Yonge Street / Highway 401 Improvements Update. Public Works and Infrastructure Committee. General Manager, Transportation Services

Similar documents
SOUTHBOUND YONGE STREET TO EASTBOUND HIGHWAY 401 F L Y -UNDER

St. Dennis Drive Conversion of Traffic Lanes to On- Street Parking and Bicycle Lanes

Toronto 2015 Pan Am/Parapan Am Games Temporary Traffic By-law Amendments for High Occupancy Vehicle Lanes (Supplementary Report)

Pedestrian Safety Review Spadina Avenue

Parking Amendments - Bay Street, between Harbour Street and Queens Quay West (York Street, Bay Street, and Yonge Street Ramp Removal)

Bloor Street West Rezoning Application for a Temporary Use By-law Final Report

Construction Staging Adelaide Street West

TORONTO TRANSIT COMMISSION REPORT NO.

7 TOWN OF BRADFORD WEST GWILLIMBURY OPA 15 INFORMATION REPORT ON THE BRADFORD BYPASS

Route 141 and I-44 Design-Build Project Community Involvement Group. March 21, 2016

Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street

Update Report - Etobicoke Creek and South Mimico Creek Trails

TORONTO TRANSIT COMMISSION REPORT NO.

RW Bruhn Bridge and Approaches Project

FEASIBILITY STUDY REFINED CONCEPT 1 PROJECT A

Public Open House. Chief Peguis Trail Project

Major Projects Overview

Expropriation of a portion of 5795 Yonge Street for public street purposes. Government Management Committee

12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization

Union Station Queens Quay Transit Link Study

Metrolinx Projects: Temporary Delegation for Long- Term Road Closures

TORONTO TRANSIT COMMISSION REPORT NO.

DENISON STREET EXTENSION. Transportation Committee. January 14, Feasibility Study

Inclusion on the City of Toronto's Heritage Register Midtown in Focus Phase 1: Main Street Properties

Building the transportation network we need for the future in Niagara Region

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts

9 CONSTRUCTION OF BATHURST STREET FROM GREEN LANE WEST TO SOUTH OF HIGHWAY 11, TOWN OF EAST GWILLIMBURY AND TOWNSHIP OF KING

TERMINAL DEVELOPMENT PLAN

Establishing a National Urban Park in the Rouge Valley

KING STREET TRANSIT PILOT

Construction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013

DTAH for the City of Toronto Dufferin Street Avenue Study Transportation Master Plan

Ridership Growth Strategy (RGS) Status Update

Town of Markham Yonge and Steeles Corridor Study and City of Vaughan Yonge Street Area Study

1.2 Corridor History and Current Characteristics

INFORMATION ONLY. Subject: Metrolinx Presentation Date: June 22, 2015

Memorandum. Fund Allocation Fund Programming Policy/Legislation Plan/Study Capital Project Oversight/Delivery Budget/Finance Contract/Agreement Other:

South of Fraser Transportation Priorities March 2017 Engagement

Major Scheme Business Case Summary Report for Programme Entry

2433 Dufferin Street Zoning By-law Amendment Application - Preliminary Report

TORONTO TRANSIT COMMISSION REPORT NO.

5.1 Traffic and Transportation

Fairfax County Parkway Widening Fairfax County

KING STREET TRANSIT PILOT

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JANUARY 25, 2011

Regulations to deter cut-through traffic - Heath Street V\fest, between Spadina Road and Avenue Road. Toronto and East York Community Council

Building the transportation network we need for the future in Niagara Region

This report recommends two new TTC transit services in southwest Toronto.

CREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS

PRIORITIES COMMITTEE MEETING

HIGHWAY 26 /GREY ROAD 2 INTERSECTION IMPROVEMENTS. The Town of The Blue Mountains

Building the transportation network we need for the future in Niagara Region

Sky Temporary Car Park Transport Statement

NORTH FRASER PERIMETER ROAD WEST CORRIDOR DEFINITION STUDY

Building the transportation network we need for the future in Niagara Region

CREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS PUBLIC MEETING DECEMBER 6, 2017

Engagement Summary Report. Trans-Canada Highway 1 RW Bruhn Bridge Replacement Project. Community Engagement November 15, 2016 to January 15, 2017

Ministry of Transportation

Re: Item 7- PR13.{)35 - Region of York Municipal Parbtership Grant Application and Approval of Two Grade-Separated Underpasses

Wellington $312 $49 $456 OVERVIEW WELLINGTON REGIONAL SUMMARY

Finchley and Golders Green Area Committee 27 April 2017

Report to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub

A. CONCLUSIONS OF THE FGEIS

MEMORANDUM. Open Section Background. I-66 Open Section Study Area. VDOT Northern Virginia District. I-66 Project Team. Date: November 5, 2015

4 VIVA PHASE 2 YONGE STREET - Y2, AND HIGHWAY 7 - H3 CORRIDORS PRELIMINARY ENGINEERING UPDATE

TORONTO TRANSIT COMMISSION REPORT NO.

Ministry of Transportation

EX28.6 REPORT FOR ACTION. Advancing Fare Integration SUMMARY. Date: October 16, 2017 To: Executive Committee From: City Manager Wards: All

DALLAS HORSESHOE PROJECT. Project Update including the Margaret McDermott Bridge Transportation and Trinity River Project Committee February 22, 2016

Report to the Strategic Development Committee

Construction Staging Area 197 Redpath Avenue

Chair and Members, The Etobicoke York Community Council. Mark Sraga, Director and Deputy Chief Building Official

Transportation TRANSPORTATION PROJECTS

Engagement Summary Report. Trans-Canada Highway 1 RW Bruhn Bridge and Approaches Project Community Engagement February 1 18, 2018.

QEW - ALTERNATIVE 3. Ÿ Widen QEW by one HOV lane in both direc ons through Freeman Interchange to North Shore Boulevard Interchange.

CREATING CONNECTIONS IN THE TOWN OF GRIMSBY PUBLIC MEETING NOVEMBER 21, 2017

Construction Staging Area 700 Bay Street - Elizabeth Street and Walton Street

CREATING CONNECTIONS IN CLARINGTON

M2 Junction 5. improvements scheme. Preferred route announcement

COMMITTEE OF THE WHOLE (WORKING SESSION) APRIL 19, 2011 YORK REGION RAPID TRANSIT HIGHWAY 7 BUS RAPID TRANSIT- VMC STATION WARD 4.

Federal Budget Submission. Prepared for the House of Commons Standing Committee on Finance. Greater Toronto Airports Authority

MINISTRY OF TOURISM AND RECREATION

HDR itrans Consulting Inc. 100 York Blvd., Suite 300 Richmond Hill, ON L4B 1J8 Tel: (905) Fax: (905)

1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET

Improving Directional Signage for TTC Services at Pearson Airport

Glasgow Street Traffic Review

Northeast Anthony Henday Drive Edmonton Ring Road Update. Strathcona Chamber of Commerce March 18, 2015

Construction Staging Area 19 Western Battery Road

MEMORANDUM. Bob Zagozda, Chief Financial Officer Westside Community Schools. Mark Meisinger, PE, PTOE Felsburg Holt & Ullevig. DATE: June 11, 2018

Northern Beaches Transport Action Plan

Request to Improve Transit along the Dufferin Street Corridor

A VISION FOR I-95. January 12, Delaware Department of Transportation

REGION OF WATERLOO INTERNATIONAL AIRPORT AIRPORT MASTER PLAN EXECUTIVE SUMMARY MARCH 2017

Launceston City Council. Kings Meadows Traffic Management Report for Public Consultation

CLACKAMAS COUNTY BOARD OF COUNTY COMMISSIONERS. Policy Session Worksheet

Open Report on behalf of Richard Wills, Executive Director for Environment and Economy

LUDWIG RD. SUBDIVISION PROJECT TRAFFIC IMPACT ANALYSIS

user s guide to Transportation Improvements in Astoria Planning Efforts outside Astoria for more information, contact:

Roundhouse Way Transport Interchange (Part of NATS City Centre Package)

Frequently Asked Questions on the Route 29 Solutions Improvements Projects

Transcription:

PW9.7 STAFF REPORT ACTION REQUIRED Yonge Street / Highway 401 Improvements Update Date: October 26, 2015 To: From: Wards: Reference Number: Public Works and Infrastructure Committee General Manager, Transportation Services Ward 16 (Eglinton-Lawrence) Ward 23 (Willowdale) Ward 25 (Don Valley West) P:\2015\ClusterB\TRA\TIM\pw15011tim.docx SUMMARY The Yonge Street/Highway 401 interchange is a major transportation junction accommodating regional traffic along the east/west Highway 401 corridor. It serves the City of Toronto along Yonge Street, both north and south and is an interchange that has been experiencing significant congestion and delays. This report advises on the status of the City s assessment of potential improvements to the Yonge Street/Highway 401 interchange. Under the Growth Plan for the Greater Golden Horseshoe (Growth Plan), the North York Centre is designated as a Major Growth Centre. The Places to Grow Act, 2006 includes a framework that requires the City to accommodate growth in the North York Centre and population forecasts anticipate significant numbers of new residents and employees by 2031. Metrolinx s Regional Transportation Plan, the Big Move, recognizes the North York Centre as an Anchor Mobility Hub, which has strategic importance given its relationship to a Major Growth Centre. To accommodate the build out of the North York Centre, the Growth Plan requires that the infrastructure needed to support these growth forecasts be identified and implemented by the City. Provincial priority will be given to infrastructure investments made by the Province that support the policies and schedules in the Growth Plan. In partnership with the Ontario Ministry of Transportation (MTO), the Transportation Services Division initiated a Feasibility Study to assess potential infrastructure improvements at pthe Yonge Street/Highway 401 interchange. Should the study Staff report for action on Yonge / Highway 401 1

demonstrate the feasibility of improvements, an Environmental Assessment would be needed to examine the alternatives in greater detail. RECOMMENDATIONS The General Manager, Transportation Services, recommends that: 1. The Public Works and Infrastructure Committee receive this report for information. Financial Impact There is no immediate financial impact resulting from adopting the recommendation in this report. Preliminary estimates for this project are included in the 2015 Capital Budget and 2016-2024 Capital Plan for Transportation Services ($25 million including expected provincial funding of 50%). These preliminary project costs will need to be refined pending a final decision on the alternative. Funding for the Environmental Assessment Study, should it proceed, is included in the 2015 Capital Budget for Transportation Services (Engineering Studies CTP815-02). The Deputy City Manager & Chief Financial Officer has reviewed this report and agrees with the financial impact statement. DECISION HISTORY At its meeting of September 22, 2015, the Public Works and Infrastructure Committee requested the General Manager, Transportation Services to report to its meeting on November 12, 2015, advising on the status of the improvements to the Yonge Street/Highway 401 interchange and detailing the reasons for the delays in moving this project forward. http://app.toronto.ca/tmmis/viewagendaitemhistory.do?item=2015.pw7.22 ISSUE BACKGROUND The Yonge Street Traffic Management Study (2009) identified four major problems or constraints in the area: operational/ capacity restraints, missing pedestrian paths/ cycle routes, collision trends, and existing transportation network capability to accommodate projected traffic that will be generated from approved, planned, and proposed developments. At the Yonge Street/Lord Seaton Road intersection, the delays and congestion attributed to the southbound left turn have been highlighted by users, staff, and Council as being Staff report for action on Yonge / Highway 401 2

undesirable. The spillback can extend as far north as Avondale Avenue during peak periods, affecting through traffic capacity on Yonge Street and placing constraints on westbound left-turning traffic existing the westbound Highway 401 off-ramp. To address these concerns, the concept of replacing the southbound left turn lane with a new direct ramp from southbound Yonge Street to eastbound Highway 401 was recommended in the Yonge Street Traffic Management Study. The functionality of this concept was further tested through a Functional Planning Study (2013) which identified seven alternative improvements to the interchange that required further assessment. A Feasibility Study is currently being carried out by the City and MTO to address the recommendations of the Functional Planning Study. The Feasibility Study was scheduled for completion in June of 2015 but has been delayed as a result of concerns raised by the MTO with the study recommendations. Feasibility Study The Feasibility Study is the second joint study carried out by the City and MTO, both of which have been co-funded. The first study (a Functional Planning Study), which was completed in 2013, recommended that a number of physical infrastructure changes be studied in greater detail. As part of its commitment to participate in this subsequent study, the MTO requested that additional investigations be completed through a Feasibility Study before a decision was made to carry out an Environmental Assessment (EA). As part of the Feasibility Study, six alternatives that are physically feasible and operationally capable of improving traffic operations at the interchange have been identified (See Attachment 1). The alternative improvements developed also gave consideration to new and/or improved cycling connections and pedestrian crossing opportunities. At this stage of the study, Ministry staff have raised a number of concerns with the alternatives. While each of the alternatives is capable of improving traffic operations on Yonge Street, especially the southbound left-turn from Yonge Street to Lord Seaton Drive, Ministry staff are concerned that increased traffic volumes will result in a reduction in collector lane speeds and increased delays to eastbound traffic in the Highway 401 collector lanes. In addition, a number of the alternatives pose constructability concerns for Ministry staff. Construction of either a flyover above Highway 401 or a tunnel beneath would involve lane closures and traffic delays for multiple years. A more detailed assessment would be required to better understand how the impact of constructing these alternatives on the operations of Highway 401 could be managed. Staff report for action on Yonge / Highway 401 3

Next Steps The Transportation Services Division has requested the MTO to provide a position about the results of the Feasibility Study. MTO s concurrence with the Feasibility Study recommendations is significant because all of the alternatives developed involve physical and operational changes that are within the limits of MTO s jurisdiction. Whether MTO participates in or agrees to fund the subsequent EA, MTO s approval is required in order to implement any physical or operational changes that are proposed within its jurisdiction. Once a response from MTO has been received, a decision about whether to proceed with an EA will be made. CONTACTS Ashley Curtis Jeffrey Dea Director, Transportation Infrastructure Manager, Infrastructure Planning Management, Transportation Services Transportation Services Tel: (416) 392-5348 Tel: (416) 392-8479 E-mail: amcurtis@toronto.ca E-mail: jdea@toronto.ca SIGNATURE Stephen Buckley General Manager, Transportation Services ATTACHMENTS Attachment 1: Feasibility Study Alternatives Staff report for action on Yonge / Highway 401 4

Feasibility Study Alternatives Alternative 1 New SB double left-turn lane at the intersection of Yonge Street and Lord Seaton (one of the left turn lanes will measure +/- 25m Provides sufficient capacity to alleviate SB congestion in the short term Staff report for action on Yonge / Highway 401 5

Alternative 2 New SB to EB on-ramp (new loop in the SW quadrant of the interchange) New EB off-ramp (SW quadrant of the interchange) to normalized intersection signal Removal of access to the Hwy 401 EB off-ramp to NB Yonge Street beneath Hwy 401 Staff report for action on Yonge / Highway 401 6

Alternative 3 New SB to EB on ramp (new loop in the SW quadrant of the interchange) Replace EB off-ramp (SW quadrant of the interchange) by moving it south to accommodate loop ramp with same access to SB Yonge and NB Yonge Street via the existing tunnel beneath Hwy 401 on the east side of the underpass Reconfiguration of the EB on ramp from Lord Seaton Road Staff report for action on Yonge / Highway 401 7

Alternative 4 New SB to EB on ramp (new loop in the SW quadrant of the interchange) Diversion of NB Yonge Street traffic into the existing NB tunnel located on the east side of the underpass New EB off-ramp (SW quadrant of the interchange) with access to Yonge Street through a normalized intersection signal Reconfiguration of the EB on-ramp from Lord Seaton Road Staff report for action on Yonge / Highway 401 8

Alternative 5 New EB on-ramp (SB Yonge Street to EB Hwy 401) via a fly-over on the west side of the underpass Staff report for action on Yonge / Highway 401 9

Alternative 6 New SB Yonge Street tunnel (west of the underpass) which opens up space for dual 280 m SB double left-turn lanes to be located in existing SB Yonge Street underpass. The new SB tunnel would accommodate the SB through movements on Yonge Street. Staff report for action on Yonge / Highway 401 10