first projects in stormwater design: 90 s Sewer and Rainwater Network of Sayago Norte, Peñarol and Ferrocarril Neighborhoods (Montevideo) - 1995 Population to be served at the end of the design period (year 2035) is 30.000 inhabitants. Served Area: 650 hectares. Modification of Weirs and Auxiliary Works of the Paraguay Wastewater System (Montevideo)- 1997 Hydraulic model: CAREDAS (Sogreah) of the combined sewer network of the Paraguay functional unit (2.920 hectares). The goal of the project is to eliminate discharges to the bay as overflowing during rainfall.

Storm water projects in vulnerable socio-economic areas Sewage and Pluvial Network Cerro Norte - La Paloma (Montevideo, 2002) Area: 490 hectares Population: 52.000 inhabitants. Four small streams cross public and private grounds, and are in part flanked by precarious homes, with obstructions and overflow problems caused by garbage and fills without planning. Sewage and Pluvial Network Rincón del Cerro Casabó (Montevideo, 2003) Area: 304 hectares. Population: 34.000 inhabitants A main stream, a dam and several affluents. Precarious homes in the margins, problems of obstructions and overflow.

Projects including stormwater retention Plan Set of the Sanitation, Pluvial Waters and Street System of Ciudad de la Costa (Canelones, 2011) Area: 2.150 hectares Population: 99.200 inhabitants. Extremely flat topography. Retention ponds Ditch retention Storm Drainage Project Arroyo Seco y Quitacalzones Basins (Montevideo, 2013) Area: 1.500 hectares. 5 closed lamination tanks between 2.000 and 11.000 m3. Final Plan Set of a Storm Drainage System in Libertad Neighborhood, Juan Lacaze (Colonia, 2013) Stormwater pumping station; 3,6 m3/s A lamination tank of 1500 m3.

Projects being developed Urban Water Plan Ciudad del Plata. (San José) Area: 13.000 hectares Population: 30.000 inhabitants. General Objective: long term goals and middle and short term action plan. Montevideo Sanitary and Urban Drainage Master Plan Area: 430 km2 Population: 1.350.000 inhabitants.

UNIDAD AGUA Y SANEAMIENTO 3 Carrasco Hydrodynamic Model _ Montevideo Master Plan 13

Montevideos Sewage and Urban Drainage Master Plan Montevideo Sewage and Drainage towards year 2050 Using integrated modelling as a decision support tool Most important basins numerically modelled Pantanoso Miguelete Paraguay-Costero Carrasco Model used: InfoWorks ICM 14

InforWorks ICM from Innovyze Integrated modeling Precipitation Hydrology/Subcatchments Sewer pipes & pump stations Storm water pipes Surface flows in streets & inlets River reaches Full integration of 1D&2D hydrodynamic simulation techniques Real Time Control Water quality and sedimentation 15

Carrasco Catchment Squematization 135 pluvial subcatchments 135 sewage subcatchment 99 km of river reaches 1441 cross sections (1/68m) 14 bridges 18 pump stations 301 sewage pipes 195 streets 233 pluvial pipes 430 stormwater inlets 16

Carrasco Catchment Squematization Bridge Route 102 over Toledo stream 17

Carrasco Validation February 2014 Calle Sección Cota relevada (m Wh) Cota modelada (m Wh) Diferencia (m) Santos Dumont 1410 9.07 9.12 0.05 Abrevadero Manga 1185-1084.2 8.68 8.66-0.02 B. de la Torre 911 8.61 8.46-0.15 Calle N 787 8.31 8.44 0.13 Bartolomé de los Reyes 787-617 8.26 8.43 0.17 18

Carrasco - Validation November 2014 Calle Sección Cota relevada (m Wh) Cota modelada (m Wh) Diferencia (m) Abrevadero Manga 1185-1084.2 7.55 7.82 0.27 B. de la Torre 911 7.61 7.26-0.35 Bartolomé de los Reyes 787-617 6.64 7.18 0.54 19

Carrasco Subcatchments specific flows Specific flow (l/s/ha) Área TR2 TR10 TR100 Área rural 15.5 24.9 42.9 Área semi-urbana 1 31.1 46.4 75.8 Área semi-urbana 2 22.3 35.3 61.9 Área urbana 1 77.7 108.5 162.1 Área urbana 2 71.4 101.1 153.0 20

Carrasco - Fluvial Dynamics Long Sections Carrasco Chacarita Manga Canteras 21

Carrasco Fluvial Dynamics Rio de la Plata Level Influence 22

Carrasco Fluvial Dynamics Hydrograph propagation 23

Carrasco Fluvial Dynamics Obstructions / Head losses Puente TR2D6h TR100D6h Ruta 102 sobre A. Toledo 0.04 0.15 Av. Italia sobre A. Carrasco 0.13 0.25 Av. Rambla sobre A. Carrasco 0.46 0.83 Ruta 102 sobre A. Manga 0.95 0.70 Cno. Repetto sobre A. Manga 0.23 0.55 Cno. Repetto sobre Afl. A. Manga 0.32 0.47 24

Carrasco Stormwater Pipes Networks Capacity / Surcharged (%) Velocities (m/s) Flows (cms) Pluvial TR2 TR10 TR100 Canteras Sur 7.9 9.0 9.8 Canteras Centro 7.5 10.3 12.0 Canteras Norte 2.0 2.2 2.4 Chacarita Sur 8.7 9.4 10.1 Chacarita Norte 26.6 33.7 38.5 Capacity(%) Green 0.5-1.0 Red > 1.0 Vel (m/s) Green 0-1 Yellow 1-2 Orange 2-3 Red > 3 25

Carrasco Stormwater Pipes Networks Chacarita Norte Canteras Central 26

Carrasco Surface affectations 27

Carrasco Surface affectations Depth of water in streets Velocities Depth (m) Blue 0.2-0.5 Green 0.5-1.0 Red > 1.0 Vel (m/s) Green 0-1 Yellow 1-2 Orange 2-3 Red > 3 28

Carrasco Surface affectations Hazard Time flooded 29

Intensidad (mm/h) Carrasco Surface affectations Spectrum of events affectation 100 90 80 NOTA: Veracierto y Saenz de Zumaran, Veracierto y Timoteo Aparicio, y Veracierto y Campomar se inundan para eventos con una recurrencia superior a la analizada. 70 60 50 40 30 20 10 0 0 3 6 9 12 15 18 21 24 Duración (hs) Tr= 2 años Tr=5 años Tr=10 años Tr=25 años Tr=50 años Tr=100 años Veracierto y Saenz de Zumaran Veracierto y Campomar Veracierto y Timoteo Aparicio Cochabamba y Puntas de Soto Nery y Palencia 30

Pumped Inflow Carrasco Pluvial intrusion Chacarita Sewage Pipe long section DWF WWF 31

Carrasco Final comments Integrated catchment modelling achieved Model is a tool capable of assessing DWF WWF CSO s and SSO s Land use planning Identify flood prone areas Pump station/energy optimization Structural/non-strucural flood mitigation measures 32

Thank you for your time Soriano 1180 Tel.: +598 2902 1066 Fax: +598 2901 9058 E-mail: csi@csi-ing.com www.csi-ing.com Montevideo 11.100 - Uruguay Carla Baldo E-mail: cbaldo@csi-ing.com Santiago Symonds E-mail: ssymonds@csi-ing.com 33