Quarterly Report Newcrest Mining Limited For the three months ending 31 March 2012 (These figures are unaudited)

Quarterly Report Newcrest Mining Limited For the three months ending 30 September 2011 (These figures are unaudited)

Newcrest Lihir Gold. Brett Fletcher Executive General Manager PNG & Indonesia

Morgan Stanley Asia Pacific Summit November Ian Smith MD & CEO

Annual Mineral Resources and Ore Reserves Statement - 31 December 2016

Market Release Newcrest Mining Limited 10 February 2012

Exploration. Colin Moorehead Executive General Manager Minerals. 7 October 2014

Quarterly Report Newcrest Mining Limited For the three months ending 30 June 2007 (These figures are unaudited)

Annual Mineral Resources and Ore Reserves Statement - 31 December 2017

Credit Suisse Asia Investor Conference March 2013, Hong Kong. Greg Robinson Managing Director and Chief Executive Officer

Wafi Golpu. Craig Jones Executive General Manager Australian Operations and Projects. 7 October 2014

For personal use only

Lihir Operations PNG Mining and Petroleum Conference 24 November Peter Aitsi Country Manager, PNG

Quarterly Report Newcrest Mining Limited For the three months ending 31 March 2013 (These figures are unaudited)

ASX Appendix 4D Half-Year Financial Report

Mining Address. Ian Smith MD & CEO Newcrest Mining Limited

NEWCREST Newcrest to acquire potential Tier 1 orebody in Canada Sandeep Biswas Managing Director and Chief Executive Officer

For personal use only

HARMONY GOLD AND NEWCREST FORM PAPUA NEW GUINEA GOLD JOINT VENTURE

Tax Contribution Report 2017

Cadia Valley. Peter Smith Executive General Manager Australian Operations

ASX Appendix 4D Half-Year Financial Report

NEWCREST LOOKING TO THE FUTURE

Newcrest & the Gold Sector. Brisbane Mining Club 26 April Ian Smith Managing Director and CEO NEWCREST

Cadia East PC2 recorded its highest quarterly ore production, and PC1 recommenced ore production

Bank of America Merrill Lynch Global Metals & Mining Conference May 2015, Barcelona, Spain

Ramelius Resources Limited ASX:RMS

For personal use only

For personal use only

Newcrest Mining Limited. March 2007 North American Roadshow Ian Smith, MD & CEO

For personal use only

Quarterly Activities Report Period Ended 31 March 2018

Gold Mining an Industry in Transition. Melbourne Mining Club 7 June Ian Smith Managing Director and CEO Newcrest Mining Limited NEWCREST 1

Quarterly Report Newcrest Mining Limited For the three months ended 30 September 2014 (these figures are unaudited)

Lihir record milling throughput rate of 14.5mtpa (annualised) delivering record quarterly gold production

Focus Begins Accelerated Development of the Mount into New Stand Alone Mining Operation

Market Release 11 March 2019

ASX Appendix 4D Half Year Financial Report 31 December 2014 NEWCREST MINING LIMITED AND CONTROLLED ENTITIES

Market Announcement ASX:NTL, NZX:NTL For Immediate Release

For personal use only

Half Year Results Newcrest Mining 15 February 2016

FOUR EAGLES JV FORMALISED SEISMIC AND DRILLING PROGRAMME COMMENCES

OZ MINERALS CONTINUED INVESTMENT IN SOUTH AUSTRALIA. TERRY BURGESS - Managing Director & CEO SAREIC - 02 May 2011

Ramelius Resources Limited ASX:RMS

Lihir Operations. 14 th PNG Mining and Petroleum Investment Conference. 5 December 2016

QUARTERLY ACTIVITIES REPORT

Mungana Signs Agreement with Newcrest to unlock Porphyry Gold-Copper Potential at Chillagoe

Quarterly Report Newcrest Mining Limited For the three months ended 31 March 2014 (these figures are unaudited)

Group AISC margin of $515/oz, higher by $74/oz compared to the September 2018 quarter

Gold production of 548koz, up 5% on the September 2017 quarter, down 14% from the June 2018 quarter

FOR THE THREE MONTHS ENDED 31 MARCH 2012

OZ MINERALS AUSTRALIA & EUROPE ROADSHOW. May 2011

For personal use only OZ MINERALS AUSTRALIAN COPPER CONFERENCE. TERRY BURGESS - Managing Director & CEO March

December 2017 Quarterly Report

SEPTEMBER 2018 QUARTERLY ACTIVITIES REPORT

FY18 Guidance updated for Cadia NTF embankment slump, Telfer production and updated economic assumptions

Quarterly Activities Report Period Ended 31 December 2017

CATALYST SECURES $1.5 MILLION PLACEMENT WITH ST BARBARA LIMITED

Quarterly Report for the Period Ending 30 September 2014

For personal use only

For personal use only

Kinross Gold Corporation Merrill Lynch Global Metals, Mining & Steel Conference May 13 15, 2008

Quarterly Report Newcrest Mining Limited For the three months ended 30 June 2015 (these figures are unaudited)

ASX Appendix 4D Half-Year Financial Report

Angas Zinc Mine From Prediction to Production

Company Announcements Office. December Quarterly Report

For personal use only

ASX Announcement 7 June 2011 Mt Isa Metals Ltd Drilling Recommences at Nabanga, Burkina Faso

MARCH 2018 QUARTERLY ACTIVITIES REPORT

For personal use only

Recent Exploration of the Olympic Dam

For personal use only

For personal use only

On The Road To Silver Mining In Mexico

Presentation on Q3 March FY18 Quarterly Report and audio webcast

LAS OPEÑAS DRILLING COMMENCED

For personal use only

Gold production at upper end of revised guidance and only 2% below original guidance

South America Copper Site Visit Non-ferrous overview

Kidman agrees to acquire 1Moz Mt Holland gold field in WA

ASX ANNOUNCEMENT 25 JANUARY 2008 FURTHER HIGH GRADE INTERCEPTS FROM THE KOKA GOLD DEPOSIT, ERITREA

OZ MINERALS UK ROADSHOW OCTOBER

For personal use only

For personal use only

BHP Billiton: A Strategy of Diversification

OZ MINERALS US ROADSHOW

Australian Securities Exchange Notice

For personal use only

Half Year Results FY18

For personal use only

Gruyere Project Development Update

Lorena Gold Project Malachite AGM 29 November 2017

OZ MINERALS CITI S 4 TH AUSTRALIAN INVESTMENT CONFERENCE OCTOBER

OMNR. ^ååì~ä=déåéê~ä=jééíáåö. OT=klsbj_bo=OMNR=== ^puw=cjp===

Transcription:

December 2011 Quarterly Results Greg Robinson CEO & Managing g Director

Disclaimer Forward Looking Statements These materials include forward looking statements. Forward looking statements inherently involve subjective judgement and analysis and are subject to significant uncertainties, risks and contingencies, many of which are outside of the control of, and may be unknown to, the company. Actual results and developments may vary materially from those expressed in these materials. The types of uncertainties which are relevant to the company may include, but are not limited to, commodity prices, political uncertainty, changes to the regulatory framework which applies to the business of the company and general economic conditions. Given these uncertainties, readers are cautioned not to place undue reliance on such forward looking statements. Forward looking statements in these materials speak only at the date of issue. Subject to any continuing obligations under applicable law or any relevant stock exchange listing rules, the company does not in providing this information undertake any obligation to publicly update or revise any of the forward looking statements or any change in events, conditions or circumstances on which any such statement is based. Ore Reserves and Mineral Resources Reporting Requirements As an Australian company with securities listed on the Australian Securities Exchange ( ASX ), Newcrest is subject to Australian disclosure requirements and standards, including the requirements of the Corporations Act and the ASX. Investors should note that it is a requirement of the ASX listing rules that the reporting of Ore Reserves and Mineral Resources in Australia comply with the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the JORC Code ) and that Newcrest s Ore Reserve and Mineral Resource estimates comply with the JORC Code. Competent Persons Statement The information in this presentation that relates to Exploration Results is based on information compiled by Colin Moorhead, EGM Minerals for Newcrest Mining Limited who is a Fellow of The Australasian Institute of Mining and Metallurgy, and a full-time employee of Newcrest Mining Limited. Mr Moorhead has sufficient experience which is relevant to the styles of mineralisation and types of deposits under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the JORC Code. Mr Moorhead consents to the inclusion in this presentation of the matters based on this information in the form and context in which they appear. Exploration Target The potential quantity and grade related to Exploration Targets in this report is conceptual in nature as there has been insufficient exploration to define a Mineral Resource. It is uncertain if further exploration will result in the determination of a Mineral Resource. 2

December Quarter Key Points 3% increase 1 in gold production to 579,073 ounces Copper production 18,171 tonnes Cash margin increased to A$1,042 per ounce Realised gold price A$1,648 oz Cash costs A$606 oz Cadia East and Lihir MOPU projects on schedule and budget Wafi-Golpu, Namosi, O Callaghans pre-feasibility studies continue Strong exploration results continue 3 1 After adjusting for sale of Queensland assets

Operations Ridgeway Deeps mobile rock breaker 4

Operations December Quarter Ridgeway Deeps Ore mined increased from 9kt/day (Dec 10) to 17kt/day (Dec 11) Interactive draw strategy introduced September Rock breaking solution implemented from October Ore Tonnes Mined (kt) 1,235 1,299 1,428 964 Mar 11 Jun 11 Sep 11 Dec 11 5 Graphed tonnes exclude other Ridgeway underground sources (SLC, Halo)

Operations December Quarter Cadia Hill Cadia Hill production impacted by ground slip Back in operation by end of January 2012 Slip zone 6

Operations December Quarter Lihir Increased gold production at lower unit cost High rainfall restricting access to higher grade Lienietz pit Processing lower grade stockpile Water pumping capacity doubled with further expansion planned Telfer Similar production at lower unit cost Ore feed commenced from West Dome pit Stage 4 cutback continues 7

Operations December Quarter Gosowong 35% higher gold production at lower unit cost Record mill throughput through plant debottlenecking Hidden Valley Increased gold production 14% higher mill throughput during the quarter Lower grades Overland conveyor belt returned to operations Bonikro Increased gold production 8

Strong Margins 23% increase in gold price and cash margin since September 10 $1,338 $1,384 $1,383 $1,409 $1,623 $1,648 Gold price (A$/oz) $850 $944 $886 $867 $1,029 $1,042 Cash margin (A$/oz) Cash costs (A$/oz) Sep 10 Dec 10 Mar 11 Jun 11 Sep 11 Dec 11 9

Costs Contained Despite Cost Pressures 484 484 503 572 534 493 Quarterly cash costs A$M Sep 10 Dec 10 Mar 11 Jun 11 Sep 11 Dec 11 Total Cash Costs Mining (net of stripping) Ore Processing Site Adminstration Realisation & Royalties Quarterly cash cost per ounce 315 259 338 275 219 231 494 440 497 542 594 606 Sep 10 Dec 10 Mar 11 Jun 11 Sep 11 Dec 11 10 Post by product credits Pre by product credits

Projects Cadia East drawbell extraction 11

Cadia Valley Vertimill Mill building Crushing and screening Thickening Flotation area 12

Cadia East (A$1.9bn project) Project more than 65% complete, remains on schedule and on budget Capital spend fully committed Successful tie in of the new crushing and screening plant Crushing and screening plant 13

Cadia East Cave development progressing to plan 2nd conveyor belt commissioned Upcoming Milestones: Final conveyors: March quarter Crushers: March quarter Flotation plant: June quarter HPGR circuit: June quarter Drawbell and ore extraction 14

Cadia East Flotation plant, ball mill building HPGR installation Remote Regrind Construction continuing to schedule Heavy Vehicle Workshop 15

Lihir Million Ounce Plant Upgrade (MOPU) CCD circuit NCA circuit Autoclave building Oxygen Compressor building 16

Lihir MOPU (US$1.3bn project) Project now 70% complete Remains on schedule and on budget Power generation commenced NCA circuit commissioned NCA circuit Power Station 17

Lihir MOPU Upcoming Milestones: Primary crushing circuit: March quarter Milling circuit: June quarter Oxygen plant: June quarter Autoclave: September quarter Commissioning and ramp up: 2H 2012 Autoclave Building Autoclave Vessel 18

Exploration Telfer core samples 19

Exploration Highlights 44 Drill Rigs Lihir High grade results from Kapit North East area drilled drilled, well beyond the current open pit. Gosowong g Toguraci: target within 1km current focus Regional exploration activities increasing. Gosowong Manus Is Tandai INDONESIA Mali Wafi-Golpu Burkina Faso CÔTE D IVOIRE Yamoussoukro Bonikro Liberia PAPUA NEW GUINEA Abidjan Hidden Valley Namosi Telfer AUSTRALIA Marsden Mt Kasi FIJI Namosi Wainaulo mineralisation extended near surface and south. Cadia Valley 100 km Telfer Mineralisation extension north and at depth for Main Dome and West Dome. Dome 20 Lihir Wafi-Golpu Further F th growth th off the th Golpu porphyry, mineralisation to the north. Mining Operation Advanced Project Greenfields Exploration

PNG, Lihir Resource Growth PLAN VIEW OPEN Area of Current Drilling Kapit North East Pacific DDHL1943-136m @ 3.5g/t Au DDHL1944-122m @ 5.7g/t Au DDHL1945-124m @ 28 2.8g/t /tau DDHL1946-118m @ 2.2g/t Au DDHL1953-66m @ 4.2g/t Au Exploration Target 3 Drill rigs Strong exploration results beyond Kapit North East Kapit Reclaimed land DDHL1884-126m @ 3.1g/t Au DDHL1888-92m @ 2.2g/t Au DDHL1889-48m @ 10g/t Au DDHL1890-205m @ 2.7g/t Au DDHL1947-64m @ 7.1g/t Au Inferred Resource boundary Lienetz Minifie Coastal Lihir Plant 2011 LIHIR RESOURCE (1) 1000 m 56Moz Au High grade mineralisation intersected at Coastal Extension of the resource to the north and east 21 (1) Newcrest Annual Statement of Mineral Resources & Ore Reserves to June 30, 2011.

Indonesia, Gosowong Growth Opportunities PLAN VIEW Contract of Work Boundary Ngoali NTD032-24 2.4m @34 34g/t /tau NTD035-4.1m @ 15g/t Au Toguraci (1) 1.4 Moz Au Tobobo Exploration Target Batu Api Matat Ngailamo Gosowong (1) 1.0 Moz Au Gosowong Plant Kencana (1) 3.5 Moz Au K2D061-13.3m @ 58g/t Au NTD035-22.3m @ 33g/t Au Jakarta 1000 km Gosowong INDONESIA AUSTRALIA Prospect 11 Drill rigs Significant results from Kencana drilling High grade epithermal veining intersected 1km north of Toguraci Regional exploration continues 4 km 22 (1) Includes past production and current Resources. Refer to Newcrest Annual Statement of Mineral Resources & Ore Reserves to June 30, 2011. Resource figures quoted on 100% basis.

WA, Telfer West Dome Significant Growth Potential SCHEMATIC LONG SECTION (looking south west) 7 Drill rigs Main Dome (1) 8.2Moz Au Saddle Target Area West Dome (1) 6.0Moz Au Continued VSC and West Dome drilling previously mined Main Dome Decline Telfer Deeps (1) 2.5Moz Au VSC (1) 1.3Moz Au MUC17001 8.9m @ 1.7g/t Au & 1.4% Cu 4.0m @ 3.5g/t Au u&05%cu 0.5% 15.5m @ 8.4g/t Au & 0.6% Cu Current development Exploration Target MRC22539A 6.6m @ 1.6g/t Au & 0.1% Cu West Dome decline design 1.0 km 5200 mrl 3200 mrl West Dome decline development progress Main Dome and West Dome extended north Reviewing saddle area between Domes 23 (1) Newcrest Annual Statement of Mineral Resources & Ore Reserves to June 30, 2011.

PNG, Wafi-Golpu JV Wafi Transfer Zone PLAN VIEW Zimake 7 Drill rigs Bavaga Targeting further growth of the Golpu porphyry Nambonga Wafi Kesiago Zenapu Hekeng Miapilli Golpu 2011 WAFI-GOLPU RESOURCE (1) 26.6Moz 6M Au & 9.0Mt Cu Accelerated drilling campaign within the Wafi Transfer Zone Kesiago, Zimake Mt Tonn Pekumbe 24 Mt Tonn 4 km Copper/gold target area (1) Newcrest Annual Statement of Mineral Resources & Ore Reserves to June 30, 2011. Resource figures quoted on 100% basis.

PNG, Wafi-Golpu JV Golpu Project PLAN VIEW WR406 (2) 961m @ 1.39g/t Au, 1.37% Cu Nambonga (1) 1.0Moz Au WR414 Diatreme OPEN Golpu (1) 19.3Moz Au 9.0Mt Cu WR315 (reported previously) 525m @ 0.34g/t Au, 0.08% Cu incl. 94m @ 0.8g/t Au, 0.2% Cu Miapilli Porphyry Drillhole in Progress WR408 WR406 21,000mN Targeting future reserve upgrades System remains open at depth Mineralisation extending north Balanced project and exploration drilling Wafi (1) 6.2Moz Au 20,000mN 500 m 20,000mE Copper/gold target area 25 (1) Newcrest Annual Statement of Mineral Resources & Ore Reserves to June 30, 2011. Resource figures quoted on 100% basis. (1) Partial result reported in previous quarter. Re-reported final result.

Fiji, Namosi Waivaka corridor potential PLAN VIEW Waisoi (1) 73Mt 7.3Mt Cu, 7.4Moz 74Moz Au PORPHYRY SYSTEM Wainabama Wainikoro Waidina Drilling targeting 7km long Waivaka Corridor NVD038-829m @ 0.26% Cu NVD040 (2) - 756m @ 0.67% Cu NVD041-258m @ 0.23% Cu NVD042-242m @ 0.44% Cu Waivaka South East Wainaulo (1) 0.67Mt Cu, 0.35Moz Au Wainaulo mineralisation extended d near surface and south New porphyry copper-gold targets identified regionally 5 km Pacific Harbour Navua Viti Levu NAMOSI FIJI Copper/gold target area 50 km Suva 26 (1) Newcrest Annual Statement of Mineral Resources & Ore Reserves to June 30, 2011. Resource figures quoted on 100% basis. (2) Partial result reported, drillhole in progress.

Other Items Divestment of Cracow & Mt Rawdon complete Corporate Bond raising US$1,000 million raised on the United States bond market US$1.7bn available in undrawn facilities Proposed Toronto Stock Exchange secondary listing by March 2012 Gerard Bond commenced in the role of Finance Director and Chief Financial Officer on 1 January 2012 27

Newcrest focus - M&A/ Exploration Studies Projects Operations Marketing/ Sales Exploration Studies Projects Operations 44 drill rigs targeting high quality near mine and d greenfields fi ld projects in Australia, PNG, Indonesia Fiji Indonesia, and Côte d Ivoire Pre-feasibility studies on Wafi-Golpu, O C ll h O Callaghans, and Namosi complete in 2012 Cadia East and Lihir MOPU delivery in calendar l d 2012 Improvement focus on: Total material movement Metal recovery Maintenance Training/skills T i i / kill 28

Appendix: Production Summary Dec Quarter Tonnes Milled (000 s) Gold Grade (g/t) Copper Grade (%) Gold Production (oz) Copper Production (t) Cadia Valley 5,021 0.92 0.25 118,203 10,731 Telfer 5,222 0.95 0.18 135,427 7,440 Lihir 1,721 3.51-157,059 - Gosowong 177 19.91-107,500 - Hidden Valley (50%) 474 1.90-26,234 - Bonikro 483 1.64-23,771 - Mt Rawdon 290 0.67-5,647 - Cracow (70%) 31 562 5.62-5,232 - Dec 2011 Quarter 13,419 1.58 0.21 579,073 18,171 Sep 2011 Quarter 13,885 1.56 0.21 587,296 19,228 29 Production from continuing operations increased from 550,190oz in the Sep quarter to 568,194oz in the Dec quarter.