ARLINGTON COUNTY, VIRGINIA

Similar documents
Recreation and Park Commission, Capital Committee. Through: Philip A. Ginsburg, General Manager Dawn Kamalanathan, Capital and Planning Manager

PIONEER PARK. City of Des Peres Parks Master Plan. SWT Design 46 INTRODUCTION

Philip A. Ginsburg, General Manager Dawn Kamalanathan, Director of Planning and Capital Division

ARLINGTON COUNTY, VIRGINIA

CITY COUNCIL AGENDA MEMORANDUM

City of Jacksonville Beach

Villages at Buffalo Run East

Let'sPlaySF! SERGEANT JOHN MACAULAY PARK. Recreation and Park Commission Approval of Concept Design November 1, 2017

COMMUNITY MEETING NOVEMBER 1, Wheaton Regional Park Pine Lake Trail

The Honorable William D. Sessoms, Jr. Members of City Council. Dear Council Members: RE: Hillier Fitness Park

TRUCKEE TAHOE AIRPORT DISTRICT BOARD OF DIRECTOR STAFF REPORT

China Creek North Park Upgrades and Glen Pump Station. Park Board Committee Meeting Monday, July 10, 2017

Approve, subject to conditions, and with a County Board review in one (1) year. (June 2003)

French Regional Park Creative Play Area

Bellevue South Park. Located between E 26th and E 28th at Mt. Carmel Place, in the Borough of Manhattan.

~ s: Memorandum

Community Park Capital Project. February 6, 2017

Community Advisory Committee Meeting #3 April 21, 2015

CITY COUNCIL AGENDA MEMORANDUM

Corktown Parks. Public Meeting. City of Toronto

Trail Feasibility Study

NEW MEADOWS PARK PROPOSED MASTER PLAN

MASTER PLAN EXECUTIVE SUMMARY

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport

White Mountain National Forest. Campton Day Use Area Development Project. Scoping Report. Prepared by the Pemigewasset Ranger District May 2013

ARLINGTON COUNTY, VIRGINIA

Final Drainage Letter Pikes Peak Community College Downtown Parking Lot Colorado Springs, Colorado

River Parks Trail: Tulsa, Oklahoma

5 September 9, 2015 Public Hearing

AGENDA MEMORANDUM Community Services Department. CSAB Meeting Date: April 10, 2018

Trail # NW Tuesday, June DESIGN. Provide an Review the Provide an. Project Goals: System system. wayfinding

Rockin River Ranch State Park

TJ Park and Community Center ::: General Information

Fire Station No. 1 Presentation MAY 16, 2016

The Chu property is a 6.57 acre parcel located in the Town of Superior on the west side of McCaslin Boulevard. In 2014, the Town of Superior acquired

Executive Summary Downtown Park Fund Allocation HEARING DATE: MAY 5, 2016

Classifications, Inventory and Level of Service

Welcome to Atwood Lake Park Master Plan Update

MORGAN CREEK GREENWAY Final Report APPENDICES

FOLWELL PARK LOCATION AND HISTORY LOCATION

4. Improvement Plan Elements

MEMORANDUM. Agenda Item: Meeting Date: A-1d 04/04/17 TO: THROUGH: DATE: FROM: SUBJECT: PRESENTERS: RECOMMENDATION: BUDGET IMPACT: PAST ACTION:

BID FORM. Bid by: Name of Bidder. Address: Address: To the Texas Department of Transportation hereinafter called the Agent.

Request Conditional Use Permit (Indoor Recreational Facility) Staff Planner Kevin Kemp

CHAPTER 6 NOISE EXPOSURE

Aquatics Master Plan Update. Dallas City Council. September 2, 2015

Action Recommendation: Budget Impact:

City of Surrey PLANNING & DEVELOPMENT REPORT File:

Lake Myra County Park. Wake County, North Carolina Community Forum #2 June 12, 2008

Langton Lake Park Implementation Planning Session One 6 June Attendees signed in

2. Goals and Policies. The following are the adopted Parks and Trails Goals for Stillwater Township:

BOARD OF AIRPORT COMMISSIONERS

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

VOLUNTEER PARK PLAYGROUND REQUEST FOR DESIGN PROPOSAL (RFD) Background: Key Pen Parks would like to replace existing play equipment at Volunteer Park.

COASTAL CONSERVANCY. Staff Recommendation December 2, 2004 COYOTE HELLYER COUNTY PARK BAY AREA RIDGE TRAIL

1. Approval of minutes of the March 4, 2010 Park and Recreation Board Meeting

Fischer s Park Master Plan

The Corporation of Delta COUNCIL REPORT Regular Meeting. To: Mayor and Council File No.: R11-131, R11-135

Recreation and Park Commission, Capital Committee

DEPARTMENT OF PLANNING JEFFERSON PARISH, LOUISIANA

ARLINGTON COUNTY, VIRGINIA

FY20 BUDGET PRESENTATION

STAFF REPORT. Airport Land Use Consistency Determination Betteravia Plaza. MEETING DATE: January 21, 2016 AGENDA ITEM: 8D

Moraine Valley Community College Campus Tree Care Plan Table of Contents

Blue River Trail Master Plan JSA to Town Hall June 2004

AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY

REQUEST FOR PLANNING COMMISSION ACTION

Aquatics Master Plan. Dallas City Council Quality of Life and Environment Committee. September 14, 2015

Chapter 4.0 Alternatives Analysis

17 Mathilda Welmering Park Planning Zone 3

Stambaugh Township 5-Year Recreation Plan - DRAFT

ADA Compliance Projects Summary Sheet

ARLINGTON COUNTY, VIRGINIA

POLICY & STRATEGIES The Vancouver Park Board approves major changes in Vancouver parks, including the design and development of parks.

City Council Report. Mayor and City Council Susan Cline, Director, Public Works, Civil Engineering Subject: Airport Runway Shortening Options

City Council Report 915 I Street, 1 st Floor Sacramento, CA

INSTRUCTIONS FOR ADMINISTRATIVE APPROVAL OF PROJECTS (OVER-THE COUNTER APPROVAL)

b. Minimum Site Area. Recreational vehicle parks shall be located on a parcel of land not less than 3 acres in area.

Port Gamble Shoreline Area Conceptual Trail Proposal

Welcome to the future of Terwillegar Park a Unique Natural Park

Dover Park Master Plan. Community Design Event Tuesday, May 22, 5 7 pm

Chapter 2: Summary of Existing Open Space System

DRAFT GENERAL IMPLEMENTATION PLAN AND SPECIFIC IMPLEMENTATION PLAN MIDDLETON MUNICIPAL AIRPORT MOREY FIELD. Revised 12/12/03

EXECUTIVE SUMMARY FALL Introduction. Findings

8. CITY COUNCIL AGENDA

Welcome to Charles Mill Lake Park Master Plan Update

City of Grand Island Tuesday, February 28, 2017 Council Session

and plant some trees, but that was only accomplished through state and federal work-relief programs.

ADMINISTRATION AND FINANCE COMMITTEE (MISCELLANEOUS)

Arlington Civic Associations SY School Board Liaison Assignments - Rev. 1/4/2018

Understanding user expectations And planning for long term sustainability 1

MUNICIPALITY OF ANCHORAGE

Norfolk International Airport

ARLINGTON COUNTY, VIRGINIA

The Baker/Carver Regional Trail is intended to

Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street

AGENDA MAPLE PLAIN PARKS COMMISSION MAPLE PLAIN CITY HALL NOVEMBER 20, :30 PM

Appendix 3. Greenway Design Standards. The Whitemarsh Township Greenway Plan

Design Considerations For Accessible Parks & Trails

LANDING S PARK CONCEPTUAL PLAN HAMILTON ANDERSON JANUARY City of Novi, Michigan. The Park at 13 Mile and Old Novi Road

Transcription:

ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of June 18, 2016 DATE: May 5, 2016 SUBJECT: Award of construction contract under ITB No. 16-240-ITB for the reconstruction of the playground, reforestation and connecting trails at Woodlawn Park, located at 1325 North Buchanan Street. C. M. RECOMMENDATION: 1. Approve the Award of Contract Number 16-240-ITB in the amount of $559,996.31 to Bennett Group and approve an allocation of $56,000 as a contingency for change orders for a total contract authorization of $615,996.31. 2. Authorize the Purchasing Agent to execute the contract documents, subject to review of by the County Attorney. ISSUES: This is a request for approval of a construction contract for the playground and trails improvements at Woodlawn Park. County Board approval is required for award of construction contracts in the amount exceeding $250,000. There are no outstanding issues. SUMMARY: This is a Neighborhood Conservation Program project for the Waycroft Woodlawn neighborhood which was approved by the Neighborhood Conservation Advisory Committee in the Fall 2013 funding round and approved by the County Board on February 25, 2014. The focus of the construction project is to remove old and outdated play equipment, replace old trails and provide new playground areas and connecting trails. The project will provide an environmentally sustainable park by relocating play equipment farther away from the stream edge and reforesting a buffer along Lubber Run stream. The new improvements include play areas for both school age (5-12) and tots (2-5 years old), including playground equipment, accessible playground surfacing, site furnishings, accessible trails, constructing new connecting asphalt trails and a reforestation buffer along Lubber Run. Following a community process that involved neighbors from the community, the Waycroft Woodlawn Civic Association (WWCA) and staff from the Arlington County Department of Parks and Recreation, the design for the playground improvements was developed. This is a request of award of contract for the construction of the park improvements. County Manager: ##### County Attorney: ***** 22. Staff: Kathy Von Bredow, Department of Parks and Recreation

BACKGROUND: The 3.2 acre Woodlawn Park is a heavily used County park which borders the Hospice property to the north, and North Buchanan Street to the west and North Abingdon Street to the east. (See attached vicinity map). Lubber Run stream daylights in the park, and the park contains environmentally-sensitive floodplain and resouce protection area (RPA) areas. In Fall 2013, a community process was initiated to develop conceptual designs for the new features at Woodlawn Park. Interested stakeholders came together through several meetings to discuss the playground design and address community concerns. Through the guidance of a communitybased design group, a conceptual plan was developed (see attachment) that was approved by the WWCA. This Neighborhood Conservation project also includes site clearing, site drainage, reforestation, new playground equipment, safety surfacing, site furnishings, connecting trails, inground solar path lighting and a water fountain. Project funding also included additional reforestation and invasive plant removal. In Spring 2014, a five-year invasive plant removal project, funded by this NC project began. In Fall 2014, a grant from the Virginia Department of Forestry was awarded, and partially funded a reforestation project consisting of 180 trees that were planted in the southern half of the park, and along the eastern edge of the stream between the 13th Street North and 14th Street North entrances. DISCUSSION: On April 26, 2016, the County s Office of the Purchasing Agent received the following four (4) bids in response to ITB No. 16-240-ITB: 1. Bennett Group $559,996.31 2. Avon Corporation $560,787.83 3. HRGM Corporation $773,424.19 4. Jeffrey Stack, Inc. $850,200.00 The lowest bid for the construction of the park improvements was received from Bennett Group in the amount of $559,996.31. The bid was found to be responsive and Bennett Group was found to be a responsible bidder. It is recommended that the contract be awarded to Bennett Group. FISCAL IMPACT: The overall project budget approved by the County Board for the Woodlawn Park Playground and Trail project is $795,000. In addition to construction the total budget also includes soft costs for design and project management. The NC program will cover the project from the Neighborhood Conservation Bond (316.437405.N549.C12.0000). - 2 -

Vicinity Map Woodlawn Park ( Waycroft Woodlawn ) 15TH ST N 15TH ST N N BUCHANAN ST 14TH ST N Woodlawn Park 14TH ST N 13TH ST N 13TH ST N 0 100 Feet Pursuant to Section 54.1-402 of the Code of Virginia, any determination of topography or contours, or any depiction of physical improvements, property lines or boundaries is for general information only and shall not be used for the design, modification, or construction of improvements to real property or for flood plain determination. Aerial Photography flown February 2011 Map prepared by Arlington County GIS Mapping Center Produced and November 2013 /

Site * VICINITY MAP - 1"=2000'

Woodlawn Park 5-12 PLAY AREA THIS PLAY AREA IS LOCATED IN AN EXISTING "OPEN FIELD" CONDITION ADJACENT TO THE EXISTING ASPHALT PATH CONNECTING 14TH STREET NORTH. IT HAS MINIMAL IMPACT OF EXISTING TREE CRITICAL ROOT ZONES. IN PLAY AREAS, ADA SURFACING TO PROVIDE ACCESS WILL BE POURED IN PLACE SAFTEY SURFACING (IMPERVIOUS). REMAINDER WILL BE ENGINEERED WOOD FIBER, WHICH IS CONSIDERED POROUS. KOMPAN EXPLORER DOME A R L I N G T O N V I R G I N I A DEPARTMENT OF PARKS AND RECREATION Park Development Division 2100 Clarendon Boulevard, Suite 414 Arlington, VA 22201 Phone: 703.228.3323 Fax: 703.228.3328 2-5 PLAY AREA THIS PLAY AREA IS LOCATED IN AN EXISTING LARGER PLAY AREA, SITED AROUND EXISTING TREES. THE POROUS PAVEMENT WALKWAY THROUGH THE PARK BORDERS THE SAND PLAY AREA, BUT IS SEPARATED BY BOULDERS AND/OR A SEAT WALL TO "CONTAIN" SAND AND CHILDREN, ALSO TO PROVIDE A GATHERING SPACE FOR PARENTS. THERE ARE ADJACENT BENCHES AND PICNIC TABLES. EXISTING ASPHALT PATH SAND PLAY WITH BOULDERS/SEAT WALL,MERRY-GO-ROUND AND SWINGS EXISTING TRADITIONAL SWINGS TO REMAIN TOT CLIMBER TO INCLUDE SLIDE AND PLAYHOUSE FEATURE EXISTING ASPHALT PATH L:\Division\Park Development\Projects\Woodlawn Park\Playground Renovation NC 2014\Design\CAD Plotted: Jul 23, 2015