Steve Randall FIHE Technical Manager HW Martin (Traffic Management) Ltd

Similar documents
M2 Junction 5. improvements scheme. Preferred route announcement

NEWSLETTER #04 June 2018

Major Scheme Business Case Summary Report for Programme Entry

M621. Junctions 1 to 7 Improvement scheme. Share your views

Queen s Circus Roundabout

Blackburn Road Blackburn Level Crossing Removal. Frequently Asked Questions August 2014 GENERAL

The resignalling scheme

SOUTH GLOS COUNCIL UPDATE FOR SUSCOM - JANUARY 2016

A120 BRAINTREE TO A12 Consultation on Route Options. 17 January 14 March 2017

Today we are showing you the early designs to improve the A27 at Arundel and we would like to hear your views on our options.

A63 Castle Street, Hull HullBID Network Lunch 24 August 2017

A303. Sparkford to Ilchester Dualling Scheme Preferred Route Announcement

Joint Transportation Board

A140 study and Major Road Network

Statement of Community Consultation. Trans Pennine Upgrade: Statement of Community Consultation (SoCC)

Response to the London Heathrow Airport Expansion Public Consultation

A303 Stonehenge Amesbury to Berwick Down

Sky Temporary Car Park Transport Statement

A31 Ringwood improvement scheme

Smart Motorways Programme

N4 Carrick-on-Shannon to Dromod Road Project. 2.1 Introduction

As at 1 May Sponsoring Authority. Halton Borough Council. Halton Borough Council. Halton Borough Council. Halton Borough Council

Report on the Crafthole Traffic Light Project 3 rd July th September 2017

Our ref: FRC/REC/Nov Steve Farrell Clerk to the Rural Economy and Connectivity Committee The Scottish Parliament.

March 4, Mr. H. Dale Hemmerdinger Chairman Metropolitan Transportation Authority 347 Madison Avenue New York, NY Re: Report 2007-F-31

4 Are you responding on your own behalf or on behalf of an organisation or group?

ACORNS PROJECTS LIMITED

A47 Business Case. Gateway to Growth ALLIANCE

RIVERSIDE BUSINESS PARK / NOTTINGHAM / NG2 1AR. Last suite available 884 m² (9,515 ft²) with 33 car parking spaces TO LET

EXPLANATORY STATEMENT

THE MARLOWE: RISK ASSESSMENT

Railroad Safety in the United States. Ian Savage

The Traffic Management Act (TMA) 2004 and roadworks; and lane rental under the New Roads and Streetworks Act (1991) in England

Report to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub

CASTLE POINT LOCAL HIGHWAYS PANEL MINUTES AND ACTIONS

Birmingham Connected Briefing October Joe Green Transportation Behaviour Change Manager, Economy, Birmingham City Council

Bespoke occupier solutions up to 2 million sq ft for sale/to let

BARROW GURNEY PARISH COUNCIL

In your area. South Kirkby to Sharlston Common LA14. June Introduction

In your area. Stonebroom to Clay Cross LA09. June Introduction

The Point Roundabout Improvement Scheme

SUSTAINABLE DEVELOPMENT PLAN 2015

East Midlands Fire and Rescue Control Centre

ASLEF s Response to the East Anglia Rail Franchise Consultation

TO LET. Headquarters Offices, Equinox, Island Business Quarter, City Link, Nottingham, SUMMARY

Traffic calming on major roads: a traffic calming scheme at Costessey, Norfolk

EASTPOINT A L E S I D E R O A D N O T T I N G H A M N G2 3G G

A TRANSPORT SYSTEM CONNECTING PEOPLE TO PLACES

Update on the Thameslink programme

Bid Manager Name and position: Mark Speed Transport and Infrastructure Planning Team Manager

Economic Development Sub- Committee

Wellington $312 $49 $456 OVERVIEW WELLINGTON REGIONAL SUMMARY

July 2016 Employment and Skills Briefing

Public consultation exhibition

Appendix 9 Melbourn Greenway Review

A30 Chiverton to Carland Cross Improvement Scheme Preferred route announcement

CONGESTION MONITORING THE NEW ZEALAND EXPERIENCE. By Mike Curran, Manager Strategic Policy, Transit New Zealand

In your area. Stourton to Hunslet LA17. June Introduction. High Speed Two (HS2) is

SUSTAINABLE DEVELOPMENT PLAN 2015

Facilitating your future

February 2016 Employment and Skills Briefing

Wales. Andy Thomas. Route Managing Director Wales. Ken Skates, Cabinet Secretary for Economy and Infrastructure, Welsh Government

Bus Passenger Survey

Traffic Calming and Road Safety Provision Options Woore Village

Welcome. Great Yarmouth Third River Crossing. Norfolk County Council

1. To inform members of the views of the West of England Joint Scrutiny Committee (JSC) following a meeting held on Wednesday 5 th March 2014

Unlocking our Coastal Heritage Strand 2 - Watermouth Bay, nr Ilfracombe

South East Traffic Solution

EAST WEST RAIL EASTERN SECTION. prospectus for growth

Partnership railway s transformation in numbers

Proposals for the Harrogate Road / New Line Junction Improvement Scheme. August / September Supported by:

Pelham Architects. Architecture Procurement Sustainability. 12/14 Pelham Road, Sherwood Rise, Nottingham NG5 1AP

CHALLENGES IN DELIVERING SAFER ROADS IN ENGLISH LOCAL AUTHORITIES

Appendix 8 Sawston Greenway Review

Proposed M9 Spur Extension. Kirkliston

BLACKWELL PARISH COUNCIL

Commissioning Director - Environment

SHAPING REGIONAL INFRASTRUCTURE

07/08 08/09 09/10 Total Carisbrooke Rest of Newport

Cabinet. South Western Railway Timetable Consultation Response. Date of Meeting 6 December 2017

Tourism Business Monitor Accommodation Report. Wave 2 Post-Easter holidays

Annex 1 Revised TEE, AMCB and Public Accounts Tables Print Version

WELCOME WELCOME TO OUR PUBLIC EXHIBITION FOR THE BOND STREET PUBLIC REALM PROJECT.

I hope to plant a tree with my three small granddaughters in the next month or so, at Hutton Buscel to mark my year as Chairman of NYCC.

Northern Beaches Transport Action Plan

UNLOCKING THE BRIGHTON MAINLINE

Minutes of the Meeting of Shirwell Parish Council held on the 12 th October 2017 in the Village Hall

Oxfordshire Local Enterprise Partnership

All persons have a duty to do all they can to avoid harm to themselves or others.

Roundhouse Way Transport Interchange (Part of NATS City Centre Package)

Lichfield Road/Aston Hall Road, Junction of, Aston, Birmingham

DULLES AREA HIGHLIGHTS. Gary Garczynski Commonwealth Transportation Board Northern Virginia District. Committee for Dulles August 4, 2016

Projects overview 2018

Inside Government Conference Case Study: Norwich Northern Distributor Road

Barton in Fabis Parish Council

Strategic Transport Forum

London Bridge station opens upgrade works

High Speed UK. Regional Mapping covering the East and West Midlands

MANOR ROYAL MATTERS #ManorRoyalMatters

Construction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013

Transcription:

Steve Randall FIHE Technical Manager HW Martin (Traffic Management) Ltd

A453 Widening M1 Junction 24 to A52 Nottingham

Project Details

Project Details Widen 11.5km of existing single carriageway

Project Details Widen 11.5km of existing single carriageway 7.5km to D2 standard between Mill Hill and the M1 Junction 24 Known as the Rural Section

Project Details Widen 11.5km of existing single carriageway 7.5km to D2 standard between Mill Hill and the M1 Junction 24 Known as the Rural Section 3km to S4 standard between Mill Hill and Farnborough Road Junction, Clifton Known as the Urban Section

Project Details Rural Section Construction of 2 new grade separated junctions

Project Details Rural Section Construction of 2 new grade separated junctions Construction of a new bridge over the East Midlands Mainline Railway

Project Details Rural Section Construction of 2 new grade separated junctions Construction of a new bridge over the East Midlands Mainline Railway Construction of a new bridge over a canal at Cedar Isle

Project Details Rural Section Construction of 2 new grade separated junctions Construction of a new bridge over the East Midlands Mainline Railway Construction of a new bridge over a canal at Cedar Isle Construction of a new bridge over the River Soar and the Soar Floodspans

Project Details Rural Section Modification of 3 existing structures

Project Details Rural Section Modification of 3 existing structures Construction of new underpass

Project Details Rural Section Modification of 3 existing structures Construction of new underpass Construction of 5 new wildlife underpasses

Project Details Rural Section Modification of 3 existing structures Construction of new underpass Construction of 5 new wildlife underpasses Construction of new roundabout at Mill Hill (Clifton Park and Ride)

Project Details Rural Section Modification of 3 existing structures Construction of new underpass Construction of 5 new wildlife underpasses Construction of new roundabout at Mill Hill (Clifton Park and Ride) Construction of 2 new flood compensation area s

Project Details Urban Section Construction of 11 new signalised pedestrian crossings

Project Details Urban Section Construction of 11 new signalised pedestrian crossings Construction of 6 new bus stops

Project Details Urban Section Construction of 11 new signalised pedestrian crossings Construction of 6 new bus stops Signalisation of 2 existing roundabouts at Crusader and Green Lane

Project Details Urban Section Construction of 11 new signalised pedestrian crossings Construction of 6 new bus stops Signalisation of 2 existing roundabouts at Crusader and Green Lane Construction of new roundabout at Farnborough Road junction

Project Details Construction duration of 2 ½ years

Project Details Construction duration of 2 ½ years Cost 150 million

Project Details Construction duration of 2 ½ years Cost 150 million Client Highways England

Project Details Construction duration of 2 ½ years Cost 150 million Client Highways England Principal Contractor Laing O Rourke

Project Details Construction duration of 2 ½ years Cost 150 million Client Highways England Principal Contractor Laing O Rourke Designer White Young Green

Key Stakeholders Nottingham City Council (Urban Section)

Key Stakeholders Nottingham City Council (Urban Section) Nottinghamshire County Council (Rural Section) Leicestershire County Council (Rural Section)

Key Stakeholders Nottingham City Council (Urban Section) Nottinghamshire County Council (Rural Section) Leicestershire County Council (Rural Section) Nottinghamshire Casualty Reduction Partnership

Key Stakeholders East Midlands Airport

Key Stakeholders East Midlands Airport Network Rail

Key Stakeholders East Midlands Airport Network Rail E.on Ratcliffe on Soar Power Station

Key Stakeholders East Midlands Airport Network Rail E.on Ratcliffe on Soar Power Station Nottingham Trent University Clifton Campus

The reason for Widening

The reason for widening A453 one of the most heavily congested roads in the East Midlands at peak times

The reason for widening A453 one of the most heavily congested roads in the East Midlands at peak times A453 is of strategic importance, linking Nottingham with the M1, East Midlands Airport, East Midlands Parkway railway station and Clifton NET park and ride

The reason for widening A453 one of the most heavily congested roads in the East Midlands at peak times A453 is of strategic importance, linking Nottingham with the M1, East Midlands Airport, East Midlands Parkway railway station and Clifton NET park and ride Very poor safety record

Between 2005 and 2011 there were 209 incidents on the A453 involving injuries

Between 2005 and 2011 there were 209 Incidents on the A453 involving injuries 495 vehicles involved

Between 2005 and 2011 there were 209 Incidents on the A453 involving injuries 495 vehicles involved 255 people who received a minor injury

Between 2005 and 2011 there were 209 Incidents on the A453 involving injuries 495 vehicles involved 255 people who received a minor injury 80 people who received a major injury

Between 2005 and 2011 there were 209 Incidents on the A453 involving injuries 495 vehicles involved 255 people who received a minor injury 80 people who received a major injury 6 people who died Source: Crashmap.co.uk

Long Lane Plant Crossing and Pedestrian Crossing

Long Lane Plant Crossing and Pedestrian Crossing

Long Lane Plant Crossing and Pedestrian Crossing

Bi-directional running

Bi-directional running

Bi-directional running

Farnborough Road Junction

Farnborough Road Junction

Farnborough Road Junction

29 th January 2014 - RTC at Parkway Junction involving 2 vehicles, driver went through red light from Power Station and collided with another vehicle coming through the junction. One person treated at the scene and taken to hospital.

Safety 6 th October 2014 Fatal accident at junction of A453 and Manor Road, Barton in Fabis

The TM Designer and the Road Safety Auditor the four stages

The TM Designer and the Road Safety Auditor Lack of trust

The TM Designer and the Road Safety Auditor Lack of trust Personal

The TM Designer and the Road Safety Auditor Lack of trust Personal What does the Auditor know about TM?

The TM Designer and the Road Safety Auditor Lack of trust Personal What does the Auditor know about TM? Stubborn

Pre-Audit Site Inspection

Pre-Audit Site Inspection Allows the Road Safety Audit team to identify potential area s of concern before the road is opened to the public

Pre-Audit Site Inspection Allows the Road Safety Audit team to identify potential area s of concern before the road is opened to the public Allows the contractor to make any changes whilst the section of road is still closed to traffic

The Stage 3 Road Safety Audit

The Stage 3 Road Safety Audit TM Designer accompanies RSA team during the audit

The Stage 3 Road Safety Audit TM Designer accompanies RSA team during the audit Explains how the traffic management system works

The Stage 3 Road Safety Audit TM Designer accompanies RSA team during the audit Explains how the traffic management system works TM designer understands where the problems are and can discuss with the RSA team what measures need to be implemented to resolve those problems

Highways England Raising the Bar

Highways England Raising the Bar To reduce the likelihood of accidents and injuries to both the workforce and travelling public

Highways England Raising the Bar To reduce the likelihood of accidents and injuries to both the workforce and travelling public Share best practice

Highways England Raising the Bar To reduce the likelihood of accidents and injuries to both the workforce and travelling public Share best practice Continual improvement

Raising the Bar Vehicle Incursions Vehicle Incursions are now accepted as one of the top 5 fatal risks for road workers

Raising the Bar Vehicle Incursions Vehicle Incursions are now accepted as one of the top 5 fatal risks for road workers Dozens of Vehicle Incursions are reported every single day

Raising the Bar Vehicle Incursions The RtB aims to reduce or eliminate Vehicle Incursions using a four step approach

Raising the Bar Vehicle Incursions Assess

Raising the Bar Vehicle Incursions Assess Address

Raising the Bar Vehicle Incursions Assess Address Implement

Raising the Bar Vehicle Incursions Assess Address Implement Monitor

Raising the Bar Vehicle Incursions Assess Address Implement Monitor

Raising the Bar Vehicle Incursions