SDM WORKSHOP ON PBN (19/10/2017) Experience from real implementations GNSS Department
25/10/2017 Agenda PBN Implementation Plan in Spain PCP Implementation Status RNP APCH Palma de Mallorca RNP APCH Barcelona and Madrid
25/10/2017 Agenda PBN Implementation Plan in Spain PCP Implementation Status RNP APCH Palma de Mallorca RNP APCH Barcelona and Madrid
PBN in Spain Why PBN? Performance-based navigation (PBN) is, rightly, the highest air navigation priority of the International Civil Aviation Organization 2030: CANSO: Performance-Based Navigation for ANSPs: Concept 3
PBN Implementation Plan in Spain Inputs PCP PBN IR National PBN Regulatory Framework PBN Implementation Plan Users 4
PCP PBN IR PBN Implementation Plan in Spain National PBN Regulatory Framework National PBN Regulatory Framework PBN Implementation Plan Users 2011 -> GPS accepted for use in Spanish Airspace. February 2014 -> National PBN Regulatory Framework. 2009 -> Creation of PBN Working Group DGAC AESA ENAIRE Users. 5
PCP PBN IR PBN Implementation Plan in Spain National PBN Regulatory Framework National PBN Regulatory Framework PBN Implementation Plan Users 6
PCP PBN IR PBN Implementation Plan in Spain Pilot Common Project 716/2014, June 2014 National PBN Regulatory Framework PBN Implementation Plan Users Flight phase PBN specification Scenarios Support system Date TMA RNP1 with RF (optional?) High density TMAs (Madrid, Barcelona, Palma) GPS 1/1/2024 Approach RNP APCH (LNAV/VNAV and LPV) High density TMAs (Madrid, Barcelona, Palma) GPS+BaroVNAV / GPS+SBAS 1/1/2024 7
PBN Implementation Plan in Spain PBN IR draft National PBN Regulatory Framework ENAIRE contribution to AMC/GM text channeled through CANSO PCP PBN Implementation Plan PBN IR Users Flight phase PBN specification Scenarios Support system Date En-route RNAV5 Routes connecting SID/STAR VOR / DME / GPS / INS 3/12/2020 TMA RNAV1 / RNP1 SID/STAR GPS and DME-DME (only RNAV1) 25/1/2024 (at least one SID/STAR per airport) 1/6/2030 (full, no- PBN only for contingency) 8
PBN Implementation Plan in Spain PBN IR draft National PBN Regulatory Framework ENAIRE contribution to AMC/GM text channeled through CANSO PCP PBN Implementation Plan PBN IR Users Flight phase PBN specification Scenarios Support system Date RNP APCH (LNAV/ VNAV and LPV/ SBAS CAT I) All IRE in airports with no PA in none of the runways GPS / GPS+BaroVNAV / GPS+SBAS 3/12/2020 Approach RNP APCH (LNAV/ VNAV and LPV/ SBAS CAT I) RNP APCH (LNAV/VNAV only) All IRE in airports with at least one PA All IRE out of SBAS coverage (18 months to implement LPV if coverage achieved) GPS / GPS+BaroVNAV / GPS+SBAS GPS+BaroVNAV 25/1/2024 3/12/2020 (no PA) 25/1/2024 (PA) LNAV (mandatory) RNP AR APCH (optional) Where limiting terrain, obstacles or air traffic separation conditions exist GPS / GPS+BaroVNAV 3/12/2020 (no PA) 25/1/2024 (PA) 9
PCP PBN IR PBN Implementation Plan in Spain Users National PBN Regulatory Framework PBN Implementation Plan Users IATA ACETA Members of PBN WG Scenarios prioritization 10
PCP PBN IR PBN Implementation Plan in Spain National Implementation Plan National PBN Regulatory Framework PBN Implementation Plan Users Flight phase PBN specification Situation Date En-route RNAV/RNP10 RNAV5 RNAV/RNP10 available in oceanic routes RNAV5 available in FL150 and above December 2020 TMA RNAV1/RNP1 RNP1 in high density TMAs (ongoing) RNAV1 available in several TMAs January 2024 RNP APCH [LNAV, LNAV/VNAV and LPV (APV)] Santander and Almería available December 2020 (no PA) January 2024 Approach RNP AR APCH Ongoing: A Coruña, Lanzarote December 2020 (no PA) January 2024 RNP APCH [LPV (SBAS CAT-I)] Asturias foreseen mid 2018 December 2020 (no PA) January 2024 11
25/10/2017 Agenda PBN Implementation Plan in Spain PCP Implementation Status RNP APCH Palma de Mallorca RNP APCH Barcelona and Madrid
PCP Implementation Status RNP1 Plan Scenario WEF State Notes Palma TMA Phase 1: SID/STAR RNAV1 Ibiza Phase 2: SID/STAR RNAV1 rest of the TMA Phase 3: RNAV1 to RNAV1/RNP1 Barcelona TMA Phase1: SID/STAR RNAV1 Barcelona Phase2: Rest of the TMA Phase3: RNAV1 to RNAV1/RNP1 Phase 1 WEF: June 2017 Phase 2 WEF: Q3 2019 Phase 3 WEF: (E) Q3 2021 Phase 1 WEF: Summer 18 Phase 2 WEF: (E) Q3 2020 Phase 3 WEF: (E) Q1 2021 PCP end date: 01/01/2024 PCP end date: 01/01/2024 Madrid TMA RNAV1 to RNP1 (E) Q3 2023 PCP end date: 01/01/2024 13
PCP Implementation Status RNP APCH Plan Airport WEF Status Notes Palma January 2018 Last step: AESA approval PCP end date: 01/01/2024 3 runway-ends (06R dismissed for environmental reasons) Barcelona (E) Q1 2019 Ongoing PCP end date: 01/01/2024 4 runway-ends Madrid (E) Q4 2019 Planned PCP end date: 01/01/2024 4 runway-ends 14
25/10/2017 Agenda PBN Implementation Plan in Spain PCP Implementation Status RNP APCH Palma de Mallorca RNP APCH Barcelona and Madrid
RNP APCH Palma de Mallorca IP #061 16
RNP APCH Palma de Mallorca PBN Implementation Process in Spain 12-18 months 17
RNP APCH Palma de Mallorca PBN Implementation Process in Spain 12-18 months Implementation processes with many external organizations (AESA, MAPAMA, CIDEFO) and internal units involved (airspace design, satellite navigation, flight validation, safety, environment, ATC training and AIS). 4 main points in the project that require external approval: design, environment, safety and ATC training. Other risks: VSS penetration (terrain). 18
RNP APCH Palma de Mallorca IP #061 LEPA RNAV (GNSS) Z RWY06L (LPV) LEPA RNAV (GNSS) Z RWY24L (LPV) LEPA RNAV (GNSS) Y RWY24L (LNAV, LNAV/VNAV) LEPA RNAV (GNSS) Z RWY24R (LPV) LEPA RNAV (GNSS) Y RWY24R (LNAV, LNAV/VNAV) WEF: 4/1/18 19
RNP APCH Palma de Mallorca Particularities Environment: RWY 06R. VSS infringement 06L. Use in parallel runways. 20
25/10/2017 Agenda PBN Implementation Plan in Spain PCP Implementation Status RNP APCH Palma de Mallorca RNP APCH Barcelona and Madrid
RNP APCH Barcelona and Madrid IP 2015_215 - Status RNP APCH Barcelona starting now, developing PMP and initial feasibility study. Airport WEF Status Notes Barcelona (E) Q1 2019 Ongoing PCP end date: 01/01/2024 4 runway-ends Madrid (E) Q4 2019 Planned PCP end date: 01/01/2024 4 runway-ends 22
Gracias Thank you Merci Ana Bodero - abodero@