TECHNICAL SPECIFICATION (OBJECTIVES, PROJECT SCALE)

Similar documents
Transport Infrastructure Investment in Viet Nam

APPENDIX 5C Profile of Key Projects

MINISTRY OF TRANSPORT VIETNAM MARITIME ADMINISTRATION DEVELOPMENT OF CONTAINER PORTS VIETNAM

THÀNH PHỐ HỒ CHÍ MINH A Nguyen Van Nghi Street, Ward 7, Go Vap District. 4 1C Nguyen Anh Thu Street, Trung My Tay Ward, District 12

Hue, 2017 Pho Duc Tru

ANNEX 1 Subprojects List and Location Maps. Table A1.1: List of the first phase subprojects under Component 4 (5 provinces, 5 basins)

FLC GROUP JSC. INTRODUCTORY PRESENTATION

Building hotel, entertainment, conference and exhibition center, approximate area of 130 ha 1,500

Known Producers/Exporters of Vietnamese Laminated Woven Sacks

OVERALL EXISTING CONDITION AND DEVELOPMENT STRATEGY OF EXPRESSWAY IN VIETNAM. BANGKOK - 13 June 2016

Location map and area relationship of Viet Phat Industrial Zone and Urban Area

Figure 5C.15 Sai Gon Moc Hoa Route. Grade Width Depth Present Target Present Plan Present Plan mainly III & partially I

The Second Annual Coastal Forum Building Resilience to Climate Change Impacts: Coastal Southeast Asia

CTY CP TVTK GTVT PHÍA NAM - TEDI SOUTH

Figure Huong River Irrigation Scheme. The Study on Nationwide Water Resources. in the Socialist Republic of Vietnam. Development and Management

TRAVEL & STAYS OFFERS

SHIPBUILDING INDUSTRY CORPORATION (SBIC) VIETNAM MARITIME INDUSTRY (Presentation at ASEF 9 th Forum)

2.3 Seismic Conditions

National project list for attracting foreign direct investment until 2020 (Enclosed to prime ministerial Decision 631/QD-TTg on April 29, 2014)

Socio-economic and Tourism Conditions 1999

SAIGON NEWPORT CORPORATION

BẢN TIN THÁNG 04/2015 1Q 2018 EARNINGS CALL

TPP ADVANTAGES INDUSTRIAL ESTATE SOLUTION. By Nguyen Chi TOAN Marketing Manager of VSIP JV 27 November 2015

VAN DON INTERNATIONAL AIRPORT. The new gateway to the heritage land DEVELOPED BY. Add

Hanoi, May 6 th, Dear Sirs/Madams,

Conservation And Aquatic Resources Development in Vietnam

The Current Status and Conservation of Bears in Vietnam

LIST OF KEY PROJECTS NEEDED TO CALL FOR INVESTMENT IN THUA THIEN HUE PROVINCE

Ghi chú. Công ty TNHH MTV Dầu khí TP.HCM. 27 Nguyễn Thông, Phường 7, quận 3, TP.HCM. SP Saigon Petro

Region/ Province/ State/ City 122 Phan Xich Long Str, Phu Nhuan District, HCM. STT Branch Name Branch Address

- - PORTCOAST CONSULTANT CORPORATION PORT COAST. December 2018 GEOTECHNICAL SURVEY

New Challenge & 22 Years Experiences of Consumer Products in Vietnam

AMATA VN Public Company Limited

- Borrowing short term loans from State Bank under the form of regranting - Borrowing loans from credit institutions and financial companies.

F-92. Catchment Area : 11,250 km 2. Hình 7.1 Mô hình sơ đồ cân bằng nước (Lưu vực sông Bằng Giang & Kỳ Cùng) Bang Giang - Ky Cung River Basin

Detail Offer/ Chi Tiết. Merchant/ Khách Sạn & Resorts Sofitel Legend Metropole Hanoi (Le Spa du Metropole)

TOKYU BINH DUONG GARDEN CITY

BRIEF ENVIRONMENT REPORT

Vietnam Marine Protected Area Management Effectiveness Evaluation

STRENGTHENING INTERNATIONAL COOPERATION IN BAMBOO DEVELOPMENT IN THANH HOA PROVINCE VIET NAM

AMATA VN Public Company Limited

Nguyễn Ngọc Lan

Facts about the Hai Phong coal-fired power plant project in Vietnam

The Viet Nam Provincial Governance and Public Administration Performance Index (PAPI) Measuring Citizens Experiences

TERMS & CONDITIONS HOME&AWAY OFFERS. Offer Detail: - 15% off on mooncake bill

TOKYU GROUP INTRODUCTION OF BECAMEX IDC CORPORATION INVESTMENT AND INDUSTRIAL DEVELOPMENT CORPORATION. Tokyu Binh Duong Garden City

The 7 th Da Nang Urban Development Forum. Date & Time: December 22th 8:30-17:00 Venue: Da Nang Administration Center

Vietnam Institute of Economics

UPDATED LIST OF 479 ESTABLISHMENTS NAFIQAD HAS APPROVED (Up to 07 May 2010) Commercial Name of Establishments

Attachment-2. The Proposal of the Coastal Environment Protection Corridor (CEPC)

6 Where we re located. 7 Binh Duong Factories. 11 Hanoi Factory

CHAPTER 3 PROVINCIAL PERFORMANCE IN 2012

The UNIVERSITY WITHOUT BORDERS Journal of ECONOMICS & BUSINESS

Viet Nam Situation Report No. 3 Floods Central Vietnam October 8, pm (Viet Nam time)

The foundation for the sustainable development Welcome to KINHBACCITY

By year 2005, VTPB overseas offices are to be set up in: Paris, Los Angeles, and Tokyo.

The main points of the MOU concluded by Tokyu Corporation with Becamex IDC Corp. are as follows:

Vietnam s Transport Sector Outlook and Engineering Opportunities

SHOW REPORT THE 10TH VIETNAM INTERNATIONAL EXHIBITION ON CHEMICAL INDUSTRY VINACHEM EXPO Time: December 02-05, 2015

Hoi Son Dam VAN CANH. -> Tan An - Dap Da Schemes are to be referred to Figure 13.4 DONG XUAN

Binh Minh Electronics Co.,Ltd.

INVESTMENT MEMORANDUM - MERGER OF VINPEARL JSC INTO VINCOM JSC

8. Projects/ Programs and Provincial Tourism Development Plans

REDEMPTION CATALOGUE

Golf & The Luxury Au Co Cruise 5 Days / 4 Nights

Contracts Awarded in May 2011

Red River Delta Provinces. Phủ Lý, Hà Nam, 24/05/2013. A policy monitoring tool for middle-income Viet Nam

Medi-Pharm Danang 2018

Năm 2015 A E. Chứng minh. Cách 1.

PAÍS SECÇÃO. Vietname Produtos da pesca. Em vigor desde 15/02/2018 Data de publicação 02/02/2018. Lista em vigor. Número de aprovação

FACTSHEET Paradise Elegance. Halong Journeys Of Distinction

07-11 November 2016 Ho Chi Minh City, Vietnam. Program for the Australian delegation to Vietwater November proudly supported by:

SNORTH VIETNAM AND LAOS DISCOVERY

VIETNAM. Initiative 1 Community-Based Poverty Reduction Tourism Program. Community-Based Poverty Reduction Tourism Program

Sika at Work. Sika Vietnam Industrial Factory Projects in Vietnam. Các dự án Nhà máy Công nghiệp tại Việt Nam

越南 ( 水产品 ) 生产企业在华注册名单 (2017/06/19 更新 )

Investor Presentation December March 2012 INVESTOR PRESENTATION

Invest in Myanmar Ms. Ei Ei Khine Economic counsellor Embassy of the Republic of the Union of Myanmar

INDOCHINES CONSULTANT & COMMERCIAL JSC

PPP Projects. Ministry of Finance. PPP Central Unit

MICE TOURISM IN VIETNAM. Trang Q. Nguyen Vietnam National Administration of Tourism Hangzhou, October 2012

BEAUTY OF NORTH VIETNAM

越南 ( 水产品 ) 生产企业在华注册名单 (2017/06/15 更新 ) 注册地址 注册类型 备注 NO.

PORTCOAST CONSULTANT CORPORATION 92 Nam Ky Khoi Nghia, District 1

Survey on Socio-Economic Development Strategy for the South-Central Coastal Area in Vietnam. Final Report

TOURISM DEMAND ANALYSIS AND FORECASTS

North Vietnam. North Vietnam

Belgium Address: Tel.: Fax: E-m ail: Website: Schedule: Consulate in Ho Chi Minh City Address: Tel.: Fax: E-m ail: Website: Schedule:

BAC LIEU PROVINCE. 1 Basic Information

FACTSHEET. Paradise Peak. Ultimate Luxury

WORLD ELITE CONVERGENCE

Measuring Governance and Public Administration in Viet Nam

THE PRIME MINISTER DECIDES: Article l.- To approve the Planning on Van

REPORT ON CORPORATE GOVERNANCE OF LISTING COMPANY (the first 6 months of 2016)

FACTSHEET. Paradise Peak. Ultimate Luxury

Viet Nam Typhoon Son Tinh (No.8)

Index. 000 Map pages 000 Photograph pages. Lonely Planet Publications 540

LIST OF CO-MERCHANTS WITH DISCOUNT RATE FOR IVB'S CARDHOLDERS

GENERAL INFORMATION NOTE 1

THIẾU ĐOÀN TÂY SƠN & ĐỐNG ĐA. Fall Camp Fiesta Island Rd San Diego, California Phone: (619)

Transcription:

LIST OF PROJECTS CALLING FOR INVESTMENT IN QUANG NINH PROVINCE IN THE PERIOD 06 TO 00 (Issued together with Decision No.86/QD-UBND dated March 8, 06 by Quang Ninh ) Total: 4 projects No. NAME OF PROJECT LOCATION TECHNICAL SPECIFICATION (OBJECTIVES, PROJECT SCALE) ESTIMATED TOTAL INVESTMENT CAPITAL FORM OF INVESTMENT CONTACTS I. TRANSPORT SECTOR (7 projects) Mui Chua Port Tien Yen - Total land use area: 5,5ha - Construct: 0 berths for handling vessels of,000-3,000 DWT, capacity of 500.000T/year VND,000 billion ( USD 47 million) PPP, ODA Transport Van Gia Port Upgrade current port to reach capacity of.000.000t/year until 00 VND,000 billion ( USD 47 million) PPP, ODA Transport 3 Hon Gai Port Ha Long - Construct berths to handle with domestic passenger ship from North to South and international cruise ships. Being capable to handle cruise ship with loading capacity of 70,000 GRT. - Until 00, handling cruise ship with loading capacity of 00,000 GRT and 950 thousands passengers/year, VND 30 billion ( USD 5 million) PPP, ODA Transport 4 Construction of main roads to connect functional areas in Van Don Economic Zone (phase II) Doan Ket, Dai Xuyen, Binh Dan, Van Yen To link main functional areas in Economic Zone. The total length: 3 km. Road of standard of grade II. VND 650 billion ( USD 3 million)

5 Cai Bau North Port In the north of Cai Bau island, Van Don - Construct a general port - Total land use area: 700ha VND 5,00 billion ( USD. billion) 6 Upgrading Cai Rong port Ugrade current port in Cai Rong town, Van Don, Quang Ninh Upgrading and widening current Cai Rong port to the North-East, South-West and South-East (towards the sea). Construction of technical infrastructure to improve transport and loading capacity and upgrade the current port to become a general port (including passenger port, cargo port, fishing port). At the same time, planning the South West area into a logistic port area. VND 4,94 billion ( USD. billion) 7 Construction of Hai Ha coastal road Border Gate Economic Zone To complete transport system in border gate economic zone as approved plans. The total length: 6,4 km, road standard of grade II, with B=8,5m VND,350 billion (~USD million), PPP II. INFRASTRUCTURE IN INDUSTRIAL AND URBAN ZONES (8 projects) Non-tariff area - clean industrial park at Economic Zone Binh Dan Cai Bau Island, Van Don District - Building a clean industrial zone with special free tax policy (duty free) to promote advantages of an airport, to stimulate and promote investment in economic zone. - Total area of land use: 50 500 hectare. VND 7,300-3,500 billion ( USD.3.5 billion) Viet Hung Industrial Zone (Phase ) Viet Hung ward, Ha Long City - Investment on building and operating the industrial zone s infrastructure and accompanying services. - Total area:,7 hectare. Around VND,000 billion ( USD 50 million)

3 Tien Yen industrial zone (Phase ) Tien Yen - Investment on building and operating the industrial zone s infrastructure - Researching area 50 hectare/350 ha of total land area VND 8000 billion (~USD38 million) 4 5 Building Administration Center in Economic Zone Construction infrastructure of a nontariff area Ha Long Hoanh Mo Dong Van Border gate economic zone Building Administration Center in Economic Zone where the locals can access to friendly and effective administrative services. Total land use area: 3 ha Location: About km far from center of Cai Rong town, and 0 km far from airport. Total land use area: 50,45 ha VND 69.93 billion (~USD 30 million) VND 440 billion (~USD million) PPP, BT BOT, 00% 6 Component projects of Dong Mai industrial zone Dong Mai industrial zone, Quang Yen town As approved detailed plans investor PPP, BOT 7 Dong Trieu industrial zone Hong Thai Dong Dong Trieu - Investment on building and operating the industrial zone s infrastructure - Researching area 50 hectare VND.4 billion (~USD58 million) 8 Construction of economic cooperation zone s infrastructure at the boder of (Vietnam) Dong Xing (China) Border Gate economic zone Construction of Border Economic Cooperation Zone s infrastructure to attract other investment to promote trade between city (Viet Nam) and Dong Xing city (China); Phase I: land use area of 700ha. Total land use area:.360ha. VND 5000 billion (~USD 74 million), PPP

III. CULTURE, TOURISM SERVICES AND TRADE (4 Projects) Eco-tourism resort on Phuong Hoang Island Eco-tourism resort on Nat Dat Island Phuong Hoang Island, Van Don District Nat Dat Island, Van Don District - Land-use area: 6,9 km(69 ha) to serve about 0.000 tourists. - Building an eco-tourism resort (beaches, villas, hotels, marina in the eco-tourism resorts, etc) - To diversify tourism products based on exploiting advantage of terrain and landscape of the area, in accordance with the requirements of economic development and environmental protection of Bai Tu Long Bay landscape. - Land-use area:.6 km. (6ha) to serve about 5000 tourists. - Building an eco-tourism resort (beaches, villas, hotels, marina in the eco-tourism resorts, etc). To diversify tourism products based on exploiting the maximum advantage of the terrain and landscape of the area, in accordance with the requirements of economic development and environmental protection of Bai Tu Long Bay landscape. VND 5,50 billion ( USD50 million) VND 3,50 billion ( USD50 million) 3 Eco-tourism resort on Yên Trung Lake Phuong Dong ward, Uong Bi city - Building an eco-tourism resort. - Studying area: 47.8 ha investor PPP,00% Uong Bi city 4 High class integrated ecotourism resort Hon Chin, Van Yen - To build a complex ò hotels, luxury resorts and entertainment services with international standard - Total land use area 8ha VND 500 billion (~USD 9 million)

5 Eco tourism resort at the sea Soi Nhụ island, Ha Long - To build a 5 star eco-tourism resort at the sea. - Total land use area: about 0ha on the the island (of which: construction land area is about 9 ha, the remains about 00ha is rock mountains and natural forests) VND 637 billion (~USD 30 million) 6 Construction of golf course and ecotourism resort in Minh Chau, Quan Lan island, economic zone Minh Chau commune and Quan Lan - Objectives: to construct a golf course and eco-tourism resort at the sea and 3,4,5 and 6 star hotels, other subsidiary works - Scale: total estimated land use area about 45 ha VND 3.500 billion 7 Eco-tourism resort at the north of Coto island At the north of Co To island - To build an eco-tourism (beaches, villas, hotels, boat stations ); diversify tourism products by maximizing the advantages of the terrain and landscape of the area in accordance with the Island s requirements of economic development and environmental protection - Area of research land: around 5 hectares VND 340 billion (~USD 6 million) Co To 8 Cai Chien tourism site Cai Chien, Hai Ha - To build infrastructure and other service works in tourism site. - Total land-use area is about 380 hectares VND 7.600 billion (~USD36 million) Construction 9 Tra Co tourism site 0 Binh Lieu tourism site Tra Co, city Binh Lieu To build infrastructure and other service works in tourism site. - Total research land area is about 80 hectares To build infrastructure and other service works in tourism site. - Total research land area is about 40 hectares VND 5.600 billion (~USD67 million) VND 800 billion (~USD38 million) Construction Construction

Cao Ba Lanh tourism site An Bien Golf course 3 Khe Che Golf course 4 International exhibition centre in City Dong Van commune Troi town and Le Loi Hoanh Bo District An Sinh Dong Trieu District City To build infrastructure and other service works in tourism site. - Total research land area is about 48,5 ha - Building a 8-hole golf course and accompanying service - Building a 7-hole golf course - Land use area: 5 hectare VND 800 billion (~USD 38million ) investor investor VND 4,00 billion ( USD 00 million) PPP,00% Binh Lieu Hoang Bo Dong Trieu VI. ECUDATION, TRAINING AND HEALTH CARE (04 Projects) International hospital Dong Xa District - Scale: 300-500 beds in total land use area of 7 ha. + Phase (04-00): 300 beds. + Phase (00-030): 500 beds VND 40-676 billion (~USD 0-3 million). PPP,00% Health International hospital Ninh Duong Ward, City - Scale: 00 400 beds. + Phase (04-00): 00 beds. + Phase (00-030): 400 beds. - Total land use area: 3.36 hectares VND 80-540 billion (~USD 4-6 million). PPP,00% Health

3 Vocational college Zone 6, Hai Yen Ward, City - Enrollment scale:,500 students per year; training vocation at 3 levels: college, secondary and elementary in the fields of: Tourism - Hotel - Entertainment, Agriculture - Forestry - Fishery, High quality commercial and financial services, Technology, Construction, Economy - Information technology - Language. Training scale:,500-3,000 students; teaching staff of about 50 teachers VND 7 billion (Approx USD 0 million) PPP,00% Labor, Invalids and Social Affair - Land-use area: -5 hectares 4 international university city - Total land use area: 50 ha - To meet the international standard of university VND 85 billion (~ USD 9 million) PPP,00% Construction V. ENVIRONMENT SECTOR AND WATER SUPPLY (0 Projects). In Uong Bi city: Estimated treatment capacity is about 5.000m3/day. Waste treatment plant construction in Cam Pha City, Uong Bí city and Van Don Cam Pha, Uong Bi City and In Uong Bi city: 0 plants with estimated treatment capacity are 34.000m3/day and 9.000m3/day correlatively. In : 0 plants with estimated treatment capacity is about 30.000m3/day and construction of waste drainage pipe system Proposed investors by PPP, BOT, ODA Natural resource and Environment Waste treatment plant construction in Hai Ha Hai Ha Construction of waste treatment plant in Hai Ha with with estimated treatment capacity 3.000m3/day and waste drainage pipe system 9km VND.74 billion (~USD9 million) PPP, BOT, ODA Natural resource and Environment

3 Construction of sand processing plant (to process sand from rubble of rhyolite rocks, conglomerate and gravel from waste rocks of coal mines and in the east area of Quang Ninh) In the east area of Quang Ninh and coal mining s To fully exploit and efficiently utilize natural resources accompanying with protecting the environment. To encourage processing deeply to produce new and high value products that meet both domestic and exportation demands. VND 47.07 million BT, 00 % Natural resource and Environment VI. AGRICULTURE SECTOR (6 projects) Developing raw material area and construction of advanced tea processing factory for export Hai Ha, Dam Ha Objectives: Developing raw material area with high-quality tea plantation to gradually replace the old breeds of low capacity and quality and build an advanced tea processing factory with capacity 8000-0.000 ton/ year. Scale: Current area 00 ha, until 00 increasing up to 500ha. investors investors Agriculture and Rural development Component projects in mollusk seed production areas Objectives: Building a mollusk seed production to attract investment in building high quality mollusk hatcheries and nursery areas, providing in Quang Ninh province and the northern coastal province Scale: total area 300ha. Of which: the surface water area 7.4ha and land use area 7.6ha investors investors Agriculture and Rural development; People committee 3 Focused cattle and poultry breeding farm project Dong Tam, Duc Yen commune and Dong Ha Tan Lap, Son HaiCommun e, Dam Ha Total land use area in Dong Tam, Duc Yen commune: 9,07ha; Total land use area in Dong Ha, Tan Lap and Son Hai: 8,79ha VND 8 billion (~USD 3,9 million) investors Agriculture and rural development

4 High tech seafood processing line Co To To process high quality seafood, to improve economic performance. Project scale: 30.000 ton/year VND 0 billion (~USD 5,7 million) 00% investors Agriculture and rural development 5 6 Sa Sung breeding and processing into commodity Industrial breeding development center Quang Minh Hai Ha Quang Phong Hai Ha To build a focused breeding area with the total land use area: 300ha Objectives: To improve the breeding industry in the province become the main production sector, contributing to the economic restructuring in agriculture towards industrialization and modernization Scale: 50ha (of which retrieving area from Phong Dong green tea company: 80ha; site clearance area: 70ha) VND 30 billion USD million 00% investors 00% investors Agriculture and rural development; Hai Ha People Hai Ha People