Chapter 4 Route Window NE3 Manor Park station. Transport for London

Similar documents
Chapter 8 Route Window NE7 Chadwell Heath station. Transport for London

Chapter 6 Route Window NE5 Seven Kings station. Transport for London

Chapter 13 Route Window NE12 Harold Wood station. Transport for London

Chapter 16 Route Window NE15 Brentwood station. Transport for London

Chapter 4 Route window W23 Taplow station. Transport for London

Chapter 21 Route window W6 West Ealing station. Transport for London

Chapter 2 Route window W25 Maidenhead station. Transport for London

Chapter 25 Route Window SE6 Plumstead portal. Transport for London

Chapter 9 Route Window C8 Whitechapel station. Transport for London

Chapter 7 Route Window C6 Farringdon station. Transport for London

Chapter 12 Route window W15 Dog Kennel bridge. Transport for London

Chapter 14 Route Window C12 Mile End Park and Eleanor Street shafts. Transport for London

Maidenhead Bridge. Proposed Work

Chapter 26 Route Window SE6A Manor Wharf. Transport for London

ISSUE 40 OCTOBER 2016 MOVING AHEAD CROSSRAIL PROJECT OCTOBER UPDATE. Andrew Wolstenholme CEO Crossrail Ltd

Sky Temporary Car Park Transport Statement

Crossrail transforming travel across London - Infrarail

97% MOVING AHEAD LINE TIME ISSUE 34 MARCH ,772 WELCOME FROM ANDREW WOLSTENHOLME 60% WON BY

CROSSRAIL Moving London Forward

Crossrail: Socio-Economic Technical Report

Crossrail / Elizabeth Line An Update

London Borough of Barnet Traffic & Development Design Team

WELCOME TO PROJECT EVERGREEN 3 CHILTERN S PROPOSED NEW OXFORD TO LONDON ROUTE

Pedestrian Safety Review Spadina Avenue

Elizabeth line Services

Guildford Borough Transport Strategy 2017, Topic Paper: Transport, June 2017 (accompanying Local Plan 2017) Local Plan Transport Strategy 2017

A. CONCLUSIONS OF THE FGEIS

Crossrail transforming travel across the capital - Railtex conference. Jeremy Long, MTR Corporation, CEO European Business 9 May 2017

Proposals for the Harrogate Road / New Line Junction Improvement Scheme. August / September Supported by:

Lake Erie Commerce Center Traffic Analysis

Railfuture East Anglia Whittlesford Parkway station audit

5.1 Traffic and Transportation

Consultation Round 2: Results and Crossrail s Response

TfL Planning. 1. Question 1

98 Manor Way, Beckenham, Kent BR3 3LR

MOVING AHEAD LINE TIME 4,700 + CROSSRAIL PROJECT MAY UPDATE 96% OF CONTRACTS AWARDED BY CROSSRAIL ARE TO COMPANIES WITHIN THE UK PROJECT

9.1 INTRODUCTION 9.2 EXISTING DEVELOPMENT. Southern Cross University

Summary Delivery Plan Control Period 4 Delivery Plan More trains, more seats. Better journeys

Major Scheme Business Case Summary Report for Programme Entry

Map showing location of public transport projects in vicinity of railway station

Finchley and Golders Green Area Committee 27 April 2017

Welcome. Great Yarmouth Third River Crossing. Norfolk County Council

Jobcentre Plus advisers giving guidance to a job seeker at the Crossrail Visitor Information centre

Construction Staging Area Blue Jays Way (357 King Street West)

PART VIII APPLICATION FOR REVISED SOUTH SIDE TRAFFIC MANAGEMENT WORKS TO FACILITATE LUAS BXD PLANNING REPORT ROADS & TRAFFIC DEPARTMENT

HORTON WHARF HORTON ROAD, WEST DRAYTON, UB7 AN EXCEPTIONAL WATERFRONT DEVELOPMENT OPPORTUNITY BENEFITTING FROM PLANNING PERMISSION FOR 87 RESIDENCES.

7.0 GROUND TRANSPORT DEVELOPMENT PLAN OVERVIEW. Sydney Airport Master Plan

A303. Sparkford to Ilchester Dualling Scheme. Public consultation. Welcome. Highways England -- creative MCR18_0016

Multi-storey station car park opens in New Year

Construction Staging Adelaide Street West

MEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM

H1: BIRMINGHAM CURZON STREET STATION

Threats to possible orbital light-rail in outer London from the current Brent Cross planning application...

4.1.1 Improved facilities and layout cont.

Felixstowe Branch Line FAQ

HIGH SPEED UK. ..connecting in London. Colin Elliff BSc CEng MICE. Quentin Macdonald BSc(Eng) CEng FIRSE MIET Systems Engineering Principal, HSUK

Scotchbarn Lane, Prescot Accessibility Statement

Transport Assessment Appendix M: Avonmouth Impacts

Concord Road Interchange. Standard hours of work

BRENT CROSS THAMESLINK

5 Rail demand in Western Sydney

5.7 Local road upgrades

Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street

Centurion Way Chichester

Report to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub

24/28 QUEEN VICTORIA STREET READING RG1 1TG

Capital & Counties. October 2007

Yonge Street / Highway 401 Improvements Update. Public Works and Infrastructure Committee. General Manager, Transportation Services

Saighton Camp, Chester. Technical Note: Impact of Boughton Heath S278 Works upon the operation of the Local Highway Network

Bloor Street West Rezoning Application for a Temporary Use By-law Final Report

A STUNNING SELECTION OF STUDIO SUITES, 1, 2 & 3 BEDROOM LUXURY APARTMENTS FACT SHEET

Business Forum. 16 March 2016

F6. Coastal Ferry Terminal Zone

Proposed Lidl Food store West Hendford, Yeovil

PARKSIDE BOW, LONDON E3

Northern Beaches Transport Action Plan

VENUE PARKING HOW TO USE OUR CAR PARKS. N8 from Oxford Street to Hainault N86 from Stratford to Harold Hill car

Gold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content

2.0 POLICY AND DEVELOPMENT FRAMEWORK. Introduction. Transport21. Celbridge Development Plan 2002

Forest Hill Society response to the draft London and South East Route Utilisation Strategy (February 2011)

Come on board. An introduction to accessible transport in London MAYOR OF LONDON. Transport for London

Gold Coast. Rapid Transit. Chapter content. Chapter four Route selection and staging

Interstate 90 and Mercer Island Mobility Study APRIL Commissioned by. Prepared by

Document Control Identification. Document History. Authorisation. Rail Safety Manager Brookfield Rail

RW Bruhn Bridge and Approaches Project

CITY OF NEWCASTLE UPON TYNE JOHN DOBSON STREET AREA. Traffic Regulation (Consolidation) Order 2009 (John Dobson Street Area Variation) Order 2015

Lansdowne Wetton BRT Public Transport Corridor Trunk Route: Planning Analysis

Round 2 Consultation Document August to October 2004

Night work update: Hills M2 Motorway and westbound on ramp at Pennant Hills Road

Non-technical summary

Offers should be for a definitive sum of money. Offers which are calculated by reference to any other received will not be entertained.

ravengreen THE MALL EALING BROADWAY LONDON W5 Well Let Town Centre Retail and Office Investment with Residential Development Potential

High quality refurbished offices adjacent to Canary Wharf

TERMINAL DEVELOPMENT PLAN

Regulatory Committee

Crossrail Business Case Update: Summary Report July 2011

Section 106 Update Memo #1 Attachment D. Traffic Diversion & APE Expansion Methodology & Maps

November 21, 2012 Barbara Kelleher, (954)

Strategic Transport Forum 21 st September 2018

M4 Junctions 3 to 12 Smart motorway

Transcription:

Chapter 4 Route Window NE3 Manor Park station

MANOR PARK STATION 4 Route Window NE3 Manor Park station 4.7 Highway access to Manor Park station is very good. A117 Station Road connects with A116 to the north and A118 to the south. There are double yellow lines outside the station. At the time of a recent survey, however, cars frequently stopped there to drop passengers off or pick them up. Whitta Road, a residential street to the north of the station, is used for the same purpose. Introduction 4.1 All construction activities in this route window are associated with Manor Park station, where it is necessary to lengthen the platforms on the proposed Crossrail lines and to remove the existing goods loop. 4.2 The Crossrail project will enhance public transport capacity between Manor Park and Stratford, the City and West End. New and faster direct travel opportunities will be available from the City, West End, and points west to Maidenhead and Heathrow. Table 4.1 gives typical journey time improvements. 4.3 One construction worksite is proposed for the works in this route window. The worksite is located to the east of the station, as shown on Map NE3 (iv). 4.4 The works are expected to take about one year, during which time rail passengers using the station will be unaffected. 4.5 The drawings provided at the end of this chapter present the main features of the route window, construction lorry routes assessed, existing facilities in the vicinity of Manor Park station and transport linkages. Baseline conditions 4.6 This route window is in the London Borough of Newham. Manor Park station is a small commuter station and within Travelcard zone 3. The area around the station is a mixture of residential, commercial and light industrial use. Manor Park is about 50 m north of the station. The City of London Cemetery is situated alongside Manor Park on the opposite side of A116 Aldersbrook Road, Manor Park Cemetery is located to the west of the station, and Wanstead Flat is to the north of Manor Park Cemetery. Figure 4.1 Station entrance, Station Road 4.8 A118 Romford Road, south of the station, is an important east west corridor in this area. It connects A406 in the east to A11 to the west. Traffic volumes on Romford Road are generally high at all times, particularly during the morning and evening peak hours. Romford Road is a two-way road, with two lanes (one of which is a bus lane) in each direction. The eastbound bus lane (towards Ilford) operates from 0700 to 1000 hours and from 1600 to 1900 hours, Monday to Saturday. The westbound bus lane (towards Forest Gate) operates from 0700 to 1000 hours, Monday to Friday. Romford Road is part of the LCN Route 12. 4.9 Manor Park station is on the Liverpool Street to Shenfield line (the Great Eastern Main Line). Rail services are scheduled at five minutes to Stratford and 12 minutes to Liverpool Street with six trains per hour in the morning peak period. 4.10 There are currently five bus routes that serve the station with a frequency of 34 buses per hour in both directions in the morning peak period. 4.11 Station Road operates as a two-way road, with a single lane in both directions. It forms part of several bus routes and has bus stops on both sides of the station. These provide rail interchange at Manor Park station. 4.12 There is no taxi rank at Manor Park station, though there is a minicab firm based at the station. This is clearly signed inside and outside the station. NE3 page 3

ROUTE WINDOW NE3 4.13 There is no off-street car parking within 15 minutes walk of Manor Park station, but there is plenty of on-street parking on the residential roads around the station. 4.14 There are two loop stands and two wall brackets for bicycles inside the station. Two bicycles were occupying them at the time of survey. There are notices advising of cycle parking at the station. The nearest cycle parking outside the station is five minutes walk away at the junction of Romford Road and Station Road south of the station, where there are three cycle racks for two cycles each. No cycles were occupying these stands at the time of the survey. Station Road forms part of the LCN Route 12. 4.15 There is a pedestrian island crossing outside the station on Station Road and a zebra crossing approximately 40 metres south of the station. 4.16 There is no mobility impaired passenger access at Manor Park station. The permanent works 4.17 Platforms are proposed to be lengthened to accommodate 10-car Crossrail trains. The Great Eastern Main Line platforms (platform 1 and the island platform 2/3) will be extended westwards and eastwards to a total length 205 m. Platform 1 will be widened. 4.18 Additional lighting will be provided to extend over the whole length of the longer platforms. Platform furniture will be upgraded; this work will include the provision of new seats and/or waiting shelters as appropriate, and upgrading of platform signs and CCTV coverage. The signalling and overhead line equipment will be altered to suit the extended platforms. 4.19 The footbridge at the eastern end of the station between platform 1 and platform 2/3 will be modified. 4.20 The track that passes south of platform 1 (the Up Independent Goods Loop ) will be removed from Forest Gate to a point east of Manor Park station to facilitate the station improvements. A replacement goods loop will be constructed between Chadwell Heath and Goodmayes. 4.21 Works at this site will be carried out from within the existing fenced boundary of the railway and will include a site at the eastern end of Manor Park station. The worksite will be accessible from Station Road. A section of Manor Park Road will be used temporarily to accommodate a mobile crane. 4.22 The main construction plant to be used at the worksite will include cranes, excavators, mini piling rigs and mechanical breakers. The track to be removed from the site will be taken by rail to a suitable railhead for disposal. Most other large items of plant and materials will be removed by rail, although some (including excavated materials) will be removed by road. 4.23 During the peak period of construction, the number of two-way lorry movements generated by the worksite will be about 10 per day, and about two per day at other times. Worksite assessment Manor Park Station worksite 4.24 The station stands at the north end of a bridge carrying Station Road over the railway. The construction works will take place within railway land. The worksite is on railway land adjacent to the Great Eastern Main Line, northeast of the Station Road bridge (see Map NE3 (iv)). It is intended that it will serve as a central materials and plant storage depot for the works to Manor Park station, Forest Gate station (Route Window NE2) and Ilford station (Route Window NE4). At present the site is occupied by a private storage company. 4.25 Access to the worksite is from Station Road (see fig. 4.2). The present layout would make it difficult for lorries to get into the site and manoeuvre once inside, so the entrance will need to be modified. For the same reason it may be necessary to move the bus stop by the entrance. These arrangements will be agreed with the London Borough of Newham and TfL. The operation of this worksite will not cause any significant traffic impact. Figure 4.2 Station Road, access to Manor Park Station worksite 4.26 It is possible to access the worksite from Romford Road via Station Road, but right turns from Romford Road (east side) into Station Road are prohibited. Therefore, the proposed lorry route is such that lorries will enter the site from the north (via Forest Drive) and leave the site to the south (via Station Road). NE3 page 4

MANOR PARK STATION 4.27 It is envisaged that a mobile crane will be used to lift part of the new footbridge into place from the adjacent road (Manor Park Road). The work is expected to be done outside normal working hours and at weekends. Cranes will be deployed under possessions of the railway. 4.28 Parking restrictions will be required in areas of Station Road and during the operations carried out from Manor Park Road. Any local traffic management will be agreed with the London Borough of Newham. 4.29 The worksite will provide parking for 10 cars. Beyond the car park there will be a two-storey office unit and a single-storey canteen. Plant and materials will be stored to the east of the site, with direct access to the railway line. Lorry routes assessment 4.30 The lorry routes will access the worksite from the north via A12 Eastern Avenue (TLRN), A114, A116, Forest Drive and Station Road. This is because right turns from Romford Road into Station Road are prohibited. Vehicles will leave the site southbound on Station Road and then go then east towards Ilford via Romford Road, and on to A406, which forms part of the TLRN. 4.31 The total number of lorry movements associated with works for Manor Park station is approximately 600. It is predicted there will be approximately 10 lorry movements a day for the estimated 10-week peak construction period. 4.32 No significant traffic and transportation issues are apparent in Route Window NE3, though the entrance to the worksite will need to be improved (see 4.25). Mitigation and temporary impacts 4.33 There are no significant construction impacts to note in Route Window NE3, hence no mitigation is required. Mitigation and permanent impacts 4.34 The significant operational impacts and mitigation measures are indicated in Table 4.2. 4.35 There is one significant impact to note at Manor Park, relating to public transport. 4.36 Passenger numbers with Crossrail are expected to increase by about 1600 passengers entering and 100 passengers leaving the station in the morning peak period (a 155 per cent increase twoway on the without Crossrail scenario). The 2016 with Crossrail flows predicted at the station are about 2800 two-way between 0700 and 1000 hours. The existing station building will provide sufficient capacity for the forecast passengers. However, there may be impacts on the local transport infrastructure in the vicinity of the station. 4.37 There are measures that can be carried out for the benefit of road users and pedestrians that will mitigate the impacts of additional passenger use at the station; these however will require further consents to be obtained before they can be implemented. In line with the approach set out in Volume 8a, an assessment of the impact of Crossrail has been carried out that assumes that such measures are in place. 4.38 Traffic levels are forecast to increase significantly on Forest Drive, north of Whitta Road during the morning peak hour. This would result in a flow of about 860 vehicles two-way, an extra 23 per cent of traffic. Similarly, traffic flows on Station Road are forecast to increase by ten per cent to a flow of about 570 vehicles two-way in the morning peak hour. It is considered that both of these links will continue to operate within highway capacity and the increases will not have any adverse effect on traffic operation. The London Borough of Newham is currently considering introducing controlled parking zones in the vicinity of stations such as Manor Park, which may result in a decrease in the number of car trips made to the station in future, compared to the existing number 4.39 Significant impacts on rail users are forecast at Manor Park. Rail passengers are forecast to experience significant journey time benefits. These are discussed below. Impact on rail journey times 4.40 Table 4.1 sets out representative journey time savings between Manor Park and selected stations during the morning peak period. They are typical of the journey time benefits to many of the stations on Crossrail. Table 4.1 Journey time savings (platform-to-platform) to and from Manor Park station From/to Heathrow Tottenham Court Road From Manor Park To Manor Park Farringdon Without Crossrail 62 26 26 22 With Crossrail 54 18 15 17 Saving (minutes) 8 8 11 5 Canary Wharf Saving (%) 13% 30% 42% 21% Without Crossrail 57 31 22 24 With Crossrail 50 18 15 17 Saving (minutes) 7 13 7 7 Saving (%) 12% 42% 32% 29% NE3 page 5

ROUTE WINDOW NE3 Table 4.2 Route Window NE3 Permanent impacts Potential impact Significance Committed mitigation Station impacts OT5 Traffic levels OT1a OT1a Public transport OT2c Significant increase (+155%) in passenger movements during the peak period: about 1600 more passengers entering the station and about 100 more leaving. Forest Drive, north of Whitta Road, 23 per cent increase in traffic flows to about 860 vehicles twoway in the morning peak hour Station Road, 10 per cent increase in traffic flows to about 570 vehicles twoway in the morning peak hour Improved journey time see journey times table Significant Significant Significant An appropriate package of mitigation measures will be developed in due course to address pedestrian and highway impacts. This package will require further consents to be obtained. Please refer to 4.37. Traffic can be accommodated within current highway capacity Traffic can be accommodated within current highway capacity Residual impact Description N/a N/a N/a Significance Nonsignificant Nonsignificant Nonsignificant Significant N/a N/a Significant NE3 page 6