Ex-Ante Evaluation Southeast Asia Division 5 Southeast Asia and Pacific Department, JICA 1. Name of the Project

Similar documents
Ex-Ante Evaluation (for Japanese ODA Loan)

Ex-Ante Evaluation (for Japanese ODA Loan)

TAPP II: Infrastructure Tracker (hard and soft) As of February 25, 2018 Funding Type

TAPP II: Infrastructure Tracker (projects and policy reforms) As of April 3, 2018

Basic Policies on Operation of National Airports Utilizing Skills of the Private Sector

Aviation and Airports

50th CONFERENCE OF DIRECTORS GENERAL OF CIVIL AVIATION ASIA AND PACIFIC REGIONS, Bangkok, Thailand, 1 4 July 2013

Investing in Transport Infrastructure: Architecture to Economic Development 10 October 2012

Ex-Post Evaluation of Japanese ODA Loan Project New Iloilo Airport Development Project

Ex-post Monitoring of Completed ODA Loan Project

Andres Lainoja Eesti Lennuakadeemia

The Republic of Kazakhstan Ex-Post Evaluation of Japanese ODA Loan Project

(i) Adopted or adapted airworthiness and environmental standards;

UPDATES ON THE NATIONAL TOURISM DEVELOPMENT PLAN

BABIA GÓRA DECLARATION ON SUSTAINABLE TOURISM DEVELOPMENT IN MOUNTAIN AREAS

The results of the National Tourism Development Strategy Assessments

NATIONAL AIRSPACE POLICY OF NEW ZEALAND

Republic of the Philippines Department of Transportation

The Republic of the Philippines

JOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012

1. Thailand has four biosphere reserves which located in different parts of the country. They are as follows;

The Strategic Commercial and Procurement Manager

TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22)

FORECASTING FUTURE ACTIVITY

1.1 Background 2 Indonesia is the world s largest archipelagic country that consists of nearly 17,000 islands in a vast

AERODROME SAFETY COORDINATION

ECOTOURISM AND BIODIVERSITY CONSERVATION

EXHIBIT K TERMINAL PROJECT PROCEDURES PHASE I - DEVELOPMENT OF TERMINAL PROGRAM & ALTERNATIVES

LOCATED AT THE GATEWAY OF THE TROPICAL PROVINCE, RIDING ON THE GROWTH MOMENTUM OF THE COUNTRY, WE ARE ON THE RIGHT TRACK OF TAKING OFF.

Press Release March 1, Refer to: Anna Salgado

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /2010

SECTOR ASSESSMENT (SUMMARY): TRANSPORT

Background of the project

Road Rehabilitation Project

Federal Aviation Administration Flight Plan Presented at the Canadian Aviation Safety Seminar April 20, 2004

Aviation Data and Analysis Seminar February Economics of Airports and Air Navigation Services Providers

COMMISSION IMPLEMENTING REGULATION (EU)

Cranfield Safety Management and Investigation Course

The implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands.

Global Sustainable Tourism Destinations Criteria

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES

GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDURJUNG AIRPORT, NEW DELHI

Philippine Transport Sector. September 2015

Airport Safety Management Systems: Integrating Planning Into the Process

Update on STX France. October, 2017

CHAPTER 1 EXECUTIVE SUMMARY

THE ICAO TECHNICAL COOPERATION PROGRAMME: A Partner in Implementing Aviation Projects and Achieving Civil Aviation Goals

ICAO Technical Cooperation Progress and Future Potential Program on Environmental Sustainable Air Transportation in Indonesia

Sustainable Procurement Policy for Heathrow Airport Limited

FINAL REPORT OF THE USOAP CMA AUDIT OF THE CIVIL AVIATION SYSTEM OF THE KINGDOM OF NORWAY

Asia Pacific Aviation

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB4960 Project Name. MIDDLE EAST AND NORTH AFRICA Sector Aviation (100%) Project ID

MEETING CONCLUSIONS. Andean South America Regional Meeting Lima, Peru 5-7 March ECOTOURISM PLANNING

Cooperative Development of Operational Safety & Continuing Airworthiness Programme. 25th COSCAP SA STEERING COMMITTEE MEETING

QUÉBEC DECLARATION ON ECOTOURISM World Ecotourism Summit Québec City, Canada, 2002

Ministry of environment, mining and spatial planning activities and methane action plan of republic of Serbia Dragana Mehandžić Ministry of

CIVIL AVIATION AUTHORITY, PAKISTAN OPERATIONAL CONTROL SYSTEMS CONTENTS

Myanmar s CNS/ATM Development Master Plan

Ratification of Conventions

Partnership for Quality Infrastructure: Investment for Asia s Future (21 May 2015)

EVERY AIRPORT CAN BENEFIT AND EVERY AIRPORT CAN CONTRIBUTE.

Rodrigues Regional Assembly Chief Commissioner s Office

Papua New Guinea Disaster Risk Reduction Framework

Korea Eco-Label Program and Green Supply Chain Related Activities

Oceans and Fisheries Working Group Work Plan

WORKING TOGETHER TO ENHANCE AIRPORT OPERATIONAL SAFETY. Ermenando Silva APEX, in Safety Manager ACI, World

PULLMAN-MOSCOW REGIONAL AIRPORT Runway Realignment Project

Chapter 4.0 Alternatives Analysis

CIVIL AVIATION AUTHORITY

Mar Jerie Meacham / DENR MOO 2012 Photo Competition

Foreign Civil Aviation Authority Certifying Statements. AGENCY: Federal Aviation Administration (FAA), DOT.

Promoting Tourism as an Engine of Inclusive Growth and Sustainable Growth in Africa. Egyptian Minister of Tourism YEHIA RASHED

Notice regarding expected tender

ZANZIBAR AIRPORTS AUTHORITY PROJECTS

SUSTAINABLE AND ENVIRONMENTALLY FRIENDLY TOURISM IN THE COASTAL ZONES OF THE BALTIC SEA AREA

Description of Airport Charges. Swedavia AB Appendix 3 to Conditions of Services, Swedavia AB

Belgian Civil Aviation Safety Policy

POVERTY REDUCTION THROUGH COMMUNITY-BASED TOURISM IN VIET NAM: A CASE STUDY

Approval of Noise Compatibility Program Ted Stevens Anchorage International Airport and Lake Hood Seaplane Base Anchorage, AK

May 15, I. Absorption-type Company Split Pursuant to the Move to a Holding Company Structure

TABLE OF CONTENTS. Washington Aviation System Plan Update July 2017 i

Safety Regulatory Oversight of Commercial Operations Conducted Offshore

REVIEW OF PERTH AIRPORT Noise Abatement Procedures

Official Journal of the European Union L 7/3

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC2840. Date ISDS Prepared/Updated: 03/22/2007 I. BASIC INFORMATION. A. Basic Project Data

SUSTAINABLE AIR TRANSPORT IN THE FUTURE TEN-T

Summary Report on the Preparatory Study for Environmental and Social Considerations

Consumer Council for Northern Ireland response to Department for Transport Developing a sustainable framework for UK aviation: Scoping document

THE CHALLENGES OF THE SDGs: PHILIPPINE STATISTICAL SYSTEM

Economic Valuation of Heritage- Related Investments: A Case Study from China

INTERNATIONAL CIVIL AVIATION ORGANIZATION

Community Based Development through Tourism in Bangladesh: Possibilities and Limitations

ANA HOLDINGS Announces Mid-Term Corporate Strategy for FY ~Strengthening the foundations of the business and looking into the future~

From: OECD Tourism Trends and Policies Access the complete publication at: Japan

Tourism and Wetlands

easyjet response to the European Commission consultation on the aviation package for improving the competitiveness of the EU aviation sector

THE MILESTONES OF INDONESIA SUSTAINABLE TOURISM DESTINATION

SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT

Proposed Action. Payette National Forest Over-Snow Grooming in Valley, Adams and Idaho Counties. United States Department of Agriculture

REPORT 2014/111 INTERNAL AUDIT DIVISION. Audit of air operations in the United Nations Operation in Côte d Ivoire

Transcription:

Ex-Ante Evaluation Southeast Asia Division 5 Southeast Asia and Pacific Department, JICA 1. Name of the Project Country: Republic of the Philippines Project: New Bohol Airport Construction and Sustainable Environment Protection Project (II) Loan Agreement: October 8, 2018 2. Background and Necessity of the Project (1) Current State and Issues of the Aviation Sector in the Philippine The Philippines (hereinafter called The Philippines ), as an island nation composed of more than 7,000 islands, depends on air transportation for mobility and currently has 83 airports all over the country. The airport in Bohol Province has also undergone a rapid increase in air demand over the past decade, rising from 240,176 passengers in 2006 to 871,383 in 2016. Expanding the existing airport, however, would be difficult due to environmental, social and other issues, and a new airport must therefore be constructed that is compliant with international safety standards and that has adequate handling capacity. The Philippine government announced the Philippine Development Plan (2017-2022) setting forth addressing a crowding issue in air transportation and constructing/expanding local airports for meeting the increasing aviation demand. The President Duterte, who took office June, 2016, initiated the Build, Build, Build Program, which seeks to accelerate infrastructure spending from 2.6% of the nation s GDP (average spending for the last 50 years) to 5.3% of its GDP during 2017 and to invest 8.4 trillion yen in total in infrastructure development for the six years (2017-2022). The Build, Build, Build Program gives top priority to this project. This project aims to construct a new airport in Panglao Island, Bohol Province to accept not only domestic flights but also international flights, so that it is consistent with the Philippine development policies. (2) Japan and JICA s Policy and operations in the Aviation Sector Under the Country Assistance Policy for the Republic of the Philippines (April 2018), Strengthening a Foundation for Sustainable Economic Growth is defined as a key target and it mentioned about the supports that should be provided to improve transport and traffic networks. The JICA Country Analysis Paper for the Philippines (November 2014) analyzes improvement of transport and traffic networks and infrastructure development by PPP as key issues. Therefore, the Project is in line with the assistance policies and analysis of the Government of Japan and JICA. Japan has provided assistance for the airport development such as MACTAN (CEBU) international airport development project (July 1991), New Iloilo Airport Development Project (August 2000) and for improvement of airport operation safety such as New Communications, Navigation and Surveillance/ Air Traffic Management (CNS/ATM) Systems Development Project (March 2002). (3) Other Donors Activity The Economic Development Cooperation Fund of the Export-Import Bank of

Korea supported the construction of an airport in Puerto Princesa, Palawan Province, through Puerto Princesa Airport Development Project (2014-2017), and the improvement of aviation security facilities and power supply equipment of Laguindingan International Airport in Cagayan de Oro, Misamis Oriental Province of the northern part of Mindanao Island, through Laguindingan Airport Air-Navigation System and Support Facilities Supply Project (2008-2013). 3. Project Components (1) Project Objectives The objective of the project is to improve operational safety and efficiency of air transportation by constructing a new airport in Panglao Island, Province of Bohol, thereby contributing to sustainable development of the Province. (2) Project Site/Target Area Panglao Island, Bohol Province (3) Project Components 1) Civil Engineering Works Runway2,500m 45m, Landing strip, Taxiways, Apron, Passenger Terminal Buildings, Boarding Bridge, Control Tower, Utility facility, and Navigation System, etc. Note that the additional scope of this period includes extension of the runway from 2,000m to 2,500m, expansion of the passenger terminal building from 8,271m 2 to 13,337m 2, and construction of the boarding bridge, etc.) 2) Consulting Services Tendering support, Construction supervision, Environment management and monitoring, Resettlement support, etc. (4) Estimated Project Cost 19,377 million yen (of which, total loan amount: 15,158 million yen, including loan amount of this period: 4,376 million yen) (5) Schedule March 2013 February 2020 (84 months). Limited commercial operation will start in October 2018, and the project will be completed when all the facilities come into service in February 2019. (6) Project Implementation Structure 1) Borrower: The Government of the Republic of the Philippines 2) Guarantor: None 3) Executing Agency: Department of Transportation (DOTr) 4) Operating and Maintaining Organization: The Civil Aviation Authority of the Philippines (CAAP) will operate and maintain the airport. Note that operation and maintenance may be entrusted to a private company in the future.

(7) Collaboration and Division of Roles with Other Projects and Donors 1) Japan s assistance activities: None 2) Other development partners assistance activities: None (8) Environmental and Social Consideration/Poverty Reduction/Social Development 1) Environmental and Social Consideration i) Category: A ii) Reason for Categorization: The Project falls into the categories of the Airport sector and Sensitive Characteristics, as specified in the Japan International Cooperation Agency (JICA) Guidelines for Environmental and Social Considerations (April 2010). iii)environmental Permit: Environmental Compliance Certificate (ECC) for this project has been issued by the Department of Environment and Natural Resources (DENR) on June 4, 2003. After that, modified ECC for additional scope in this period has been issued on July 25, 2017. iv) Anti-Pollution Measures: Regarding noise and dust, the contractor conducts construction work only in the daytime and regularly sprinkle water. And the contractor will prevent water pollution by management of waste oil. Also, after commencement of operation, set noise buffer zone as noise control, make departure and arrival schedule limited to the daytime, implement waste management plan as waste management. Through construction and operation phase, soil pollution will be prevented. Regarding discharge from the airport facility, it will be treated by the facility inside the airport and discharged into soaking yard and then into the underground. v) Natural Environment: The Project is not conducted in or near a sensitive area such as national parks, and is expected to cause little adverse environmental impacts. Regarding terrestrial ecosystem, Provincial government of Bohol will implement biodiversity protection plan, which mention 620,000 tree plantings around the Province, in cooperation with Bohol Island State University and local people. Regarding marine ecosystem, monitoring will be conducted mainly by Local Government Unit in order to minimize the negative impact to ecosystem. vi) Social Environment: The project causes 439 lots (about 2,196,707m 2 ) of land acquisition and resettlement of 77 households. Land acquisition and resettlement has been started in accordance with the country s laws and regulations and Resettlement Action Plan (RAP), and all resettlements are already complete. Currently, one lot (867m 2 ) is not complete, so DOTr is taking action with the related organizations. vii) Others and Monitoring: Based on Environment Management Planand Monitoring plan, Multi-partite Monitoring Team (MMT) will conduct monitoring on air quality, noise and waste. MMT consists of National government agency such as DENR and DOTC, Local Government Unit, related agencies and NGO. Also, Provincial government of

Bohol will conduct monitoring tree planting, land acquisition, resettlement and livelihood activity. 2) Cross-cutting Issues: i) Measures against Climate Change: None ii) Action against and Consideration of Poverty: None iii)measures against Infectious Disease, such as AIDS and HIV During the construction, it is expected that a significant number of workers (migrant workers) will come from areas outside of the Project sites. To cope with these issues, JICA will request the Executing Agency to incorporate an HIV/AIDS clause into bidding documents so that construction contractors can provide measures to prevent the development of HIV/AIDS among construction workers. iv) Participatory Development and e) Consideration for the Person with Disability, etc. The Philippines ratifies the Convention on the Rights of Persons with Disabilities, so JICA plans to introduce universal (barrier-free) design based on Article 9. For example, the passenger terminal building will have escalators, multi-purpose toilets, check-in counters for wheelchairs, boarding bridges, and voice broadcasting. Note that it is necessary to conform to the local barrier-free regulations and guidelines, including the Accessibility Law (BP344). 3) Gender Classification: Gender Informed (Significant) <Activities and reasons for classification> The passenger terminal building shall be designed in consideration of female users; for example, the building has security cameras, and toilets separated by sex. (9) Other Important Issues None

4. Targeted Outcomes (1) Quantitative Effects Performance Indicators (Operation and Effect Indicators) Indicator Baseline (2010 Actual) Target (2021) 2 years after project completion Number of passengers/year 572,476 1,527,600 (passenger for domestic flight) Number of passengers/year 0 238,200 (passenger for international flight) Number of aircraft movements/year 4,664 13,734 (including international flight) (2) Qualitative Effects Improvement of operational safety, efficiency of air transportation and passengers satisfaction, and promotion of the economic growth of Bohol Province. (3) Internal Rate of Return Assuming the conditions listed below, the Project s economic internal rate of return (EIRR) is 27.7%, and financial internal rate of return (FIRR) is 3.3% [EIRR] Cost: Project cost (excluding tax), O&M cost Benefits: Shortening of travel time, Tourism revenue from foreigners, Reduction of transportation cost, etc. Project life: 30 years (after commencement of airport operation) [FIRR] Cost: Project cost, O&M cost Profits: Airport fee, Passenger terminal fee Project life: 30 years (after commencement of airport operation) 5. Prerequisites / External Factors (1) Prerequisites: None (2) External Factors: None 6. Lessons Learned from Past Projects The ex-post evaluation of Selected Airports (Trunkline) Development Project I and II points out that although CAAP conducts sound activities necessary to airport operation and maintenance, it cannot address problems timely. For example, when the local airport encounters a sudden facility or equipment failure, the operator cannot use its own income to take quick action, because the headquarter of CAAP collects all the income from the local airport and the operator has to follow given procedures to require the headquarters to give money other than the predefined budget. Moreover, the communication between the headquarters and the local airport is not smooth in many cases. In this project, CAAP will be in charge of operation and maintenance, and the new Bohol Airport will be much larger in scale than the existing one, so the

authority needs to establish an appropriate organizational structure for a good operation and maintenance. Accordingly, JICA will oblige CAAP to submit a prior report on an organization structure plan that will include how to secure adequate personnel and budget and to establish an ordering system between the headquarters and the new Bohol Airport in emergency events, and give advice as necessary to help the authority establish an appropriate organizational structure. 7. Evaluation Results This project aims to improve operational safety and efficiency of air transportation by constructing a new airport in Panglao Island, Province of Bohol, thereby contributing to sustainable development of the Province. Therefore, the project is aligned with Philippines development policy and Japan and JICA s country assistance policies. Furthermore, the project is expected to contribute to Sustainable Development Goals (SDGs) Goal 9 (Build resilient infrastructure), making JICA s support of the Project necessary and relevant. 8. Plan for Future Evaluation (1) Indicators for Future Evaluation: Per 4. (1) to (3) (2) Timing Ex-post evaluation (Two years after project completion) END