SDM WORKSHOP ON PBN (19/10/2017)

Similar documents
Strategic Plan

EUROMED GNSS II Achievements and expectations. Presented By: M. Akram HYDRI Head of Air Traffic Studies and Planning Division OACA

RNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood.

APAC PBN UPDATE Slide 1 of xx

Contextual note SESAR Solution description form for deployment planning

Status of PBN implementation in France

NAM/CAR Regional Safety/Air Navigation/Aviation Security Implementation Matters 5.2 Effectiveness of air navigation implementation mechanisms

DSNA NAVIGATION STRATEGY

European Aviation Safety Agency

GETTING EXPERIENCE IN PBN PROCEDURES DESIGN. GENERAL OVERVIEW OF INECO ACTIVITIES AROUND THE WORLD

Implementation of PBN in Armenian airspace

IATA User Requirements for Air Traffic Services (URATS) NAVIGATION. MIDANPIRG PBN SG/3 Meeting Cairo, Egypt, February 2018

GNSS/EGNOS services and applications in civil aviation

(RN R A N V A V & & RN R P N

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES

GNSS/EGNOS services and applications in civil aviation

Performance Based Navigation Implementation of Procedures

Open Questions & Collecting Lessons Learned

PBN Syllabus Aeroplane. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

PBN Syllabus Helicopter. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

E GNSS in Aviation: status and trends, aviation grants Workshop Deployment of Galileo and EGNOS in Portugal

Controller Training Case Study Implementation of new RNP AR APCH for RWY07 (North Circuit) at HKIA

ICAO framework for LPV

PBN Performance. Based Navigation. Days 1, 2 & 3. ICAO PBN Seminar Seminar Case Studies Days 1,2,3. Seminar Case Studies

AIM and PBN Airport Community Benefits. IAAE Saskatoon, May 2013

NEW FPL Transition Phase & Implementation Stages

Performance Based Navigation Operational End-State 2023

Learning Objectives. By the end of this presentation you should understand:

Saint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis

Evolving and improving landing networks with EGNOS

NEW CALEDONIA PBN PLAN

APV IMPLEMENTATION PLAN

Russian Federation ATM modernization program

UK Implementation of PBN

EGNOS based Operations Implementation Status and Plans for EGNOS Service Provision Workshop Copenhagen 29 th -30 th September 2015

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN

TWELFTH AIR NAVIGATION CONFERENCE

PLAN. 1. Generalities 2. Current Situation 3. Future Strategy + Actions required 4. Conclusion. Ministry of transport 2013

Título ponencia: Introduction to the PBN concept

UK Performance-based Navigation (PBN) Implementation Status

USE AND APPLICATION OF GNSS IN THE IMPLEMENTATION OF NAVIGATION BASED ON PERFORMANCE IN ECUADOR

French DSNA approach to CNS rationalization & evolution


International Civil Aviation Organization. The Eighth Meeting of the Performance Based Navigation Task Force (PBN TF/8)

Navigation at the. Federal Aviation Administration Crossroads

The support of an European ANSP

Patrizio Vanni (Project Coordinator)

Nav Specs and Procedure Design Module 12 Activities 8 and 10. European Airspace Concept Workshops for PBN Implementation

PBN Operational Approval Continental En Route Navigation Specifications

SBAS-ASECNA Programme Status

PBN, ADQ, ADQ2 IR EUROCONTROL Activities Status

EASA RNP (AR) Workshop The Landscape Working Together

EUROCONTROL approach to the execution of the PBN IR Mandate

ORGANISER HOST LEAD SPONSOR

New generation aircraft in the instrument approach domain. Jean-Christophe Lair Airbus Test pilot 1 st Feb. 2017

Performance Based Navigation Implementation Plan Revised 2017 New Zealand

Promoting EGNSS Operational Adoption in BLUEMED FAB CYPRUS

Implementation challenges for Flight Procedures

Performance Based Navigation Implementation in Thailand

ATNS. Performance Based Navigation Roadmap SOUTH AFRICA

IATA EUR Airline PBN implementation requirements - March State Airport TMA/Runways Specifics. Austria VIE PRNAV SIDs/STARs

GNSS/EGNOS services and applications in civil aviation

EUROCAE Symposium & 54 th General Assembly. London, April 2017

Bangkok, Thailand, July State PBN Plan and Status of PBN Implementation THAILAND PBN IMPLEMENTATION PLAN. (Presented by Thailand)

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez

PBN Implementation inside Italian Airspace Status update Summer 2013

TERPS vs PANS-Ops Procedure Design and Operational Differences

DSNA Navigation Strategy. Benoit Roturier (DSNA)

AUSTRALIA AERONAUTICAL INFORMATION SERVICE AIRSERVICES AUSTRALIA GPO BOX 367 CANBERRA ACT 2601 CESSATION OF NAVIGATION APPROVALS UNDER CAO 20.

THIS INFORMATION IS EMBRAER PROPERTY AND CANNOT BE USED OR REPRODUCED WITHOUT WRITTEN AUTORIZATION.

TABLE OF CONTENTS 1.0 INTRODUCTION...

ICAO Regional Seminar on Performance - Based Navigation (PBN) Nairobi, Developments and Benefits. 4 December 2008.

SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT

SOUTH AFRICA. Performance Based Navigation (PBN) Roadmap

Aircraft Systems and 4D Trajectory Management

34 th Airline/ATS Safety Forum

SBAS as a solution for safe approaches in New Zealand and Australia

A Pilot s perspective

Effective: PERFORMANCE-BASED NAVIGATION (PBN) IN AUSTRALIA

Performance Framework for MID Region Air Navigation Planning and Implementation MEAUSE SURVEYS. (Presented by IATA and CANSO) SUMMARY

ESSP EGNOS Service Provider. ICAO APV Workshop (26/05/2011)

E-GNSS systems for GA

EXPLANATION OF TPP TERMS AND SYMBOLS

ICAO PBN GO TEAM PBN Implementation Workshop ENAC / ATM

LPV implementation to non-instrument runways

easyjet, EGNOS and LPV EGNOS Workshop, Athens, 3rd October 2017

GNSS AVIATION APPLICATIONS AND PROGRAMMES IN MADAGASCAR

ENAV experience on LPV implementation

Performance Based Navigation (PBN) Implementation Plan Republic of Mauritius

PBN and Procedure Design training

JOINT ICAO EUR PERFORMANCE BASED TASK FORCE & EUROCONTROL RAISG MEETING

Overview of Continental En-route Navigation Specifications RNAV 5, RNAV 2 and RNAV 1

Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation

Appendix 2 List of regulatory references. Appendix 3 List of reference documents. Appendix 4 Background information

APPLICATION FOR RNP APPROACH OPERATIONAL APPROVAL OR RENEWAL

Presentation of the First Deputy Director, Scientific and Research Institute of Airnavigation

Approach Specifications

Home LIST OF ACRONYMS

Special Africa-Indian Ocean Regional Air Navigation Meeting (Durban, South Africa 24 to 29 November 2008) FOLLOW-UP ON ATM RECOMMENDATIONS

First LPV 200 approach in Europe. Paris Charles de Gaulle. Benoit Roturier DSNA ESSP Workshop Warsaw Direction Générale de l Aviation Civile

Transcription:

SDM WORKSHOP ON PBN (19/10/2017) Experience from real implementations GNSS Department

25/10/2017 Agenda PBN Implementation Plan in Spain PCP Implementation Status RNP APCH Palma de Mallorca RNP APCH Barcelona and Madrid

25/10/2017 Agenda PBN Implementation Plan in Spain PCP Implementation Status RNP APCH Palma de Mallorca RNP APCH Barcelona and Madrid

PBN in Spain Why PBN? Performance-based navigation (PBN) is, rightly, the highest air navigation priority of the International Civil Aviation Organization 2030: CANSO: Performance-Based Navigation for ANSPs: Concept 3

PBN Implementation Plan in Spain Inputs PCP PBN IR National PBN Regulatory Framework PBN Implementation Plan Users 4

PCP PBN IR PBN Implementation Plan in Spain National PBN Regulatory Framework National PBN Regulatory Framework PBN Implementation Plan Users 2011 -> GPS accepted for use in Spanish Airspace. February 2014 -> National PBN Regulatory Framework. 2009 -> Creation of PBN Working Group DGAC AESA ENAIRE Users. 5

PCP PBN IR PBN Implementation Plan in Spain National PBN Regulatory Framework National PBN Regulatory Framework PBN Implementation Plan Users 6

PCP PBN IR PBN Implementation Plan in Spain Pilot Common Project 716/2014, June 2014 National PBN Regulatory Framework PBN Implementation Plan Users Flight phase PBN specification Scenarios Support system Date TMA RNP1 with RF (optional?) High density TMAs (Madrid, Barcelona, Palma) GPS 1/1/2024 Approach RNP APCH (LNAV/VNAV and LPV) High density TMAs (Madrid, Barcelona, Palma) GPS+BaroVNAV / GPS+SBAS 1/1/2024 7

PBN Implementation Plan in Spain PBN IR draft National PBN Regulatory Framework ENAIRE contribution to AMC/GM text channeled through CANSO PCP PBN Implementation Plan PBN IR Users Flight phase PBN specification Scenarios Support system Date En-route RNAV5 Routes connecting SID/STAR VOR / DME / GPS / INS 3/12/2020 TMA RNAV1 / RNP1 SID/STAR GPS and DME-DME (only RNAV1) 25/1/2024 (at least one SID/STAR per airport) 1/6/2030 (full, no- PBN only for contingency) 8

PBN Implementation Plan in Spain PBN IR draft National PBN Regulatory Framework ENAIRE contribution to AMC/GM text channeled through CANSO PCP PBN Implementation Plan PBN IR Users Flight phase PBN specification Scenarios Support system Date RNP APCH (LNAV/ VNAV and LPV/ SBAS CAT I) All IRE in airports with no PA in none of the runways GPS / GPS+BaroVNAV / GPS+SBAS 3/12/2020 Approach RNP APCH (LNAV/ VNAV and LPV/ SBAS CAT I) RNP APCH (LNAV/VNAV only) All IRE in airports with at least one PA All IRE out of SBAS coverage (18 months to implement LPV if coverage achieved) GPS / GPS+BaroVNAV / GPS+SBAS GPS+BaroVNAV 25/1/2024 3/12/2020 (no PA) 25/1/2024 (PA) LNAV (mandatory) RNP AR APCH (optional) Where limiting terrain, obstacles or air traffic separation conditions exist GPS / GPS+BaroVNAV 3/12/2020 (no PA) 25/1/2024 (PA) 9

PCP PBN IR PBN Implementation Plan in Spain Users National PBN Regulatory Framework PBN Implementation Plan Users IATA ACETA Members of PBN WG Scenarios prioritization 10

PCP PBN IR PBN Implementation Plan in Spain National Implementation Plan National PBN Regulatory Framework PBN Implementation Plan Users Flight phase PBN specification Situation Date En-route RNAV/RNP10 RNAV5 RNAV/RNP10 available in oceanic routes RNAV5 available in FL150 and above December 2020 TMA RNAV1/RNP1 RNP1 in high density TMAs (ongoing) RNAV1 available in several TMAs January 2024 RNP APCH [LNAV, LNAV/VNAV and LPV (APV)] Santander and Almería available December 2020 (no PA) January 2024 Approach RNP AR APCH Ongoing: A Coruña, Lanzarote December 2020 (no PA) January 2024 RNP APCH [LPV (SBAS CAT-I)] Asturias foreseen mid 2018 December 2020 (no PA) January 2024 11

25/10/2017 Agenda PBN Implementation Plan in Spain PCP Implementation Status RNP APCH Palma de Mallorca RNP APCH Barcelona and Madrid

PCP Implementation Status RNP1 Plan Scenario WEF State Notes Palma TMA Phase 1: SID/STAR RNAV1 Ibiza Phase 2: SID/STAR RNAV1 rest of the TMA Phase 3: RNAV1 to RNAV1/RNP1 Barcelona TMA Phase1: SID/STAR RNAV1 Barcelona Phase2: Rest of the TMA Phase3: RNAV1 to RNAV1/RNP1 Phase 1 WEF: June 2017 Phase 2 WEF: Q3 2019 Phase 3 WEF: (E) Q3 2021 Phase 1 WEF: Summer 18 Phase 2 WEF: (E) Q3 2020 Phase 3 WEF: (E) Q1 2021 PCP end date: 01/01/2024 PCP end date: 01/01/2024 Madrid TMA RNAV1 to RNP1 (E) Q3 2023 PCP end date: 01/01/2024 13

PCP Implementation Status RNP APCH Plan Airport WEF Status Notes Palma January 2018 Last step: AESA approval PCP end date: 01/01/2024 3 runway-ends (06R dismissed for environmental reasons) Barcelona (E) Q1 2019 Ongoing PCP end date: 01/01/2024 4 runway-ends Madrid (E) Q4 2019 Planned PCP end date: 01/01/2024 4 runway-ends 14

25/10/2017 Agenda PBN Implementation Plan in Spain PCP Implementation Status RNP APCH Palma de Mallorca RNP APCH Barcelona and Madrid

RNP APCH Palma de Mallorca IP #061 16

RNP APCH Palma de Mallorca PBN Implementation Process in Spain 12-18 months 17

RNP APCH Palma de Mallorca PBN Implementation Process in Spain 12-18 months Implementation processes with many external organizations (AESA, MAPAMA, CIDEFO) and internal units involved (airspace design, satellite navigation, flight validation, safety, environment, ATC training and AIS). 4 main points in the project that require external approval: design, environment, safety and ATC training. Other risks: VSS penetration (terrain). 18

RNP APCH Palma de Mallorca IP #061 LEPA RNAV (GNSS) Z RWY06L (LPV) LEPA RNAV (GNSS) Z RWY24L (LPV) LEPA RNAV (GNSS) Y RWY24L (LNAV, LNAV/VNAV) LEPA RNAV (GNSS) Z RWY24R (LPV) LEPA RNAV (GNSS) Y RWY24R (LNAV, LNAV/VNAV) WEF: 4/1/18 19

RNP APCH Palma de Mallorca Particularities Environment: RWY 06R. VSS infringement 06L. Use in parallel runways. 20

25/10/2017 Agenda PBN Implementation Plan in Spain PCP Implementation Status RNP APCH Palma de Mallorca RNP APCH Barcelona and Madrid

RNP APCH Barcelona and Madrid IP 2015_215 - Status RNP APCH Barcelona starting now, developing PMP and initial feasibility study. Airport WEF Status Notes Barcelona (E) Q1 2019 Ongoing PCP end date: 01/01/2024 4 runway-ends Madrid (E) Q4 2019 Planned PCP end date: 01/01/2024 4 runway-ends 22

Gracias Thank you Merci Ana Bodero - abodero@