Initial OPW Designation APSR AFRR IRR Co-ordinates Easting: Northing: River / Catchment / Sub-catchment Type of Flooding / Flood Risk

Similar documents
^ox, 7. Environment Agency. Hayling Island North Strategy *. M ^, v. * > -.

Research Briefing Flood and Coastal Erosion Risk Management in Wales

Monifieth (Potentially Vulnerable Area 07/10) Local Plan District Local authority Main catchment Tay Estuary and Montrose Angus Council, Dundee coasta

Kirkcaldy Sea Wall Improvements. Non-technical Summary. For illustration purposes only to give an indicative representation of the scheme.

PORTISHEAD BRANCH LINE PRELIMINARY ENVIRONMENTAL INFORMATION REPORT VOLUME 4 APPENDIX Water Receptors

Wilts & Berks Canal. Appendix E: Hydrology and Hydraulics CONTENTS 1. INTRODUCTION 2 2. HYDROLOGY 2 3. HYDRAULIC MODEL 2 4.

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES

12. Sowter Road Introduction Christchurch Court

Hydraulic Report. Trail 5 Snowmobile Trail Over Mulligan Creek. Prepared By: COLEMAN ENGINEERING COMPANY Karisa V. Falls, P.E.

Hydro-Electric Schemes Compliance Report June June 2013

RIO VISTA MUNICIPAL AIRPORT

EAST DON TRAIL ENVIRONMENTAL ASSESSMENT. Community Liaison Committee Meeting #3 July 15, :30 to 8:30 pm Flemingdon Park Library

St. Clements C of E Academy, Butlin Street, Birmingham, B7 5NS. Installation of multi-use games area and associated access works.

Rhuddlan Community Flood Plan

Striving for resilience in the face of climate change

11 Majors Barn. 19 Mill Street Exploring Abergavenny

City of Doral Flood Warning and Response Plan

Introduction. The System. Model Limitations, Assumptions, and Parameters. Optional Services Tech Memo

Welcome KROSNO CREEK DIVERSION PROJECT CLASS ENVIRONMENTAL ASSESSMENT

London Biggin Hill Airport Runway 03 Approach A9912 N02 DC. Noise Assessment Extended D Charles 1.0 INTRODUCTION

Southsea Flooding and Coastal Erosion Risk Management Scheme

Hamilton School, Hamilton Road, Birmingham, B21 8AH

TOWPATH MOWING GUIDELINES

Agenda Report. Spruce Street Outlet Drainage Improvements Tower Road Relief Sewer

Land at Craigtoun St Andrews. Residential Development Opportunity

The December 2013 storm in England :the value of learning from the past

SUMMER VILLAGE OF SILVER SANDS. Municipal Development Plan

THE ICs INTERNATIONAL BRISBANE AREA AQUA PARK PROPOSAL

Public consultation exhibition

INFORMATION FOR STANWELL MOOR AND STANWELL COMMUNITIES

Queensland Reconstruction Authority Rebuilding a stronger, more resilient Queensland

Groundwater Recharge/Discharge Y 1, 2, 3, 4, 5, 16 X Wetland appears to be a contiguous hydraulic system, draining towards Goff Mill Brook.

insouthglos Economy .co.uk Our economy

Mr. Michael Malone CPS Energy 145 Navarro Street San Antonio, Texas Project No

TPA Emergency Planning and Response

TOWN PLANNING SUBMISSION TO THE GREATER SYDNEY COMMISSION LANDS AT ARTARMON

Wilts and Berks Canal Trust

Energy from Waste and Recycling Facility Trident Park, Cardiff. Planning History. January 2010 SLR Ref: B

Current Status. Schemes At Construction

Appendix F Public authorities responses

Clam Harbour Provincial Park

Open Report on behalf of Richard Wills Executive Director for Communities. Planning and Regulation Committee. County Matter Application - S38/0590/13

Ms P Goldfinger Date: 18 September 2017 Head of Programme The Architecture Centre Our Ref: M15/

Case Study: 1. The Clarence River Catchment

Schedule of Planning Applications Committee Date: 23 May Reference: 06/18/0064/F Great Yarmouth Officer: Mr J Beck Expiry Date:

Rhu Cottage West Loch Tarbert Argyll PA29 6YF. A fantastic home set in 36 acres with private shore access on the banks of West Loch Tarbert

DEPARTMENT OF HOMELAND SECURITY. U.S. Customs and Border Protection. Extension of the Air Cargo Advance Screening (ACAS) Pilot Program

AGAWAM CONSERVATION COMMISSION April 26, 2018

Tesco Express, Alcester Road South, Kings Heath, Birmingham, B14 6EB

SAFEGUARDING OF AERODROMES. Advice Note 1

"Transboundary coordination according to the FD Directive in the shared river basins of Greece

5 PRECINCT INFRASTRUCTURE PLAN

Date: 11 th January, From: Plaistow & Ifold Parish Neighbourhood Plan - Steering Group. Plaistow & Ifold Parish Council

Gatwick Stream Riverside Garden Park, Horley

URBAN DESIGN REPORT. Proposed Residential Development, Old Church Road, Caledon East

Kent Pedestrian Guard Railing Assessment

Rule Governing the Designation and Establishment of All-Terrain Vehicle Use Trails on State Land

29 Plas Derwen. Exploring Abergavenny

State of the Solent Edition 3: 10. Coastal Risk Management Indicators

MANAGING COASTAL HAZARDS THROUGH BENEFICIAL REUSE OF DREDGED SAND AND AN ADAPTIVE WORKS STRATEGY

INTERNAL AUDIT DIVISION REPORT 2017/051. Audit of the aviation safety programme in the African Union-United Nations Hybrid Operation in Darfur

insouthglos Economy .co.uk Our economy

Blackfriars (North Port) & 1 Atholl Place, Perth, PH1 5LU For Sale

HAMPTON-IN-ARDEN PARISH COUNCIL ANNUAL MEETING

A detached period home with loch views. rhu house by tarbert, argyll, pa29 6yf

Perth and Kinross Council Development Control Committee 12 December 2012 Report of Handling by Development Quality Manager

Vista Field Airport. Master Plan Update. February, Prepared for: Port of Kennewick One Clover Island Kennewick, Washington

Section 61 Recreational Vehicle Park / Campground (Bylaw No. 2012/10)

FAA RECORD OF DECISION. Appendix D FINAL EIS ADDENDUM DOCUMENTS

M20 junction 10a improvement scheme. We want to hear your views

Airport Master Plan Update June 15, 2017

Airport Master Plan Update June 15, 2017

Scotchbarn Lane, Prescot Accessibility Statement

I508. Devonport Peninsula Precinct

Airspace infringements: review and actions process

The north half of Section 18, Township 37 North, Range 6 East, Second Principal Meridian, Jefferson Township, Elkhart County, Indiana; also,

City of Fort Lauderdale. Frequently Asked Questions. Proposed Sea Wall Ordinance

Stephanie Sinnott, Executive Director, Finance, Office of the City Manager

Flood History. Floodplain Descriptions

2018 SPRING MELT: FLOOD PREPAREDNESS

GOOSENECK SWAMP INFORMATION DAY - Saturday 14 th December 2013

1. The purpose of this report is to seek the Works, Traffic and Environment Committee s recommendation for:

Sainsburys Store, Mere Green Road, Sutton Coldfield, Birmingham, B75 5BT

Display of 1 no. illuminated large format advert hoarding

Concord Road Interchange. Standard hours of work

Photographic Log Client: Project Number: Site Location: Site Name: Photograph ID: Date: Location: Direction: Comments: Photograph ID:

Hearings will be held in the Shirley Huffman Auditorium in the Charles D. Cameron Public Services Building, 155 North First Avenue, Hillsboro, Oregon.

Arrangements for the delivery of minor highway maintenance services by Town and Parish Councils

ANNUAL REPORT DALLAS LOVE FIELD AIRPORT. March 14, 2006

The implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands.

Waukegan & Calumet Rivers. All Hands Meeting

SMP2 Meeting of Client Steering Group (9) At Dorset House. Monday 16 th June 2008, 1400

Header i

PPCR/SC.4/5 October 9, Meeting of the PPCR Sub-Committee Washington, D.C. October 28, REVIEW OF ON-GOING WORK OF THE MDBs IN DJIBOUTI

MARINA BOLADO PENAGOS A METHODOLOGY TO ASSESS THE ROLE OF THE RIVER DISCHARGES TO THE GULF OF CADIZ ON THE NUTRIENT SUPPLY TO THE ALBORAN SEA

The Collection and Use of Safety Information

VISITOR RISK MANAGEMENT APPLIED TO AVALANCHES IN NEW ZEALAND

Porter Fk. #1. All unauthorized items removed as per FS & Rec Res guidelines. Footbridge may be needed for wheel chair access and for safety

Kent Pedestrian Guard Railing Assessment

ENVIRONMENT ACTION PLAN

Transcription:

Location: Shannon International Airport, Co. Clare Unique ID: 275484 (from PFRA database) Initial OPW Designation APSR AFRR IRR Co-ordinates Easting: 137674 Northing: 161045 River / Catchment / Sub-catchment Type of Flooding / Flood Risk (identify all that apply) Shannon Estuary Fluvial non-tidal Fluvial tidal Coastal Stage 1: Desktop Review 1.1 Flood History (include review of Floodmaps.ie) River Flow Path At this location the Shannon Estuary is inter-tidal, and therefore can be considered to potentially have both fluvial tidal and coastal flooding influences. There are also a few minor watercourses that could potentially present a flood risk. Shannon International Airport is located on the northern shore of the River Shannon behind tidal embankments, immediately southwest of Shannon Town. The estuary of the River Fergus is located west of the airport, which also has tidal embankments defending the land behind. Flood event records There are two flood records listed for north of Shannon Airport from 2000 & 2005. The mapped flood area corresponds to: Ballycally - Surface water ran off land onto road L3169 in January 2005. The runoff was from land to south of road. Water flowed around one no. dwelling house but house was not flooded. This is a rare event. Also, c 2000 the L7174 was flooded due to tidal backup from the estuary. A flap valve has been installed into the estuary since and the problem has not recurred. Flooding at Carrigerry near Shannon. No. of Properties damaged was two. 1.2 Relevant information on flooding issues from OPW and LA staff PFRA database comments (in italics): OPW comments IRR airport Incl. as APSR (even through also part of Shannon Town APSR?) LA comments Critical Infrastructure, Airport building approximately 2 metres below level of Shannon and also has a basement. Large aviation fuel store at site. Site is also a SEVESO site. Clare County Council wish to have the Airport designed as either a signifi Note: Text truncated in PFRA database Flood Risk Review Report UoM 27 Shannon International Airport IRR V0_B 1

Meeting / discussion summary comments: OPW comments OPW maintain embankments east of the local road to the airport, and Shannon Airport maintain those west of this point. OPW referred to an area west of the town and airport that may be assessed within this APSR (or airport IRR): sluiced land commission area where houses are protected by embankments LA comments Major concern with regard to the flooding potential from the Shannon in the event of a breach of the embankments. 1.4 PFRA Data 1.4.1 PFRA hazard mapping PFRA mapping available in GIS layer: Yes No PFRA mapping included on FRR map: Yes No Note: Whilst the PFRA mapping is available for the area (for fluvial flooding), there is no coastal mapping. 1.4.2 Summary of Principal Receptors Type Number (approx.) FRI score (if available) Note: Shannon International Airport has no score included in the PFRA database under its own entry: 1AIR_Shannon Airport. However, under Shannon town, there is a score associated with the airport as shown below. N/A Airport_Cr_Weighted_T_C 34250 Total 34250 1.7 Stage 1 Evaluation Aspect Clearly IRR Uncertain Flood History (1.1) x OPW / LA Information (1.2) PFRA Evaluation (1.4) Overall Desktop Evaluation (if any above aspect is uncertain then overall designation is uncertain) x x x (1) 1.8 Proposed level of assessment for Stage 2 site visits Level A Site Visit Level B Site Visit X Note: (1) Although the flood history does not suggest there is a major flooding problem at Shannon Airport, it is considered to be at potentially high risk given its location behind the Shannon embankments. A Level B Site Visit assessment is therefore appropriate for this major infrastructure of national importance. Flood Risk Review Report UoM 27 Shannon International Airport IRR V0_B 2

Stage 2: Site Inspection Level B Assessment Date and Time of Inspection Names of inspection team (including OPW/LA staff if present) Iain Blackwell Lewis Maani Date: 09/06/11 Time: 16:00 2.3 Local knowledge - on-site comments (OPW, LA and any info volunteered by local residents during visit) No on-site comments 2.4 Comments on hydraulic constrictions (bridges, etc.) and conveyance routes Flood risk at Shannon Airport is primarily from the Shannon Estuary. However, there are a number of smaller watercourses including drains that are within the area, for which there are culvert and bridge crossings. It is also noted that the Fergus Estuary to the west may present a flood risk. Given the flat topography of the land behind the embankments (Shannon and Fergus) any breach of the defences would tend to spread across the land behind the embankments, affecting Shannon Airport. There is no clear conveyance route away from the airport. 2.6 Defence Assets Formal and Informal Flood Defence Assets (include effective and ineffective assets to inform asset survey and potential mitigation measures) Open Channel Watercourses Man-made river channel Flood relief channel Canal Mill leat Drainage channels / back drains Bridges and Culvert crossings Single Arch bridge Multi-Arch bridge Single Span bridge Multi-Span bridge Box culvert(s) Pipe culvert(s) Arch Culvert(s) Culverted Watercourses (culvert length is greater than just a crossing) Box culvert(s) Pipe culvert(s) Arch Culvert(s) Irregular Culvert(s) Walls and Embankments Embankment(s) Raised wall(s) Retaining wall(s) Control Structures weirs, gates, dams Fixed crest weir Adjustable weir Dam / Barrage Sluice gates Lock gates Radial gates Storage On-line storage (natural) On-line storage (artificial) Off-line storage Outfalls Flapped outfall(s) into watercourse Unflapped outfall(s) into watercourse i.e. from smaller watercourses, drains etc. into river / estuary / sea Tidal flap(s) Tidal sluice(s) i.e. from main watercourse into estuary / sea Flood Risk Review Report UoM 27 Shannon International Airport IRR V0_B 3

Other Pumping Station Erosion Protection Sand Dunes Additional notes (if required): Shannon (including the airport) is protected on its south side by extensive flood defence embankments of varying heights. These extend for many kilometres to the east and west, along the Shannon Estuary and the Fergus Estuary protecting large areas of low lying land behind them. Integral to the flood defence provided by these embankments is the series of drainage channels and back drains behind the embankments, outfalls (with tidal flaps) from these drainage channels through the embankments, and pumping stations to discharge water through the embankments. 2.8 Initial Potential Mitigation Measures Non-structural measures Structural measures Planning and Development control Sustainable Urban Drainage Systems Flood forecasting / warning Change in Operating Procedures for water level control: Public awareness campaign Individual property protection Land use management Strategic development management for floodplain development: (integration of measures into strategic development proposals) Storage: On-line Off-line Flow diversion: Flood relief channel Flood relief culvert Increase conveyance: Bridge works Channel works Floodplain Flood defences: Walls Embankments Localised works: Defence raising In-fill gaps Trash screen Maintenance works: Culvert / channel clearance Asset maintenance Relocation of properties: Improve existing defences: (describe) The main embankments protecting Shannon International Airport will form an important part of a flood risk management strategy for the location (including Shannon itself). This is a significant asset already in operation, and therefore provides a basis for improvements where necessary, for example, localised raising (if identified as being necessary). Other (describe): Outcomes Recommended Designation Summary Comments (if required) APSR not an APSR IRR Shannon Airport has a major flood risk from tidal flooding in the event of a breach of the Shannon Estuary or Fergus Estuary embankments. It is recommended to be identified as an IRR on the basis of its location behind these embankments and its strategic national importance, rather than because of any previous flood events. Flood Risk Review Report UoM 27 Shannon International Airport IRR V0_B 4

Photo 1: Embankment and back drain outfalls close to Shannon Airport. Photo 2: Pumping Station located at the end of a major back drain close to Shannon Airport. Photo 3: Airport car park and other infrastructure located directly behind the Shannon Embankments at a lower level than the estuary inter-tidal zone. Photo taken from top of embankment. Photo 4: Airport car park showing significant difference in elevation between car park and embankment crest (approximately 2.0m). Flood Risk Review Report UoM 27 Shannon International Airport IRR V0_B 5

Photo 5: Access road along the top of the embankment bordering the Shannon Estuary inter-tidal-zone. The Shannon Estuary inter-tidal zone is seen beyond the crash barrier. Photo 6: Major Shannon tidal embankment adjacent to the airport road towards the eastern end of the airport. Photo 7: View from the top of the embankment (above the pumping station in Photo 2) looking west. Airport infrastructure assets located immediately behind the embankment. Photo 8: Shannon Airport from the air with frontage to the Shannon Estuary. Flood Risk Review Report UoM 27 Shannon International Airport IRR V0_B 6

135000 135500 136000 136500 137000 137500 138000 138500 139000 139500 140000 140500 Shannon International Airport 163000 163500 164000 134500 Legend 162500 APSR Boundary for CARs only Historic Flooding Incidents Rail Network Roads (National Roads Authority) Airport Land OPW Embankments 162000 Water bodies mapped from RADARSAT-2 * Hydrometric Gauging Stations EPA River Network Historic Flood Data Architectural Heritage UNESCO Sites Special Protection Area Special Area for Conservation Rail Stations 161500 Nursing Homes Residential Care for the Elderly Proposed National Heritage Area National Heritage Area Benefiting Lands Schools Ports and Harbours 161000 OPW Buildings Flood Extents (PFRA, 2010) 10% AEP Flood Extent (1 in 10 chance in any given year) 1% AEP Flood Extent (1 in 100 chance in any given year) Health Centres Garda Stations 160500 Hospitals Fire Stations 0.1% AEP Flood Extent (1 in 1000 chance in any given year) Civil Defence Head Quarters 160000 Airports * Data Source - Service Régional de Traitement d Image et de Télédétection (SERTIT) (acquired on the 5th of December 2009). 159500 Client The PFRA Flood Extents shown are indicative. They have been developed using simple and cost-effective methods that are suitable for the PFRA. They should not be used for local decision-making or any other purpose without verification. Project Title Shannon International Airport Job No. FINAL 32103000 Scale 1:20,000 @ A3 Drawing Status Figure No. 159000 Shannon CFRAM Study Flood Risk Review Map IRR5 AD/SF Drawn 0 0.2 0.4 0.8 Km Includes Ordnance Survey Ireland data reproduced under OSi Licence number EN0021011. Unauthorised reproduction infringes Ordnance Survey Ireland and Government of Ireland copyright, Ordnance Survey Ireland, 2011. Copyright reserved Jacobs UK Ltd 95 Bothwell Street, Glasgow, G2 7HX Revision Checked JC Review KK/JM Oct 04, 2011 Approved IB/PS