For personal use only

Similar documents
For personal use only

For personal use only

Quarterly Activities Report Period Ended 31 March 2018

Quarterly Activities Report Period Ended 31 December 2017

CATALYST SECURES $1.5 MILLION PLACEMENT WITH ST BARBARA LIMITED

ASX ANNOUNCEMENT 25 JANUARY 2008 FURTHER HIGH GRADE INTERCEPTS FROM THE KOKA GOLD DEPOSIT, ERITREA

MARCH 2018 QUARTERLY ACTIVITIES REPORT

Focus Begins Accelerated Development of the Mount into New Stand Alone Mining Operation

FOUR EAGLES JV FORMALISED SEISMIC AND DRILLING PROGRAMME COMMENCES

ASX Announcement 7 June 2011 Mt Isa Metals Ltd Drilling Recommences at Nabanga, Burkina Faso

For personal use only

For personal use only

December 2017 Quarterly Report

For personal use only

For personal use only

Ramelius Resources Limited ASX:RMS

Quarterly Report for the Period Ending 30 September 2014

LAS OPEÑAS DRILLING COMMENCED

Highlights. Quarterly Activities Report: September Kurnalpi Project. Lindsays project

For personal use only

QUARTERLY OPERATIONS REPORT 30 JUNE Highlights: BOARD AND MANAGEMENT YAMARNA

Gruyere Project Development Update

SEPTEMBER 2018 QUARTERLY ACTIVITIES REPORT

QUARTERLY ACTIVITIES REPORT

For personal use only

Mungana Signs Agreement with Newcrest to unlock Porphyry Gold-Copper Potential at Chillagoe

Lorena Gold Project Malachite AGM 29 November 2017

Angas Zinc Mine From Prediction to Production

Kidman agrees to acquire 1Moz Mt Holland gold field in WA

Australian Mines increases Marymia ground holding

For personal use only

FOR THE THREE MONTHS ENDED 31 MARCH 2012

For personal use only

On The Road To Silver Mining In Mexico

JUNE 2012 QUARTERLY REPORT

For personal use only

Market Announcement ASX:NTL, NZX:NTL For Immediate Release

For personal use only

Northern Territory. Ark wishes to extend the strike and further define the size of the Golden Honcho deposit, with the

Haoma Mining NL A.B.N

DECEMBER 2017 QUARTERLY ACTIVITIES REPORT

Australian Securities Exchange Notice

OMNR. ^ååì~ä=déåéê~ä=jééíáåö. OT=klsbj_bo=OMNR=== ^puw=cjp===

On The Road To Silver & Gold Mining In Mexico

ORION METALS LIMITED (ASX: ORM) ACTIVITIES REPORT FOR QUARTER ENDING 31 st August 2014.

Recent Exploration of the Olympic Dam

Ramelius Resources Limited ASX:RMS

WOOLGAR PROJECT DRILL PROGRAM RESULTS NOVEMBER 2004

KEY POINTS. Significant Resource increase at the Tier-1 mines:

Activities Report for Quarter ended 31 March 2018

Quarterly Activities Report for the period ended 30 September 2018

For personal use only

HARMONY GOLD AND NEWCREST FORM PAPUA NEW GUINEA GOLD JOINT VENTURE

Altera Resources Ltd

For personal use only OZ MINERALS AUSTRALIAN COPPER CONFERENCE. TERRY BURGESS - Managing Director & CEO March

2011 Annual General Meeting. Greg Robinson Managing Director & CEO

For personal use only

For personal use only

For personal use only

Corporate Presentation March 2015

On The Road To Silver Mining In Mexico

THE NEW HIGH- GRADE AUSTRALIAN GOLD DISCOVERY

Inca de Oro Copper-Gold Project and Carmen deposit sale process

Market Release 11 March 2019

Quarterly Activities Report December 2018

ON TIME AND ON BUDGET: PROCESSING PLANT OVER 90% COMPLETE AND FIRST PRODUCTION SET FOR MARCH

For personal use only

Newcrest Mining Limited

Candelaria and Ojos del Salado Chile

For personal use only

South America Copper Site Visit Non-ferrous overview

QUARTERLY REPORT 1 JULY 2017 to 30 SEPTEMBER 2017

For personal use only

Market Release Newcrest Mining Limited 10 February 2012

Artemis Resources Limited

Presentation on Q3 March FY18 Quarterly Report and audio webcast

For personal use only

For personal use only

OZ MINERALS AUSTRALIA & EUROPE ROADSHOW. May 2011

FOCUS MINERALS LIMITED

Haoma Mining NL A.B.N

For personal use only

ROADSHOW PRESENTATION

December 2014 Quarterly Report

SEPTEMBER 2015 ASX:CDV

Annual Mineral Resources and Ore Reserves Statement - 31 December 2016

For personal use only

UNLOCKING THE POTENTIAL OF THE EAST MENZIES GOLDFIELD

SPITFIRE RESOURCES LIMITED SPITFIRE DIVERSIFIES WITH TASMANIAN COAL ACQUISITION

BMO CAPITAL MARKETS GLOBAL METALS & MINING CONFERENCE PRESENTATION 25 FEB 2008

Australian Resource Reviews Gold 2016

ORO VERDE LIMITED (ASX: OVL)

KEMPFIELD DRILLING COMMENCES, TARGETING Ag, Au, Pb AND Zn

Activities Report for Quarter ended 31 December 2017

For personal use only

DECEMBER 2007 QUARTERLY REPORT

Kinross Production Continues on Plan

BRIEFING PAPER APRIL 2002 MINING AREA C DEVELOPMENT PORT HEDLAND PORT & CAPACITY EXPANSION

Quarterly Activities Report For The Period Ending 31 March 2018

Kinross Nevada tour highlights growth potential at Bald Mountain and Round Mountain

Transcription:

5 September 2016 ABN 91 124 752 745 Drilling Underway At The Koala Gold Mine, Mt Coolon Gold Project, Qld Stage 1 drilling for 1,100 metres has commenced on schedule at the Koala Gold Mine. Drilling is designed to test the resource area around the old (circa 1930) underground workings, including old stope margins and remnant pillars. Stage 2 will follow and comprise a further 3,500 metres of drilling and both programmes will provide data to improve the confidence level of the current Koala resource in the area of the old underground workings. The drilling program forms part of the study to evaluate recommencement of mining operations at the Koala Gold Mine. Australian Resources company GBM Resources Limited (ASX: GBZ) ( GBM or the Company ) is pleased to announce the commencement of a diamond drilling program at the Koala Gold Mine at Mount Coolon, located in the Drummond Basin, Queensland. The program is designed to infill historical drilling data through the Koala Lode within the area of old underground workings located along strike of the Ross Mining open pit. Drilling will test for mineralisation along stope margins and high-grade lode quartz in remnant pillars and along strike from stopes. Maximum drill hole target depths have been kept to below-surface depths considered accessible by open pit mining. Assay results are expected to come available late October 2016. The Company continues the evaluation of the known mineralising systems and aims to advance a number of near-term production options and activities during the September Quarter 2016. The Company expects to be in a position to confirm the intention to proceed with the development of either toll milling or heap leaching the old open pits, along with the progress with the Eugenia Heap Leach or both by the end of the fourth quarter this calendar year. ASX Code: GBZ COMPANY DIRECTORS Peter Thompson Managing Director/ Executive Chairman Neil Norris Exploration Director Executive Hun Seng Tan Non- Executive Director CONTACT DETAILS Principal & Registered Office Suite 8, 7 The Esplanade, Mt Pleasant, WA 6153 Exploration Office 10 Parker Street, Castlemaine, Victoria 3450 Website www.gbmr.com.au Email info@gbmr.com.au Phone +61 (8) 9316 9100 Fax +61 (8) 9315 5475 Phone (Exploration Office) +61 (3) 5470 5033

Figure 1: Drill site at Koala for Stage 1 program. View to north-east.

Figure 2: Koala planned drilling program (Phase 1 and 2). Figure 3: Koala long projection showing current Inferred Resource colour coded for gold grade x width. Old workings stopes and drives shown in grey. Ross pit outline (1990 s) at north end. Historic drilling pierce points in purple and GBM planned drilling pierce points in pale blue.

Figure 4: Mt Coolon Gold Project tenement group location plan. For Further information please contact: Peter Thompson Karen Oswald Managing Director Marko Communications GBM Resources Limited Tel: 0423 602 353 Tel: 08 9316 9100 Email: Karen.oswald@markocommunications.com.au About GBM Resources GBM Resources Ltd (ASX: GBZ) is an Australian resource company that listed on the ASX in 2007, headquartered in Perth WA, with exploration operations in Queensland and Victoria. The Company s primary focus is in key commodities of gold and copper-gold, assets in Australia. GBM tenements cover an area greater than 4,300 square kilometres in eight major projects areas in Queensland and Victoria. GBM is prioritising the exploration and development of the Mount Coolon Gold Project and Mount Morgan Gold Copper Project.

Mt Coolon Project Resource Summary Project Location Resource Category Total Cut-off Measured Indicated Inferred 000' t Au g/t Au ozs 000' t Au g/t Au ozs 000' t Au g/t Au ozs 000' t Au g/t Au ozs Koala Open Pit 370 2.8 33,500 750 2.1 51,700 1,110 2.4 85,000 0.4 Underground Extension 50 3 5,100 230 3.9 28,500 280 3.7 33,700 2.0 Tailings 114 1.6 6,200 9 1.6 400 124 1.6 6,600 1 Total 114 1.7 6,200 429 2.8 39,000 980 2.5 80,200 1,514 2.6 125,300 Eugenia Oxide 1,305 0.9 39,300 219 0.7 5,100 1,524 0.9 44,400 0.4 Sulphide 2,127 0.9 62,300 1,195 1.2 45,500 3,322 1.0 107,800 0.4 Total 3,432 0.9 101,600 1,414 1.1 50,600 4,846 1.0 152,200 0.4 Glen Eva Below pit. 132 7.8 33,200 21 5.9 4,000 154 7.5 37,200 3.0 Total 114 1.7 6,200 3,993 1.4 173,800 2,415 1.7 134,800 6,514 1.5 314,700 Notes Table 1: Current global resource table for Mt Coolon Gold Project. Please note rounding; tonnes (1,000t), grade (0.1g/t) and contained gold (100 ounces). The information in this report that relates to Mineral Resources, Exploration Targets and Exploration Results is based on information compiled by Neil Norris, who is a Member of The Australasian Institute of Mining and Metallurgy and The Australasian Institute of Geoscientists. Mr Norris is a full-time employee of the company, and is a holder of shares and options in the company. Mr Norris has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Norris consents to the inclusion in the report of the matters based on his information in the form and context in which it appears. The Company confirms that the form and context in which the Competent Persons findings are presented have not been materially modified from the original market announcements. The Company confirms that it is not aware of any new information or data that materially affects the information included in the respective announcements and all material assumptions and technical parameters underpinning the resource estimate with those announcements continue to apply and have not materially changed.