Purpose of Presentation. Outline of Presentation. Preliminary Design Presentation HIGHTSTOWN MUNICIPAL BUILDING Hightstown, NJ

Similar documents
9' - 0" Locker Bay 237 SF. Elementary Reception 741 SF. Receptionist 82 SF. Work room 105 SF. In School Suspension 89 SF. Conference room 349 SF

CIDNA&Resolution&Re.&Trammell&Crow&Company& April&9,&2014&Amended&

Reorganization & Minutes of Planning Board Open Session- February 14, 2013

HEARST GARDENS BERKELEY, CA 94702

KING CONDOMINIUM RESIDENCES (REZONING)

15150 Memorial Drive 155,100 RSF OF OFFICE SPACE AVAILABLE

Cambridge Avenue. Cleveland Avenue. Chicago Avenue. Chicago Avenue. Curbed planters with groundcover,

THE "WESTPORT" First Floor

Greenville-Spartanburg International Airport RFP - Janitorial Services Contract Space Exhibits 8/22/17

North Tonawanda Memorial Pool Feasibility Study. Council Presentation October 23, 2018 PRELIMINARY PRESENTATION

CAMS Capitol Accessibility, Maintenance and Safety

Development Resource Guide

110 N Coeur d'alene Ave, Harrison, ID 83833

554 sq ft AFTERSALES STAFF PARKING - 21 CARS NO

FOR SALE. FREEHOLD BUILDING AND SITE With detailed planning consent for 6 x two bed flats and 4 x one or two bed houses

Exhibit 2. Preconstruction Jan Jun-19

Full Address. Contractor Name. 426 Old Orchard 11/01/2018Active Dr. Dickinson, TX Dr. Dickinson, 3018 Ave H WS4 William 11/01/2018Active

SOUTH DAKOTA BOARD OF REGENTS. Full Board ******************************************************************************

LOST HILLS ROAD INTERCHANGE PROJECT CONSTRUCTION UPDATE. CALABASAS CITY COUNCIL April 26, 2017

*Can be combined for a total of ±7,802 SF. Suite 740-3,488 RSF - Available Furniture also available with suite 740

HUNT DESIGN ASSOCIATES INC.

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019

PROJECT TEAM VICINITY PLAN NTS LOCATION PLANS NTS. Mark Petrella, A.I.A. Kimberly McCarron, NCARB

INSPECTION HISTORY REPORT Friday, December 8, 2017

OVERVIEW ROY H. MURPHY COMMUNITY CENTER AND POOL. May 2016 NEW CENTER PARK NEW POOL

County of Fairfax, Virginia. Silver Line Update. Committee for Dulles March 2, Mark Canale Fairfax County Department of Transportation

During Construction. Full Resident and Non-Resident Services. Contract Administration and Construction Supervision of Groundside and Airside Projects

Wissahickon School District

Kaufland, Chirnside Park

3660 MARKET STREET, ST. LOUIS, MO armorydistrict.com

SK 1.0 SITE STATISTICS PRELIMINARY DOCUMENTS. PROPOSED APARTMENT BUILDING 115 & 117 ERB STREET EAST Waterloo, Ontario PROJECT: DATE: REFERENCE: -

Sampson Veterans Memorial Cemetery: Administration Building A001.01

SCHEMATIC PACKAGE SHEET INDEX

The Revere. Independence Single-Family Homes OPTIONAL ELEVATION C. *Rendering is Artist s Conception.

San Francisco International Terminal 3 /Boarding Area E San Francisco International Airport Civic Design Review Informational Package.

7425 Knightdale Blvd Knightdale, NC 27545

City of Redding Airports

AIRLINE CONSULTATION MEETING

MBTA WOLLASTON. Station Improvements Public Meeting. January 14, 2016

Proposal Quote/Bid. Permit Required. Oversight AITE. Doors

County of Ventura - Division of Building and Safety Report of Permits Issued for the Week Ending 11/24/2018

FOR LEASE 7707 Gateway Boulevard, Newark CA

Super Efficient High Value BREEZY POINT. Beach Homes. AmeriSus

FOR SALE Rare Mid-Town Location

ADDENDUM NO. TWO AB

COMMERCIAL LAND/BUILDING Salmon Arm Industrial Park. For Sale $1,350,000

Imagery 2017 Google, Map data 2017 Google Commercial Land with finished offsites

Fire Station No. 1 Presentation MAY 16, 2016

BRUNSWICK'S BOWLING 350 MCHENRY ROAD, BUFFALO GROVE, IL

Leidesdorff Village D&S Developement 2277 Fair Oaks Boulevard, Studio 220 Sacramento, California

5 LOT APPROVED TENTATIVE MAP OCEAN VIEWS

APPROVED 10 LOT TENTATIVE TRACT MAP - OCEAN VIEWS

Capital Projects Funds

OFFICE FOR SALE/LEASE 21 East Omaha Street, Rapid City, SD $645,000 $9.75/SF NNN. Highlights. Property Details. Sale Price: Lease Rate:

2223 MONTANA AVENUE FOR LEASE. CHANDLER GRIFFIN mobile View Profile CONTACT: PROPERTY SPECS BILLINGS MONTANA 59101

MINUTES BOROUGH OF LAVALLETTE REGULAR MEETING OF THE PLANNING BOARD Thursday, November 14, P.M.

Reston EastPointe Sunset Hills Road Reston, VA 20190

IS A BUDGET ONLY DESCRIPTION QUANTITY UNIT

AND AND ALL OF SAID LANDS SITUATE, LYING AND BEING IN THE CITY OF HOLLYWOOD, BROWARD COUNTY, FLORIDA, CONTAINING 326,439 SQUARE FEET ( ACRES).

CAPITAL IMPROVEMENT PROGRAM 2018 CAPITAL BUDGET ADOPTED CITY OF ELMIRA, NEW YORK

MT. DIABLO. ±8,707 SF Available. High Profile Junior Anchor Retail. Lana Daoudi lic

FLOOR PLANS. Georgia World Congress Center Centennial Olympic Park

,271

CLIVE ELEMENTARY SCHOOL

Surgical Services and Observation Unit Project Given by Highland Hospital to the Highland Park Community.

ADVANCED WARNING SYSTEM FOR SHARED USE CROSSING ON HOWARD STREET EAST OF NORDICA AVENUE

WELCOME WELCOME TO OUR EXHIBITION ON THE FUTURE OF TOOTING HIGH STREET

VISTA AZUL- APPROVED 20 LOT TENTATIVE MAP

Schedule of Planning Applications Committee Date: 23 May Reference: 06/18/0064/F Great Yarmouth Officer: Mr J Beck Expiry Date:

BUCKHANNON, WEST VIRGINIA

MINUTES DESIGN & REVIEW BOARD. September 8, 2015

FOR LEASE Available Spring 2018

1 Choose the. 3 Reserve your. Why Choose Grid? THE FIRST BUILD & BUY HOME ONLINE IN MALAYSIA. The Perfect 1st Home or Investment

Town Hall Meeting. July 28, 2016 Sherwood School of Music 1312 S. Michigan Ave.

Belmont Village Shopping Center

Real Estate Development Project Management Asset Management

INSTRUCTIONS FOR ADMINISTRATIVE APPROVAL OF PROJECTS (OVER-THE COUNTER APPROVAL)

Living Spaces. Session No. CH1T1. Presented by Rex Barber and Ryan Koeniger Engineering Ministries International AIA/CES Provider No.

CITY OF BROOKFIELD Capital Improvement Fund Budget

No 30 x 48 space is provided for a wheelchair under the picnic table.

1 TP-08 3 TP-08 TP-06 EX.RL SPRINKLER STORAGE TANKS SPRINKLER PUMP ROOM RETAINING WALL WITH HANDRAIL TOW

As the Toronto Transit Commission (TTC) operates a transit service on Bay Street, City Council approval of this report is required.

THE FIRST-EVER SPORTS & ENTERTAINMENT SMART CITY

3660 MARKET STREET, ST. LOUIS, MO armorydistrict.com

MAJOR EXTERIOR & INTERIOR RENOVATION

Introduction BACKGROUND THE PUBLIC EXHIBITION

Customer Detail Report + Map

Second Street Improvements Project Project Update Archive

ADA Checklist for Emergency Shelters

Metro ExpressLanes April 5, 2011 Community Meeting re: Adams Blvd Improvements

STARA PLANINA REVISION OF APPLE PLATEAU BASE AREA DEVELOPMENT

FOR LEASE 7999 Gateway Boulevard, Newark CA

City of Rolling Hills INCORPORATED JANUARY 24, 1957

310 4th Avenue South, Nashville, Tennessee ,200 SF. Restaurant. at SOBRO HAMPTON INN FUTURE 2,200 SF RETAIL SPACE

Orlando Loch Haven Park (Conditional Use Permit) Project Overview (updated 5/31/2018)

Village of Lombard, Illinois Capital Improvement Plan FUNDING SOURCE SUMMARY


Notice and Opportunity to Comment on New Proposed Passenger Facility Charge (PFC) New Application

OFFICE SUITES AVAILABLE

Aesthetic value This 1950s building has medium aesthetic value and makes a neutral contribution to the character of the conservation area.

Transcription:

Preliminary Design Presentation HIGHTSTOWN BUILDING Hightstown, NJ September 16, 2013 Eli Goldstein, AIA, PP, LEED Managing Partner, Architects 1 Purpose of Presentation The primary purpose of this Presentation is to provide the Council with the information necessary to select a Design Scenario to advance. Outline of Presentation Aerial Views of Site, showing alternatives Plans of Existing and of 4 Potential Designs Site Plan Diagrams, showing alternatives Comparison of the Design Schemes Design Recommendation Additional Background Information 2 Aerial View of Site Historical Society North Main Street Police Borough Hall Fire House BUILDING 3

Aerial View of Site Historical Society North Main Street Police Borough Hall Fire House BUILDING, AFTER DEMOLITION OF BUILDING 4 Aerial View of Site Historical Society North Main Street Police Existing Addition Fire House BOROUGH HALL WITH ADDITION (SCHEMES 2 & 3) 5 Aerial View of Site Historical Society North Main Street Police New Borough Municipal Hall & Police Fire House NEW COMBINED & BUILDING (SCHEME 4) 6

112 sq ft JAN CONFERENCE 294 sq ft 146 sq ft STOR. VAULT 108 sq ft ENTRY FOYER 117 sq ft TAX DEPT. 496 sq ft BOROUGH 496 sq ft MEETING AND 1002 sq ft 115 sq ft Existing Floor Plans 7 Existing First Floor CORRIDOR 8 Existing Second Floor CORRIDOR 9

IT 30 sq ft EVIDENCE 165 sq ft ID 85 sq ft SALLY PORT PROC. 149 sq ft INTERVIEW RM. JUV JUSTICE DISPATCH 164 sq ft DETECTIVE SGTS. LT DIRECTOR 110 sq ft COUNTER 130 sq ft ARMORY 111 sq ft PUBLIC CONF. RM. / DOMESTIC VIOLENCE 178 sq ft 393 sq ft #4 161 sq ft IMPOUNDT GARAGE 393 sq ft SQUAD 261 sq ft #3 241 sq ft 155 sq ft RECORDS 125 sq ft 112 sq ft JAN CONSTRUCTION 291 sq ft 146 sq ft STOR. FOYER 152 sq ft BORO 108 sq ft TAX WORK ASST. 497 sq ft CFO MEETING AND 770 sq ft JUDGE KITCHENETTE 117 sq ft LUCNH 115 sq ft Design Scenario Separate Police NOTE: Plans are subject to revision to accommodate Mechanical and Electrical Equipment Rooms and chases, once their sizes and locations have been established. 10 Scheme First Floor ADDITIONS = 2,970 SQ FT TOTAL AREA = 5,472 SQ FT 11 Scheme Second Floor ADDITIONS = 2,970 SQ FT TOTAL AREA = 5,472 SQ FT EVIDENCE LOCKERS CORRIDOR 12

IT 30 sq ft EVIDENCE 165 sq ft DETECTIVE SGTS. LT DIRECTOR ID 85 sq ft COUNTER SALLY PORT PROC. 149 sq ft INTERVIEW RM. JUV JUSTICE 130 sq ft DISPATCH 207 sq ft ARMORY 111 sq ft PUBLIC CONF. RM. / DOMESTIC VIOLENCE 192 sq ft 393 sq ft #4 181 sq ft IMPOUNDT GARAGE 393 sq ft SQUAD 261 sq ft 241 sq ft 155 sq ft RECORDS 125 sq ft #3 ELEV. MACHINE VESTIBULE 186 sq ft 112 sq ft CONSTRUCTION 291 sq ft JAN 146 sq ft STOR. FOYER 152 sq ft BORO 108 sq ft TAX WORK ASST. 497 sq ft MEETING AND 770 sq ft JUDGE CFO KITCHENETTE 117 sq ft LUCNH 115 sq ft Design Scenario Police Addition NOTE: Plans are subject to revision to accommodate Mechanical and Electrical Equipment Rooms and chases, once their sizes and locations have been established. 13 Scheme First Floor ADDITIONS = 3,155 SQ FT TOTAL AREA = 5,657 SQ FT 14 Scheme Second Floor ADDITIONS = 3,155 SQ FT TOTAL AREA = 5,657 SQ FT EVIDENCE LOCKERS CORRIDOR 15

ENTRANCE SALLY PORT TOILET 40 sq ft 269 sq ft ID 75 sq ft COUNTER IT 110 sq ft SQUAD 258 sq ft PROC. 131 sq ft INTERVIEW RM. JUV JUSTICE 110 sq ft 139 sq ft RAMP VEHICLE SPLY STORAGE DISPATCH 117 sq ft DAIS 1491 sq ft EVIDENCE 188 sq ft 70 sq ft 70 sq ft IMPOUNDT GARAGE 327 sq ft PUBLIC CONF. RM. / DOMESTIC VIOLENCE 206 sq ft RAMP SGTS. 125 sq ft #3 70 sq ft #4 70 sq ft DETECTIVE 125 sq ft 84 sq ft 225 sq ft ARMORY VESTIBULE 100 sq ft PROPERTY 66 sq ft 114 sq ft JUDGE 97 sq ft 122 sq ft 115 sq ft ARCHIVES 83 sq ft 195 sq ft ARCHIVES 119 sq ft CL TAX LUNCH 144 sq ft CONSTRUCTION 207 sq ft WORK 497 sq ft CFO BORO LT 145 sq ft DIRECTOR 145 sq ft RECORDS ARCHIVES 88 sq ft RECORDS 176 sq ft EXEC. SESSION / PUBLIC CONF. RM. 189 sq ft Design Scenario #3 Integrated Addition NOTE: Plans are subject to revision to accommodate Mechanical and Electrical Equipment Rooms and chases, once their sizes and locations have been established. 16 Scheme #3 First Floor ADDITIONS = 3,362 SQ FT TOTAL AREA = 5,864 SQ FT CORRIDOR 17 Scheme #3 Second Floor ADDITIONS = 3,463 SQ FT TOTAL AREA = 5,965 SQ FT WITNESS RAMP RAMP KITCHENETTE 18

ENTRANCE MECH. / EQPT. / JAN CL. 68 sq ft 95 sq ft JUDGE 121 sq ft SALLY PORT 327 sq ft LT 176 sq ft SGTS. 176 sq ft SQUAD 292 sq ft CONSTRUCTION 200 sq ft 307 sq ft INTERVIEW RM. JUV JUSTICE 95 sq ft EXEC. SESSION / PUBLIC CONF. RM. 224 sq ft KITCHENETTE ARCHIVES 121 sq ft MOVABLE BARRIER CL. STOR. GUN LOCKER EL. + 0'-7" IT 59 sq ft EL. + 1'- 2" EL. + 1'- 2" NORTH MACHINE RM. 59 sq ft CL RAMP COUNTER 63 sq ft 63 sq ft PROC. 122 sq ft 156 sq ft DISPATCH 168 sq ft 247 sq ft RECORDS 168 sq ft 42 sq ft PASS-THRU PLAZA KITCHENETTE BREAK 193 sq ft DAIS EL. + 0'-0" 1402 sq ft MAIN EL. 0'- 0" BODY SCANNER EL. + 1'-9" #3 63 sq ft HOLDING 88 sq ft ID EL. + 1'- 9" RAMP STAFF 42 sq ft CL ARMORY 102 sq ft EL. + 1'- 2" EL. + 0'- 0" SOUTH ASST. 128 sq ft COATS COPIER TAX 109 sq ft SERVICE WINDOW IMPOUNDT GARAGE 327 sq ft DETECTIVE 207 sq ft EVIDENCE 227 sq ft DIRECTOR 196 sq ft PUBLIC CONF. RM. / DOMESTIC VIOLENCE 245 sq ft SPLY ALCOVE JAN CL. 82 sq ft BORO 121 sq ft 128 sq ft WORK 307 sq ft CFO 109 sq ft Design Scenario #4 Entirely New NOTE: Plans are subject to revision to accommodate Mechanical and Electrical Equipment Rooms and chases, once their sizes and locations have been established. 19 Scheme #4 First Floor PROPERTY LOCKERS GUN LOCKER EVIDENCE LOCKERS AREA = 6,036 SQ FT 20 Scheme #4 Second Floor RAMP RAMP AREA = 6,036 SQ FT 21

Massing Study for Scheme 4 22 Interior Perspective Study of Council Room in Scheme 4 23 Shortcomings in Thermal Envelope of existing Borough Hall Roofs are either poorly insulated or uninsulated Exterior walls are either poorly insulated or uninsulated These characteristics necessitate larger capacity mechanical equipment than for a new building This larger equipment results in higher operating costs, year after year. A new building will be much more energyefficient, resulting in significant operational economies over its service life. 24

LOT 14 Stone Abutment LOT 14 Stone Abutment Wood Deck Junction Box Wood Deck # JC10 W/ 3 - Trans 2-4" Conduit # JC10 HIGHTSTOWN FIRE HOUSE W/ 3 - Trans 2-4" Conduit Junction Box LOT 13 Concrete Driveway Depressed Concrete Curb LOT 13 HIGHTSTOWN FIRE HOUSE Concrete Driveway Depressed Concrete Curb # JC357H W/ Flood Light Grate 81.03 Grate 81.33 Rim 83.31 # JC357H W/ Flood Light Grate 81.03 Grate 81.33 Rim 83.31 Grate 81.35 Rim 82.14 Concrete Block Wall # No ID Flag Pole Inv 71.61 Bollards Police Communications LOT 12 Grate 81.35 Tower Grease Trap Rim 83.87 s Junction Box Rim 82.14 Concrete Block Wall Flag Pole Inv 71.61 Bollards Police Communications LOT 12 # No ID Tower Grease Trap Rim 83.87 s Junction Box Rim 84.07 Rim 84.07 Generator # B228FH HIGHTSTOWN BOROUGH BUILDING Generator HIGHTSTOWN BOROUGH BUILDING 'B' Inlet Gr. 84.27 Tc. 84.85 Junction Box # B228FH 'B' Inlet Gr. 84.27 Tc. 84.85 Junction Box Grate 80.46 Storm MH Rim 80.53 # JC356H Rim 82.56 LOT 11 Ramp # No ID # JC162HB W/ Elec Meter Box Grate 80.46 Storm MH Rim 80.53 # JC356H Rim 82.56 LOT 11 Ramp # No ID # JC162HB W/ Elec Meter Box Conc. Pad W/ Metal Cabinet Depressed Curb LOT 10 Conc. Pad W/ Metal Cabinet Depressed Curb Exist. Striping # JC501H Street Light LOT 10 Exist. Striping # JC501H Street Light Grate 81.37 # 779H Wood Ramp Concrete Curb # JC355 W/ 2 - Trans Conc. Parking Stop Grate 81.37 # 779H Concrete Curb Wood Ramp Wood Deck # JC355 W/ 2 - Trans Conc. Parking Stop Wood Deck Conc. Parking Stop LOT 4 LOT 5 LOT 6 # 40613H Deck Deck LOT 7 HISTORICAL SOCIETY LOT 9 Conc. Parking Stop LOT 4 LOT 5 LOT 6 # No ID W/ 2- Street Lights Deck Deck LOT 7 HISTORICAL SOCIETY LOT 9 # 40613H # No ID # No ID W/ 2- Street Lights Stop Sign # BT28H LOT 8 # No ID # JC163HB W/ Trans Stop Sign # BT28H LOT 8 # JC163HB W/ Trans Rim 83.16 Rim 83.64 # BT2H # No ID Rim 83.16 Rim 83.64 # BT2H Rim 83.49 # No ID # No ID # JC13H # BT28HT # JC359HB # H360 COPYRIGHT 2013 BY THE GOLDSTEIN PARTNERSHIP. ALL RIGHTS RESERVED. Rim 83.49 # No ID # JC13H # BT28HT # JC359HB # H360 COPYRIGHT 2013 BY THE GOLDSTEIN PARTNERSHIP. ALL RIGHTS RESERVED. Site Plan Comparison NOTE: Plans are subject to revision to accommodate Mechanical and Electrical Equipment Rooms and chases, once their sizes and locations have been established. 25 Conc. A/C Pad 2-3' High Timber Piles Inv 71.91 Inv 71.59 24" RCP 15" RCP Inv 82.00 N O R T H M A I N S T R E E T MECHANIC S T R E E T B A N K S T R E E T NORTH HIGHTSTOWN BUILDING NORTH MAIN STREET, HIGHTSTOWN, NJ 08520 SITE PLAN SCALE: 1" = 40'- 0" 08/22/13 Site Diagram: Existing 26 Conc. A/C Pad 2-3' High Timber Piles Inv 71.91 Inv 71.59 24" RCP 15" RCP Inv 82.00 N O R T H M A I N S T R E E T MECHANIC S T R E E T B A N K S T R E E T NORTH HIGHTSTOWN BUILDING NORTH MAIN STREET, HIGHTSTOWN, NJ 08520 SITE PLAN SCALE: 1" = 40'- 0" 08/27/13 Site Diagram: Schemes 2 & 3 27

LOT 14 Stone Abutment Wood Deck # JC10 W/ 3 - Trans 2-4" Conduit Junction Box LOT 13 HIGHTSTOWN FIRE HOUSE Concrete Driveway Depressed Concrete Curb # JC357H W/ Flood Light Grate 81.03 Grate 81.33 Rim 83.31 Grate 81.35 Rim 82.14 Concrete Block Wall Flag Pole Inv 71.61 Bollards Police Communications LOT 12 # No ID Tower Grease Trap Rim 83.87 s Junction Box Rim 84.07 Generator HIGHTSTOWN BOROUGH BUILDING # B228FH 'B' Inlet Gr. 84.27 Tc. 84.85 Junction Box Grate 80.46 Storm MH Rim 80.53 Rim 82.56 LOT 11 Ramp # No ID # JC162HB W/ Elec Meter Box Conc. Pad W/ Metal Cabinet Depressed Curb LOT 10 Exist. Striping # JC501H Street Light Grate 81.37 # 779H Conc. Parking Stop Wood Ramp Concrete Curb Wood Deck Conc. Parking Stop LOT 4 LOT 5 LOT 6 # 40613H Deck Deck LOT 7 HISTORICAL SOCIETY LOT 9 # No ID W/ 2- Street Lights # No ID Stop Sign # BT28H LOT 8 # JC163HB W/ Trans Rim 83.16 Rim 83.64 # BT2H # No ID Rim 83.49 # No ID # BT28HT # JC359HB # H360 COPYRIGHT 2013 BY THE GOLDSTEIN PARTNERSHIP. ALL RIGHTS RESERVED. Conc. A/C Pad 2-3' High Timber Piles Inv 71.91 Inv 71.59 24" RCP 15" RCP Inv 82.00 N O R T H M A I N S T R E E T MECHANIC S T R E E T B A N K S T R E E T NORTH HIGHTSTOWN BUILDING NORTH MAIN STREET, HIGHTSTOWN, NJ 08520 SITE PLAN SCALE: 1" = 40'- 0" 08/21/13 Site Diagram: Scheme 4 28 Comparison of Design Scenarios 29 BLDG. FOOT- PRINT Comparison of Design Schemes RECOMDED SCHEME SCHEME 1 2 3 4 BOROUGH HALL RENOVATED RENOVATED RENOVATED NEW/COMBINED BUILDING SEPARATE BLDGS. MEETS PROGRAM? OPERATING COST PROJECT DURATION BLDG. AREA (in nom. sq. ft.) RELATIVE RISK NEW ADDITION ADDITION NEW/COMBINED 2 1 1 1 NO NO YES YES HIGH MEDIUM MEDIUM LOW INTERMEDIATE LONGEST LONGEST SHORTEST 12,000 SF 12,000 SF 12,000 SF 12,000 SF INTERMEDIATE HIGHEST HIGHEST LOWEST 30

Some aspects of Borough Hall not in conformance with current codes Egress Stairwells, which are not enclosed Courtroom, which is not fully accessible Lack of a secure route to walk detainees to Court Toilet Rms, which are too small for occupant load Mold and asbestos must be remediated. Because making Borough Hall habitable again requires that the building be unoccupied during construction, this is a reconstruction project, which triggers these and other upgrades. 31 Questions & Answers 32