Planning & Development Group

CertAlert. Hurricane Field Condition Report

San Bernardino International Airport Authority Ramp Joint Seal Replacement & Pavement Repair Project

Dallas Love Field Community Weekly Update

A Love Note from Me to You

A Love Note from Me to You

Input Efforts Online survey of tenants and users Focus group meetings with Tenants and users Agencies and stakeholders General Aviation Pilot

A Love Note from Me to You

OLD AIRPORT (PFN) RW 05/23 RW 14/32. 4,884-FEET X 150-FEET MIRL 4-BOX VASIs (5 & 23 APPROACHES) REILS

SURFACE MOVEMENT GUIDANCE AND CONTROL SYSTEM PLAN. Los Angeles International Airport

CHICO MUNICIPAL AIRPORT NON-MOVEMENT AREA DRIVER TRAINING PROGRAM

Dallas Love Field Community Weekly Update

Effective: PERTH AIRPORT AIRSIDE SURFACE MONITORING FOR FORRESTFIELD AIRPORT LINK TUNNELLING

San Bernardino International Airport Authority Building 795

Notice and Opportunity to Comment on New Proposed Passenger Facility Charge (PFC) New Application

Section 32 TABLE OF CONTENTS Airfield and Aircraft Operations. 32.A General B Aircraft

Ground Vehicle Operations Training READING REGIONAL AIRPORT

Inauguration 2017 Dulles Tower

Dallas Love Field Community Weekly Update

Dallas. Weekly Update. Field. Thursday. Thursday. Love Field lo. vefield.com and. complaints via. the Airport.

CONSTRUCTION SAFETY AND PHASING PLAN (CSPP)

Community Notices. Upcoming Yongergnow. January 12th 2017 JANUARY

Special Modification To Standards Process for Airplane Design Group VI. The Boeing Federal Aviation Administration

RECONSTRUCT/REHABILITATE TRANSIENT APRON AND TAXIWAY 'A' PHASING PLAN - PHASE 1

50 Ways to Improve Your Airport: Engaging Airport Management on Key Issues

Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL

SECTION 32. Airfield and Aircraft Operations

FY Five Year Airport Capital Plan Supplemental Project List As of 12/12/16

City of Tallahassee, FL Department of Aviation

Dallas Love Field Community Weekly Update

CONSENT DECREE & 3,500 RUNWAY

Dallas Love Field Community Weekly Update

LANCASTER AIRPORT DRIVER TRAINING PROGRAM

Winona Runway Shift Project

18 Sep 07 Oct 2018 $ 5998

Beginning balance available for Priority I Projects: $1,737,029

Progress Report Copyright 2005, Sevenson Environmental Services, Inc. All Rights Reserved.

Guide to Creating a Practice Runway

SAN FRANCISCO INTERNATIONAL AIRPORT

Teterboro Airport Overview

Second Street Improvements Project Project Update Archive

18 Sep 07 Oct 2018 $ 5998

18 Sep 19 Oct 2018 $ 7998

Dallas Love Field Community Weekly Update

DATE OF AERIAL PHOTOGRAPHY:

OPERATING DIRECTIVE Number: D Aviation Authority Revised: 03/26/13

PUBLIC NOTICE. Table 1 Projects Proposed by Amendment

SYSTEM BRIEF DAILY SUMMARY

MASTER PLAN UPDATE. Planning Advisory Committee (PAC) FRESNO YOSEMITE INTERNATIONAL AIRPORT. Meeting #4

NON MOVEMENT AREA DRIVERS TRAINING

dispatch September 2018 VOlume 11. Issue 3

City of Grand Island Tuesday, December 12, 2017 Council Session

Public Information Center August 12, 2010

PREFERRED PLAN Kahului Airport Master Plan and Noise Compatibility Program Update

A Love Note from Me to You

RENO-TAHOE INTERNATIONAL AIRPORT USERS COMMITTEE BRIEF OF MINUTES May 18, :30 p.m.

Chapter 4 Airport Facility Requirements

MEMORANDUM VILLAGE OF NORTHBROOK

TECHNICAL REPORT #7 Palm Beach International Airport Airport Layout Plan

PUBLIC NOTICE FOR PROPOSED COLLECTION OF PASSENGER FACILITY CHARGES AT COLORADO SPRINGS AIRPORT

Dallas Love Field Community Weekly Update

Progress Report Copyright 2005, Sevenson Environmental Services, Inc. All Rights Reserved.

Dallas Love Field Community Weekly Update

Modernizing Safety. Air. Land. Sea.

MCAS Cherry Point Course Rules Brief

PUBLIC MEETING GRAND COUNTY AIRPORT BOARD REGULAR MEETING AGENDA. December 3 rd, :00 P.M. County Council Chambers 125 E Center St Moab, UT 84532

CHAPTER 2 INVENTORY EXISTING CONDITIONS 2.1 AIRFIELD FACILITIES Airspace

TABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved

General Aviation Master Plan Update

SEYCHELLES CIVIL AVIATION AUTHORITY Seychelles International Airport. Summer Schedule 2017 (5 th Edition)

Appendix D Airfield Ongoing Projects Alternatives

Progress Report Copyright 2005, Sevenson Environmental Services, Inc. All Rights Reserved.

Merritt Island Airport

Public Review Draft South County Airport Master Plan Report. County of Santa Clara San Martin, California

22 Days Escorted Tour Fly & Cruise Scandinavia Celebrity Host Ian Healy Denmark, Sweden, Russia Finland

DECA Facility Hours As of 29 January 2018

Kansas City Aviation Department. Update to Airport Committee October 20, 2016

1.1.3 Taxiways. Figure 1-15: Taxiway Data. DRAFT Inventory TYPICAL PAVEMENT CROSS-SECTION LIGHTING TYPE LENGTH (FEET) WIDTH (FEET) LIGHTING CONDITION

TO: Planning Advisory Committee (PAC) Members RE: Pangborn Airport Master Plan PAC Meeting #4 Presentation Material DATE: July 18, 2017

North America West Coast Central America West Coast WAMS

JUNEAU INTERNATIONAL AIRPORT (JNU) RESTRICTED AREA TEST

COLLEGE FOOTBALL PLAYOFF NATIONAL CHAMPIONSHIP

Will it Fit? Preliminary Findings

PUBLIC NOTICE ***************************** New Castle Airport. Intention to File a Passenger Facility Charge (PFC) Application

RFP No C001 Fixed Base Operator, Dulles Airport. May 3, 2017

Table of Contents. Overview Objectives Key Issues Process...1-3

WINTER NEWS LETTER-2018

Airside Construction Safety: The Human Factor

Addendum - Airport Development Alternatives (Chapter 6)

CAPITAL IMPROVEMENT PROGRAM LEE S SUMMIT AIRPORT

14 C.F.R. Part 158. Passenger Facility Charge Program Logan International Airport. Public Notice

Denver International Airport

Hollaway Consulting Engineers, LLC Statement of Qualifications

Vaccine Summit - Driving Growth, Creating Impact

What is an Airport Master Plan?

Kansas City, Missouri (direct, non-stop destination from RSW)

Project Start Date: Project Completion Date: July 1, Contractor: Mattson Construction Contact Information: Nate Lillemon

Transcription:

Mon SUN MONDAY 01/06/2014 Ops. Construction (650)821-3341 2 2 1 1 1 1 SFO P&G - Power Wash 0130-0430 PM Crew will power wash various areas around Boarding Area C. 12 Woolpert/SFO Surveyors - AGIS Survey and Report. 1300-1600 FAA / SFO Escort Survey crew from Plot 3 to GPS control stations, W1383, X1383 & A1384. See diagram. 15 SFO Surveyors - Lay Out Lead-In Lines and Gate Markers -1100 8974B Escort Surveyor in-and-around BA-E for lead-in line to Gate 64 and various gate markers. 19A SFO Painters: Tracking Markings for B/A E Gates -1430 PM Crew will be tracking B/A E gate markings. Painters may require assistance. 20 Hensel Phelps BA-E - Deliveries, Off- Haul, Fuel Flush -1700 8974B 21 Hensel Phelps ATCT - Deliveries - 9015B Escort required to/from Northfield Checkpoint, Gate 82 & Gate 24A or 24B. SFPD to Monitor/Control AOA Access Gate 24A (-1700 hrs.) Escort required to/from Southfield Checkpoint, Gate 82, Gate 23C & the Secured Connector site. Note: Anticipated delivery times are @ & 0900 55 SFIA ELEC SHOP- AIRS Items 0730-1430 PM Airfield Complex - Escort Required. 57 SFIA ELEC SHOP 0000-0500 PM Airfield Complex - Escort Required. RWY TWY* TXL or GT VSR SITE SURVEY ASO NO IMPACT AF: ATCT: ADM: Const. Ofc: Ops: Surv: Elec: Paving: Painters: 1/3/2014 2:17 PM

Tue MON TUESDAY 01/07/2014 R 2 2 1 1 1 1 SFO P&G - Power Wash 0130-0430 PM Crew will power wash various areas around Boarding Area C. 2 Woolpert/SFO Surveyors - AGIS Survey and Report. 2330-0930 FAA / SFO Close RWY 10L-28R (0001- hrs.) Escort required. Meet crew at Plot 3 at 2330 hrs. to survey RWY end/threshold, RWY profile survey, RWY end photos. Continue survey & photos of NAVAIDs, if needed, after RWY opening. 19A 20 SFO Painters: Tracking Markings for B/A E Gates Hensel Phelps BA-E - Deliveries, Off- Haul, Fuel Flush -1430 PM -1700 8974B Crew will be tracking B/A E gate markings. Painters may require assistance. Escort required to/from Northfield Checkpoint, Gate 82 & Gate 24A or 24B. SFPD to Monitor/Control AOA Access Gate 24A (-1700 hrs.) 21 Hensel Phelps ATCT - Deliveries, - 9015B Escort required to/from Southfield Checkpoint, Gate 82, Gate 23C & the Secured Connector site. Note: Anticipated delivery times are @. 23 SFO Spray man 0600-1000 PM Airfield Complex - Escort as needed. 44 SFO Fuel - Fuel Vault Maintenance 1700-1900 PM Escort required. Crew will need escort to Fuel Vaults 6,8,9,10, & 11 for weekly mandated services. Restrict TWY as necessary. 55 SFIA ELEC SHOP- AIRS Items 0730-1430 PM Airfield Complex - Escort Required. 57 SFIA ELEC SHOP 0000-0500 PM Airfield Complex - Escort Required. RWY TWY* TXL or GT VSR SITE SURVEY ASO NO IMPACT 1/3/2014 2:17 PM

Wed TUE WEDNESDAY 01/08/2014 2 2 1 1 1 1 SFO P&G - Power Wash 0130-0430 PM Crew will power wash various areas around Boarding Area C. 2 Woolpert/SFO Surveyors - AGIS Survey and Report. 2330-0930 FAA / SFO Close RWY 10R-28L (0001- hrs.) Escort required. Meet crew at Plot 3 at 2330 hrs. to survey RWY end/threshold, RWY profile survey, RWY end photos. Continue survey & photos of NAVAIDs, if needed, after RWY opening. (01/06) - Close Aircraft Gate 93 (01/06-01/13) Escort as needed to/from worksite. Work to include, temp. VSR realignment, pavement removal, valve repair, pit lid extension, pavement replacement, concrete pour & cure. 20 Hensel Phelps BA-E - Deliveries, Off-Haul, Fuel Flush -1700 8974B 21 Hensel Phelps ATCT - Deliveries, - 9015B Escort required to/from Northfield Checkpoint, Gate 82 & Gate 24A or 24B. SFPD to Monitor/Control AOA Access Gate 24A (- 1700 hrs.) Escort required to/from Southfield Checkpoint, Gate 82, Gate 23C & the Secured Connector site. Note: Anticipated delivery times are @. 23 SFO Spray man 0600-1000 PM Airfield Complex - Escort as needed. 44 SFO Fuel - Fuel Vault Maintenance 1700-1900 PM Escort required. Crew will need escort to Fuel Vaults 6,8,9,10, & 11 for weekly mandated services. Restrict TWY as necessary. 55 SFIA ELEC SHOP- AIRS Items 0730-1430 PM Airfield Complex - Escort Required.

Thu WED THURSDAY 01/09/2014 2 2 1 1 1 1 SFO P&G - Power Wash 0130-0430 PM Crew will power wash various areas around Boarding Area C. 2 Woolpert/SFO Surveyors - AGIS Survey and Report. 2330-0930 FAA / SFO Close RWY 1R-19L (0001-0600 hrs.) Escort required. Meet crew at Plot 3 at 2330 hrs. to survey RWY end/threshold, RWY profile survey, RWY end photos. Continue survey & photos of NAVAIDs after RWY opening. At ~1000 hrs. coordinate with ATCT for short closure for survey photos at the end of the runway 19A 20 SFO Painters: Tracking Markings for B/A E Gates Hensel Phelps BA-E - Deliveries, Off-Haul, Fuel Flush -1430 PM -1700 8974B 21 Hensel Phelps ATCT - Deliveries. - 9015B Crew will be tracking B/A E gate markings. Painters may require assistance. Escort required to/from Northfield Checkpoint, Gate 82 & Gate 24A or 24B. SFPD to Monitor/Control AOA Access Gate 24A (-1700 hrs.) Escort required to/from Southfield Checkpoint, Gate 82, Gate 23C & the Secured Connector site. Note: Anticipated delivery times are @ & 1000. 23 SFO Spray man 0600-1000 PM Airfield Complex - Escort as needed. 44 SFO Fuel - Fuel Vault Maintenance 1700-1900 PM Escort required. Crew will need escort to Fuel Vaults 6,8,9,10, & 11 for weekly mandated services. Restrict TWY as necessary. 55 SFIA ELEC SHOP- AIRS Items 0730-1430 PM Airfield Complex - Escort Required. 57 SFIA ELEC SHOP 0000-0500 PM Airfield Complex - Escort Required. RWY TWY* TXL or GT VSR SITE SURVEY ASO NO IMPACT 1/3/2014 2:17 PM

Fri THU FRIDAY 01/10/2014 2 2 1 1 1 1 SFO P&G - Power Wash 0130-0430 PM Crew will power wash various areas around Boarding Area C. 1A SFO P&G - Grind and Pave FH#1 0000-0600 PM Grind & Pave behind Fire House #1. 2 Woolpert/SFO Surveyors - AGIS Survey and Report. 2330-0930 FAA / SFO Close RWY 1L-19R (0001-0600 hrs.) Escort required. Meet crew at Plot 3 at 2330 hrs. to survey RWY end/threshold, RWY profile survey, RWY end photos. Continue survey & photos of NAVAIDs after RWY opening. At ~1000 hrs. coordinate a short closure with ATCT for survey photos at the end of the runway SFO Painters: Tracking Markings for B/A E 19A Gates 20 Hensel Phelps BA-E - Deliveries, Off-Haul, Fuel Flush -1430 PM -1700 8974B 21 Hensel Phelps ATCT - Deliveries. - 9015B Crew will be tracking B/A E gate markings. Painters may require assistance. Escort required to/from Northfield Checkpoint, Gate 82 & Gate 24A or 24B. SFPD to Monitor/Control AOA Access Gate 24A (-1700 hrs.) Escort required to/from Southfield Checkpoint, Gate 82, Gate 23C & the Secured Connector site. Note: Anticipated delivery times are @. 44 SFO Fuel - Fuel Vault Maintenance 1700-1900 PM Escort required. Crew will need escort to Fuel Vaults 6,8,9,10, & 11 for weekly mandated services. Restrict TWY as necessary. 55 SFIA ELEC SHOP- AIRS Items 0730-1430 PM Airfield Complex - Escort Required. 57 SFIA ELEC SHOP 0000-0500 PM Airfield Complex - Escort Required. RWY TWY* TXL or GT VSR SITE SURVEY ASO NO IMPACT 1/3/2014 2:17 PM

Sat FRI SATURDAY 01/11/2014 2 2 1 1 1 30 SFO Sweeper/Vactor/Mower Driver Available if requested -1600 PM Contact via Maint. Control if needed. 44 SFO Fuel - Fuel Vault Maintenance 1700-1900 PM Escort required. Crew will need escort to Fuel Vaults 6,8,9,10, & 11 for weekly mandated services. Restrict TWY as necessary. RWY TWY TXL or GT VSR SITE SURVEY ASO NO IMPACT 1/3/2014 2:17 PM

Sun SAT SUNDAY 01/12/2014 2 2 1 1 1 30 SFO Sweeper/Vactor/Mower Driver Available if requested -1600 PM Contact via Maint. Control if needed. RWY TWY TXL or GT VSR SITE SURVEY ASO NO IMPACT 1/3/2014 2:17 PM

2014 Airport or Project # Description **** CONTRACTOR PHONE NUMBERS **** SFIA CONTRACT MGR. // SFIA INSPECTOR // CONTRACTOR CONTACT 8788 AIRFIELD PAVEMENT RECONSTRUCTION/ RWY RUBBER REMOVAL PROJECT MANAGER - STAN PALAT - 821-7735, DANIEL LEE, 650-453-8880 9015A 8671B ATCT Tower RSA RWY 01L & 01R Paving & Lighting Hensel Phelps Superintendent - Jason Coyne - (650) 821-9353, (831) 970-0285 Cell. Project Manager - Mark Fantozzi P.E. - (650) 821-7854, (408) 489-9185 Cell. 8974 T3 B/A E Upgrade Project Manager - Tony Breslin - (650) 821-6522, Hensel Phelps - Kayla Burtness - (650) 821-0456, (650) 315-6660 Cell T6877-2 Signature Flight Support FBO Hanger C 8673 Airfield Operations Building Project Director - Vinson Heine - (510) 231-5547 Office, (415) 748-1628 Mobile, Overaa - Supervisor - (510) 719-3130 Project Manager - Derek Homer - SFIA Inspector - Robert Stalf - (650) 821-7731, (650) 302-3585 Cell, Superintendent - Gus Lotti - (415) 543-2100, (415) 850-7047 Cell PM Burns & McDonnell - Fuel Pit Extension Project Manager - Kurt Janisch Burns & Mcdonnell, (816) 822-3568, (816) 333-9400. Alt. Contacts: Luke Clisbee (816) 377-5843, Rick Parra (858)320-2933, Tyler Mclroy (816) 588-7425 Page 8 of 8