REQUEST FOR PROPOSAL FOR GROUND HANDLING AT COPENHAGEN & OSLO

Similar documents
Request for Proposal for Hiring of Ground Support Equipments for All Airports of Pakistan

HIRING OF HOTEL SERVICES FOR ACCOMMODATING PIA TRANSIT & DELAYED FLIGHT PASSENGERS AT KARACHI INSTRUCTIONS TO BIDDERS

HIRING OF HOTEL SERVICES FOR ACCOMMODATING PIA TRANSIT & DELAYED FLIGHT PASSENGERS AT KARACHI INSTRUCTIONS TO BIDDERS

Tender Notice for Hotel Layover Services

INCENTIVE PROGRAM

Airport ENGINEERING Services Department Passenger Handling Services

aerogate Directory of Services and Prices 2018 Living ideas Connecting lives

Hamburg Airport Catalogue of Charges for Extra Services Ground Handling

TENDER DOCUMENT: B737NG EXPAT PILOTS FOR AICL

Daily Traffic Survey (DTS) File formats XLS, XLSX, CSV

Sida 1 av 7 Ivan Forsman SGHA HMV Kopia

Sida 1 av 7 Ivan Forsman SGHA externa flygbolag doc

INVITATION FOR BID VENDOR: BID OPENING:

VIP Aviation Handling Charges in Georgia

Annex-I Terms of Reference

Hamburg Airport Airport Charges Part II

PALANGA AIRPORT INCENTIVE SCHEME

To be in effect from 1 September 2017 to 31 August 2019 CONTENTS

LUFTHAVNS VIKAR AIRLINE SUPERVISION & SERVICES CPH

REQUEST FOR PROPOSAL (RFP) SCHEDULE FOR ACMI (WET) LEASE OF TWO AIRCRAFT

Lee County Port Authority. Southwest Florida International Airport Emergency Contingency Plan

Conditions of Carriage

CIVIL AVIATION AUTHORITY, PAKISTAN OPERATIONAL CONTROL SYSTEMS CONTENTS

PAKISTAN INTERNATIONAL AIRLINES

Customer Service Plan

TERMS OF REFERENCE (TOR) FOR PROVISION OF MOBILE ACCESSIBILITY SERVICE - RFQ/UFAA/015/

Request for Proposal (RFP) Fixed Wing Aircraft Transportation Services. For Matawa First Nations

Terms and Conditions of the Carrier

We may retain and use the personal information that you transmit to us relating to yourself and members of your party for the purposes of:

AIC Series A FEB 2018

REQUEST FOR PROPOSAL (RFP) SCHEDULE FOR ACMI (WET) LEASE OF TWO AIRCRAFT. (Ref: RFP Notice No ; Date: 22 November 2018)

CINCINNATI/NORTHERN KENTUCKY INTERNATIONAL AIRPORT 2017 AIR SERVICE INCENTIVE PROGRAM. Revision 2 (11/20/2017)

Customer service and contingency plans For Flights between Bolivia and the United States

CONTRACT LAW. Module 28 Prof. Ludwig Weber, McGill University

PART D SECTION 2 STAND ALLOCATION

Ground Handling Tariffs and Regulations for Esbjerg Airport

Ground Handling Social Dialogue Support. The limitation of ramp handling licenses at Rome Fiumicino Airport

W Aviation FBO Aruba N.V General Aviation Pricing Policy

SECTION TRAINING HELO. Date: 01/08/16 Page: 1 of Table of Contents Training, Helicopter

3.1. Unless otherwise agreed between INFLITE and the Charterer and specified in the Charter Booking Confirmation, normal terms of payment will be:

LOUNGE/CHECK-IN/SPECIAL SERVICES LOUNGE

FAX MESSAGE PLEASE NOTE THE ABOVE APPROVAL IS BASED ON THE FOLLOWING REQUIREMENTS BEING FULLY MET.

REFUND POLICY & PROCEDURES

CHARGES REGULATIONS APPLYING TO COPENHAGEN AIRPORT IN FORCE DURING THE PERIOD 1 APRIL 2018 TO 31 MARCH 2019

Tariff Name. Telecommunication Systems Space Allocation and Infrastructure Right of Way Tariff

DANGEROUS GOODS STANDARD DEPARTMENT Operations Manual s Dangerous Goods Segment Checklist

CITY OF NEWPORT AND PORT OF ASTORIA REQUEST FOR PROPOSALS -- SCHEDULED AIRLINE SERVICE BASIC INFORMATION

Irregular Operations (IROPS)

REGULATION On application of Discount coefficients to the Airport charges to be collected at Boryspil International Airport

Performance monitoring report for first half of 2015

Route Support Cork Airport Route Support Scheme ( RSS ) Short-Haul Operations Valid from 1st January Introduction

Charges AERONAUTICAL FEES 02

INTRODUCTION OF AIRPORT COLLABORATIVE DECISION MAKING (A-CDM) AT SINGAPORE CHANGI AIRPORT

Charges AERONAUTICAL FEES 02

CAAC China. CCAR 121 Subpart P Crew members Flight and Duty time Limits, and Rest Requirements Revision Oct-2017

Revision of the Third Air Package

INTERNATIONAL INSTITUTE FOR DEMOCRACY AND ELECTORAL ASSISTANCE

Tender : Baggage Handling Service

Changi Airport A-CDM Handbook

Master Minimum Equipment Lists/Minimum Equipment Lists. Amendment Summary PART-MMEL/MEL. Amendment No. Effective Date Subpart Paragraph

Page 1 sur 18 LFTH

IND. Indianapolis International Airport Long Onboard Recovery Plan. Updated 7/2017

IND Indianapolis International Airport Long Onboard Recovery Plan

Generic OpSpec A332 - DRAFT

GUYANA CIVIL AVIATION REGULATION PART X- FOREIGN OPERATORS.

This Section 1 contains the requirements for the approval of Master Minimum Equipment Lists and Minimum Equipment Lists.

A REGULATION OF THE CITY AND BOROUGH OF JUNEAU, ALASKA. Adoption of Title 07, Juneau International Airport Chapter 10, Rates and Fees

REGULATIONS FOR DECLARATION AND DISPOSAL OF UNCLAIMED ITEMS OF THE PIRAEUS CONTAINER TERMINAL S.A. IN THE PIRAEUS FREE ZONE

Data Analysis and Simula/on Tools Prof. Hamsa Balakrishnan

TRAFFIC COMMERCIAL AIR CARRIERS

Airport Monthly Air Transport Movements Guidance Notes CAA Business Intelligence

Group Policies GROUP POLICY REVISION : 27 JANUARY P a g e 0

The Coordinator s Activity Report

BURLINGTON INTERNATIONAL AIRPORT EMERGENCY CONTINGENCY PLAN

Page 1 sur 19 LFTH

Revision of IATA RP1743e IATA Irregularity codes

TEAM INTEGRATED ENGINEERING, INC. TRAVEL PROCEDURES FOR REST AND RELAXATION (R&R)

8.4.9 Fatigue Management. Republic of Korea

MID Annual Safety Report Third Edition

The Coordinator s Activity Report

India Trade Promotion Organisation (A Govt. of India Enterprise) Gate No. 3, Pragati Bhawan, Pragati Maidan New Delhi

GHANA CIVIL AVIATION AUTHORITY

Performance monitoring report for first half of 2016

AIP GEN SRI LANKA REGULATIONS AND REQUIREMENTS 25 MAY 17 GEN 1.2 ENTRY, TRANSIT AND DEPARTURE OF AIRCRAFT

UNITED STATES OF AMERICA DEPARTMENT OF TRANSPORTATION OFFICE OF THE SECRETARY WASHINGTON, D.C.

REPORT 2014/111 INTERNAL AUDIT DIVISION. Audit of air operations in the United Nations Operation in Côte d Ivoire

PASSENGER JOURNEY. Our vision: a seamless, secure and efficient walking pace journey that is highly personalized throughout.

Airport charges and services SION LSGS SIR

GUIDELINES FOR THE ADMINISTRATION OF SANCTIONS AGAINST SLOT MISUSE IN IRELAND

WHEREAS, the City operates and manages Rapid City Regional Airport (RAP); and

For on-line registration:

Jönköping Airport Price List

FINAL REPORT BOEING , REGISTRATION PK-LHQ WIND INCIDENT, CHANGI AIRPORT 26 MAY 2013 AIB/AAI/CAS.093

Name Correction Process

Quality Standards - Provision of PRM Assistance

BUY AMERICAN PREFERENCE A1.1 SOURCE A1.2 APPLICABILITY. Title 49 USC 50101

Regulations for Ground Handling and fees. Valid from 1. july 2018, V.2.5

luxaviation S.A. GENERAL TERMS AND CONDITIONS OF BUSINESS

INFORMATION REGARDING VISITOR PASSES AT CALGARY INTERNATIONAL AIRPORT

FACILITATION (FAL) DIVISION TWELFTH SESSION. Cairo, Egypt, 22 March to 2 April 2004

Transcription:

PIA intends to hire the services of well reputed ground handling companies for the ground handling of its flights at CPH, Copenhagen, Denmark & OSL, Oslo, Norway. Guidelines for the submission of proposals are given below: All proposals should be drawn on IATA SGHA 2008 format. And Separate proposals required for OSL & CPH. This contract will be for three years, with a standard 60 days exit clause, with no condition on termination. Rates needed for following aircraft type: A320, B777 Turnaround Rates for Scheduled flights Business Class Lounge Charges per passenger Heater Cooling Unit Air Start GPU Additional Push Back Additional man-power Towing Additional Manpower Baggage Delivery Services No EBT commission clause should be suggested. PIA will use our own HITIT Crane as DCS and for load control. Rates quoted should be valid for three years. Besides the proposals, following information should also be submitted: List of current clientele, along with the type of aircraft & handling provided to them. Letter of recommendations from 02 existing clients. Authorization from airport authority to operate from terminal/airport. A detailed list of ground support inventory; quantity, date of acquisition& specification. Acceptance of our service level standards & flight schedule. Important: Tender will be opened on Single Stage Two Envelope basis. All bidders must submit two sealed envelopes simultaneously, one containing technical proposal and the other financial proposal. Technical Proposal will be opened on tender opening date. PIA will be at liberty to extend the opening date, revise the requirement or annul the whole tender proceedings at any stage prior to opening of Bids; no change will be done after the bids are opened. Closing date time which is the last date for submission of tender is 1200 hrs 25 Th September 2018 at below address: For CPH: Arshad Khan Manager PIA Vester Farimagsgade 1606 Copenhagen V Denmark For OSL: Manager Norway PIA, Edvard Munchs Veg 2 Postboks 93, Gardermoen Airport Norway Technical proposals will be opened on the same day at 1230 hrs GMT in presence of all participating agents who wish to attend. Pakistan International Airlines reserves the right to reject any tender in part or full after assigning a reason, however PIACL will not be required to justify the grounds of rejection.

Interested parties who can provide these services should submit tenders directly with PIACL, no subagents will be entertained. No tender will be entertained after expiry of aforesaid date & time. PIA will not be responsible for postal delays or any other reason. Bid Evaluation Criteria All proposals will be evaluated as per following criteria: Marks Weight age:-. Technical: 50%. Marks Weight age:-. Financial: 50%. Financial Proposal of only technically qualified proposals will be opened. The Handling Agent getting maximum marks on 50-50 weight age (50 % for technical & 50 % for Financial will be awarded contract. Mandatory Requirements TECHNICAL EVALUATION PERFORMA Ground Handling Company Y = In / N = Out Authorization from airport authority to operate from CPH/OSL airport. Provision of Basic Ground Handling Services as per IATA SGHA for narrow bodied and wide bodied aircraft (whichever aircraft is operated) Type of handling provided Other Requirements Comments Weight Score Age and condition of Ground Support Equipment Clientele Training & Certification Company Profile & Experience Financial Position Y/N Y/N All services provided by the bidding 20 company Sub-contractors 10 5 years old (good working condition) 10 10 years old (good working condition) 5 Old equipment - bad working 0 condition More than or equal to 5 airlines, at least 2 Five star airline 10 More than or equal to 5 airlines, at 8 least 1 Five star airline 2 to 5 airlines 5 IOSA / ISAGO certified company 5 Not certified 0 Highly established, well experienced 10 (More than 05 years) Recently established with experience less than 02 years 5 Sound 5 Not so sound 2 No. of skilled manpower 60% skilled employees 5

Acceptance of SLA with penalties Total Score 40% skilled employees 3 Acceptance of SLA with penalties 15 Acceptance of SLA without penalties 5 Minimum Passing Marks 40 80 Required List of Services for CPH: Section 1 REPRESENTATION, ADMINISTRATION& SUPERVISION 1.1.1; 1.1.2; 1.1.3; 1.1.4; 1.2.1; 1.2.2; 1.2.4 1.3.1(a; 1.3.2; 1.3.3; 1.3.7; 1.3.8 Section 2 Section 3 Section 4 Section 5 PASSENGER SERVICES RAMP SERVICES LOAD CONTROL, COMMUNICATION & FLIGHT OPERATIONS CARGO AND MAIL SERVICES 2.1.1; 2.1.2; 2.1.3(a)(1); 2.1.4; 2.1.5; 2.1.6(a); 2.1.7(a)(b)(c) 5 days (d)(e)(f); 2.1.8; 2.1.9(b)(1)(2) 2.2.1; 2.2.3(a) the handling agent will pay after five incident per 12 month and only if proven fine is presented; 2.2.4; 2.2.5; 2.2.6; 2.2.7; 2.2.8; 2.2.10; 2.2.11(a); in coordination with CPHKKPK; 2.2.12; 2.2.13(d)(e)(d)(f)(g); 2.1.14 2.3.2; 2.3.3(a)(1) 3.1.1; 3.1.2; 3.1.3; 3.1.4; 3.1.5; 3.1.6; 3.1.7(a); 3.1.8 3.2.1(b) 3.3.1; 3.3.2(f) safety cones; 3.3.3(a)(c) for scheduled ground stop up to 60 min incl 3.4.1 (a)(c) on request and recharge 3.4.2 (a)(c) on request and recharge 3.5.1 departure only; 3.52(a)(b) 3.6.1(a)(c)(1)(b)(3); 3.6.2(b)(2); 3.6.3(a); 3.6.4(a)(1); 3.6.5(a) within the airport; 3.6.6; 3.6.7; 3.6.8(a); 3.7.1(a)(c) on request and recharge 3.8.1(b); 3.8.2(a)(1(b)(2) 3.9.1(a); 3.9.2(b) or towbarless; 3.9.3(a) 3.11.1; 3.11.2(a)(b)(c)(d)(e)(f)(g)(h)(i); 3.11.7(a); 3.11.8 3.12 3.13 3.17 4.1.1; 4.2.1(a)(b)(c)(d)(e)(1); 4.2.1(a)(b); 4.2.2; 4.3.1; 4.3.2; 4.4.1(b); 4.4.2; 4.4.4(e)(2) 5.1.3(b)(7) within the airport Section 6 SUPPORT SERVICES 6.2.1(1); 6.2.2(a)(3)(b)(1)(3)(4)(5) 6.3.1(a); 6.3.2; 6.3.3 once weekly; 6.3.4; 6.3.5 6.4.1 6.5.1 6.6.1(a)(2)(c) 6.7.1; 6.7.2 Section 7 SECURITY SERVICES 7.1.2(b)(1)(2)(3)(4)(5); 7.1.3(b)(1)(2)(30; 7.1.4(a)(1)(2)(4)(b)(3)

Required List of Services for OSL: Section 1 REPRESENTATION, ADMINISTRATION& SUPERVISION 1.1.1, 1.1.2, 1.1.3, 1.1.4, 1.2.1, 1.2.2, 1.2.3, 1.2.4, 1.2.6(c), 1.3.1(b),1.3.2, 1.3.3, 1.3.4, 1.3.5, 1.3.6(in consultation with the carrier),1.3.7, 1.3.8 Section 2 Section 3 Section 4 PASSENGER SERVICES RAMP SERVICES LOAD CONTROL, COMMUNICATION & FLIGHT OPERATIONS 2.1.1, 2.1.2, 2.1.3(a)(1)(5)(b)(2)(6), 2.1.4, 2.1.5, 2.1.6,2.1.7(a,b,c,e,f), 2.1.8, 2.1.9(b)(1)(2), 2.2.1, 2.2.3(a), 2.2.4(a), 2.2.5(1), 2.2.6, 2.2.7, 2.2.8, 2.2.9, 2.2.11(1), 2.2.12(a)(b), 2.2.13, 2.2.14(a)(b)(c)(d)(e)(f)(g)(h)(i)(oversize luggage), 2.3.2, 2.3.3 3.1.1, 3.1.2, 3.1.3, 3.1.4, 3.1.5, 3.1.6, 3.1.7, 3.1.8, 3.2.1(a), 3.3.1, 3.3.2(f) safety cones, 3.3.3(a) up to 60 minutes. 3.4.1 on request and recharge 3.4.2 on request and recharge 3.6.1(a), 3.6.2(b)(1), 3.6.3(a), 3.6.4(a)3.6.5(a), 3.6.6, 3.6.7, 3.6.8 3.7.1 on request and recharge 3.8.1 3.9.1(a), 3.9.2(b)3.9.3(a), 3.9.3(b) on request and recharge, 3.11.1, 3.11.2(a)(b)(c)(d)(e)(f)(g)(h)(i), 3.11.53.11.7, 3.11.8, 3.12.1(a), 3.12.2, 3.13.1(a), 3.13.2, 4.1.1, 4.1.2(a)(b)(c)(d)(e)(1), 4.1.3(a)(c)(d), 4.2.1(a)(b)(d), 4.2.2, 4.2.3, 4.4.1(a), 4.4.2 Section 5 Section 6 CARGO AND MAIL SERVICES SUPPORT SERVICES 5.1.3(b)(7) Within the airport 6.2.1(a)(c)(1)(2), 6.2.2(a)(b)(1)(3)(4)(5)(6), 6.3.1(a)(1), 6.3.2, 6.3.3, 6.3.4, 6.3.5, 6.4.1, 6.5.1, 6.6.1, 6.7.1(a)(3)(c)(terminal and cargo building 6.7.2, 6.8.1 Section 7 SECURITY SERVICES 7.1.1(a), 7.1.2(b), 7.1.3(b), 7.1.4(a)(1)(2)(4)(b)(3)

Service Level Agreement SERVICE ASSURANCES 1. Targets to be reviewed and assessed quarterly. 2. Failure to meet 5 out of 6 Performance Indicators / Targets will result in a deduction of 3% of the handling charges for the quarter. (rechargeable items to be excluded) PERFORMANCE INDICATORS & TARGETS 1 GENERAL A Punctuality 98 % On-time Performance B Baggage Handling Mishandled baggage, maximum 3 bags per 1000 passengers travelled. 2 - PASSENGER HANDLING A (Check-In) (T/A Standard) Check in to be open 240 minutes prior to STD with correct signage B Queue Time: Queuing time at the Business Class Counter to be not more than 5-6 minutes. Queuing time at the Economy Class Counter to be not more than 15 minutes. C-Pax Count No more than 2 passengers in line at Business Class Counter. No more than 5-6 passengers in line at Economy Class Counter. D-Check-In Time Average check in processing time to be not more than 3 minutes Check in close out time 45 minutes prior to STD E Gate Functions Boarding gate opened 90 minutes prior to ETD Boarding gate manned 60 minutes prior to ETD Boarding commencement 40 minutes prior to ETD Boarding/delay announcements to be made as per carrier s procedures. 3 RAMP HANDLING A Baggage Handling Arrival

FOR AIRCRAFT PARKED AT AEROBRIDGE First bag B777 Last bag B777 First bag to be delivered by 15 minutes after on blocks Last bag to be delivered by 40 minutes after on blocks o o Business Class container/ baggage to delivered first in all circumstances Make transfer baggage available to the accepting carrier 60 minutes after on blocks Departure Class wise segregation /loading should be done to enable offloading of Business class baggage first upon arrival. Ensure baggage reconciliation system adopted, whereby, baggage loaded/recorded by ULD to facilitate prompt baggage off-loading of missing passengers. Record, ULD number, to be maintained at station with copy given to crew for use at transit station. Prior to baggage loading, staff in baggage make-up area must perform a physical check to ensure that only serviceable ULD s are used. PIA to be informed of any unserviceable ULDs and they will advise disposition of unit. B Cleaning To be completed 10 minutes prior to commencement of passenger boarding, as per the stipulated time for the respective aircraft/station. C Arrival Functions Appropriate Ground Support Equipment to be available at parking position at 10 minutes before on blocks. Chocks to be positioned immediately after blocks on. Handling company to ensure that only authorised trained personnel open the aircraft door. Passenger disembarkation to commence within 5 minutes after on blocks Mail and documents to be delivered to mail facility by 90 minutes after on blocks. D Departure Functions Mail to be delivered to aircraft side by 10 minutes prior to ETA. Pushback equipment available 10 minutes prior to ETD. Ramp staff and equipment to remain at aircraft side till chocks are off. 4 DELAYED FLIGHT HANDLING In the event of delay / diverted flight, the handling agent will consult, plan and coordinate with PK on necessary handling arrangements. If required as per situation, to arrange adequate counters and staffing to recheck-in and retag passengers baggage for departure. 5 - LOAD CONTROL AND OPERATIONS

Load sheet and NOTOC to be delivered by 10 minutes prior ETD. Pre-flight documentation to be delivered to the aircraft by 15 minutes prior ETD. Messages to be sent immediately after departure. Special emphasis for the handling of elderly passengers and families with infants. 6 - GROUND SAFETY NIL aircraft accidents caused by the Handling Company s ground support equipment. Handling charges shall waive for the flight in the event of damage to the aircraft. Note: Station Manager PIA will monitor Service Level Compliance in order to excel service quality and forward report to head office on monthly basis. PENALTY Due Punctuality Delay attributed and caused by the handling agent. Duration of Delay Beyond 15 to 25 mins Beyond 25 to 35 mins Beyond 35 to 60 mins Penalty,Percentage & Condition 15% of Basic Handling Charges of the affected flight to be waived 25% of Basic Handling Charges of the affected flight to be waived 50% of Basic Handling Charges of the affected flight to be waived Other Penalties for CPH: Missing EBT document ITEM DESCRIPTION Business plus LD3 not made separately. late Opening of Check In counters Late closing of counter Baggage Interception not done For NB Aircraft Less than 2 conveyors Any condoning of excess baggage ex departure station or spotted after arrival at arriving station. REIMBURSEMENT AMOUNT DKK 200 per missing Document DKK 200 per flight DKK 100 per counter DKK 100 per counter DKK 200 per flight DKK200 per flight Actual amount of excess baggage + DKK 200 per event Other Penalties for OSL: ITEM DESCRIPTION Missing EBT document Business plus LD3 not made separately. late Opening of Check In counters Late closing of counter Baggage Interception not done For NB Aircraft Less than 2 conveyors REIMBURSEMENT AMOUNT NOK 200 per missing Document NOK 200 per flight NOK100 per counter NOK 100 per counter NOK200 per flight NOK 200 per flight

Any condoning of excess baggage ex departure station or spotted after arrival at arriving station. Actual amount of excess baggage + NOK 200 per event