Next Generation Cycleway Design. Improving connectivity and cycling behaviours through design

Similar documents
Report to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub

Bus Priority Package. Presentation to Leigh Business Forum. 11 December 2015

Active Travel Strategy for Perth and Kinross

Presentation to BRT UK Technical Visit to Leigh to Ellenbrook Guided Busway

Review of Highcliffe Shopping Centre

A Response to: Belfast On The Move Transport Masterplan for Belfast City Centre, Sustainable Transport Enabling Measures

Member-led Review of Cycling Infrastructure

Roundhouse Way Transport Interchange (Part of NATS City Centre Package)

A TRANSPORT SYSTEM CONNECTING PEOPLE TO PLACES

Part four. In this part you will find: The next steps to deliver the master plan

Borough High Street Low Emission Neighbourhood

Our business plan for making travel easier in Greater Manchester

Investing in Greater Manchester transport 2017/2018

Proposals for the Harrogate Road / New Line Junction Improvement Scheme. August / September Supported by:

Appendix 6 Fulbourn Greenway Review

What s happening with Transport in Bristol?

03 Opportunities and Strategies Union Canal Study 17

As part of our transport vision, Leeds City Council, working with the West Yorkshire Combined Authority and Leeds Bradford Airport Company, is

Upper Clutha Transport Report

City Deal City Centre Enabling Infrastructure Public Realm. Derek Dunsire PRINCIPAL OFFICER: DRS CITY CENTRE REGENERATION / CITY DEAL

IRISH PARKING ASSOCIATION. The use of Pay and Display in Traffic Management in Kilkenny City

Open Report on behalf of Richard Wills, Executive Director for Environment and Economy

Member-led Review of Cycling Infrastructure

RE: Victoria Road upgrade (RTA December 2007). Thank you for the briefing from your department and the invitation to comment on the above.

WELCOME WELCOME TO OUR PUBLIC EXHIBITION FOR THE BOND STREET PUBLIC REALM PROJECT.

Station Travel Plan Malton, Scarborough & Seamer

West Midlands Sustainable Urban

Schedule of Planning Applications Committee Date: 23 May Reference: 06/18/0064/F Great Yarmouth Officer: Mr J Beck Expiry Date:

Queen s Circus Roundabout

2.0 POLICY AND DEVELOPMENT FRAMEWORK. Introduction. Transport21. Celbridge Development Plan 2002

PART VIII APPLICATION FOR REVISED SOUTH SIDE TRAFFIC MANAGEMENT WORKS TO FACILITATE LUAS BXD PLANNING REPORT ROADS & TRAFFIC DEPARTMENT

LISTED BUILDING AND FIRE STATION CENTRAL SITE WHITGIFT STREET OLD PARADISE GARDENS

M621. Junctions 1 to 7 Improvement scheme. Share your views

Sharing the Way with Sustainable Transport Options

Major Scheme Business Case Summary Report for Programme Entry

Riverside Heights, Norwich. Travel Plan

The Point Roundabout Improvement Scheme

Creating a High Quality Business District

Further details on interventions and funding are available within each Local Area Implementation Plan.

2015/16. Council LOGO ATTRACTIVE SEAMLESS RELIABLE IMPROVED CONNECTIVITY ACCESS FOR ALL REDUCED EMISSIONS

Urban Design Meets Economic Regeneration. Weston Civic Pride Initiative. Weston Civic Pride Initiative. Weston Civic Pride Initiative

Uniclass L534+L212. August home zones. paving PRECAST CONCRETE PAVING SOLUTIONS FOR TODAY S RESIDENTIAL STREET ENVIRONMENTS.

Reducing traffic: a new plan for public transport

Guildford Borough Transport Strategy 2017, Topic Paper: Transport, June 2017 (accompanying Local Plan 2017) Local Plan Transport Strategy 2017

Rail & Bus for Herefordshire. Buses Supplement Spring 2018

LONDON BRIDGE FUTURE STREETS: VISION AND PROJECTS A RESPONSE TO THE MAYOR OF LONDON ROADS TASK FORCE BY TEAM LONDON BRIDGE.

Improving our roads to drive our future

Felixstowe Branch Line FAQ

FUTURE TRANSPORT STRATEGY AND GREATER SYDNEY SERVICES AND INFRASTRUCTURE PLAN. Western Parkland City

Histon Road Local Liaison Forum (HR LLF) Minutes

Our borough Our future Our choice

SUMMARY. Make the town centre better for pedestrians with shared spaces and improved connections

The Belfast Manifesto

Arts and Cultural Precinct Masterplan. July 2017

Draft City Centre Transport Proposals

Business Case Approved. Under Construction. Business Case Approved. Under Construction

Strategic Transport Forum

WELCOME. Members of the development team are on hand to answer questions and feedback forms are available for your comments.

EAST WEST RAIL EASTERN SECTION. prospectus for growth

Strategic Cross Border Planning in the West Midlands

CITY OF EDINBURGH COUNCIL WRITTEN SUBMISSION

SOUTHBOUND YONGE STREET TO EASTBOUND HIGHWAY 401 F L Y -UNDER

Map showing location of public transport projects in vicinity of railway station

Sustainable mobility and the transition to a low-carbon retailing economy

Public Open House. Chief Peguis Trail Project

STAG - Part 1 Appraisal Summary Table

Multi-storey station car park opens in New Year

HARBOUR EDGE STITCH. Uniting the Waterfront with the City Centre

Committee. Presentation Outline

M2 Junction 5. improvements scheme. Preferred route announcement

With a world-class infrastructure, a global financial exchange, inspiring architecture, enabling services and a

Enterprise Way. The new Airport City link road. June 2017 Progress Update

Leicester Square Action Plan Summary

Living & Working Access and Recreation

East Lancashire Highways and Transport Masterplan East Lancashire Rail Connectivity Study Conditional Output Statement (Appendix 'A' refers)

Gold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content

Train Stations are not just arrival and departure locations

Tesco Express, Alcester Road South, Kings Heath, Birmingham, B14 6EB

Southam Town Centre Community Highway Improvement Project HAVE YOUR SAY

ACORNS PROJECTS LIMITED

Proposed Capital Programme 2016/17 to 2018/19 including the Capital Budget 2016/17

A140 study and Major Road Network

Part 005 Implementation Strategy _

North Essex Parking Partnership Operational Report. PART 1:April to August 2018

AUCKLAND $1.2 BILLION $1.9 BILLION $149 MILLION 15% SPEND $5.7 BILLION

Kilometres. Blacktown. Penrith. Parramatta. Liverpool Bankstown. Campbelltown

Christchurch City Council. Major Cycleways. Activity Management Plan. Long Term Plan

Agenda Item 5: Rail East Midlands Rail Franchise Consultation

Board meeting

Member-led Review of Cycling Infrastructure

DARWIN LUXURY HOTEL CONNECTIVITY AND PUBLIC REALM Our concept includes:

LOCAL GOVERNMENT ROADS AND TRANSPORT STRATEGY

WHAT MAKES A SUCCESSFUL BUSINESS COMMUNITY?

Commissioning Director - Environment. Officer Contact Details Jane Shipman;

AIREBOROUGH NEIGHBOURHOOD DEVELOPMENT FORUM

Hong Kong West Kowloon Station of High Speed Rail as New Gateway to Mainland China

Our Future City. Tuesday 5 th July, 4pm-6pm Suite 1, Jurys Inn Brighton

places Mooloolaba s heart five

Western Bay of Plenty District Council

A63 Castle Street, Hull HullBID Network Lunch 24 August 2017

Transcription:

Next Generation Cycleway Design Improving connectivity and cycling behaviours through design

Safe segregation between Place Users to offer improved safety and a defined space for each user group Elevated sections offering increased segregation, a defined area and ease of maintenance Cycle hubs located at key locations that integrate parking and servicing facilities to benefit user and interchange between modes of transport Our next generation cycleway designs can also introduce the following innovative features Use of marking and colour to influence road user behaviour to indicate different uses/user groups and wayfinding Integrate environmental features into cycleway design such as SuDs (Sustainable Urban Drainage Systems) and Rain Gardens (subject to suitable space). Creative junction designs to develop safe and useable environments that flow and benefit all users Road safety audits - to understand and develop appropriate and safe proposals 2

Next Generation Cycleway Design With the nation s roads becoming increasingly saturated with vehicular traffic, versus the government s requirements to reduce pollution levels and encourage healthier lifestyles for citizens, the investment and demand for installing cycleways on roads, parks and countryside has never been higher. The aspiration through good design and installation is to encourage a modal shift to the use of cycleways by the public on a daily basis in order for communities to truly reap the benefits of less congested roads, improved health and cleaner air. At Capita our cycleway design team can design the next generation of cycleways that will not only improve the cycling facilities and connectivity in your locality but will also help to encourage perception and the behaviour change of cycling by members of the public. Supporting your next generation cycleway design requirements Our team of experienced landscape architects, highway engineers, road safety advisors, quantity surveyors and project managers all work together to design cycleways bespoke to the needs of the locality, environment, users and clients. The team can: Design new cycleways, retrofitted to your existing infrastructure from concept design to completion Design new cycleways, integrated into new proposed infrastructure from concept design to completion Provide designs to upgrade existing cycleways from concept design through to completion Design independent cycle hubs that include parking and servicing facilities 3

Our experience Port Salford Greenway Working on behalf of Salford City Council, Capita were commissioned to design and construct the Port Salford Greenway scheme, a project to deliver a network of high quality cycling and walking routes in the city. There was a need to create cycling and pedestrian links for both leisure and commuting purposes, helping to connect users within Salford to a key and developing nodal location. Capita provided landscape architecture, highway and structural engineering and quantity surveying services to the project, as well as project managing both phases one and two of the scheme until its completion. With this, Capita provided new footbridges, lighting and benches along the routes, in order to create a safer and more pleasant feel to the areas. Did you know our cycleway designs have won awards at the 2018 CIHT North West Awards, the 2017 National Transport Awards and the 2016 Cycle Planning Awards, working alongside our client Salford City Council. The team were also responsible for refurbishing subways along the route, vegetation and tree clearance where necessary to accommodate the route and replacement tree planting where possible. 4

Looplines As part of Salford s strategy and central government agendas to encourage cycling and walking as alternative options for commuters. Capita, working as a delivery partner with Salford City Council, has designed and delivered various cycle looplines around Salford to encourage traffic-free activity throughout the city. Our landscape architects provided design services to improve and extend Ellenbrook, Roe Green, Linnyshaw and Tyldesley looplines, creating high quality, striking traffic-free cycling and walking routes. All looplines required extensive site clearance works, underpass refurbishments, footpath widening and landscaping. The landscape team also placed new signage on all routes to help people direct users to key destinations throughout the City. Carpino Place Our multidisciplinary team in partnership with Salford City Council, designed and delivered a high quality public space outside a new development of townhouses in Central Salford The team designed and delivered the new cycle lane which was re-routed behind the bus stop on Oldfield Road to avoid conflict between buses and cyclists. For safer access to and from Carpino Place and the surrounding area, pedestrian crossing points were also created. The design work also included the installation of rain gardens for improved drainage, street furniture in the form of cycle stands, bollards, a litter bin and a bus shelter and incorporates high quality paving to complement the existing public realm around the war memorial on the Oldfield Road and Chapel Street junction. 5

Image created by Planet IE, street scene designed by UV 1 New tree planting with Sustainable Drainage Systems 2 Enhanced public realm 3 Rain garden incorporating Sustainable Drainage Systems 4 Cycle lane directed to rear of bus stop 4 5 6 7 Integrated loading bay Terraced and segregated cycle lane Raised table to promote speed reduction and provide crossing facility 2 3 5 6 1 7 Chapel Street East In partnership with Salford City Council, Capita s multidisciplinary team consisting of Landscape Architects and Highway Engineers have produced proposals that include continuous footways and cycle tracks making it safer and more attractive to walk and cycle in the city centre. Chapel Street East is one of the first schemes to be funded through the Greater Manchester Cycling and Walking Challenge Fund and will form part of the Beelines network for Greater Manchester which aims to create the largest joined up system of walking and cycling routes in the UK. Our team is responsible for delivering the scheme, from the design work to supervising plans for Chapel Street East, as well as ensuring implementation of the scheme goes smoothly. Our proposals for Chapel Street East won a Healthy Streets award for Proposal of the Year 2018 Did you know? Our design team have a detailed understanding of cycling policy, planning policy and working in a local authority environment. We can support local authorities with cycle facility funding applications We are experienced in organising, facilitating and managing community consultation exercises. We can work anywhere in the UK We work on projects of all sizes and complexities We have access to a wider pool specialised skills if required for bespoke projects 6

Contact us If you want to find out more about our cycleway design services please contact: Dan.sterry@urbanvision.org.uk 0161 779 6051 https://www.urbanvision.org.uk https://twitter.com/urbanvision_uk https://www.linkedin.com/company/urban-vision-partnership-limited 7