DSNA Navigation Strategy. Benoit Roturier (DSNA)

Similar documents
Status of PBN implementation in France

Evolving and improving landing networks with EGNOS

DSNA NAVIGATION STRATEGY

French DSNA approach to CNS rationalization & evolution

First LPV 200 approach in Europe. Paris Charles de Gaulle. Benoit Roturier DSNA ESSP Workshop Warsaw Direction Générale de l Aviation Civile

NOTICES FROM MEMBER STATES

NAM/CAR Regional Safety/Air Navigation/Aviation Security Implementation Matters 5.2 Effectiveness of air navigation implementation mechanisms

Taking Saturation into account in investment projects: Case study on Paris Lyon line

15 years of experience of GNSS approach procedures implementation: where are we now?

Open Questions & Collecting Lessons Learned

IATA User Requirements for Air Traffic Services (URATS) NAVIGATION. MIDANPIRG PBN SG/3 Meeting Cairo, Egypt, February 2018

EGNOS based Operations Implementation Status and Plans for EGNOS Service Provision Workshop Copenhagen 29 th -30 th September 2015

Título ponencia: Introduction to the PBN concept

ICELANDAIR NICE-REYKJAVIK SURVEY. OPPORTUNITIES SURVEY FRANCE FROM/TO NICE AIRPORT Routes Online 2012

EUROMED GNSS II Achievements and expectations. Presented By: M. Akram HYDRI Head of Air Traffic Studies and Planning Division OACA

GBAS implementation status: international context and situation in France

UK Implementation of PBN

E-GNSS systems for GA

EGNOS SERVICE PROVISION WORKSHOP DFS: EGNOS vertical guidance for Baro-VNAV procedures German history and background information

ESSP EGNOS Service Provider. ICAO APV Workshop (26/05/2011)

GNSS/EGNOS services and applications in civil aviation

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES

SBAS as a solution for safe approaches in New Zealand and Australia

PBN Implementation in the UK

GNSS/EGNOS services and applications in civil aviation

A Pilot s perspective

GBAS implementation status: international context and situation in France

TWELFTH AIR NAVIGATION CONFERENCE

SDM WORKSHOP ON PBN (19/10/2017)

New generation aircraft in the instrument approach domain. Jean-Christophe Lair Airbus Test pilot 1 st Feb. 2017

Saint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis

APAC PBN UPDATE Slide 1 of xx

E GNSS in Aviation: status and trends, aviation grants Workshop Deployment of Galileo and EGNOS in Portugal

Regulative Baseline for the Implementation of IFR Operations at Uncontrolled Aerodromes in the Czech Republic / CZCAA IFR Study.

NEW CALEDONIA PBN PLAN

RNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood.

(RN R A N V A V & & RN R P N

Contextual note SESAR Solution description form for deployment planning

USE AND APPLICATION OF GNSS IN THE IMPLEMENTATION OF NAVIGATION BASED ON PERFORMANCE IN ECUADOR

Appendix 2 List of regulatory references. Appendix 3 List of reference documents. Appendix 4 Background information

PBN Syllabus Helicopter. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

PBN Syllabus Aeroplane. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

ICAO framework for LPV

ICAO Global Provisions and Regional Strategy for the Introduction of GNSS Services in Africa-Indian Ocean (AFI) Region

JOINT ICAO EUR PERFORMANCE BASED TASK FORCE & EUROCONTROL RAISG MEETING

MEDUSA & NANSC, Egypt

Performance Based Navigation (PBN) Implementation Plan. The Gambia

ANNEX F PRELIMINARY IMPACT ASSESSMENT ON CIVIL-MILITARY ORGANISATION

PLAN. 1. Generalities 2. Current Situation 3. Future Strategy + Actions required 4. Conclusion. Ministry of transport 2013

Aircraft Systems and 4D Trajectory Management

EASA RNP (AR) Workshop The Landscape Working Together

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT

APV Implementation in the UK Initiative

Flight Operations Inspector Manual

ICAO PBN GO TEAM PBN Implementation Workshop ENAC / ATM

SBAS Frequently Asked Questions

Bangkok, Thailand, July State PBN Plan and Status of PBN Implementation THAILAND PBN IMPLEMENTATION PLAN. (Presented by Thailand)

Final Approach Operations Symposium

APPLICATION FOR RNP APPROACH OPERATIONAL APPROVAL OR RENEWAL

THIS INFORMATION IS EMBRAER PROPERTY AND CANNOT BE USED OR REPRODUCED WITHOUT WRITTEN AUTORIZATION.

AUSTRALIA AERONAUTICAL INFORMATION SERVICE AIRSERVICES AUSTRALIA GPO BOX 367 CANBERRA ACT 2601 CESSATION OF NAVIGATION APPROVALS UNDER CAO 20.

Terms of Reference for a rulemaking task. Revision of operational approval criteria for performance-based navigation

AIRSPACE. Aviation Consultancy at its best. Specialist aviation support to help solve problems for airports and airport developers

U.S. DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION. National Policy

Russian Federation ATM modernization program

UK Performance-based Navigation (PBN) Implementation Status

Avionics requirements for State aircraft

Flight Safety Division Case Nr. Page 1 of 11

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES

AREA NAVIGATION RNAV

International Civil Aviation Organization. The Eighth Meeting of the Performance Based Navigation Task Force (PBN TF/8)

ICAO WORKSHOP. LOW VISIBILITY PROCEDURES (LVP) and APPROACH PROCEDURE with VERTICAL GUIDANCE (APV) ICAO EUR/NAT, PARIS.

European Aviation Safety Agency

GNSS AVIATION APPLICATIONS AND PROGRAMMES IN MADAGASCAR

Flight Procedure Design and Cartography

AIM and PBN Airport Community Benefits. IAAE Saskatoon, May 2013

PBN Implementation Plan - Fiji Version 1 19 January 2010

Wide Area Augmentation System (WAAS) and Local Area Augmentation System (LAAS) Update

Banque de France Key figures 2017

PBN, ADQ, ADQ2 IR EUROCONTROL Activities Status

EGNOS looking to the east of Europe: SHERPA Project

PBN Implementation Plan Tonga

The support of an European ANSP

TABLE OF CONTENTS 1.0 INTRODUCTION...


Presentation of the First Deputy Director, Scientific and Research Institute of Airnavigation

PBN Implementation Plan Italy. Version 1

Pat Reines Avionics Support for GBAS and Performance Based Navigation (PBN)

APV IMPLEMENTATION PLAN

SBAS IS the only effective solution for safe approaches at every airport in Australia and New Zealand NZ Airports Assn 10 th Sept 2015

FLIGHT OPERATIONS PANEL

Implementation of PBN in Armenian airspace

PBN Implementation inside Italian Airspace Status update Summer 2013

LFBO / Toulouse-Blagnac / TLS

Title: PBN Operations and Licensing Requirements - Declaration for AOC Holders

Draft PBN Implementation Plan Papua New Guinea

Patrizio Vanni (Project Coordinator)

The concept of Buses with a High Level of Service in France (BHNS) TranSUrban International Seminar Valdemoro - 27/28 November 2006

Technical considerations on rapid transit mode selection BRT / LRT potentialities in France

easyjet, EGNOS and LPV EGNOS Workshop, Athens, 3rd October 2017

Transcription:

DSNA Navigation Strategy Benoit Roturier (DSNA) 1

Context supporting DSNA navigation strategy ICAO Navigation strategy Performance Based Navigation (PBN) concept Resolutions of the ICAO 36th Assembly (2007): Eurocontrol Navigation strategy & GNSS policy Airspace users discussions SESAR 2

En route Performance Based Navigation implementation status in 2010 RNAV 5 in service over France since 1998 Supported by GNSS ABAS Route network (above FL 115 ) mature. Extension to lower Flight Level via RNAV 1 Terminal Initial implementation within TMA Paris, Montpellier et Lyon Since 2008, all TMA deployments are with RNAV 1 Supported by GNSS ABAS Approach & Landing Approaches study started in 2000 (with AF at Paris CdG). Today about 50 GNSS approaches without vertical guidance under publication by DSNA Supported by GNSS ABAS GNSS approaches with GNSS vertical guidance studies started in 2005, EGNOS Supported by GNSS SBAS GNSS Landing System Cat I procedure to support Airbus certification at Blagnac Supported by GNSS GBAS 3

User needs identified to improve PBN implementation Major airlines needs RNAV 1 arrival/departures within large terminal areas Re-inforce the GNSS approaches with vertical barometric guidance (APV Baro-VNAV) Introduce RNP Approaches with Authorisation (RNP AR) for specific gains Business Jets Any path supporting increased airport accessibility, safety and high performances. Supports GNSS approaches with EGNOS Helicopters RNAV 1 arrival/departures Supports GNSS approaches with EGNOS, Medical Evacuation Other General Aviation Supports GNSS approaches with ABAS & APV EGNOS 4

Approaches with vertical guidance DSNA strategy Any new published GNSS approach shall also support EGNOS vertical guidance: APV EGNOS safety studies completed by DSNA DSNA is now awaiting ESSP SAS certification for LPV publication Implementation coordinated with interested users (Business, Helicopters, Beluga ATI airline) Target is all IFR runway ends by 2016 APV Baro-VNAV will also be implemented on RNAV approach charts on request of airspace users: Implementation coordinated with Air France DGAC studies have started in 2009 Generic safety studies expected from Eurocontrol ( 2010?) ILS Cat I proposed to be progressively replaced by APVs from 2015 on DSNA managed airfields Aim is to reduce progressively the costs related to the large number of ILS Cat I in France (> 100) 5

GNSS approaches deployment status end 2009 43 Lille 08 Published Rouen 22 Design finished Paris - Le Bourget 27 LNAV + LPV Perpignan 15 Design finished but specification change or completion required Paris - Le Bourget 25 LNAV Pau 31 Study under progress Paris - Le Bourget 07 LNAV + LPV Paris - Orly 02 LPV Paris - Orly 08 LPV Status end 2009 Paris - Orly 24 LPV Paris - Orly 06 LPV 94 LNAV runways studied Paris - Orly 26 LPV 24 LPV runways studied Paris CDG 27 L LNAV + LPV 4 GLS runways studied Paris CDG 26 L LNAV + LPV 1 RNP AR runway Marseille 13 R LNAV + LPV Marseille 31 L Hélicos LNAV + LPV Bastia 16 LNAV + RNP AR test Bordeaux 05 LNAV + LPV Bordeaux 23 LNAV + LPV Brest 07R LPV UPDATE 3 LNAV La Réunion La Rochelle 27 LNAV 23 Lille 08 LPV + API RNAV Nice 22 SALEYA LNAV Royan 28 LNAV Pointe à Pitre 11 LNAV Modif Brest 08 API RNAV Pau 31 LNAV 19 Rennes 10 LNAV Tarbes 20 LNAV Rouen 22 LNAV UPDATE Clermont LNAV 26 Beauvais 13 LNAV Rouen 04 LNAV Angoulême 28 LNAV + LPV Rodez 13 LNAV Merville LNAV 04 Angoulême 28 Helicopter LNAV Muret 12 LNAV Merville LPV 04 Albert Bray 09 LNAV + LPV Fort de France 27 LNAV Beziers 28LNAV Calais 24 LNAV 13 Fort de France 09 LNAV Pau 13 LNAV Caen 31 LNAV + LPV Clermont LNAV 26 Modif Cayenne 26 API RNAV Carcassonne 10 LNAV Blagnac 14 32 GLS Clermont LNAV+ LPV 26 Modif Cayenne 09 API RNAV Le Mans 02 LNAV Brest 08 LNAV Toussus 07 LNAV Saint Yan 15 L LNAV UPDATE Melun 28 API RNAV Biarritz 0 9LNAV Le Touquet 32 LNAV Dzaoudzi 16 LNAV Pontoise 05 LNAV 8 Calvi 18 LNAV Figari 05 LNAV Dzaoudzi 34 LNAV Pontoise 23 LNAV Melun 29 LNAV Figari 23 LNAV Vannes LNAV 22 LNAV Saint Nazaire 08 LNAV Limoges 04 LNAV Saint Denis Gillot 14 LNAV Deauville 12 LNAV Vannes LPV 22 Saint Yan 33 LNAV 5 Cayenne 26 LNAV Saint Denis Gillot 30 LNAV Pointe à Pitre 29 LNAV Saint Etienne 36 LNAV Saint Yan 15 LPV Cayenne 08 LNAV St Pierre Pierrefonds 08 LNAV Caen 13 LNAV Marie-Galante 09 LNAV Toussus 07 LPV Lille 08 LNAV Tikehau 06 LNAV Limoges 22 LNAV + LPV La Rochelle 10 LNAV Paris - Orly 20 LNAV Soulac Helicopter LNAV Lyon Bron 18 LNAV Tikehau 24 LNAV Nuku Hiva 06 LNAV Le Havre 05 LNAV Paris - Orly 02 LNAV Orléans-2 24 LNAV Miquelon 12 LNAV Rangiroa 09 LNAV Nuku Hiva 24 LNAV Paris - Orly 06 LNAV Paris - Orly 08 LNAV Blois 06 LNAV St Pierre 08 LNAV Rangiroa 27 LNAV Besancon 23 hélicos LNAV Paris - Orly 26 LNAV Paris - Orly 24 LNAV Roanne 20 LNAV St Pierre 26 LNAV Hyeres (Toulon) 05 LNAV Perpignan 15 LNAV Cholet 21 LNAV Laval 33 LNAV L'ile d'yeu LNAV 2004 2005 2006 2007 2008 2009 6

EGNOS approach chart example See also: DRAFT Not approved http://www.dsna-dti.aviation-civile.gouv.fr/ dti/extra/dti/revue-technique/09/ 7

PBN Regulation The technology transition cycle is at least 20 years for aviation Due to the lifetime cycles of aircraft / avionic equipments Avoid reaching early benefits, due to technology coexistence May strongly affect the airspace users interest (see MLS example) The only PBN-like regulation existing today is for En-Route (RNAV 5) Discussions to widen the scope of a PBN regulation are starting now in Europe PBN Regulation should apply to both Airspace users (equipment) and ANSPs (procedures design) What should be its scope for PBN En-route, Terminal airspace and Approaches? Effective date not before 2018 probably Opportunity for Europe to think now about its future navigation strategy and try to shorten the 20 years cycle if possible! 8