,, ~ :!! ~ ... a.. ~ C\I. c (1) ca.a. c, CJ. C') c.o. (1) Cl) Cl)

Similar documents
Interstate 90 and Mercer Island Mobility Study APRIL Commissioned by. Prepared by

PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor

Memorandum. Roger Millar, Secretary of Transportation. Date: April 5, Interstate 90 Operations and Mercer Island Mobility

EAST LINK EXTENSION 2017 SEPA Addendum

Study Methods and Assumptions

5.1 Traffic and Transportation

2018 Service Implementation Plan Executive Summary

Treasure Island Supplemental Information Report Addendum

CITY MANAGER S OFFICE CITY OF MERCER ISLAND, WASHINGTON 9611 SE 36 th Street Mercer Island, WA (206)

Arlington County Board Meeting Project Briefing. October 20, 2015

McLean Citizens Association Transportation Committee Project Briefing

Public Information Meetings. October 5, 6, 7, and 15, 2015

MEMORANDUM. Open Section Background. I-66 Open Section Study Area. VDOT Northern Virginia District. I-66 Project Team. Date: November 5, 2015

APPENDIX H MILESTONE 2 TRAFFIC OPERATIONS ANALYSIS OF THE AT-GRADE CROSSINGS

Design Public Hearing

Mercer SCOOT Adaptive Signal Control. Karl Typolt, Transpo Group PSRC RTOC July 6th, 2017

San Mateo County Transportation Authority Board Meeting November 2, 2017 Item #10 1

East Link Project Update. Maintenance of Traffic During Construction. April 21, 2015

10.0 Recommendations Methodology Assumptions

Development of SH119 BRT Route Pattern Alternatives for Tier 2 - Service Level and BRT Route Pattern Alternatives

Traffic Analysis Final Report

1.2 Corridor History and Current Characteristics

CENTRAL AND EAST CORRIDORS

Thanks! Detail by option.

HOV LANE PERFORMANCE MONITORING: 2000 REPORT EXECUTIVE SUMMARY

APPENDIX J MODIFICATIONS PERFORMED TO THE TOR

Activity-Based Model Applications

Director King County Department of Transportation. King County Department of Transportation

DEIS Comments 1. Page iv, Permit or Approval, Federal, Franchise for use ofinterstate Right-of-Way (ROW)

HDR itrans Consulting Inc. 100 York Blvd., Suite 300 Richmond Hill, ON L4B 1J8 Tel: (905) Fax: (905)

Organization Date. Sound Regional Council Regional Project Evaluation Committee. Brian Nielsen, Program Administrator

Washington Dulles International Airport (IAD) Aircraft Noise Contour Map Update

I-405 Express Toll Lanes Coming in 2015

Tolling in Washington State. Craig J. Stone, P.E. Assistant Secretary, Toll Division

Travel Time Estimates

Metro ExpressLanes April 5, 2011 Community Meeting re: Adams Blvd Improvements

Appendix 4.1 J. May 17, 2010 Memorandum from CTPS to the Inter Agency Coordinating Group

MEMORANDUM. Lynn Hayes LSA Associates, Inc.

Union Station Queens Quay Transit Link Study

TABLE OF CONTENTS. Coral Springs Charter High School and Middle School Job No Page 2

The Benefits of a Whittier Blvd. Alignment for the Metro Eastside Extension

Strategies to keep people and goods moving in and through Seattle. SR 99 Closure and the Seattle Squeeze

Highway & Bridge Construction Market Update Southern Region

Rapid Transit From Arbutus Street to UBC. Policy and Strategic Priorities Council Meeting January 30, 2019

Congestion Pricing The Latest Weapon the U.S. War on Traffic Congestion. Darren Henderson, AICP

REPORT TO THE PARKS AND RECREATION COMMISSION rd Avenue NE, Woodinville, WA

I-66 Inside the Beltway Feasibility Study

Part 1 Facility Description, Hours, Access and Occupancy (5) Type [5]

Memorandum. Fund Allocation Fund Programming Policy/Legislation Plan/Study Capital Project Oversight/Delivery Budget/Finance Contract/Agreement Other:

This page intentionally left blank

Texas Transportation Institute The Texas A&M University System College Station, Texas

Transportation Improvement District (TID) Exercise New Castle County Unified Development Code

TransAction Overview. Introduction. Vision. NVTA Jurisdictions

Northwest Corridor LRT Line to Irving/DFW

Silver Line Operating Plan

LUDWIG RD. SUBDIVISION PROJECT TRAFFIC IMPACT ANALYSIS

Published Counts TrafficMetrix

BNA Master Plan Update Community Advisory Committee Meeting No. 5

Sample enumeration model for airport ground access

APPENDIX H Transportation Projects Considered for Cumulative Impact Analysis

Exposition Corridor Transit Project Phase 2

SANTA CLARA COUNTY I-280 CORRIDOR STUDY

95 Express Managed Lanes Consolidated Analysis Technical Report

2014 PERFORMANCE OF HIGH-OCCUPANCY VEHICLE FACILITIES ON FREEWAYS IN THE WASHINGTON REGION

San Mateo 101 Corridor Strategies:

Evaluation of the Cost-Effectiveness of HOV Lanes

GREENBELT-BWI THURGOOD MARSHALL AIRPORT EXPRESS LINE ROUTE B30

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis

Revolutionary Mobility

Planning. Proposed Development at the Southeast Corner of Lakeshore Road West and Brookfield Road Intersection FINAL.

Northwest Corridor LRT Line to Irving/DFW

Selection of a Locally Preferred Alternative for the Interstate 405 Improvement Project Between State Route 55 and Interstate 605.

IMPACT OF NORTH-SOUTH TRAFFIC

Executive Summary. See Figure ES-5 on page 9. Figure ES-6: Typical At-Grade Alignment. Figure ES-7: Typical Underground Alignment

Analysis of Operational Impacts of Continuous Descent Arrivals (CDA) using runwaysimulator

South Bay Metro Green Line Extension

I-95/395 HOV/Bus/HOT Lanes Project Overview

SR 520 Program. The road to the world s longest floating bridge. August 2015

Increasing Short-Term Throughput on the San Francisco-Oakland Bay Bridge

An Orientation to Today s Webinar

Pedestrian Safety Review Spadina Avenue

FINAL TERMINAL TRAFFIC MONITORING STUDY

Research Report Agreement T4118, Task 24 HOV Action Plan HOV ACTION PLAN

TAM Investment Decision Making Asset Management Peer Exchange July 2016

FHWA P/N Guidelines. Corridor Relationship. Highway 22 Segment 1 - US 169 to CSAH 2 Relevance / Documentation of Need

Hampton Roads Express Lane Network

Arlington County Board Work Session Eastbound Widening January 17, Amanda Baxter, VDOT Special Projects Development Manager

Updating the vision for regional transit

7272 WISCONSIN AVENUE LOCAL AREA TRANSPORTATION REVIEW

Assessment of Travel Trends

Building Level Planning Committee March 30, 2016

WATERBORNE TRANSIT. April 21, 2010

DOWNTOWN BRT ALTERNATIVE - 19th AVE

Evaluation of the Effectiveness of High Occupancy Vehicle Lanes

SPADE-2 - Supporting Platform for Airport Decision-making and Efficiency Analysis Phase 2

Los Angeles County Metropolitan Transportation Authority. Metro Rail Gold Line Eastside Extension - Operations

11 December Inverness Airport Outline Business Case

Caliber Charter School VALLEJO, CA

Mount Pleasant (42, 43) and Connecticut Avenue (L1, L2) Lines Service Evaluation Study Open House Welcome! wmata.com/bus

RARE STAND ALONE PAD WITH DRIVE-THRU ACCESSIBILITY ON

Transcription:

a..... C') c.o c,... - C\I "',, c (1) ca.a :!!... CJ (1) Cl) c Cl) :E O> -I

Study Methods and Assumptions Refresher Conditions and years Study area Future forecasts and projects Performance measures DRAFT.ANALYSIS FOR RE"' -

Conditions and Study Years - -- - - I -_(;>nditiol].s! I - Vear. I Existing - l!jltimate N.o Ba..ild I Construction: - - I.. 216 x 22 x x 235 x x Existing & No-Build Conditions Ultimate Condition (235) - Assumes both 1-9 Two-Way Transit and HOV and East Link projects are built and operating - Option 1: Ml vehicles able to use HOV lanes and ICW - Option 2: Ml vehicles restricted from HOV lanes and ICW

Conditions and Study Years East Link Construction - Mid-point of construction (22) - 1-9 Two-Way Transit and HOV Project completed - Operational Scenarios: Ml SOV eligible to use the HOV lanes and ICW Ml SOV restricted from the HOV lanes and ICW HOV lane converted to a general-purpose lane DEAFT ANALYSIS FOR 1 RE\l

1-9 Freeway Study Area i r tea.,.. - - 1-9 Study Area Boundary '"",_ ' I \ r o:.. \ \!,,. ::. -. 1-9 between western terminus and 1-45 Analyzed both AM and PM peak periods DRAFT ANALYSIS FOR RE\l

Iii' SE 27th St.,.,..., co g. g. Mercer Island Study Area 1-9lJ.lll l(si r2'.!l Q 1iE'211!1:ll. l \ '! co -:r.rj.e't",<p... 4'. l tnl-,. :r I<! SE t - ".. ): '..._.,... "' I -1-'. - - 17or.. ' MC :>IL VARA ' w.,. $l'.27msr if '",.... i. ;; I Jc: 11'1 IC; DETAIL.:m1 st:?all\!. ";# r i:: l:l J r IC! :ff"!f.. a- ' f i.. Oi la a II\ I<! "'""- - se'%<41l CJ...,.i. ;... I r;: ' l.l.llnt. IJurtJanlc',...,,. _. ' lb - BEAUMONT Sf.Vin Q."":A ii 11 / ti! i ll.,,,, I,.,.,. I Q.Q :r... J'. tt H... a: I? i i 1.. f e ix I - JR,.; a st'6:r>si; i.\\.. r U3'11hQ" a.. -t' ' i... > '. ' \, I ll1 \ -., 9 R, - r:i 71t'I St ' "' 1:.. I $.i DRAFT ANAlYSIS FOR EEVIE

Future Forecasts and Projects PSRC model - Forecasts for 22 and 235 - Utilize PSRC adopted Land Use Targets forecast Sound Transit model - Bus and light rail ridership forecasts Reasonably foreseeable projects: - Includes Connecting Washington projects - 1-9 Two-Way Transit is completed immediately prior to East Link construction - ST 2 program is complete by 235 - ST 3 is not assumed

Freeway Performance Measures 1-9 freeway measures: - Vehicle and transit demand forecasts - 1-9 congestion diagrams/level of service - Travel times - Vehicle and person throughput VISSIM and Synchro used for analysis results DRAFT ANALYSIS FOR REV.

Existing Results and Calibration Based on 216 data Synchro and VISSIM - Intersection LOS and queues - 1-9 travel times, throughput and congestion diagrams 1-9 Freeway Calibration - FHWA Simulation Guidelines and WSDOT VISSIM Protocols Volumes, Travel Times, Congestion Maps Met both FHWA and WSDOT guidelines and congestion reflects field conditions

Draft 235 Analysis Results Mercer Island 1-9 travel patterns 1-9 congestion maps 1-9 travel times to/from Mercer Island 1-9 vehicle and person throughput

AM Peak Period Travel Patterns To/From Mercer Island Mercer Island to Seattle Etside to Mercer Island - - 3% 29%,,.i e to Island '\. Total Trips To/From Mercer Island Mercer Island to Eastside To Ml 6,5 7,2 From Ml 7,7 8,7 Peak period 6:3AM lo 1 O:OOAM ID RAFT ANAL YS'IS F.OR REVI

PM Peak Period Travel Patterns To/From Mercer Island Mercer Island to Seattle Qi Eside to Mercer Island LEU..Jti& c:a Pl - ""'.t v». -E,,.I... r I'll, "' i Total Trips To/From Mercer Island - Mercer Island to Eastside,, To Ml 8,9 1,6 From Ml 7,6 9, Peak period = 3:3PM to 7:PM DRAFT ANAl!. V.S IS ifgr lrlevi

"' c. ca :E c 1:J c:: :J 1..., _g Cl) No Build Ultimate 1 () DRAFT - For Internal Re11few Only Material has not been ff!lllewed or OPPRJlll!d by any party - c:: bd. l j. Q).. (.) I 1 I -- I -- 1:J c:: :J :9-1 :::c:;j -,... -,......... t. t. -......... LRT LRT 13 DRAFT ANALYSIS FOR REVIEW

C\I.ru ca E a:. (]) -ca E a:. "'O :::J co z.... 1rrrr1rrrrrrr1 ""...... rrrrrr111rrrr1......, w > w a: a: u...: _,_ Cf) Cf) <( z <( tl <( a: JEJJUEJQ punoqise3 sdew uo11sa6uoo l/\ld SEOt!

Ultimate 2: 1-9 Eastbound Congestion Congestion forms between 1-5 and the Mt. Baker tunnel Consider modifying the transition location of the eastbound HOV lane to begin east of Mt. Baker tunnel

"'O C\I! Q) i «J E :;::; 1)1 C\I Q) ro E E :::::> Q) ro E _.:; 32 ::::I al z 11111111111111 :!!!!!!!! lllllflltlllll c c -- _!II.- I w > w a: a: en en <( z <( ti: <( a: punoqjsbm JBJUBQ punoqjse3 <O sdew uonsa6uo WY SEO

tn c. cu :E c... - tn \J c:: :::s Cl) Q) '- C) c (15 :E CL Lt) M N \J (/) No Build............. '"....... l t "9 17 DRAFT ANALYSIS FOR REVIEW Ultimate 1 LRT Ultimate 2 LRT DRAFT- For Internal Review Only Matedal has not been rrvlewed or approved by any party H Ultimate 2 Modified LRT........ HN......

1-9 Travel Times Developed to/from Mercer Island - Includes all on- and off-ramps on Mercer Island - Western 1-9 endpoint is at 4th Avenue (Seattle) - Eastern 1-9 endpoint is at 1-45 (Bellevue) Developing for SOV, HOV and Transit Data shown is only travel time on 1-9 - does not include travel time on Mercer Island streets.. \ \. ',,,...,. '\... '" " lj ' \ I. \ ii l.. \ t

235 AM Peak Period SOV Travel Times: To Mercer Island., From Bellevue (1-45) - To East Mercer Way and Island Crest Way From Seattle (4 1 h Avenue) - To West Mercer Way, 77th Avenue SE, Island Crest Way arid East Mercer Way XIX Ultimate 2 I Ultimate 2 Modified "Ultimate 2 Modified adjusts the beginning of the eastbound HOV lane to east of the Mouftl Baker,T1 DRAFF ANALYSIS F.OF.l REVl

235 AM Peak Period SOV Travel Times: From Mercer Island v.t... <t?' " :ii- s- = ii '41 4 \ "-t, To Bellevue ( 1-45) i Id - From East Mercer Way and Island Crest Way To Seattle (4th Avenue) - From West Mercer Way,?6th Avenue SE, Island Crest Way and East Mercer Way No-Build includes 77th Ave and Island Crest W DRAfrT ANALYSIS,FQH.fREVIE

235 PM Peak Period SOV Travel Times: To Mercer Island H From Bellevue (1-45) - To E. Mercer Way and Island Crest Way From Seattle (4th Avenue) - To W. Mercer Way, 77th Avenue SE, Island Crest Way and E. Mercer Way - No-Build includes 77th Ave and Island Crest Way via centelr XIX.. Ultlmale 2 I Ultimate 2 Modified l>ultlmate 2 ModlHed adjusts lhe beginning of the eastbound HOV lane to east of.the Moun! DMFT ANALYSIS ffof.t REV

235 PM Peak Period SOV Travel Times: From Mercer Island r'!!l Ml%11i!M m11.f!1, - 7. 6. 1.. - 'P:Jll_fllt=... MT (Q : ; fj 1 ' '1 ' M To Bellevue ( 1-45) 13 - From East Mercer Way and Island Crest Way To Seattle (4th Avenue) - From West Mercer Way, 76th Avenue SE, Island Crest Way an f East Mercer Way DRAF;r ANALYSIS.FOAi RE\llE

235 AM Peak Period Vehicle and Person Throughput w Mercf!l tstond " Vehicle 41,1 43,1 42,2 Vehicle 43,9 45,8 45,1 Person 65,9 77,6 n,2 Person 67,8 79,7 79,2 A from NB - 18% 17% A from NB - 18% 17 /o 'Results for Ulllmale 2 Modified *Vehicle and person throughputs include all modes (SOV, HOV, transit, elc.) DRAFT ANALYSIS FOR REVI

235 PM Peak Period Vehicle and Person Throughput Q1 ij:j Floating Bridge i...,. Men::er bland " Vehlcle 41,5 46, 44,3 Vehicle 43,7 5,7 4a,.5 Person 65,9 81,4 8,7 Person 65,4 85,8 84,5 fl from NB 24% 22% fl from NB 31% 29% Results for Ultimate 2 Modified vehicle and person throughputs Include all modes (SOV, HOV, transit, elc.) DRAFT ANALYSIS.F.OH REV.JE