Port Feeder Barge: Floating Infrastructure for African Ports. 2 nd German-African Infrastructure Forum. Prof. Dr.-Ing.

Similar documents
Lecture 12. Layout & Securing

HATCH OPENINGS AND ALLOWABLE LOADS HATCH OPENINGS

LIFTing HEAVY CARGO FOR WORLDWIDE TRANSPORT

LIFTing HEAVY CARGO FOR WORLDWIDE TRANSPORT

Propulsion Trends in Container Vessels

Propulsion Trends in Container Vessels

Cement Carrier. Cristina Masaveu. new buildings

Dedicated to Electric & Hybrid Propulsion. A Future-Oriented Automation Platform. Scaldis Fully Self-Propelled Crane Vessel

HUTCHISON PORTS STOCKHOLM

LIFTing HEAVY CARGO FOR WORLDWIDE TRANSPORT

PERIODICAL NEWSLETTER

EcoBox Multi-Purpose Vessels

Lecture 11. Container Ships

Lake to Sea shipping. History Present Future

Ships designed by Wartsila, a powerful proposition. Wilco van der Linden Sales director Wärtsilä Ship Design

Flagship of EVERGREEN Intra-Asia trade B-Type Vessel

LIFTIng HEAVY CARgO FOR WORLDWIDE TRAnSPORT

Reducing emissions through innovative tug design

TARIFF OF HARBOUR DUES

For Immediate Release September 3, CONSTRUCTION BEGINS ON NEW CABLE FERRY Special steel cutting ceremony held at shipyard

ASIA NORTH EUROPE SERVICES

Ship Launching in Small Shipyards

FPMC INMARSAT number (Bridge), (Cabin) 1.16 Ship's address

MoorMaster, automated mooring for ports automation

Suez Canal Transit. Characteristics of the current canal lengths

KEEL MARINE LTD Naval Architects, Marine Engineers and Surveyors

Table of Contents. CMA CGM Mozambique Profile

Port of Los Angeles CIP Shaun Shahrestani Chief Harbor Engineer Director of Construction September 27, 2018

Developments in berth layout

MSC Flaminia: The New ECO-Ship MSC Geneva: Widening of Container Ships

Page -3- Report # 583AShw/1207. St. Kitts and Nevis

56m Multipurpose Vessel / Icebreaker Listing ID:

Cantiere delle Marche Darwin Expedition Yacht STELLA DEL NORD. DEL NORD Yacht. Denison Yacht Sales

Gas as marine fuels operational aspects

Reducing Vessel Emissions in Hong Kong & Pearl River Delta region: Stakeholder Action & Regional

MV Energy Scout Of UT 755L Design

Innovation based development of Klaipeda Port technologies

Shipbuilding Mega Yards Largesse

POSEIDON MED II Fleet of vessels Port infrastructure

PAXOCEAN GROUP. Corporate Presentation. 30 September 2017

Dredging in Fowey Chapter 3 Post departure of the Lantic Bay

Russian Icebreaking, Ice-Pilotage & Hydro- Meteorological Services on the NSR Dr. Bjørn Gunnarsson, Managing Director

LNG the future fuel in ferry and cruise ship ports?!

Half-yearly Report 2013

CURRENT PORT CHARGES AND TARIFFS FROM 01/01/2016 TO

Case Study 9 MSC CARLA Complete Hull Failure in a Lengthened Container Vessel


Matson: 2015 Overview. Association of Pacific Ports January 15, 2016

KEEL MARINE LTD Naval Architects, Marine Engineers and Surveyors. Reference List of Projects involving Estuary, Harbour, Inland Waterway & River Craft

Vessel s name: MV TANAIS DREAM

102' (31.09m) Cantiere delle Marche

400 Man / 8 Point / 300MT+25MT Crane / Accommodation/Work Barge

SCHEDULE OF PORT CHARGES

replacement SONNE status report

Analysis of technical data of Ro-Ro ships

Alexandria Port, Egypt

EMERGENCY TOWING CAPABILITIES IN LITHUANIA. Igor Kuzmenko Lietuvos maritime academy

SERVICE QUALITY IMPROVEMENT AT THE CONTAINER TERMINAL OF THE PORT OF CASABLANCA. 12 th ASEAN PORT & SHIPPING &12 June, Jakarta, Indonesia

Using Victor 6000 on board R/ V Sarmiento de Gamboa

GREENPORTS February 2009, Naples

TSAKOS INDUSTRIAS NAVALES S.A.

Bahamas (BMA) Flag. Eagle Shipping Ltd

Fabienne MARGAIL HEAD OF HINTERLAND DEPARTMENT MARSEILLE FOS PORT AUTHORITY. HINTERPORT 18 may 201& - Marseille

SCHEDULE OF PORT CHARGES

Textile and Apparel Importer Trade and Transportation Conference

86' (26.21m) Cantiere delle Marche

Port of Long Beach 2012 Capital Program Update. G.J. Cardamone, PE, FCMAA Director of Construction Management

Annual Summary of Marine Safety Reports

Shanghai Green Port Construction. Shanghai Municipal Transportation Commission

Collision between the tug Arafura

Section 4 / Rev Page 1 of 5

TURKISH SHIPBUILDING/ RECYCLING INDUSTRIES AND NATIONAL POLICIES SUPPORTING GREENER SHIPPING

Port of Tallinn Estonia s Biggest Maritime Gateway

Discover a proven way! PORT of KLAIPEDA. Klaipeda Port Extensive Business Opportunities Artūras Drungilas. Marketing and Corporate Affairs Director

The ship s keel has a diver-installed Multi-Beam Sonar mounting carriage located 1/3 length from the bow.

Efficiency that delivers GENERAL PRESENTATION UCSD FRONTERA FRIDAY APRIL 1 ST. 2016

WORKSHOP ON MODERNISATION OF DANUBE VESSEL FLEET WÄRTSILÄ PORTFOLIO. Wärtsilä Ship Design 18th April 2018

Port of Los Angeles Japan Business Association July, 24, 2009

Brussels, December 6 th 2016 Scandinavian-Mediterranean Corridor Meeting MARITIME CONNECTIONS OF THE SCANDINAVIAN-MEDITERRANEAN CORRIDOR

BUILDING THE CAPACITY FOR GREATNESS 2019 STATE OF THE PORT

M/V. Tonnage Measurement (ITC-69) Tartous Naval Architect. Guardian Bureau of Shipping LLC Page 1 of 14 Form 5510/TM-69/GBS/DEL/01

ASIA MEDITERRANEAN NETWORK. April 2018

ShipBuilding. Built for Brazil. DP Gezina. First to the Field Fast Support & Intervention. Comfort Conversion TRACKING OFFSHORE & HIGH-SPEC VESSELS

SALDANHA BAY PORT INFORMATION

American Institute of Marine Underwriters

The NSR as an alternative to the southern sea transportation route between Europe and South-Eastern Asia

Port of Los Angeles IAPH Green Port Survey

The Potential Impacts of the Panama Canal Expansion on Texas Ports Final report PRC 17-78

Djurgårdsvarvet The Scandinavian Shipbroker

WELCOME TO OUR WORLD

Integrating Life-Cycle Solutions for Maximum Return on Investment

Capable Accommodation work Barge with helideck. Large Work Deck with 400t deck crane. Accommodation for 165 pax. Mynx. Accommodation Work Barge

Waterways Council November 10, 2017

SMIT INTERNATIONALE (GABON) S.A. Part 2 Left : The 1975 build Makokou seen here departing from Port Gentil.

Capability Statement. Connecting global markets

MARITIME ECONOMICS. 1. This question paper consists of 12 pages. Please check that your paper is complete.

Zaliv Ship Design LLC

Bigger. Broader. Better. A preview of APL services with OCEAN ALLIANCE

48m Offshore Multipurpose Vessel. Certificates freshly renewed) Listing ID: General Description. 24 March Listing ID: {675618}

Yachts for the cruise industry. Stirling design international thibaut tincelin - principal. march 19th 2009

Transcription:

2 nd German-African Infrastructure Forum December 3 4, 2014 Munich Port Feeder Barge: Floating Infrastructure for African Ports Prof. Dr.-Ing. Ulrich Malchow Hamburg

African port congestion

African port situation

The "Port Feeder Barge" Main Data (preliminary): length: beam: capacity (3 Layers): 64 m 21 m 168 TEU reefer plugs: 14 container crane: - height: 17 m - outreach: 29 m - capacity: 40 t ruder propeller: 4

The "Port Feeder Barge" Main Data (preliminary): length: 64 m beam: 21 m capacity (3 Layers): 168 TEU reefer plugs: 14 container crane: - height: 17 m - outreach: 29 m - capacity: 40 t ruder propeller: 4 Technical partners:

General Arrangement Type: Self propelled, double ended, self sustained container barge Length o.a. Breadth moulded Depth Draught (seagoing) Draught (inland) Deadweight (seagoing) Deadweight (inland) Container capacity Stack load 64.0 m 21.2 m 4.8 m approx. 2.0 m approx. 3.1 m approx. 1,000 t approx. 2,500 t 168 TEU (14 reefer plugs) 75 t (20ft), 90 t (40ft) Crane capacity Spreader 49 t @ 27.0 m 39 t @ 29.0 m Fully automatic, telescopic, turning device, overheight frame Propulsion (diesel electric) Speed 4 x rudder propeller (4 x 280 kw) 7 knots (at 3.1 m draught)

Crane Overheight frame Turning device Spreader

Operation circle 64 m crane rails quay edge 19,68 m 3 x 28 TEU = 84 TEU narrow 3 x 2 TEU = 6 TEU

Operation circle outreach

Various Port Feeder Barge applications replacement of reduction of floating terminal improved container trucking feeder vessel shiftings for inland navigation midstream operation within ports within ports vessels (and salvage)

Intra port shuttle

Floating barge terminal

Floating barge terminal before completion

Floating barge terminal Public investment: 0 Mill Required area: 0 ha Duration of plan approval: 0 years after completion

Midstream operation

Midstream operation

Midstream operation

Midstream operation Vertical Accessibility beam fulcrum beam fulcrum 6,000 TEU vessel Hong Kong midstream barge Port Feeder Barge 6,000 TEU vessel Horizontal Accessibility

Midstream operation serving a 6,000 TEU vessel Hong Kong Midstream Barge: 4 4 4 4 4 4 4 4 4 4 4 4 4 3 3 4 4 4 4 3 3 4 4 4 4 3 3 3 4 4 4 4 3 3 3 1 4 4 4 3 3 3 1 4 4 4 3 3 3 1 4 4 4 3 3 3 1 4 4 4 3 3 3 1 4 4 4 3 3 3 1 4 4 4 3 3 3 1 4 4 4 3 3 3 1 4 4 4 3 3 3 1 TEU 307 28 60 56 52 36 36 30 9 Port Feeder Barge: 6 8 8 8 8 8 10 6 6 8 8 8 8 8 10 6 6 8 8 8 8 8 10 4 6 6 8 8 8 8 8 10 4 6 6 8 8 8 8 8 10 2 4 6 6 8 8 8 8 8 10 2 4 6 6 8 8 8 8 8 10 2 4 6 6 8 8 8 8 8 2 4 6 6 8 8 8 8 8 2 4 6 6 8 8 8 8 8 2 4 6 6 8 8 8 8 8 2 4 6 6 8 8 8 8 8 2 4 6 6 8 8 8 8 8 2 4 6 6 8 8 8 8 8 2 4 6 6 8 8 8 8 8 TEU 20 48 84 90 120 120 120 120 120 70 912

Replacement 1 x pontoon type barge 1 x tug boat 2 x harbour cranes = 1 x Port Feeder Barge

Extended versions > 168 252 336 400 TEU

Special version for long items

Wind Feeder Barge Type: Self propelled, self sustained, double ended, heavy load, lo-lo/ro-ro barge Length o.a. Breadth moulded Depth Draught (seagoing) Draught (inland) Deadweight (seagoing) Deadweight (inland) 96.0 m 32.2 m 5.0 m approx. 2.5 m approx. 3.5 m approx. 4,200 t approx. 6,850 t Ro-ro access via loose heavy load bridging plates at all sides (no bulwark). Cargo deck with flush mounted container foot points. Ballast system. Cargo deck area approx. 2,900 m² Deck load 15 t/m² (with higher point loads) Container capacity 438 TEU Crane capacity Propulsion Speed (at 3.5 m draught) 100 t @ 30.0 m 30 t @ 44.5 m 4 x rudder propeller 8 knots

Fuelled by LNG Emissions: SO X : - 100 % NO X : - 90 % CO 2 : - 20 % Soot: - 100 %

Fuelled by LNG

Fuelled by LNG

Fuelled by LNG

Fuelled by LNG

Contact Managing Director: Prof. Dr.-Ing. Ulrich Malchow Gr. Elbstrasse 38 22767 Hamburg / Germany T: +49 (0)40 / 401 6767 1 F: +49 (0)40 / 401 6767 4 E-Mail: info@portfeederbarge.de www.portfeederbarge.de