Masterplanning Study Contents

Similar documents
WELCOME. Members of the development team are on hand to answer questions and feedback forms are available for your comments.

Pre-application submission for Committee: Phase 4 development at West Hendon

Enterprise and Business Scrutiny Panel

ASHTON GATE SPORTS & CONVENTION CENTRE. A New Home For Bristol Flyers

9.1 INTRODUCTION 9.2 EXISTING DEVELOPMENT. Southern Cross University

Bartlett Square Welcome. Investment Framework. London Airport Ltd

Transforming Torbay s Town Centres: Car Parks and Cash Machines

Calderdale MBC. Wards Affected: Town. Economy and Investment Panel: 20 October Halifax Station Gateway Masterplan

Caloundra South overview Ben Allen, General Manager Sustainable Communities

West of England. Priority Places Requiring Public Investment

Delivering and Investing in Future Infrastructure Projects

Introduction 3. Part 1: Defining and Measuring a High Quality Planning Service 4. Part 2: Supporting Evidence 34

Urban Design Meets Economic Regeneration. Weston Civic Pride Initiative. Weston Civic Pride Initiative. Weston Civic Pride Initiative

Welcome to public consultation for the redevelopment of the existing leisure centre site.

Bolton Council Invest in Bolton. Welcome INVEST IN

Local Development Scheme

Creating a High Quality Business District

Vision Planning for Metropolitan Areas. Ian Macleod Head of Development (East) and Planning Strategy Birmingham City Council

Welcome to our exhibition

Council Briefing Minutes

Hotel and Hospitality Services. Capita Real Estate

Welcome. North. Westgate

Table 1 overleaf summarises the changes in planned growth between the 2016 and 2017 iterations of the plan.

Permitted Development rights for change of use from Commercial to residential request for exemption

WHAT MAKES A SUCCESSFUL BUSINESS COMMUNITY?

HARBOUR EDGE STITCH. Uniting the Waterfront with the City Centre

LIVE YOUR LIFE AT THE TOP

Birmingham City Centre Vision for Movement

2.1 TITLE: VMC PARKS MASTER PLAN AND IMPLEMENTATION STRATEGY PROJECT UPDATE

Greenwich Peninsula Investor and Analyst Day 12 March 2013 Quintain Estates and Development PLC

Funding of the Croxley Rail Link from planning obligations held by HCC

Llandudno Junction. Regeneration Proposals for the Future. December 2009

PO Box 257 PO Box 257 PARRAMATTA NSW 2124 PARRAMATTA NSW 2124

JOINT CORE STRATEGY FOR BROADLAND, NORWICH AND SOUTH NORFOLK EXAMINATION MATTER 3C EASTON/COSTESSEY

A Response to: Belfast On The Move Transport Masterplan for Belfast City Centre, Sustainable Transport Enabling Measures

Supplementary Planning Document

Strategic Transport Forum 21 st September 2018

Major Schemes and the wider Strategic Network

New West End Company. Richard Dickinson. New West End Company Chief Executive. Capital Management

3450 Dufferin Street - Official Plan Amendment, Zoning Amendment and Draft Plan of Subdivision Applications Request for Directions Report

Figure 3: Global Sydney. Draft Metropolitan Strategy for Sydney. North Sydney CBD. Second Harbour Crossing. Walsh Bay Arts Precinct.

Co-ordinated and Orderly Growth A Suite of Infrastructure and Public Assets for the Future... 1

UrbanBuzz. 2 nd December Roger Madelin Joint Chief Executive, Argent Group PLC

LIVE. WORK. PLAY. STATUS OF DEVELOPMENT FALL Produced for information by the Town of Markham

Major Scheme Business Case Summary Report for Programme Entry

The decision on whether to take enforcement action falls outside the scope of delegated powers.

2433 Dufferin Street Zoning By-law Amendment Application - Preliminary Report

PLANNING THE SUNBURY GROWTH CORRIDOR

Stewarding the Local Economic Recovery

TAYplan SDPA. Main Issues Report. Options for Scotland s s SusTAYnable Region (Strategic Development Planning Authority)

Tonsley Property Information Memorandum

Part 005 Implementation Strategy _

Wolverhampton City Council

401, and 415 King Street West - Zoning Amendment Application - Preliminary Report

Corporate Report Format 28 February 2017

City Deal City Centre Enabling Infrastructure Public Realm. Derek Dunsire PRINCIPAL OFFICER: DRS CITY CENTRE REGENERATION / CITY DEAL

SUBJECT: Downtown Mobility Hub draft New Precinct Plan and Policy Framework

Toga has appointed Urbis to assist in developing a Toga response to the draft District Plans. Urbis has

WELCOME. Welcome to the first public exhibition of proposals for the development of the Paddington Central Management Office.

REAL ESTATE PLAN ADOLFO SUÁREZ MADRID-BARAJAS AIRPORT

Downtown Mobility Hub: Draft New Precinct Plan. Art Gallery of Burlington September 7, 2017

Public Realm & Landscape

SOUTH WORCESTERSHIRE DEVELOPMENT PLAN - PREFERRED OPTIONS 2011: SCHEDULE OF ISSUES AND RECOMMENDED RESPONSES Row No.

THE LONDON BOROUGH OF HOUNSLOW (HOUNSLOW HIGH STREET QUARTER) COMPULSORY PURCHASE ORDER 2015 THE LONDON BOROUGH OF HOUNSLOW

Director, Community Planning, North York District

REAL ESTATE PLAN ADOLFO SUÁREZ MADRID-BARAJAS AIRPORT

ROCHESTER RIVERSIDE. City of learning, culture, tourism and enterprise.

SEABURN INTRODUCTION. Workshop Masterplan. Regeneration win bid to re-develop Land at Seaburn. consultants appointed to bring forward proposals

HOTEL/LEISURE/COMPLEMENTARY RETAIL OPPORTUNITY

Liverpool John Lennon Airport Master Plan to Interim Consultation Summary October 2017

DEVELOPMENT MAP 2017/18

A Master Plan is one of the most important documents that can be prepared by an Airport.

RegeneratingGlasgow. Development and Regeneration Services. Glasgow City Council. September 2008

Toronto and East York Community Council. Acting Director, Community Planning, Toronto and East York District

LISTED BUILDING AND FIRE STATION CENTRAL SITE WHITGIFT STREET OLD PARADISE GARDENS

Welcome WINSTON GROUP. Welcome to our public exhibition on the Winston Group s proposals to redevelop 110 Walm Lane, Willesden Green.

ACI World Conference and Exhibition, Marrakech, 2011

This economic statement provides analysis with respect to land at Tarneit North, and has been prepared on behalf of Amex Corporation.

Report of the Strategic Director of Place to the meeting of Executive to be held on 11 September 2018

A140 study and Major Road Network

Supporting information to an application for preapplication 3 rd February 2017

Our Future City. Tuesday 5 th July, 4pm-6pm Suite 1, Jurys Inn Brighton

Business Case Approved. Under Construction. Business Case Approved. Under Construction

COLLEGE STREET STUDY Community Consultation Meeting. December 2015

I508. Devonport Peninsula Precinct

Committee. Presentation Outline

CITY RAIL LINK. New Public Transport Stations and Development Opportunities at Karangahape Road, Newton and Aotea Quarter

Global Mega-trends Urbanisation a key driver of growth. Steve McCann Group CEO and Managing Director Lend Lease

Business Park Luton. High quality business space available within an attractive parkland setting

FIGURES TABLES. Table 1 - Public Engagement Participation Table iii

The Edinburgh 12. Monthly Bulletin March City of Edinburgh Council. Steve McGavin Head of Business Partnerships

Draft City Centre Transport Proposals

GUNGAHLIN TOWN CENTRE

WORKING DRAFT (DECEMBER 2016) - FOR COMMUNITY REVIEW BY

Team London Bridge Response to the Department for Transport Consultation on the combined Thameslink, Southern and Great Northern franchise

125,000 sq ft HQ warehouse facility sold to IPECO Holdings (STP)

Submission on Draft Ingleburn Structure Plan. Prepared for: Ingleburn Chamber of Commerce & Industry Inc. 6 February 2015

Presentation to the British Irish Airport s EXPO John Heffernan Chief Development Officer, Dublin Airport

CITY & COUNTY OF SWANSEA SWANSEA TALL BUILDINGS STRATEGY STATEMENT OF REPRESENTATION

LIVERPOOL INVESTMENT OPPORTUNITIES

Transcription:

/ Ascot Road, Watford Masterplanning Study May 016

/ Ascot Road, Watford Masterplanning Study Contents Existing Uses and Road etwork Potential Developmet s Masterplanning Strategy Masterplan Vision Proposed Vehicle and Pedestrian Movement Proposed Building Uses - Ground Floor Proposed Building Uses - Upper Floors and Storey Heights Proposed Phasing Strategy and Quantum of Development Proposed Potential Locations Indicative Massing Studies

Introduction Watford Borough Council s Local Plan Part : Allocations and Development Management Policies 006-031 Publication version, is on public consultation until midday 3 October 016. As part of this process a master plan study has been undertaken for the western part of the area identified in the Local Plan Part 1 - Core Strategy as Special Policy Area 6, Western Gateway. This covers a corridor from Tolpits Lane in the north to Ascot Road in the south. With a new Metropolitan Line station scheduled to open at Cassiobridge, Ascot Road in 00, Policy SPA 6 aims to deliver a wider regeneration of the area by describing appropriate uses and objectives for future development. The objective of the /Ascot Road Master Plan Study is to build on the policy foundations of SPA6 and to provide a framework to facilitate redevelopment that improves and upgrades the area from an economic development and environmental perspective, whilst capitalising on the potential of the new station. The proposals can be summarised as follows: Masterplan approach Urban restructuring to create a new place High quality urban design and public realm Improved legibility and connectivity to the surrounding urban fabric. Higher-density mixed-use development close to the new station including new homes, employment floorspace, a local retail/leisure hub, a primary school, and community facilities. Infrastructure improvements. By adopting a masterplan approach, a single vision is established which provides certainty to the local community, landowners and investors. It can become a mechanism to attract key investment from both public and private sources. Such support helps to reduce risk which in turn helps an idea become reality. However there needs to be a degree of flexibility to the masterplan so that it can adapt over time to changing conditions. Timescales In terms of timescales the regeneration of the area is likely to take place over an extended time period with some areas of development coming forward in advance of the new station, whilst others will not start being built until after the station is completed. ext Steps It is intended that feedback from this consultation will help inform a more detailed development brief for the area to be led by the Council working with local communities and delivery partners. Work on this will be undertaken during autumn 016 and early 017 with a further consultation being scheduled for spring 017.

Existing Uses and Road etwork 1:000 @ A1 Watford Road Whippendell Road Restaurant Hotel Surgery Existing Ascot Road Existing River Gade Sports Centre Cassiobury Park Greenhill Cresent Existing Tolpits Lane Watford Business Park Tolpits Lane Holywell Community Centre Croxley Green Business Park Tolpits Lane Key Watford County Council/ Three Rivers District Council boundary Special Policy Area 6 River Colne Hampermill Lake Road etwork

Potential Development s 1:000 @ A1 PS4 Potential 7,000m PS5 Potential 3,000m PS1 Potential 3,100m Station River Gade PS3 Potential 33,000m PS6 Potential 6,00m Proposed Station Car Park PS7 Potential 3,400m S1 Orion 10,800m 400 S 100 4,000m PS Potential 8,700m Cassiobury Park S3a 11,400m 15 S3b 18,300m 175 S3c 5,700m 50 Key First Watford Phase County Developments Council/ Three s Rivers District Council boundary Potential s s Future Potential Potential s s Storey Potential umbers of Units 1 4 River Colne Hampermill Lake

Masterplanning Strategy 1:000 @ A1 Restaurant Hotel Existing Station Surgery Existing Mixed Use Mixed Use Sports Centre 5 minutes walking time from station Existing Watford Business Park Future 10 minutes walking time from station Holywell Community Centre Croxley Green Business Park 15 minutes walking time from station First Phase Developments Key s Potential Watford County s Council/ Three Rivers District Council boundary Future Potential s Road etwork 4 Storey umbers

Masterplanning Vision 1:000 @ A1 River Gade Cassiobury Park Key Watford County Council/ Three Rivers District Council boundary River Colne Hampermill Lake

Ascot Road / Ascot Road, Watford, Masterplanning Study Proposed Vehicle and Pedestrian Movement 1:000 @ A1 Watford Road Whippendell Road estaurant Hotel Surgery River Gade Sports Centre Cassiobury Park Greenhill Cresent Tolpits Lane Watford Business Park Tolpits Lane Holywell Community Centre Croxley Green Business Park Tolpits Lane Key Watford County Council/ Three Rivers District Council boundary Existing Road etwork Proposed Road Access Proposed Pedestrian Access River Colne Hampermill Lake

Proposed Building Uses, Ground Floor 1:000 @ A1 River Gade Cassiobury Park Key Watford County Council/ Three Rivers District Council boundary Cassiobridge Station Active Frontage First Potential Phase Developments s Station / Office Car Parking Potential s Future Existing Potential Trees s Proposed Trees 4 Storey umbers River Colne Hampermill Lake

Proposed Building Uses, Upper Floors and Storey Heights 1:000 1 15 8 6 River Gade 7 6 6 10 6 Cassiobury Park 4 6 4 4 4 4 3 3 3 3 Key Watford County Council/ Three Rivers District Council boundary Cassiobridge Station Active Frontage Potential Development Station / Office Car Parking Existing Trees Proposed Trees 4 Total Storey umbers from Ground Level River Colne Hampermill Lake

Proposed Phasing Strategy and Quatum of Development 1:000 @ A1 PS4 PS5 PS1 Station River Gade PS3 PS6 S1 PS7 S PS Cassiobury Park S3a S3b S3c Total Building Area m Average GEA m / Unit* Total umber of Units Density Units / hectare Retail Area m Phase Plot 1 S1 3000 80 400 370 1000 S3c 4500 90 50 56 Total 36500 85 450 46 1000 S3b 1600 90 175 100 Total 1600 90 175 100 0 3 S3a 10600 85 15 130 Total 10600 85 15 130 4 S 9000 80 100 50 400 Total 9000 80 100 50 400 TOTAL 57700 850 1400 * ote average unit size based on the following mix and subject to review of Planning Policy: 80m - 10% studio, 30% 1 bed, 45% bed, 15% 3 bed+ 85m - 35% 1 bed, 45% bed, 0% 3 bed+ 90m -35% 1 bed, 35% bed, 30% 3 bed + ** ote car parking provision for station (146 spaces + 10 accessible) to be included within this site Potentail Additional s Total Building Plot Area m PS1 3100 PS 8700 PS3 33000 PS4 7000 PS5 3000 PS6 600 PS7 3400 TOTAL 64400 Key Watford County Council/ Three Rivers District Council boundary Phase 1 Phase Phase 3 Phase 4 Phase 5 River Colne Hampermill Lake

Potential Locations 1:000 @ A1 L1. 4,00m 4,600m 7,00m L. 8,400m 6,300m

Ha tte rs L an e / Ascot Road, Watford, Masterplanning Study Indicative Massing Studies oa tr co As ol d Scho Cassiobridge Station ll Road Whippende Overview from orth

/ Ascot Road, Watford, Masterplanning Study Indicative Massing Studies Cassiobridge Station d oa tr o sc A Scho ol Cassiobridge Station Overview from South East