OVERALL EXISTING CONDITION AND DEVELOPMENT STRATEGY OF EXPRESSWAY IN VIETNAM. BANGKOK - 13 June 2016

Similar documents
Transport Infrastructure Investment in Viet Nam

THÀNH PHỐ HỒ CHÍ MINH A Nguyen Van Nghi Street, Ward 7, Go Vap District. 4 1C Nguyen Anh Thu Street, Trung My Tay Ward, District 12

MINISTRY OF TRANSPORT VIETNAM MARITIME ADMINISTRATION DEVELOPMENT OF CONTAINER PORTS VIETNAM

CTY CP TVTK GTVT PHÍA NAM - TEDI SOUTH

2.3 Seismic Conditions

National project list for attracting foreign direct investment until 2020 (Enclosed to prime ministerial Decision 631/QD-TTg on April 29, 2014)

The Viet Nam Provincial Governance and Public Administration Performance Index (PAPI) Measuring Citizens Experiences

New Challenge & 22 Years Experiences of Consumer Products in Vietnam

Region/ Province/ State/ City 122 Phan Xich Long Str, Phu Nhuan District, HCM. STT Branch Name Branch Address

- Borrowing short term loans from State Bank under the form of regranting - Borrowing loans from credit institutions and financial companies.

APPENDIX 5C Profile of Key Projects

Figure 5C.15 Sai Gon Moc Hoa Route. Grade Width Depth Present Target Present Plan Present Plan mainly III & partially I

ANNEX 1 Subprojects List and Location Maps. Table A1.1: List of the first phase subprojects under Component 4 (5 provinces, 5 basins)

CHAPTER 3 PROVINCIAL PERFORMANCE IN 2012

The Current Status and Conservation of Bears in Vietnam

Known Producers/Exporters of Vietnamese Laminated Woven Sacks

F-92. Catchment Area : 11,250 km 2. Hình 7.1 Mô hình sơ đồ cân bằng nước (Lưu vực sông Bằng Giang & Kỳ Cùng) Bang Giang - Ky Cung River Basin

Ghi chú. Công ty TNHH MTV Dầu khí TP.HCM. 27 Nguyễn Thông, Phường 7, quận 3, TP.HCM. SP Saigon Petro

TRAVEL & STAYS OFFERS

Vietnam Marine Protected Area Management Effectiveness Evaluation

Nguyễn Ngọc Lan

Measuring Governance and Public Administration in Viet Nam

Conservation And Aquatic Resources Development in Vietnam

Red River Delta Provinces. Phủ Lý, Hà Nam, 24/05/2013. A policy monitoring tool for middle-income Viet Nam

8. Projects/ Programs and Provincial Tourism Development Plans

Hoi Son Dam VAN CANH. -> Tan An - Dap Da Schemes are to be referred to Figure 13.4 DONG XUAN

The Viet Nam Provincial Governance and Public Administration Performance Index (PAPI) Measuring Citizens Experiences

Building hotel, entertainment, conference and exhibition center, approximate area of 130 ha 1,500

BẢN TIN THÁNG 04/2015 1Q 2018 EARNINGS CALL

UPDATED LIST OF 479 ESTABLISHMENTS NAFIQAD HAS APPROVED (Up to 07 May 2010) Commercial Name of Establishments

Lao Tourism Services

REDEMPTION CATALOGUE

Socio-economic and Tourism Conditions 1999

FLC GROUP JSC. INTRODUCTORY PRESENTATION

ITE HCMC, Vietnam s Premier International Travel Trade Event, Returns To Impact World s Travel Patterns For 14 th Edition

Figure Huong River Irrigation Scheme. The Study on Nationwide Water Resources. in the Socialist Republic of Vietnam. Development and Management

Vietnam Member s report on activities to ICRI. Presented by Nguyen Van Long. Reporting period November April 2007

PAÍS SECÇÃO. Vietname Produtos da pesca. Em vigor desde 15/02/2018 Data de publicação 02/02/2018. Lista em vigor. Número de aprovação

LIST OF CO-MERCHANTS WITH DISCOUNT RATE FOR IVB'S CARDHOLDERS

Vietnam s Transport Sector Outlook and Engineering Opportunities

- - PORTCOAST CONSULTANT CORPORATION PORT COAST. December 2018 GEOTECHNICAL SURVEY

REPORT ON CORPORATE GOVERNANCE OF LISTING COMPANY (the first 6 months of 2016)

Location map and area relationship of Viet Phat Industrial Zone and Urban Area

SAIGON NEWPORT CORPORATION

TERMS & CONDITIONS HOME&AWAY OFFERS. Offer Detail: - 15% off on mooncake bill

Motorbike Tour LAOS Vietnam 1 - ITINERARY

越南 ( 水产品 ) 生产企业在华注册名单 (2017/06/15 更新 ) 注册地址 注册类型 备注 NO.

TECHNICAL SPECIFICATION (OBJECTIVES, PROJECT SCALE)

The UNIVERSITY WITHOUT BORDERS Journal of ECONOMICS & BUSINESS

Travel redemption catalogue

PORTCOAST CONSULTANT CORPORATION 92 Nam Ky Khoi Nghia, District 1

The foundation for the sustainable development Welcome to KINHBACCITY

Sales points. No. Name of Agency Address

Index. 000 Map pages 000 Photograph pages. Lonely Planet Publications 540

Vietnam: Typhoon WUTIP VIETNAM: Situation Map

Train time table in Vietnam Air Route Hydrofoil services. - Car (4seats): Toyota Corolla, Toyota Altis, Ford Laser, Mazda, Accord, Deawoo

Detail Offer/ Chi Tiết. Merchant/ Khách Sạn & Resorts Sofitel Legend Metropole Hanoi (Le Spa du Metropole)

Viet Nam Situation Report No. 3 Floods Central Vietnam October 8, pm (Viet Nam time)

The Second Annual Coastal Forum Building Resilience to Climate Change Impacts: Coastal Southeast Asia

SECOND NORTHERN MOUNTAINS POVERTY REDUCTION PROJECT DISASTER RISK ASSESSMENT FOR THE NORTHERN MOUNTAINS PROVINCES

Don t believe everything you read in the media about the Vietnam Property Market

By year 2005, VTPB overseas offices are to be set up in: Paris, Los Angeles, and Tokyo.

Table Number of Tourism Resources by Tourism Regions in Vietnam Type of Resources. Tourism Regions North (share) Central South

, GIAY CHUNG NHAN BANG KY DOANH NGHIEP CONG TY CO PHAN

越南 ( 水产品 ) 生产企业在华注册名单 (2017/06/19 更新 )

Regional Development along Economic Corridors: Southern Coastal and Northern Sub-Corridors in Vietnam

PHU LUC SUA DOI VA BO SUNG DIEU LE

COMPANY PROFILE THIEN VU ADVERTISING JOINT STOCK COMPANY

DETAILED LIST OF CUSTOMERS I. BUSINESS VALUATION

EXPLORING VIETNAM. 12 Days / 11 Nights DATE PLACE ACTIVITY MEAL

Sika at Work. Sika Vietnam Industrial Factory Projects in Vietnam. Các dự án Nhà máy Công nghiệp tại Việt Nam

Beauty of nature in Northern Vietnam (10D9N) Page 1/3

Vietnam Heritage Tour 15 days Destinations: Code: B Breakfast, L Lunch, D Dinner, G - Guide Details: Day 1: Hanoi Arrival (G)

TOURISM DEMAND ANALYSIS AND FORECASTS

ITE HCMC 2017 Closed with a Record of Attendance & Meetings

BEAUTY OF NORTH VIETNAM

Network of Airports in Vietnam

THE MINING - GEOLOGY DESIGN SURVEY AND CONSTRUCTION CONSULTING JOINT STOCK COMPANY PROFESSIONAL COMPETENCE

Viet Nam. Situation Report No. 6 Typhoon #11 Mirinae November 9, pm (Viet Nam time) I Summary

Exploring Vietnam. 13 days - 12 nights TIME PLACE ACTIVITY MEAL

TPP ADVANTAGES INDUSTRIAL ESTATE SOLUTION. By Nguyen Chi TOAN Marketing Manager of VSIP JV 27 November 2015

September 2014 savills.com.vn

Investor Presentation December March 2012 INVESTOR PRESENTATION

542 Lonely Planet Publications Pty Ltd

Decision No. 201/QD-TTg of January 22, 2013, approving the master plan on development of Vietnam's tourism through 2020, with a vision toward 2030

VIETNAM TRAVEL MART BRIEF INTRODUCTION. Best Travel Deals in Vietnam!

Hanoi, May 6 th, Dear Sirs/Madams,

Countries» Sourcing From Guides» About» Contact us

VINCOM JOINT STOCK COMPANY. Investor Presentation March 2012 INVESTOR PRESENTATION

Recommended Itinerary

GHN Market Report: Vietnam 2013

INDOCHINES CONSULTANT & COMMERCIAL JSC

Membership Discount 10% 20% Handbook Sales. special discount. discount

Binh Thuan Province Wind Power Master Plan

AMATA VN Public Company Limited

2018 Calendar. Connecting people and possibilities.

Absolute Vietnam Package Tour 19 days / 18 nights

Cau River. Map of River. Table of Basic Data. Vietnam 5

SPLENDOURS OF VIETNAM

SPLENDOURS OF VIETNAM

Transcription:

OVERALL EXISTING CONDITION AND DEVELOPMENT STRATEGY OF EXPRESSWAY IN VIETNAM BANGKOK - 13 June 2016

TABLE OF CONTENTS A. Orientation of Expressway Development in Vietnam B. Current condition of Expressway network C. Priority of projects to be funded to 2020 D. Effects of climate change on Vietnam road network

A. ORIENTATION OF EXPRESSWAY DEVELOPMENT IN VIETNAM The Master plan of national expressway network is established of 22 routes with a total length of 5,873km, including: - The North - South expressway: 02 routes with the length of 3,262km; - The Northern expressway system: 07 routes with the length of 1,099km; - The Middle and Central Highlands expressway system: 03 routes with the length of 264km; - The Southern expressway system: 07 routes with the length of 984km; - The ring road system in Hanoi and Hochiminh city: 07 routes with the length of 264km. 1

A. ORIENTATION OF EXPRESSWAY DEVELOPMENT IN VIETNAM I. The North - South expressway: Including 02 routes with the total lengths of 3,262 km. 1. The Eastern route: - Length : 1,941 Km - Carriage way : 4-6 lanes 2. The Western route: - Length : 1.321 Km START POINT SECTION 1 END POINT SECTION 1 START POINT Phap Van(Ha Noi) - Carriage way : 4-6 lanes START POINT SECTION 2 2.1 Section 1: Phu Tho - Pho Chau - Length : 457 Km -Carriage way : 4-6 lanes 2.2 Section 2: Ngoc Hoi - Chon Thanh - Rach Gia - Length : 864 Km - Carriage way : 4-6 lanes END POINT SECTION 2 END POINT (Vĩnh Long) 2

A. ORIENTATION OF EXPRESSWAY DEVELOPMENT IN VIETNAM II. The Northern expressway system: Including of 07 radial routes connecting to Hanoi, with total length of 1.099km; 02 ring roads with total length of 181km. 1. Route Lang Son - Bac Giang - Bac Ninh: Length :130 Km; 4-6 lanes 2. Route Ha Noi - Hai Phong: Length: 105Km, 6 lanes 3.Route Ha Noi - Viet Tri - Lao Cai: Length: 264 Km, 4-6 lanes 4.Route Ha Noi - Ha Long - Mong Cai: Length: 294 Km, 4-6 lanes 5.Route Ha Noi - Thai Nguyen - Bac Kan: Length: 90Km, 4-6 lanes 6.Route Ha Noi - Hoa Lac - Hoa Binh: Length: 56 Km, 4-6 lanes 8.Ring road 3: Length: 56 Km, 4-6 lanes - 7.Route Ninh Binh-Hai Phong-Quang Ninh: Length: 160Km, 4 lanes 9. Ring road 4: Length: 125Km, 6-8 lanes 3

A. ORIENTATION OF EXPRESSWAY DEVELOPMENT IN VIETNAM III. The Middle and Central Highlands expressway system: Including 3 routes with the total length of 264km. 1.Route Hong Linh - Huong Son: Length: 34Km, 4 lanes 2.Route Cam Lo - Lao Bao: Length: 70 Km, 4 lanes 3.Route Quy Nhon - PleiKu: Length: 160 Km, 4 lanes 4

A. ORIENTATION OF EXPRESSWAY DEVELOPMENT IN VIETNAM IV. The Southern expressway system: Including 7 routes with the total length of 984km; Hochiminh city ring road 3 length of 83km 3.Route HCM City - Chon Thanh: Length: 69 Km, 6-8 lanes 8. Ring road 3-HCM city: Length: 83 Km, 6-8 lanes 4.Route HCM city - Moc Bai: Length: 55 Km, 4-6 lanes 2. Route Dau Giay - Da Lat: Length: 209Km, 4 lanes 1.Route Bien Hoa - Vung Tau: Length: 76Km, 6 lanes 5. Route Chau Doc - Can Tho - Sãc Trang: Length: 200Km, 4 lanes 6. Route Ha Tien - Rach Gia - Bac Lieu: Length: 225 Km, 4 lanes 7. Route Can Tho - Ca Mau: Length: 150Km, 4 lanes 5

A. ORIENTATION OF EXPRESSWAY DEVELOPMENT IN VIETNAM V. Demand for capital: The total captital for investment in the expressway network (5,753km) is approximately 47.9 billions USD), in which: To year 2020: total construction of 2,639km/24.7 billions USD After 2020: total construction of 3,114km 23.2 billions USD. VI. Expectation of land: The planning area for construction of expressway is 41,104 ha (the appropriated area of the routes which have been built is 2,916ha, the adding area shall be 38,188ha). 6

B. CURRENT CONDITION OF EXPRESSWAY

I. The Northern expressway system: B. CURRENT CON DITION OF EXPRESSWAY 6. Route Ha Noi - Lang Son: 140 Km, 4-6 lanes, Total investment: 1.400 mil.usd. 46 Km Completed. 64 Km under construction. 2. Ha Noi - Thai Nguyen. 62 Km, 2-4 lanes, Total investment: 324 mil USD (ODA 238 mil USD, government fund 86 mil USD). Completed 3. Route Ha Noi - Lao Cai: 264 Km, 2-4 lanes, Total investment Phase 1: 1,249 millions USD (ADB: 1,096 millions USD, Completed 4. Route Lang - Hoa Lac: 29.2 Km, 6 lanes, Total investment: 7,527 billions VND. Completed 7. Route Noi Bai - Ha Long: 169 Km: 6 lanes, Total investment: 940 millions USD, FS. 8. Route Ha Long - Mong Cai: 150Km, 4-6 lanes, Total investment 850 millions USD 59 Km under construction. 1. Route Ha Noi - Hai Phong: 105 Km, 6 lanes, Total investment: 1.367 millions USD.BOT investment Completed 5. Ring Road 3 Ha Noi: 56 Km, 4-6 lanes. Mai Dich - Phap Van, Completed - ` 12

B. CURRENT CON DITION OF EXPRESSWAY II. The Southern expressway system 1. Route Ring Road 3-TP.HCM: 157Km, under FS 2. Route Dau Giay - Lien Khuong: 209 Km, 4 lanes, total investment: 33.000 bil. ång. 19 Km Completed 11.Route Bien Hoa - Vung Tau (combined with enlarging NH51)): 69 Km, 6 lanes, total investment 500 millions USD (8,500 billions);. 13

III. The North - South expressway B. CURRENT CON DITION OF EXPRESSWAY 1. HN - Cau Gie - Ninh Binh: 80 Km, 6 lanes, Total investment: 470 millions USD, Owner: VEC; structure of capital. Completed 2. Ninh Binh - Thanh Hoa: 121Km, 6 lanes, Total investment 27,000 billions VND (1,588 billions USD), Feasibility Study; calling for PPP invesstment 3. Thanh Hoa - Ha Tinh: 96 Km, 4-6 lanes, Total investment: 22,185 billions VND (1,305 millions USD), Feasibility Study, calling for PPP invesstment. 4. Hue - Da Nang: 105 Km, 4 lanes, Total investment : 10.695 billions VND (627 millions USD), 66 km under construction 5. Da Nang - Quang Ngai: 127 Km, Phase 1: 4 lanes, Total investment: 1,600 millions USD (JICA + WB). Under construction 6. Quang Ngai - Qui Nhon: 180 Km, 4 lanes, Total investment: 1,562 millions USD, Feasibility Study. 7. Nha Trang - Phan Thiet: 200 Km, 4-6 lanes, Total investment: 1,600 millions USD (27,200 billions VND), Feasibility Study. 10

B. CURRENT CON DITION OF EXPRESSWAY III. The North - South expressway (cont) 8. Dau Giay - Phan Thiet: 98 Km, 6 lanes, Phase 1: 4 lanes, Total investment: 870 millions USD, FS completed. Calling PPP investment 9. HCM - Long Thanh - Dau Giay: 55 Km, Phase 1: 4 lanes, Total investment: 932 millions USD, JICA loan 516.5 millions USD + ADB 410.2 millions USD + Reciprocal Capital (6 millions USD). Completed. 10. Long Thanh - Ben Luc: 58 Km, Phase 1: 4 lanes; Total investment 1,122 millions USD (19,074 billions VND), Planned to borrow ADB & JICA loans. Under Construction. 11. HCM - Trung Luong: 40 Km, Phase 1: 4 lanes. Completed. 12. Trung Luong - My Thuan: 51 Km, Phase 1: 4 lanes, FS completed. BOT Invested. Under Construction 13. My Thuan - Can Tho: 42 Km, Phase 1: 4 lanes; FS completed. Planned to borrow JICA loan. 11

Expressway, Interchange and Toll gate B. CURRENT CON DITION OF EXPRESSWAY

Tunnels on expessway B. CURRENT CON DITION OF EXPRESSWAY

Immersed tunnel B. CURRENT CON DITION OF EXPRESSWAY

Cable stayed bridge and PC bridges B. CURRENT CON DITION OF EXPRESSWAY

Urban bridges B. CURRENT CON DITION OF EXPRESSWAY

Beautiful Bridges B. CURRENT CON DITION OF EXPRESSWAY

C. Priority of Projects to be funded

C. PRIORITY OF PROJECTS TO BE FUNDED 1) Ninh Binh - Thanh Hoa: 121km, 6 lanes; total investment 1,6 bil. USD 2) Thanh Hoa - Ha Tinh: 96km, 4-6 lanes; total investment 1,3 bil. USD 3) My Thuan - Can Tho: 42km, 4-6 lanes; total investment 500 millions USD; 4) Nha trang- Phan Thiet: 98km, Phase 1: 4 lanes; total investment 870 millions USD; 5) Dau Giay - Lien Khuong: 209 km; 4 lanes 6) HCM - Moc bai: 59 km; 4 lanes 14

D. Effects of climate change on Vietnam road network

D. EFFECT OF CLIMATE CHANGE - According to the Ministry of Natural Resources & Environment of Vietnam : In Vietnam, the sea levels will rise between 3 and 15 cm by 2010 and by 15 to 90 cm in 2070. Affected areas include: Ca Mau, Kien Giang, Ba Ria - Vung Tau (south), Thanh Hoa (in Central), Nam Dinh, Thai Binh (north). 16

D. EFFECT OF CLIMATE CHANGE Detailed planning coastal road in the Northern of Vietnam 17

C. EFFECT OF CLIMATE CHANGE Detailed planning coastal road in the Middle of Vietnam 18

D. EFFECT OF CLIMATE CHANGE Detailed planning coastal road in the Souththern of Vietnam 19

D. EFFECT OF CLIMATE CHANGE Combining dyke construction and coastal road construction at for some sections of the routes 21

Thank you for attention!