POLFRA IMPLEMENTATION Progress Report FREE ROUTE AIRSPACE WORKSHOP

Similar documents
Free Route Airspace Maastricht (FRAM)

Free Route Airspace Workshop Conclusions and Future Projects Outlook

Borealis Free Route Airspace ~ Concept of Operation ~ NM User Forum 28 January 2016

January 2018 Air Traffic Activity Summary

APPENDIX E ACTION PLAN FOR THE IMPLEMENTATION OF ATFM AT SAM AIRPORTS A: AIRPORT. Task description Start End

Cross-border Free Route Airspace Implementation Workshop Conclusions and Recommendations

Luxembourg TMA Contingency measures. Clear the sky procedure & Agreement on service continuity

International Civil Aviation Organization. Agenda Item 6: Free Route Airspace Concept implementations within the EUR Region FREE ROUTE AIRSPACE DESIGN

AIP ITALIA Servizio Informazioni Aeronautiche

Free Route Airspace (FRA) Application in NMOC - Guidelines

Dynamic Airspace Overview concepts, complexities, benefits and outlook

Airspace User Forum 2012

Introducing Free Route Airspace: Summary Paper from NEFAB Customer Consultation Days Helsinki, October 21, 2014 and Oslo, October 23, 2014

Paolo Nasetti Head of En-route Operations. Bruxelles, 28 January 2016

The Effects of the Introduction of Free Route (HUFRA) in the Hungarian Airspace

How CFSPs work. processes, requirements, difficulties. Tuesday, June 19th, 2018 CFPSG PRESENTATION FABEC SC OPS/AOG RADISSON ZURICH AIRPORT 1

LETTER OF AGREEMENT BETWEEN POLISH VACC AND SWEDEN FIR

Implementation of SESAR Pilot Common Project. - expected effects

Network Manager Adding value to the Network 29 September 2011

Free Route Airspace (FRA) Application in NMOC - Guidelines

Safety / Performance Criteria Agreeing Assumptions Module 10 - Activities 5 & 6

Free Route Airspace ASM Dimension. Giuseppe Acampora

DANUBE FAB real-time simulation 7 November - 2 December 2011

The Network Manager tasks and the ASM improvement initiative

DTTAS Quarterly Aviation Statistics Snapshot Quarter Report

DTTAS Quarterly Aviation Statistics Snapshot Quarter Report

UKRAINE SITUATION AND THE INFLUENCE ON THE TRAFFIC SHIFTS

DTTAS Quarterly Aviation Statistics Snapshot Quarter Report

Implementation of air traffic flow management (ATFM) in the SAM Region REVIEW OF THE ATFM ACTION PLAN. (Presented by the Secretariat)

Free Route Airspace Definitions

SJC North and South Flow

Case study London Heathrow & London Heathrow-Amsterdam

NATS. SAIP AD3 Jersey Interface Change Stage 1 Assessment Meeting. Friday 2 nd February x NATS presenters.

STRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003

Alternate WX SIDs And Routes Ernst Potzel / Klaus Lang, DFS ACC Munich

Dynamic Management. of the. European Airspace Network. ADR Data Catalogue. Annex A: Supported Services

EUROCONTROL. Centralised Services Workshop. Peter Matern CS#5 EAIMS 5 March 2014

AIRSPACE STRUCTURE. In aeronautics, airspaces are the portion of the atmosphere controlled by a country above its territory.

InterFAB Cooperation: XMAN Implementing Extended Cross-Border Arrival Management. World ATM Congress Madrid, 8 March 2016

Advanced Flexible Use of Airspace (AFUA) Kris DELCOURTE, EUROCONTROL Davide BARDELLI, LUFTHANSA SYSTEMS

Letter of Agreement. between. and

NAV CANADA and DATA LINK IMPLEMENTATION. Shelley Bailey NAV CANADA May 2016 Sint Maarten

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit

AIP PORTUGAL ENR NOV-2007

CAPAN Methodology Sector Capacity Assessment

SIMULATION OF BOSNIA AND HERZEGOVINA AIRSPACE

International Virtual Aviation Organisation. Letter of Agreement. between. and. Effective: 15/05/2017 Edition: 1

SSP progress in Latvia. Overview

PERFORMANCE MEASURE INFORMATION SHEET #16

Network Operations Performance

LETTER OF AGREEMENT. Between

As of Nov. 17th 2011 Sweden and Denmark implemented the concept of Free Route Airspace (FRA). This will be described in the section below.

Distributed Multi-Nodal ATFM Project Overview & Progress. ICAO MID ATFM/TF/1 & ICAO World Cup 2022 TF/ Sep 2018

BUSINESS AVIATION TRAFFIC TRACKER EUROPE. April 2017

THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR AIR NAVIGATION SYSTEMS MAURITIUS

FLIGHT OPERATIONS INTRODUCTION ICAO Air Navigation Commission

International Virtual Aviation Organisation. Letter of Agreement. between. and. Effective: 15/05/2017 Edition: 2

Disruptive Technologies in Air Traffic Management

BUSINESS AVIATION TRAFFIC TRACKER EUROPE. September 2018

Advisory Circular. File No.: Z U Issue No.: 01

BUSINESS AVIATION TRAFFIC TRACKER EUROPE. June 2018

FRA AIP publication and EAD data provision. Asa STANDAR

GEN 3. SERVICES GEN AERONAUTICAL INFORMATION SERVICES

9 ANSPs 3 FABs > 4M flights/year > 11,000 flights daily 39% of European traffic

Flexible Use of Airspace. in ITALY. EUROCONTROL, 11 December 2018

OPTIMIZATION OF SAM AIRSPACE. (Presented by the Secretariat)

Capacity Planning and Assessment Network Operations Planning

FREE ROUTE AIRSPACE IMPLEMENTATION IN ARMENIA (ARMFRA)

BUSINESS AVIATION TRAFFIC TRACKER EUROPE. May 2018

2.2 ANSP Certification, Designation & Cross-Border ANS Provision

FLIGHT EFFICIENCY PLAN

BUSINESS AVIATION TRAFFIC TRACKER EUROPE. January 2018

F r o m B O B C AT t o C r o s s - B o r d e r AT F M

Sweden. Swedish Visitors in Finland Statistical Trends and Profile

NEFAB Annual Report 2016

South Korea. South-Korean Visitors in Finland Statistical Trends and Profile

Civil-Military Cooperation. Advanced Flexible Use of Airspace

Spain. Spanish Visitors in Finland Statistical Trends and Profile

Morocco ASBU Implementation

Norway MARKET REVIEW Norwegian Visitors in Finland Statistical Trends and Profile

Belgium. Belgian Visitors in Finland Statistical Trends and Profile

Operational Instruction

Appendix. Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Gatwick Airport Limited

Number of tourism trips of residents increased namely for leisure

AERONAUTICAL INFORMATION SERVICES

Dubai contest LIDAR in Dubai DANS Wake Vortex campaign DXB Operations Dependent Diagonal Approach implementation Phase RPAT Approach concept

Network Preparations Re-opening of Airspace over Kosovo

CIVIL AVIATION PUBLICATION CAP 00 GENERAL

VALUES UTILITY CREDIBILITY PROMPT RESPONSE MANAGE, SO THAT EVERYBODY CAN FLY.

Total expenditure by international tourists visiting Spain in August increases by 3.8% compared with the same month last year

FABEC Operations. From a project-driven approach to continuous operational improvements

Enter here your Presentation Title 1

Hampton Roads Express Lane Network

DASHBOARD DEC YOUR MONTHLY UPDATE FOR IOWA ONE CALL

In cover a detail of new night/ week end shortest routes for overflying Sardinia Area

FAO-EuFMD/EC/OIE Tripartite Group Meeting on control of FMD and other exotic diseases in the Southern Balkans

International Civil Aviation Organization CHINA RMA REPORT. (Presented by the China RMA) SUMMARY

Lelystad Departure Route Analysis

Produced by: Destination Research Sergi Jarques, Director

LETTER OF AGREEMENT BETWEEN BODØ FIR AND MURMANSK FIR

Transcription:

POLFRA IMPLEMENTATION Progress Report FREE ROUTE AIRSPACE WORKSHOP Łukasz Godlewski Polish Air Navigation Services Agency Brussels, 25.05.2018

Agenda Project ImplementationPhases Recent, Current& FutureActivities Concept of Operations FRA Significant Points Airportconnections Connecting Routes from/to nearby airports Restrictions Real Time Simulation 2

Project Implementation Phases P2010+ project: FRA in FIR EPWW included in two Real Time Simulations (EEC, Bretigny) Implementation: 28.02.2019 H24; FL095 Feasibility study DCT FRA Development Validation, Finalization Extension 2013 2014 2015 2016 2017 2018 2019 2020 3

2017 2018 2019 Recent& Current Activities JAN I NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB POLFRA Concept Development/Airspace Design Two options of lower limit developed: FL095 FL305 Concept validation internal RTS: both options validated, Validation report prepared PANSA Management Decision: H24 FRA above FL095, Coordination with neighbouring states (including delegated airspace issues) Finalisation of the concept First ECTL/ENV validation sesion Safety Case/FHA Second ECTL/ENV validation sesion Airspace users information day CAA approval Third ECTL/ENV validation sesion AIP publication 2 AIRAC cycles in advance Implementation: 28.02.2019 4

Recent & Current Activities Close coordination with Eurocontrol/NM initiated in 2016 ONGOING; NEST/SAAM environment prepared for various scenarios, FTS report COMPLETED; Creating necessary restrictions, e.g. mandatory segment /intermediate points, entry-exit points restrictions COMPLETED- to be validated; Two main scenarios developed(different lower limit): FL95, FL305 Final decision regarding lower limit: FL095 Internal RTS executed, both scenarios validated, report prepared COMPLETED; Safety case initiated ONGOING; NM Validations initiated ONGOING; 5

Future Activities Feasibility study DCT FRA Development Validation, Finalization Extension 2013 2014 2015 2016 2017 2018 2019 2020 Next steps of POLFRA development: Removal of ATS route network, To extend POLFRA into cross-border FAB Baltic Free Route Airspace, Potential extension of POLFRA/FAB Baltic FRA to cross-border FRA with already existing (or planned) FRA of neighboring FABs (e.g. DK-SE FAB, FABEC, FAB CE) and countries (e.g Ukraine, Belarus). 6

Concept of Operations main assumptions FRA with Intermediate Points Area of applicability: ACC Warszawa AoR +/- delageted airspaces (delegated airspace issues to be finalized) No segment length restriction Trajectories shall not plan closer than 5NM to the lateral border Compulsory Connecting Routes for main departure / arrival flows (marginal flows connect via any A / D point)withinand outsidefir EPWW The planning of DCT segments that are partially outside the lateral limits of FRA EPWW (multiple re-entry segments) is not allowed; Generally flights may not be planned through active TRAs, TSAs, prohibited, restricted or danger areas (detailed definition in RAD Appendix 7). Intermediate points must be used to avoid the active areas; The ATS route network within FIR EPWW will be maintained for transition period (duration of the period not decided yet). 7

FRA Significant Points 8

Feeding routes to/from TMA Warszawa In case of airportswithin TMA Warszawa, feeding routes will be used to stabilize the traffic flows to/from main airports. Additional restrictions (sectors) for planning arrivals to TMA Warszawamight be used to further stabilize the traffic flows. 9

Connecting Routes from/to nearby airports Additionalrestrictionsfor mainairportslocatedin close vicinity of FIR EPWW Based on existing transfer conditions: Traffic proceeding inbound or outbound airports located in close vicinity of FIR EPWW shall be planned via relevant FRA arrival, departure points using mandatory intermediate points; Mandatory segments for traffic to/from LKKB/LKPR/LKVO Mandatory segments for departures. Mandatory segments for arrivals. 10

Connecting Routes from/to nearby airports Mandatory segments for traffic to/from EDDB/EDDT Mandatory segments for departures. Mandatory segments for arrivals. 11

EN-ROUTE FRA RESTRICTIONS Example of restrictions based on waypoint: to reduce complexity, to prevent sector clipping/re-entries, with objective to maximise throughput and maintain capacity. Example of traffic from TOMTI: Green available for planning Orange ENTRY FRA points not available for planning Teal, dark blue EXIT FRA points not available for planning (ENTRY EXIT point restrictions) Purple, blue pairs of points have to include DIMEX or ADVAB point in planning to channel traffic 12

EN-ROUTE FRA RESTRICTIONS Example of restrictions based on sector volumes: to balance sector load, to prevent sector clipping/re-entries, with objective to maximise throughput and maintain capacity. 13

COORDINATION WITH NEIGHBOURING FIRs AND AUs First workshops with FIR Sweden (ESAA) dedicated to preparing the rules of FRA in delegated Airspace (MIDSEA and RÖNNE SOUTH) - tests of possible solutions are ongoing. Consultation with all the neighbouring FIRs ongoing (FBZ in the vicinity of border, changes to LoAs). Information Day forneighbouringansps,cfsps and AOs planned in October 2018. 14

Real Time Simulation Five days of Real Time Simulation (end of December 2017 beginning of January 2018) Participation of 18 ATCOs (ACC) different ACC ATCO work experience (from 1 to 26 years, on average 11 years), Total hours simulated: 16, 6 different traffic samples, based on most traffic demanding days from summer 2017, 7 different sector configurations tested, Both considered options(fl95/fl305) simulated, Objective was to validate theoretic airspace design, gainfeedback from ATCOsand to check which lower limit of POLFRA is favorable from operational point of view. 15

PANSA - Dependencies Overlapping areas issue in NM systems -NM software release (expected autumn 2018), Implementation of updated version of local ASM tool CAT2.0 (planned update autumn 2018), Publication of FBZs(planned autumn 2018), B2B interface between NM systems and CAT2.0 for automated processing/transferring of the AUP/UUP (tests are ongoing). 16

Thankyoufor yourattention! Do youhaveanyquestions? Łukasz Godlewski POLFRA Project Manager tel. +48 (22) 574 5718 +48 603 106 198 lukasz.godlewski@pansa.pl