Capital Improvement Plan

Similar documents
Capital Improvement Program Fiscal Year

Village of Lombard, Illinois Capital Improvement Plan FUNDING SOURCE SUMMARY

CITY OF COACHELLA CAPITAL IMPROVEMENT PROGRAM TOTAL PROJECTS REVENUE SUMMARY TABLE ES-1

CAPITAL PROGRAM SUMMARY

FIRE Equipment Fire Training Equipment 105, , Total of Equipment 105, ,

City of Grand Island Tuesday, December 12, 2017 Council Session

Fuller/Fuller Heights Road Improvements

SEWERS AND STORM DRAINS. Storm Drain Pipe Repair

Annual Listing of Federally Obligated Projects in Santa Barbara County Federal Fiscal Year (October 1, 2014 to September 30, 2015)

CAPITAL IMPROVEMENT PLAN

Great Things to Come in El Centro!

Capital Projects Funds

THREE MILE PLAN TOWN OF SUPERIOR COLORADO

Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street

CHAPTER 3.0 PROJECT DESCRIPTION

Capital Five-Year Fiscal Forecast

CITY OF BROOKFIELD Capital Improvement Fund Budget

SAN RAFAEL City Council January 20, 2015

Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd

Capital Improvement Program

Basic Project Information

FY TIP Fiscal Constraint 2017 Total Commitments. agencies (the Michigan Department of programmed in the Kalamazoo Area


District of Squamish Financial Plan for the Years Capital Revenues and Expenditures

Brevard County Utility Services Department

- Countywide - Roadway Cone Zone / Lane Closure / Sidewalk Repair Schedule

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications

Town of Cary Capital Listing

AGENCY NAME TRANSPORTATION

ODOT DISTRICT CONSTRUCTION PROGRAM JOHN R. KASICH, OHIO GOVERNOR JERRY WRAY, ODOT DIRECTOR KIRK SLUSHER, DISTRICT DEPUTY DIRECTOR

Progress Report for Projects of Regional Significance

CITY OF PALMDALE. REPORT to the Mayor and Members of the City Council from the City Manager

June 2013: Capital Improvements Update. through $ 126,196,202 Available Funding through 2018 $ 149,783,656. Staff s Recommendation

Community Park Capital Project. February 6, 2017

Palm Beach County Traffic Report July 13 through July 20, 2012

City of Olathe, Kansas Capital Improvement Plan Projects 2016 thru 2020

1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET

RIO VISTA MUNICIPAL AIRPORT

4 VIVA PHASE 2 YONGE STREET - Y2, AND HIGHWAY 7 - H3 CORRIDORS PRELIMINARY ENGINEERING UPDATE

STREET CONSTRUCTION PROGRAM SUMMARY CALENDAR YEAR 2018 / 2019 FISCAL YEAR Street From To Construction Type Cost Estimate

Construction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013

Major Projects Overview

City of Madera Engineering Division. Citizen s Oversight Committee February 13, 2019

Design Meeting Presentation

Transportation TRANSPORTATION PROJECTS

LONG BEACH EXCHANGE DEBUTING SPRING 2018

CITY OF PALMDALE. REPORT to the Mayor and Members of the City Council from the City Manager

November 21, 2012 Barbara Kelleher, (954)

APPENDIX A DATA COLLECTION BIBLIOGRAPHY SANTA CLARA COUNTY I-680 CORRIDOR STUDY

Port of Long Beach 2012 Capital Program Update. G.J. Cardamone, PE, FCMAA Director of Construction Management

AGENDA ITEM I-6 Public Works

As the Toronto Transit Commission (TTC) operates a transit service on Bay Street, City Council approval of this report is required.

Progress Report for Projects of Regional Significance

Canada and Alberta announce 33 new infrastructure projects

2012 WATER & SEWER ALLEY CONSTRUCTION CONTRACT, PACKAGE II SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD

FORT WORTH DISTRICT. Springtown Area Projects. Loyl C. Bussell, P.E. Acting District Engineer. Thursday, February 8, 2018 Date.

Bridging Belmont. By ROGER AMSDEN, LACONIA DAILY SUN

PURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40

35 Bee Tree Park Planning Zone 3

Port Macquarie-Hastings Pedestrian Access and Mobility Plan. Working Paper COMMUNITY ENGAGEMENT

FY FY 2022 TRANSPORTATION IMPROVEMENT PROGRAM (TIP) North Front Range Transportation & Air Quality Planning Council

2 ROADS CAPITAL CONSTRUCTION PROGRAM UPDATE

A Message from the Director

Microsoft Enterprise Agreement Renewal and Software License Management Awarded to Softchoice Corporation

Los Angeles International Airport (LAX) Airside $907M

Ohio Department of Transportation Traffic Advisory. District 4 Allen C. Biehl, P.E., Deputy Director S. Arlington Road.

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications. FY TIP Project Title/Location Number

Construction Update. Local Officials Briefing March 2016

Fuller Road/Fuller Heights Road Improvements

FY Regional Transportation Improvement Program Basic Project List (All Values in Thousands of Dollars) All costs in current dollars

List of Our Ongoing Noise and Vibration Monitoring Projects

APPROVED 10 LOT TENTATIVE TRACT MAP - OCEAN VIEWS

ADVANCED WARNING SYSTEM FOR SHARED USE CROSSING ON HOWARD STREET EAST OF NORDICA AVENUE

Palm Beach County Traffic Report August 24 through August 31, 2012

Municipal Facilities PD - DuJIS. Automatic Remote Blanket sensing to eliminate weekend checks - Water & Sewer Sewer Capital 12,000-12,

Project Start Date: Project Completion Date: July 1, Contractor: Mattson Construction Contact Information: Nate Lillemon

Open Report on behalf of Richard Wills, Executive Director for Environment and Economy

Interoffice Memorandum

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications. FY TIP Project Title/Location

PennDOT Interstate Work next week March 30-April 3:

RESORT AREA STRATEGIC ACTION PLAN (RASAP) STEERING COMMITTEE MEETING - APRIL 3, 2019

Kansas Department of Transportation DISTRICT TE / TA-T043(301) Project(s): Min: Max:

FY Transportation Improvement Program Basic Project List (in Thousands)

,271

ATTACHMENT C CITY OF FEDERAL WAY 2018 ASPHALT OVERLAY PROJECT BID SCHEDULE

Long water shutdown scheduled for Tuesday, September 18

Update Report - Etobicoke Creek and South Mimico Creek Trails

MEMORANDUM. Honorable Mayor and City Councilmembers William S. Joynes, Sr., City Administrator

Welcome to the Illinois High-Speed Rail Chicago to St. Louis Construction Update Meeting. Today s meeting will provide an overview of the Program,

OFFICE OF THE CITY MANAGER

SADDLE CREEK ENTRANCE (PRIVACY) GATE OPERATING AGREEMENT BETWEEN SADDLE CREEK COMMUNITY SERVICES DISTRICT AND CASTLE & COOKE CALIFORNIA, INC

May 1, 2015 Meredith Cruz, (561) Palm Beach County Traffic Report May 1 through May 8, 2015

Final Drainage Letter Pikes Peak Community College Downtown Parking Lot Colorado Springs, Colorado

FY16-FY21 The City of Frederick Capital Improvements Program

Vista Field Airport. Master Plan Update. February, Prepared for: Port of Kennewick One Clover Island Kennewick, Washington

Vasona Light Rail Signal Design Challenges. Hugh D. MacGillivray, Hatch Mott MacDonald Dennis Mellon, Santa Clara County Transportation Authority

Construction Staging Adelaide Street West

2018 Capital Improvement Budget Department Summary by Funding Source

Village of Orland Park Capital Improvement Plan

Transcription:

PROGRAM DESCRIPTION: The represents City Council approved projects and includes each of the project's total costs and the estimated funding requirements for the next five years. Projects are funded by various sources, as noted in the following Project Funding Summary. Funding sources include, but are not limited to, Community Development Commission (CDC), Gas Tax, Arterial Highway Rehabilitation Program (AHRP), Measure M (the half cent sales tax approved by voters in 1990), Highway Bridge Replacement and Rehabilitation Program (HBRRP), Capital Outlay Reserve (COR), Facility Maintenance, and Water and Sewer Funds. Page J-1

Summary by Project Type Water System Improvements $ 310,000 $ - $ - $ - $ - $ - Storm Drains 15,000 15,000 15,000 15,000 15,000 15,000 Sewers 251,000 270,400 205,600 225,000 225,000 225,000 Street Median Enhancements 91,000 - - - - - Intersection Improvements 330,000 - - - - - Arterial Street Rehabilitation 1,124,400 658,800 319,900 404,000 677,300 1,394,400 Bridges - - 3,677,800 2,500,000 - - Community Center and Parks 170,000 - - - - - City Hall Facilities 57,000 - - - - - Police Facilities - 35,000 60,000 - - - City Yard Facilities 40,000 - - - - - Ongoing Projects 1,193,500 1,050,300 1,093,600 1,162,800 778,200 690,400 Total $ 3,581,900 $ 2,029,500 $ 5,371,900 $ 4,306,800 $ 1,695,500 $ 2,324,800 Page J-2

Summary by Funding Source CDC $ 156,000 $ - $ - $ - $ - $ - COR 918,200 440,100 481,600 550,800 166,200 78,400 Facility Maintenance 57,000 35,000 60,000 - - - Gas Tax 60,000 60,000 60,000 60,000 60,000 60,000 HBRRP - - 2,898,500 1,941,300 - - Measure M 390,000 390,000 390,000 390,000 390,000 390,000 OCTA 644,400 658,800 1,099,200 962,700 677,300 1,394,400 Sewer 263,000 282,400 217,600 237,000 237,000 237,000 Stimulus Package 500,000 - - - - - Traffic Congestion Relief / Prop 1B 248,300 148,200 150,000 150,000 150,000 150,000 Water 345,000 15,000 15,000 15,000 15,000 15,000 Total $ 3,581,900 $ 2,029,500 $ 5,371,900 $ 4,306,800 $ 1,695,500 $ 2,324,800 Page J-3

Project Summary Project Total Project Cost Water System Improvements: MCC at City Yard Station and Relocate the Electric Service Motor - Replace existing outdated motor control center (MCC) at the City Yard and relocate Edison meter, using Water funds. The MCC is used for pumping water at the Booster Station. Carryover from FY 2008-09. $ 75,000 $ 75,000 $ - $ - $ - $ - $ - Install 3' Block Retaining Wall and 5' W.I. Fence at City Yard (NPDES) - Install 3 high block retaining wall (BRW) with 5 high wrought iron fence (WIF), using Water funds. WIF would comply with Home Land Security requirements and BRW would comply with NPDES requirements to protect surface water from entering waters of the USA. Carryover from FY 2008-09. 248,700 235,000 - - - - - Total Water System Improvements 323,700 310,000 - - - - - Storm Drains: Install NPDES devices - Install storm drain NPDES devices on catch basins in response to potential requirements for NPDES by Santa Ana Regional Water Quality Control Board, using COR funds. Ongoing project for FY 90,000 15,000 15,000 15,000 15,000 15,000 15,000 Total Storm Drains 90,000 15,000 15,000 15,000 15,000 15,000 15,000 Page J-4

Project Summary Project Total Project Cost Sewers (Ongoing): Longitudinal Crack Repairs - Repair cracks and/or reline sewer lines per Sewer Master Plan, using Sewer funds. Ongoing. $ 960,800 $ 186,000 $ 194,000 $ 130,800 $ 150,000 $ 150,000 $ 150,000 Removal of Grease and Encrustation - Clean sewer lines, as necessary, to remove encrustation from sewer pipes per Sewer Master Plan, using Sewer funds. Ongoing. 441,200 65,000 76,400 74,800 75,000 75,000 75,000 Total Sewers 1,402,000 251,000 270,400 205,600 225,000 225,000 225,000 Street Median Enhancements: Moody Street Center Median. Carryover from FY 2008-09 46,000 46,000 - - - - - Moody Street (La Luna to Malaga) Center Median. Design portion of project using COR funds. New project for FY 45,000 45,000 - - - - - Total Street Median Enhancements 91,000 91,000 - - - - - Intersection Improvements: Orangethorpe & Walker Intersection Improvement - modify intersection at Walker St. and Orangethorpe Ave. to improve vehicle capacity and reduce congestion subject to results of a traffic study and receipt of an Intersection Improvement (I.I.P) grant from O.C.T.A. I.I.P fund ($200,000) & local match provided from G.M.A. fund ($50,000). Carryover from FY 2008-09. 250,000 240,000 - - - - - Page J-5

Project Summary Project Total Project Cost JFK Pedestrian Signal Upgrade at Walker St. and John F. Kennedy High School using GMA funds ($80,000), and CDC funds ($20,000). Carryover from FY 2008-09. $ 100,000 $ 90,000 $ - $ - $ - $ - $ - Total Intersection Improvements 350,000 330,000 - - - - - Arterial Street Rehabilitation: Crescent Ave. - W.C.L. TO E.C.L. 304,300-304,300 - - - - La Palma Ave. - Coyote Creek Channel to Moody St. 404,000 - - - 404,000 - - - Moody St. to Walker 354,400 - - - - 354,400 - - Walker St. to Valley View St. 348,700 - - - - - 348,700 Moody St. - S.C.L. TO La Palma Avenue 354,500-354,500 - - - - - La Palma Ave. to Houston Ave. 324,400 324,400 - - - - - - Houston Ave. to Orangethorpe Ave. 200,000 - - - - 200,000 - Orangethorpe Ave. - Moody St. to Walker St. 255,700 - - - - - 255,700 - Walker St. to 91 Frwy 330,500 - - - - - 330,500-91 Frwy to Valley View St.(CDC) 600,000 600,000 - - - - - Valley View St. - S.C.L. TO Thelma Ave 131,400 - - - - - 131,400 - Orangethorpe Ave. to 183rd St. 154,400 - - - - - 154,400 Walker St. - Crescent Ave. to La Palma Ave. 219,900 - - 219,900 - - - - La Palma Ave. to Houston Ave. 100,000 - - 100,000 - - - - Houston Ave. to Orangethorpe Ave 173,700 - - - - - 173,700 Page J-6

Project Summary Project Total Project Cost - Orangethorpe Ave. to 183rd St. $ 122,900 $ - $ - $ - $ - $ 122,900 $ - Arterial Street Block Walls Painting. Painting of Arterial Block Walls throughout the City using COR Funds. New for FY 200,000 200,000 - - - - - Total Arterial Street Rehabilitation 4,578,800 1,124,400 658,800 319,900 404,000 677,300 1,394,400 Bridges: Bridge at La Palma (Del Amo Bridge/Coyote Creek) - Widening of La Palma Ave./Del Amo Bridge with OCTA and HBRRP Federal funds in conjunction with the Cities of Cerritos, Cypress, and Lakewood. 3,677,800 - - 3,677,800 - - - Bridge at Walker (Marquardt/Coyote Creek) - Widening of Walker St./Marquardt Ave. bridge with OCTA and HBRRP Federal funds in conjunction with the City of Cerritos. 2,500,000 - - - 2,500,000 - - Total Bridges 6,177,800 - - 3,677,800 2,500,000 - - Community Center and Parks: Central Park Gazebo project. Replace deteriorated gazebo and install a new pre fabricated octagon shape gazebo, using COR funds. New for FY 65,000 65,000 - - - - - Central Park Restroom project. Refurbuse deteriorated restrooms, using COR funds. New for FY 70,000 70,000 - - - - - Page J-7

Project Summary Project Total Project Cost Central Park Sidewalks. Removal and replacement of sidewalks at Central Park parking lot with Terra sidewalk's using COR funds. New for FY $ 35,000 $ 35,000 $ - $ - $ - $ - $ - Total Community Center and Parks 170,000 170,000 - - - - - City Hall Facilities: Replace A/C Unit at City Hall - Replacement of a 7.5 ton air conditioning unit in the City Hall that services the City Council Chambers, using Facility Maintenance funds. 22,000 22,000 - - - - - Repaint City Hall Exterior - Repaint the exterior of the City Hall building, using Facility Maintenance funds. 35,000 35,000 - - - - - Total City Hall Facilities 57,000 57,000 - - - - - Police Facilities: Reroof Police Facility - Reroof Police Facility using Facility Maintenance funds. 35,000-35,000 - - - - Seismic Retrofit City Hall Facility - Conduct seismic upgrades at City Hall Facility to ensure compliance with seismic safety standards, using Facility Maintenance funds. 60,000 - - 60,000 - - - Total Police Facilities 95,000-35,000 60,000 - - - Page J-8

Project Summary Project Total Project Cost City Yard Facilities: Develop a City Yard Master Plan; $20,000 from COR fund, $20,000 budgeted under Water Fund. Carryover from FY2008-09. $ 40,000 $ 40,000 $ - $ - $ - $ - $ - Total City Yard Facilities 40,000 40,000 - - - - - Total Before Ongoing Projects 13,375,300 2,388,400 979,200 4,278,300 3,144,000 917,300 1,634,400 Local Streets: Residential Pavement Management Program - Rehabilitate residential streets according to City Council adopted plan, using COR, Gas Tax, Prop 1B, Measure M, and Traffic Congestion Relief funds. The $ value is based on the Residential Pavement Management Report. Average annual budget required is $817,100. Carryover from FY 2008-09. 4,856,685 841,500 898,300 941,600 1,010,800 626,200 538,400 Raise and Repair Water Valves and Sewer Manholes - Raise and repair water valves and sewer manholes with residential pavement management program, using Water and Sewer funds. Carryover from FY 2008-09. 162,000 27,000 27,000 27,000 27,000 27,000 27,000 Repair Broken/Settled Curb and Gutter - Repair Broken/Settled Curb and Gutter, using Gas Tax and Measure M funds. 750,000 125,000 125,000 125,000 125,000 125,000 125,000 Page J-9

Project Summary Project Total Project Cost Street Sign Replacement 200,000 200,000 - - - - - Total Ongoing Projects 5,968,685 1,193,500 1,050,300 1,093,600 1,162,800 778,200 690,400 Total $ 19,343,985 $ 3,581,900 $ 2,029,500 $ 5,371,900 $ 4,306,800 $ 1,695,500 $ 2,324,800 Page J-10

Project Funding Summary Project Name CDC Arterial Street Rehabilitation 91 Freeway to Valley View Street 100,000 - - - - - Upgrade pedestrian signal at Walker Street / JFKHS 10,000 - - - - - Median on Moody 46,000 - - - - - CDC Total 156,000 - - - - - COR Install Filters on Catch Basins (NPDES) 15,000 15,000 15,000 15,000 15,000 15,000 Develop a City Yard Master Plan 20,000 - - - - - Central Park Sidewalks 35,000 - - - - - Central Park Restrooms 70,000 Moody Street Center Median (La Luna to Malaga) 45,000 Central Park Gazebo 65,000 - - - - Arterial Street Block Walls 200,000 - - - - - Street Sign Replacement Program 200,000 - - - - - Residential Pavement Management Program 268,200 425,100 466,600 535,800 151,200 63,400 COR Total 918,200 440,100 481,600 550,800 166,200 78,400 Facility Maintenance Replace A/C Unit at City Hall 22,000 - - - - - Repaint City Hall Exterior 35,000 - - - - - Reroof Police Facility - 35,000 - - - - Seismic Retrofit City Hall Facility - - 60,000 - - - Facility Maintenance Total 57,000 35,000 60,000 - - - Page J-11

Project Funding Summary Project Name Gas Tax Residential Pavement Management Program 10,000 10,000 10,000 10,000 10,000 10,000 Repair Broken/Settled Curb and Gutter 50,000 50,000 50,000 50,000 50,000 50,000 Gas Tax Total 60,000 60,000 60,000 60,000 60,000 60,000 HBRRP Bridge at La Palma (Del Amo Bridge/Coyote Creek) - - 2,898,500 - - - Bridge at Walker (Marquardt/Coyote Creek) - - - 1,941,300 - - HBRRP Total - - 2,898,500 1,941,300 - - Measure M Residential Pavement Management Program 315,000 315,000 315,000 315,000 315,000 315,000 Repair Broken/Settled Curb and Gutter 75,000 75,000 75,000 75,000 75,000 75,000 Measure M Total 390,000 390,000 390,000 390,000 390,000 390,000 OCTA Arterial Street Rehabilitation 324,400 658,800 319,900 404,000 677,300 1,394,400 Orangethorpe Avenue & Walker Street Intersection Improvements 240,000 - - - - - Upgrade pedestrian signal at Walker Street / JFKHS (GMA) 80,000 - - - - - Bridge at La Palma (Del Amo Bridge/Coyote Creek) - - 779,300 - - - Bridge at Walker (Marquardt/Coyote Creek) - - - 558,700 - - OCTA Total 644,400 658,800 1,099,200 962,700 677,300 1,394,400 Sewer Longitudinal Crack Repairs 186,000 194,000 130,800 150,000 150,000 150,000 Removal of Grease and Encrustation 65,000 76,400 74,800 75,000 75,000 75,000 Raise and Repair Water Valves and Sewer Manholes 12,000 12,000 12,000 12,000 12,000 12,000 Sewer Total 263,000 282,400 217,600 237,000 237,000 237,000 Page J-12

Project Funding Summary Project Name Stimulus Package Arterial Street Rehabilitation 500,000 - - - - - Stimulus Total 500,000 - - - - - Traffic Congestion Relief / Prop 1B Residential Pavement Management Program 248,300 148,200 150,000 150,000 150,000 150,000 Traffic Congestion Relief Total 248,300 148,200 150,000 150,000 150,000 150,000 Water MCC at City Yard Station and Relocate Electric Service Motor 75,000 - - - - - Develop a City Yard Master Plan 20,000 - - - - - Raise and Repair Water Valves and Sewer Manholes 15,000 15,000 15,000 15,000 15,000 15,000 Install 3' Block Retaining Wall and 5' W.I. Fence at City Yard (NPDES) 235,000 - - - - - Water Total 345,000 15,000 15,000 15,000 15,000 15,000 Grand Total $ 3,581,900 $ 2,029,500 $ 5,371,900 $ 4,306,800 $ 1,695,500 $ 2,324,800 Page J-13

THIS PAGE INTENTIONALLY LEFT BLANK Page J-14