Construction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013

Fuller/Fuller Heights Road Improvements

Transportation TRANSPORTATION PROJECTS

AGENCY NAME TRANSPORTATION

CITY OF BROOKFIELD Capital Improvement Fund Budget

Village of Lombard, Illinois Capital Improvement Plan FUNDING SOURCE SUMMARY

Area Surrounding Maplewood Manor

THREE MILE PLAN TOWN OF SUPERIOR COLORADO

Crenshaw/LAX Transit Project Construction Update Community Meeting. November 15, 2018

FIRE Equipment Fire Training Equipment 105, , Total of Equipment 105, ,

Capital Improvement Program Fiscal Year

Fuller Road/Fuller Heights Road Improvements

CAPITAL IMPROVEMENT PLAN

Route 29 Solutions Projects

ONONDAGA CREEKWALK PHASE II. Public Information Meeting Series 1

CITY OF PEMBROKE 2004 BUDGET. July 6, 2004

CAPITAL IMPROVEMENT PLAN FOR THE FIVE YEAR PERIOD ENDING JUNE 30, 2023 ALLOCATION OF RESOURCES. Cash - General Fund Transfer Total

CITY OF COACHELLA CAPITAL IMPROVEMENT PROGRAM TOTAL PROJECTS REVENUE SUMMARY TABLE ES-1

Palm Beach County Traffic Report July 13 through July 20, 2012

RESOLUTION No APPROVAL OF WAYNE COUNTY AIRPORT AUTHORITY FISCAL YEAR 2018 BUDGET. By Board Member Mark Ouimet

Public Open House. Chief Peguis Trail Project

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications

Crenshaw/LAX Transit Project Construction Update Community Meeting September 27 th, 2017

PFC Quarterly Status Report September 30, 2016

Guide to. Road Construction Projects

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019

Non-Motorized Transportation

November 21, 2012 Barbara Kelleher, (954)

Transportation Supporting Dulles Airport

Town of Rocky Mountain House

City of Olathe, Kansas Capital Improvement Plan Projects 2016 thru 2020

Dufferin Jog Elimination Project

Exit 136 (Centreport Parkway/Stafford County) to Exit 130 (Route 3/Fredericksburg)

BOND PROGRAMS PROJECTS SCHEDULE AND DELIVERY

Clackamas County Development Agency

Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd

December 2012 Update. I-95 New Haven Harbor Crossing. Corridor Improvement Program

Notice and Opportunity to Comment on New Proposed Passenger Facility Charge (PFC) New Application

FINAL. Bicycle/Pedestrian Feasibility Study City of DeBary Dirksen Drive Trail. Prepared For: Volusia County MPO

WELCOME! TSPE DFW MID-CITIES. January Chapter Meeting

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015

Major Projects Overview

University Region Non-Motorized Plan 2015

Vista Field Airport. Master Plan Update. February, Prepared for: Port of Kennewick One Clover Island Kennewick, Washington

Dulles Toll Road Rate Setting Process

State Route 8 Corridor. Northern Summit County s Path to Success

Basic Project Information

Second Street Improvements Project Project Update Archive

City of Tallahassee, FL Department of Aviation

Fort Myers Downtown & Riverfront Redevelopment

AIRPORTS DIVISION. The Hawaii Airports System Is Self-Supporting

PUBLIC SAFETY. FY 2015 BUDGET Prince William County CIP-PUBLIC SAFETY 551

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT

3. COLTA / HUGA CONNECTIONS - PRELIMINARY

New PFC Application #13

CITY OF PALMDALE. REPORT to the Mayor and Members of the City Council from the City Manager

Metrolinx Projects: Temporary Delegation for Long- Term Road Closures

Public Notice July 14, 2017

Lafourche Parish Government REQUEST FOR QUALIFICATIONS. Landscape Architectural Services

PUBLIC NOTICE. Table 1 Projects Proposed by Amendment

City of Redding Airports

RESORT AREA STRATEGIC ACTION PLAN (RASAP) STEERING COMMITTEE MEETING - APRIL 3, 2019

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

FORT WORTH DISTRICT. Springtown Area Projects. Loyl C. Bussell, P.E. Acting District Engineer. Thursday, February 8, 2018 Date.

Palm Beach County Traffic Report August 24 through August 31, 2012

Los Angeles International Airport (LAX) Airside $907M

DRAFT. Dorabelle Campground Rehabilitation

Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street

MEMORANDUM VILLAGE OF NORTHBROOK

Business Item No XXX. Proposed Action That the Metropolitan Council approve the Coon Creek Regional Trail Master Plan.

EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts

CHICAGO DEPARTMENT OF AVIATION. Current Construction Projects AND THE O HARE MODERNIZATION PROGRAM. May 2, 2014

PURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40

Project Deliverable 4.1.3f Individual City Report - City of San Dimas

Brevard County Utility Services Department

7272 WISCONSIN AVENUE LOCAL AREA TRANSPORTATION REVIEW

2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016

Construction Staging Adelaide Street West

2017 Appropriation Budget Table of Contents Board Approved August 19, 2016

- Countywide - Roadway Cone Zone / Lane Closure / Sidewalk Repair Schedule

Ann Arbor Municipal Airport Ann Arbor, MI Date of Latest ALP ACIP Airport Code - A Airport Identifier - ARB

Welcome KROSNO CREEK DIVERSION PROJECT CLASS ENVIRONMENTAL ASSESSMENT

CAPITAL PROGRAM SUMMARY

Exit 148 (Quantico) to Exit 133 (Route 17/Fredericksburg)

Hospital Link Project Project Update September 2015

user s guide to Transportation Improvements in Astoria Planning Efforts outside Astoria for more information, contact:

Design Meeting Presentation

CHAPTER 4: ALTERNATIVES

RESIDENT ENGINEERING, CONSTRUCTION MANAGEMENT & QA/QC SERVICES (CONTINUOUS CONTRACTS FROM

PROGRESS REPORT WATERFRONT PROGRAM. Q (January - March) Highlights from Q1 2018

BOARD OF AIRPORT COMMISSIONERS

Community Park Capital Project. February 6, 2017

SAN RAFAEL City Council January 20, 2015

Boston Redevelopment Authority 2/26/ Chestnut Hill Avenue Boston/Brookline, MA

Update of MDX Open Road Tolling

Transcription:

THE CITY OF FREDERICK CAPITAL IMPROVEMENT PROGRAM FY2012-2017

TABLE OF CONTENTS Capital Improvement Program FY 2012-2017 GENERAL FUND 110006 - Joint Communications Page 1-2 120002 - DPW Building A Roof Replacement.. Page 3-4 120003 - New DPW Storage Building Page 5-6 ROADS 310004 - Monocacy Blvd/Rt 15 Interchange.. Page 7-8 310303 - Gas House Pike Improvements Page 9-10 310304 - Monocacy Blvd. Central Section Phase II. Page 11-12 320007 - Opossumtown Pike/TJ Drive Intersection Improvements Page 13-14 ROADSIDE INFRASTRUCTURE 340000 - Streetlight Upgrades Page 15-16 340005 - Pedestrian Signal at US 40/Waverly Drive. Page 17-18 340006 - Streetlight Replacement ARRA... Page 19-20 340102 - Sidewalk Retrofit. Page 21-22 340401 - New Traffic Signal Construction. Page 23-24 340402 - Traffic Light Conversion ARRA.. Page 25-26 380001 - Shared Use Path Plan Improvements... Page 27-28 380006 - Way Finding. Page 29-30 PARKS 410001 - Carroll Creek Linear Park. Page 31-32 410007 - Riverside Center Park.. Page 33-34 410008 - Walnut Ridge Park Page 35-36 410011 - Avalon Park.. Page 37-38 410017 - Clover Ridge Park. Page 39-40

PARKS cont d TABLE OF CONTENTS 410024 - Carrollton Park. Page 41-42 411201 - Hill Street Regional Park.. Page 43-44 411202 - West Side Regional Park.. Page 45-46 450102 - Grove Stadium Improvements. Page 47-48 WATER 310304 - Monocacy Blvd. Central Section Phase II.. Page 49-50 360009 - Water Distribution. Page 51-52 360011 - New Design Water Plant Expansion. Page 53-54 360015 - North Side Water Tank.. Page 55-56 360018 - Water Loss Reduction.. Page 57-58 360022 - Water Resource Project. Page 59-60 360023 - Ballenger Creek Interconnect Page 61-62 360024 - Patrick Street Water Main Replacement... Page 63-64 360025 - Water & Sewer Security Page 65-66 360028 - East Street Interchange Utilities Page 67-68 360029 - Bowers/Whittier Connector Pipeline Page 69-70 360031 - Fishing Creek Pipeline.. Page 71-72 360032 - SCADA System Page 73-74 360033 - Lake Linganore Page 75-76 360601 - Watershed Land Acquisition Page 77-78 SEWER 370003 - Shookstown Interceptor Sewer. Page 79-80 370007 - Wastewater Flow Meter Replacement Page 81-82 370008 - Gas House Pike WWTP Expansion & Improvements.. Page 83-84 370009 - Ballenger-McKinney WWTP Page 85-86 370300 - Inflow and Infiltration Reduction Page 87-88

TABLE OF CONTENTS AIRPORT FUND 380051 - FAA Part 77. Page 89-90 380054 - Airport Property Acquisitions. Page 91-92 380062 - Property Acquisition Bowman s Farm. Page 93-94 380065 - Runway 5-23 and 30 Extension Page 95-96 380067 - Bailes Lane Demolition & Site Work.. Page 97-98 380068 - Acquire/Obstruction Removal Waffle House Page 99-100 380071 - Acquire/Obstruction Removal Tulip Hill Houses. Page 101-102 380077 - Air Traffic Control Tower. Page 103-104 380079 - Localizer Antenna Replacement Page 105-106 PARKING FACILITIES 380401 - Parking Deck # 4.. Page 107-108 380402 - Parking Deck # 5.. Page 109-110 380408 - Site G Deck #6..... Page 111-112 380413 - Church Street Deck Rehab/Rebuild Page 113-114 STORM WATER 350001 - South Street Storm Drain.. Page 115-116 350020 - Carroll Creek Flood Control Project. Page 117-118

THE CITY OF FREDERICK, MARYLAND CAPITAL IMPROVEMENT PROGRAM FY 2012-2017 TOTAL CITY CITY SHARE CITY SHARE ONLY TOTAL SHARE APPROVED PRJ. NO.a PROJECT NAME PROJECT REQUIRED TO DATE FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 GENERAL FUND FACILITIES 110006 Joint Communications 1,000,000 1,000,000 0 1,000,000 0 0 0 0 0 120002 DPW Building A Roof Replacement 579,542 579,542 600,000 (20,458) 0 0 0 0 0 120003 New DPW Storage Building 1,000,000 1,000,000 0 0 1,000,000 0 0 0 0 ROADS 310004 Monocacy Blvd./Rt 15 Interchange 2,250,000 2,250,000 1,000,000 0 0 0 1,250,000 0 0 310303 Gas House Pike Improvements 5,817,937 3,923,808 4,108,852 (185,044) 0 0 0 0 0 310304 Monocacy Blvd. - Central Section 51,799,119 51,569,406 15,189,406 0 0 0 0 13,880,000 22,500,000 320007 Opossumtown Pk./TJ Dr. Intersection Imps. 4,328,095 4,111,095 811,095 300,000 1,500,000 1,500,000 0 0 0 ROADSIDE INFRASTRUCTURE 340000 Streetlight Upgrades 3,157,047 3,037,047 3,037,047 0 0 0 0 0 0 340005 Pedestrian Signal at US40 and Waverly Drive 68,052 68,052 68,052 0 0 0 0 0 0 340006 Streetlight Replacement - ARRA 455,494 250,346 250,346 0 0 0 0 0 0 340102 Sidewalk Retrofit 593,296 190,524 198,819 (8,295) 0 0 0 0 0 340401 New Traffic Signal Construction 1,144,420 1,144,420 634,420 30,000 225,000 30,000 225,000 0 0 340402 Traffic Light Conversion - ARRA 164,732 38,580 38,580 0 0 0 0 0 0 380001 Shared Use Path Plan Improvements 1,065,009 850,009 580,009 0 0 90,000 90,000 90,000 0 380006 Way Finding 640,000 360,000 360,000 0 0 0 0 0 0 PARKS 410001 Carroll Creek Linear Park 23,069,000 16,372,502 16,122,502 250,000 0 0 0 0 0 410007 Riverside Center Park 1,570,530 1,453,050 843,000 0 0 0 610,050 0 0 410008 Walnut Ridge Park 381,607 381,607 387,971 (6,364) 0 0 0 0 0 410011 Avalon Park 384,000 384,000 0 0 0 384,000 0 0 0 410017 Clover Ridge Park 438,000 438,000 0 0 35,000 403,000 0 0 0 410024 Carrollton Park 73,316 73,316 90,000 (16,684) 0 0 0 0 0 411201 Hill Street Regional Park 3,804,453 2,980,303 2,988,107 (7,804) 0 0 0 0 0 411202 West Side Regional Park 19,289,000 18,400,000 18,000,000 0 0 200,000 200,000 0 0 450102 Grove Stadium Improvements 4,100,000 2,100,000 2,100,000 0 0 0 0 0 0 Total General Fund: 127,172,649 112,955,607 67,408,206 1,335,351 2,760,000 2,607,000 2,375,050 13,970,000 22,500,000 Debt Funding (90,250,104) (53,900,104) (650,000) 0 0 0 (13,200,000) ########## Special Assessments (3,676,805) (3,676,805) 0 0 0 0 0 0 Impact Fees (843,000) (843,000) 0 0 0 0 0 0 City Pay-As-You-Go 18,185,698 8,988,297 685,351 2,760,000 2,607,000 2,375,050 770,000 0 x - New project

THE CITY OF FREDERICK, MARYLAND CAPITAL IMPROVEMENT PROGRAM FY 2012-2017 TOTAL CITY CITY SHARE CITY SHARE ONLY TOTAL SHARE APPROVED PRJ. NO.a PROJECT NAME PROJECT REQUIRED TO DATE FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 WATER AND SEWER FUND WATER 310304 Monocacy Blvd. - Central Section - Ph. II 8,714,000 8,714,000 7,014,000 0 0 0 0 1,100,000 600,000 360009 Water Distribution 11,931,350 11,928,133 12,705,000 (776,867) 0 0 0 0 0 360011 New Design Water Plant Expansion 51,750,000 51,750,000 51,750,000 0 0 0 0 0 0 360015 North Side Water Tank 4,150,000 2,150,000 150,000 0 0 2,000,000 0 0 0 360018 Water Loss Reduction 15,165,275 15,165,275 5,311,000 (145,725) 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 360022 Water Resource Project 13,033,255 12,973,255 5,068,000 (94,745) 0 8,000,000 0 0 0 360023 Ballenger Creek Interconnect 2,612,322 2,612,322 2,809,000 (196,678) 0 0 0 0 0 360024 Patrick Street Water Main Replacement 6,804,935 6,804,935 8,190,252 (1,385,317) 0 0 0 0 0 360025 Water and Sewer Security 220,000 220,000 220,000 0 0 0 0 0 0 360028 East Street Interchange Utilities 250,000 250,000 250,000 0 0 0 0 0 0 360029 Bowers/Whittier Connector Pipeline 4,486,782 4,486,782 4,486,782 0 0 0 0 0 0 360031 Fishing Creek Pipeline 13,580,000 13,580,000 80,000 0 1,000,000 12,500,000 0 0 0 360032 SCADA System 500,000 500,000 500,000 0 0 0 0 0 0 360033 Lake Linganore 429,900 429,900 29,900 0 200,000 200,000 0 0 0 360601 Watershed Land Acquisition 763,353 402,890 402,890 0 0 0 0 0 0 SEWER 370003 Shookstown Interceptor Sewer 898,000 898,000 898,000 0 0 0 0 0 0 370007 Wastewater Flowmeter Replacement 520,000 520,000 320,000 0 0 200,000 0 0 0 370008 Gas House Pk. WWTP Expansion & Imp'ts. 71,373,551 56,373,551 11,241,000 9,132,551 500,000 27,000,000 8,500,000 0 0 370009 Ballenger-McKinney WWTP 17,483,000 17,483,000 2,683,000 14,800,000 0 0 0 0 0 370300 Inflow and Infiltration Reduction 5,091,837 4,978,267 4,978,267 0 0 0 0 0 0 Total Water and Sewer Fund: 229,757,560 212,220,310 119,087,091 21,333,219 3,700,000 51,900,000 10,500,000 3,100,000 2,600,000 Debt Funding (190,591,844) (112,659,360) (21,332,484) 0 (47,500,000) (8,500,000) (600,000) 0 Special Assessments (2,490,735) (2,490,000) (735) 0 0 0 0 0 Impact Fees 0 0 0 0 0 0 0 0 Pay-As-You-Go 19,137,731 3,937,731 0 3,700,000 4,400,000 2,000,000 2,500,000 2,600,000 AIRPORT FUND 380051 FAA Part 77 856,000 12,000 12,000 0 0 0 0 0 0 380054 Airport Property Acquisitions 17,114,000 1,263,000 1,263,000 0 0 0 0 0 0 380062 Property Acquisition - Bowman's Farm 5,550,000 71,000 71,000 0 0 0 0 0 0 380065 Runway 5-23 and 30 Extension 3,396,000 45,000 0 0 0 0 0 9,000 36,000 380067 Bailes Lane Demolition and Site Work 10,168,200 129,228 13,000 5,228 44,000 39,000 28,000 0 0 380068 Acquire/Obstruction Removal - Waffle House 2,400,000 31,000 31,000 0 0 0 0 0 0 380071 Acquire Tulip Hill Houses 1,500,000 21,000 14,000 0 7,000 0 0 0 0 380077 Air Traffic Control Tower 4,832,462 0 650,000 (650,000) 0 0 0 0 0 x 380079 Localizer Antenna Replacement 500,000 0 0 0 0 0 0 0 0 Total Airport Fund: 46,316,662 1,572,228 2,054,000 (644,772) 51,000 39,000 28,000 9,000 36,000 Debt Funding 0 (650,000) 650,000 0 0 0 0 0 Special Assessments 0 0 0 0 0 0 0 0 Impact Fees 0 0 0 0 0 0 0 0 Pay-As-You-Go 1,572,228 1,404,000 5,228 51,000 39,000 28,000 9,000 36,000 x - New project

THE CITY OF FREDERICK, MARYLAND CAPITAL IMPROVEMENT PROGRAM FY 2012-2017 TOTAL CITY CITY SHARE CITY SHARE ONLY TOTAL SHARE APPROVED PRJ. NO.a PROJECT NAME PROJECT REQUIRED TO DATE FY 12 FY 13 FY 14 FY 15 FY 16 FY 17 PARKING FACILITIES FUND 380401 Parking Deck #4 18,319,136 14,044,136 14,150,000 (105,864) 0 0 0 0 0 380402 Parking Deck #5 12,250,000 12,250,000 12,250,000 0 0 0 0 0 0 380408 Site G Parking Garage 16,865,000 16,865,000 1,135,000 0 0 0 0 0 15,730,000 x 380413 Church Street Deck Rehab / Rebuild 2,274,000 1,705,500 0 1,105,864 599,636 0 0 0 0 Total Parking Facilities Fund: 49,708,136 44,864,636 27,535,000 1,000,000 599,636 0 0 0 15,730,000 Debt Funding (43,250,000) (27,520,000) 0 0 0 0 0 ########## Special Assessments 0 0 0 0 0 0 0 0 Impact Fees 0 0 0 0 0 0 0 0 Pay-As-You-Go 1,614,636 15,000 1,000,000 599,636 0 0 0 0 STORM WATER FUND 350001 South Street Storm Drain 4,836,894 4,836,894 836,894 0 0 0 0 2,000,000 2,000,000 350020 Carroll Creek Flood Control Project 55,905,005 23,145,438 21,895,438 0 0 0 1,250,000 0 0 Total Storm Water Fund: 60,741,899 27,982,332 22,732,332 0 0 0 1,250,000 2,000,000 2,000,000 Debt Funding (19,484,703) (15,484,703) 0 0 0 0 (2,000,000) (2,000,000) Special Assessments (383,000) (383,000) 0 0 0 0 0 0 Impact Fees 0 0 0 0 0 0 0 0 Pay-As-You-Go 8,114,629 6,864,629 0 0 0 1,250,000 0 0 TOTAL CIP: 513,696,906 399,595,113 238,816,629 23,023,798 7,110,636 54,546,000 14,153,050 19,079,000 42,866,000 x - New project

THE CITY OF FREDERICK, MARYLAND CAPITAL IMPROVEMENTS PROGRAM FOR FY 2012-2017 CIP NUMBER: 110006 PROJECT NAME: Joint Communications PROJECT MANAGER: FPD Technical Services Bureau Administrator SCOPE Expansion of the Frederick County Emergency Communications Center to accommodate the relocation of Frederick Police Department communications staff. Procurement of hardware /software to accommodate consolidation of dispatch centers and utilization of single consolidated County/City radio network. JUSTIFICATION: FPD Radio Network Replacement Both the City and County have expressed interest in sharing a combined digital radio network and are currently exploring the possibilities to attain this goal. The concept is based on the premise that the County s current radio network would be enhanced to accept the additional needs required by the Frederick Police Department. The County s current road map for improvement is based on the need of the Sheriff s Office and Fire/Rescue to improve in-building coverage that the current system lacks. A combined radio network is only possible if the following conditions are met, (1) both parties agree; (2) the level of in-building coverage, of the new county radio network, significantly increases to the same high level of the current police UHF radio system, and (3) additional frequencies are obtained to accommodate the additional radio traffic. Should these conditions be met, resulting in a joint/combined radio network, considerable monetary savings would result for the City over building its own new 700/800 MHz network. Consolidated Dispatch Center with Frederick County A new communications center historically has been programmed in the agency s space needs study for a new police facility. The agency s current communications center is grossly over crowded. Frederick County s five (5) year old 9-1-1 Center has reached it capacity and requires additional space. This situation presents a unique opportunity to again revisit the idea of consolidating the City and County centers under one roof. Based on an expression of interest from both City and County elected officials Frederick County contracted with a consultant (RCC) to consider the feasibility of this concept. At this stage an exact funding amount for the City s space cannot be accurately be projected until the two government bodies establish a cost sharing formula. What is known, based on the 2005 Frederick Police Department space needs study, by 2024 Frederick Police will require space for eight (8) dispatcher console positions and associated supervisory office. Mayor Holtzinger and Board of County Commissioners President Jan Gardner met on 03/25/2009 (along with other staff personnel from both the County and City) to discuss the proposal. Mayor Holtzinger pledged support of the concepts for both initiatives. Subsequently monies were allocated to the CIP project. Page 1

Expressed in Thousands EXPENDITURES TOTAL TO-DATE FY12 FY13 FY14 FY15 FY16 FY17 PLANNING/ENG. - - - - - - - - LAND/R.O.W. - - - - - - - - UTILITIES - - - - - - - - CONSTRUCTION - - - - - - - - EQUIPMENT 1,000.000-1,000.000 - - - - - MISCELLANEOUS - - - - - - - - TOTAL EXPENDITURES 1,000.000-1,000.000 - - - - - REVENUES TOTAL TO-DATE FY12 FY13 FY14 FY15 FY16 FY17 CITY OPERATING 1,000.000-1,000.000 - - - - - DEBT ISSUE - - - - - - - - SPECIAL ASSESSMENT - - - - - - - - IMPACT FEES - - - - - - - - FEDERAL GRANT - - - - - - - - STATE GRANT - - - - - - - - COUNTY GRANT - - - - - - - - OTHER - - - - - - - - TOTAL REVENUES 1,000.000-1,000.000 - - - - - ESTIMATED OPERATING BUDGET IMPACT: REVENUE EXPENSE NET 0 0 0 0 0 0 Joint Communications 110006 Fund 306 - General CIP Page 2

THE CITY OF FREDERICK, MARYLAND CAPITAL IMPROVEMENTS PROGRAM FY2012-2017 CIP NUMBER: 120002 PROJECT NAME: DPW Building A Roof Replacement PROJECT MANAGER: Deputy Director of Public Works - Operations SCOPE: The 3,000 square foot standing seam metal roof over the fuel island will be repaired in spring of 2009. The old roof on Building E was removed down to the metal deck, and an 8,600 sq ft. 4-ply build up roof system installed with modified type 3 asphalt and a flood and gravel surface. New installation l included new insulation, medal flashing, and new gutters and downspouts. Roof on Building A was replaced in 2006. JUSTIFICATION: The existing roof carries a 10-year warranty and was installed in May, 1991. This replacement and repair will eliminate the roof leaks ponding that are causing interior damage and prevent the further deterioration of the masonry caps. Page 3

Expressed in Thousands EXPENDITURES TOTAL TO-DATE FY12 FY13 FY14 FY15 FY16 FY17 PLANNING/ENG. - - - - - - - - LAND/R.O.W. - - - - - - - - UTILITIES - - - - - - - - CONSTRUCTION 579.542 600.000 (20.458) - - - - - EQUIPMENT - - - - - - - - MISCELLANEOUS - - - - - - - - TOTAL EXPENDITURES 579.542 600.000 (20.458) - - - - - REVENUES TOTAL TO-DATE FY12 FY13 FY14 FY15 FY16 FY17 CITY OPERATING 579.542 600.000 (20.458) - - - - - DEBT ISSUE - - - - - - - - SPECIAL ASSESSMENT - - - - - - - - IMPACT FEES - - - - - - - - FEDERAL GRANT - - - - - - - STATE GRANT - - - - - - - - COUNTY GRANT - - - - - - - - OTHER - - - - - - - - TOTAL REVENUES 579.542 600.000 (20.458) - - - - - ESTIMATED OPERATING BUDGET IMPACT: REVENUE EXPENSE NET 0 0 0 0 0 0 DPW Building A Roof Replacement 120002 Fund 306 - General CIP Page 4

THE CITY OF FREDERICK, MARYLAND CAPITAL IMPROVEMENTS PROGRAM FY 2012-2017 CIP NUMBER: 120003 PROJECT NAME: New DPW Storage Building PROJECT MANAGER: Deputy Director of Public Works - Operations SCOPE: This project is the design, purchase, and installation of a new 43,000 sq ft steel building in the DPW complex for use as a vehicle, equipment and material storage building. The project includes the construction of a 6-inch concrete floor slab, pouring concrete footers, and placing piers to support the building's frame structure at the site in the DPW Yard. Project will also include new electrical and water/sewer services. JUSTIFICATION: DPW presently stores vehicles and equipment outside, which become damaged by the weather by causing rust and other equipment failures. By having vehicles and equipment in covered storage, it will be easier to repair and maintain the equipment and therefore increase the life cycle of the equipment. Page 5

Expressed in Thousands EXPENDITURES TOTAL TO-DATE FY12 FY13 FY14 FY15 FY16 FY17 PLANNING/ENG. 100.000 - - 100.000 - - - - LAND/R.O.W. - - - - - - - - UTILITIES - - - - - - - - CONSTRUCTION 900.000 - - 900.000 - - - - EQUIPMENT - - - - - - - - MISCELLANEOUS - - - - - - - - TOTAL EXPENDITURES 1,000.000 - - 1,000.000 - - - - REVENUES TOTAL TO-DATE FY12 FY13 FY14 FY15 FY16 FY17 CITY OPERATING 1,000.000 - - 1,000.000 - - - - DEBT ISSUE - - - - - - - - SPECIAL ASSESSMENT - - - - - - - - IMPACT FEES - - - - - - - - FEDERAL GRANT - - - - - - - - STATE GRANT - - - - - - - - COUNTY GRANT - - - - - - - - OTHER - - - - - - - - TOTAL REVENUES 1,000.000 - - 1,000.000 - - - - ESTIMATED OPERATING BUDGET IMPACT: REVENUE EXPENSE 0 0 0 0 0 NET 0 0 0 0 0 0 DPW Storage Building 120003 Fund 306 - General CIP Page 6

THE CITY OF FREDERICK, MARYLAND - CAPITAL IMPROVEMENTS PROGRAM FY 2012-2017 CIP NUMBER: 310004 PROJECT NAME: Monocacy Blvd./ RT 15 Interchange PROJECT MANAGER: Deputy Director of Engineering SCOPE: Complete a scoping meeting, begin planning process, develop plan for the construction of an interchange. The second phase will include the engineering and design of the project as prescribed in the planning process. A memorandum of understanding between the City, County and State was entered into in order to fund the design with SHA responsible for managing the design. City Staff will participate in meetings and provide data and input where applicable. JUSTIFICATION: Safety along US 15 will be enhanced by the construction of the interchange by eliminating at-grade crossings in the City of Frederick area. The connection will also provide a vital connection linking the east and west sides of the City of Frederick on the north side of town. This connection is expected to help alleviate congestion at the US 15 at Opossumtown Pike/Motter Ave interchange. Page 7

Expressed in Thousands EXPENDITURES TOTAL TO-DATE FY12 FY13 FY14 FY15 FY16 FY17 PLANNING/ENG. 1,750.000 1,000.000 - - - 750.000 - - LAND/R.O.W. 500.000 - - - - 500.000 - - UTILITIES - - - - - - - - CONSTRUCTION - - - - - - - - EQUIPMENT - - - - - - - - MISCELLANEOUS - - - - - - - - TOTAL EXPENDITURES 2,250.000 1,000.000 - - - 1,250.000 - - REVENUES TOTAL TO-DATE FY12 FY13 FY14 FY15 FY16 FY17 CITY OPERATING 1,750.000 500.000 - - - 1,250.000 - - DEBT ISSUE 500.000 500.000 - - - - - - SPECIAL ASSESSMENT - - - - - - - - IMPACT FEES - - - - - - - - FEDERAL GRANT - - - - - - - - STATE GRANT - - - - - - - - COUNTY GRANT - - - - - - - - OTHER - - - - - - - - TOTAL REVENUES 2,250.000 1,000.000 - - - 1,250.000 - - ESTIMATED OPERATING BUDGET IMPACT: REVENUE EXPENSE NET 0 0 0 0 0 0 Monocacy Blvd./Rt 15 Interchange 310004 Fund 306 - General CIP Page 8

THE CITY OF FREDERICK, MARYLAND- CAPITAL IMPROVEMENTS PROGRAM FY 2012-2017 CIP NUMBER: 310303 PROJECT NAME: Gas House Pike Improvements Phase 1 PROJECT MANAGER: Deputy Director of Engineering SCOPE: The City of Frederick will reconstruct Gas House Pike from Monocacy Blvd eastward to the City boundary along Gas House Pike. This project results from the City s participation with a developer driven project to reconstruct Gas House Pike. The City will be responsible for frontage improvements along the Clustered Spires Golf Course, and for providing a shared access between the Golf Course and the adjacent property to the west. This project has been completed and it is being kept in the CIP in order to track Developer contributions as reimbursements are made from Riverside Corporate Park per the DRRA between the City and Riverside. JUSTIFICATION: This project will be funded partially by developer funding and partially by City of Frederick funds. The roadway widening is needed to accommodate the great increase in traffic as a result of development along the roadway. Page 9

Expressed in Thousands EXPENDITURES TOTAL TO-DATE FY12 FY13 FY14 FY15 FY16 FY17 PLANNING/ENG. 283.757 295.000 (11.243) - - - - - LAND/R.O.W. - - - - - - - - UTILITIES - 88.000 (88.000) - - - - - CONSTRUCTION 5,525.102 5,610.903 (85.801) - - - - - EQUIPMENT - - - - - - - - MISCELLANEOUS 9.078 9.078 - - - - - - TOTAL EXPENDITURES 5,817.937 6,002.981 (185.044) - - - - - REVENUES TOTAL TO-DATE FY12 FY13 FY14 FY15 FY16 FY17 CITY OPERATING 94.903 144.123 (49.220) - - - - - DEBT ISSUE 3,828.905 3,964.729 (135.824) - - - - - SPECIAL ASSESSMENT - - - - - - - - IMPACT FEES - - - - - - - - FEDERAL GRANT - - - - - - - - STATE GRANT - - - - - - - - COUNTY GRANT - - - - - - - - OTHER 1,894.129 1,894.129 - - - - - - TOTAL REVENUES 5,817.937 6,002.981 (185.044) - - - - - ESTIMATED OPERATING BUDGET IMPACT: REVENUE EXPENSE NET 0 0 0 0 0 0 Gas House Pike Improvements 310303 Fund 306 - General CIP Page 10

THE CITY OF FREDERICK, MARYLAND-CAPITAL IMPROVEMENTS PROGRAM FY 2012-2017 CIP NUMBER: 310304 PROJECT NAME: Monocacy Boulevard Central Section PROJECT MANAGER: Deputy Director of Engineering SCOPE: The design and construction of Monocacy Blvd Central Section which extends from Gas House Pike in the north to Hughes Ford Road in the south, including the design and construction of the bridge over Monocacy River, extension of Schifferstadt Blvd and East Church Street to connect with Monocacy Blvd., and the design and construction of the bridge over Carroll Creek. Monocacy Blvd in this section will be a four lane road with associated curb and gutter and sidewalks / bike paths. This project also includes completion of the Carroll Creek Flood Control Levee along Gas House Pike. Portions of the design/construction fronting the Nicodemus property shall be paid for by the property owner as stipulated in their annexation agreement. This project includes associated water and sewer infrastructure. JUSTIFICATION: This section of roadway will create an eastern loop for motorists to go around Frederick. It will relieve congestion in town and provide additional choices for motorists to travel without entering already congested arterials. The roadway will provide key relief needed for East Street as it begins to carry significantly more traffic in 2009 when the East Street extended project is complete along with the I-70 ramps to East Street. Page 11

Expressed in Thousands EXPENDITURES TOTAL TO-DATE FY12 FY13 FY14 FY15 FY16 FY17 PLANNING/ENG. 2,080.000 2,080.000 - - - - - - LAND/R.O.W. 9,512.000 7,500.000 - - - - 2,012.000 - UTILITIES 100.000 100.000 - - - - - - CONSTRUCTION 40,107.119 5,739.119 - - - - 11,868.000 22,500.000 EQUIPMENT - - - - - - - - MISCELLANEOUS - - - - - - - - TOTAL EXPENDITURES 51,799.119 15,419.119 - - - - 13,880.000 22,500.000 REVENUES TOTAL TO-DATE FY12 FY13 FY14 FY15 FY16 FY17 CITY OPERATING 2,814.904 2,620.728 (485.824) - - - 680.000 - DEBT ISSUE 48,220.778 12,034.954 485.824 - - - 13,200.000 22,500.000 SPECIAL ASSESSMENT 533.724 533.724 - - - - - - IMPACT FEES - - - - - - - - FEDERAL GRANT - - - - - - - - STATE GRANT - - - - - - - - COUNTY GRANT - TIF - - - - - - - - OTHER - Sale of Land/Dev. 229.713 229.713 - - - - - - TOTAL REVENUES 51,799.119 15,419.119 - - - - 13,880.000 22,500.000 ESTIMATED OPERATING BUDGET IMPACT: REVENUE EXPENSE NET 0 0 0 0 0 0 Monocacy Blvd. - Central Section 310304 Fund 306 - General CIP Page 12

THE CITY OF FREDERICK, MARYLAND CAPITAL IMPROVEMENTS PROGRAM FY 2012-2017 CIP NUMBER: 320007 PROJECT NAME: Opossumtown Pike / Thomas Johnson Drive Intersection Improvements PROJECT MANAGER: Deputy Director of Engineering SCOPE: Widen northbound Opossumtown Pike to lengthen the left-turn and right turn bays at Thomas Johnson Drive. This will include relocation of utilities, reconstruction of sidewalk, and traffic signal modifications. Widen southbound Thomas Johnson Drive to install additional left-turn lane at Opossumtown Pike (to be completed by others). JUSTIFICATION: The intersection of Opossumtown Pike at Thomas Johnson Drive currently operates at a LOS F during peak periods. This project will greatly improve the intersection s operations. The project is also needed to correspond with the SHA project that will rebuild and widen the Opossumtown Pike/Motter Avenue Bridge over US 15. The SHA will provide a free right turn from the northbound US 15 ramp to northbound Opossumtown Pike at Thomas Johnson Drive. This will significantly reduce delay and congestion in the interchange area and at the intersection of Opossumtown Pike at TJ Drive. Page 13

Expressed in Thousands EXPENDITURES TOTAL TO-DATE FY12 FY13 FY14 FY15 FY16 FY17 PLANNING/ENG. 26.000 26.000 - - - - - - LAND/R.O.W. 702.000 202.000 500.000 - - - - - UTILITIES 150.000 150.000 - - - - - - CONSTRUCTION 3,450.095 450.095-1,500.000 1,500.000 - - - EQUIPMENT - - - - - - - - MISCELLANEOUS - - - - - - - - TOTAL EXPENDITURES 4,328.095 828.095 500.000 1,500.000 1,500.000 - - - REVENUES TOTAL TO-DATE FY12 FY13 FY14 FY15 FY16 FY17 CITY OPERATING 3,024.095 24.095-1,500.000 1,500.000 - - - DEBT ISSUE 1,087.000 787.000 300.000 - - - - - SPECIAL ASSESSMENT - - - - - - - - IMPACT FEES - - - - - - - - FEDERAL GRANT - - - - - - - - STATE GRANT - - - - - - - - COUNTY GRANT - - - - - - - - OTHER 217.000 17.000 200.000 - - - - - TOTAL REVENUES 4,328.095 828.095 500.000 1,500.000 1,500.000 - - - ESTIMATED OPERATING BUDGET IMPACT: REVENUE EXPENSE NET 0 0 0 0 0 0 Opossumtown Pike/Thos. Johnson Intersection 320007 Fund 306 - General CIP Page 14

THE CITY OF FREDERICK, MARYLAND CAPITAL IMPROVEMENTS PROGRAM FY 2012-2017 CIP NUMBER: 340000 PROJECT NAME: Streetlight Upgrade PROJECT MANAGER: Superintendent of Lights/Signals SCOPE: This multi-year project allows the City's Street Light and Traffic Control Department to upgrade all streetlights currently powered by direct-bury series circuits. All of these streetlights will be converted to parallel circuits routed in conduit and their present lamp systems, both incandescent and high-pressure-sodium will be converted to QL induction lamps (low pressure mercury discharge). As a minimum, the City must procure materials and contracted services according to the following responsibilities: City Provided Services: Management (project management, procurement, inspection), demolition (removal and disposal of existing pole bases), and installation (refurbish existing poles, pulling underground wires in conduit, install poles and heads). Contractor Provided Services: Excavate existing direct-bury wire, trench and install new PVC conduits, fabricate new concrete pole bases, grade and seed, and repair any damaged surfaces. During construction, this effort will affect residents as follows: 1) streetlights in specific project areas will be partially- or wholly inoperable for a short duration (approximately 45-90 days), and 2) installation of underground conduits and new pole bases will disturb the ground between the curb and sidewalk in front of some residences. FY10 Pearl ST. from Carrollton Dr. to Center St., Carrollton Dr. Prospect to Catoctin., Birmingham Dr. in the court, Banksia Dr., Pinoak Pl, Whiteoak Pl., Mary St. from Norva to James St. and Charles St. as part of CIP 340000 (Streetlight Upgrades). The upgrading project shall consist of but not be limited to the furnishing and installing of approximately 71 concrete pole foundations (to include anchor bolts) 15,000 ft of 1-1/2 PVC conduit SCH 40, to be furnished and installed, 2,000 of trenching backfilling and compaction, restoration, 13,000 of boring, and 12 roadway boring @ 60 each. Project for following years: Center St., Carrollton Dr., Burck St., Birmingham Dr., Catoctin Ave., Manor Ct., Logan St. and Loganberry Ct. JUSTIFICATION: The City s upgrade of the existing high-voltage, series street lighting circuits will improve system safety and availability, and will reduce operating and maintenance costs. This project also generally satisfies the direction set forth in the Frederick City Comprehensive Plan (Chapter 8) that recommends that the City increase its energy efficiency to reduce the overall consumption of energy. Page 15

Expressed in Thousands EXPENDITURES TOTAL TO-DATE FY12 FY13 FY14 FY15 FY16 FY17 PLANNING/ENG. - - - - - - - - LAND/R.O.W. - - - - - - - - UTILITIES - - - - - - - - CONSTRUCTION 3,157.047 3,157.047 - - - - - - EQUIPMENT - - - - - - - - MISCELLANEOUS - - - - - - - - TOTAL EXPENDITURES 3,157.047 3,157.047 - - - - - - REVENUES TOTAL TO-DATE FY12 FY13 FY14 FY15 FY16 FY17 CITY OPERATING 3,037.047 3,037.047 - - - - - - DEBT ISSUE - - - - - - - - SPECIAL ASSESSMENT - - - - - - - - IMPACT FEES - - - - - - - - FEDERAL GRANT - - - - - - - - STATE GRANT - - - - - - - - COUNTY GRANT - - - - - - - - OTHER 120.000 120.000 - - - - - - TOTAL REVENUES 3,157.047 3,157.047 - - - - - - ESTIMATED OPERATING BUDGET IMPACT: REVENUE EXPENSE NET 0 0 0 0 0 0 Streetlight Upgrades 340000 Fund 306 - General CIP Page 16

THE CITY OF FREDERICK, MARYLAND-CAPITAL IMPROVEMENTS PROGRAM FY 2012-2017 CIP NUMBER: 340005 PROJECT NAME: Pedestrian signal to cross US 40 at Waverley Drive PROJECT MANAGER: Deputy Director of Engineering SCOPE: This project will construct a pedestrian countdown signal at the intersection of US 40 and Waverley Drive. The pedestrian controls will also require stopping US 40 Alternate to allow pedestrians the opportunity to cross the slip ramp from US 40 Alternate to US 40 eastbound. This will require a new signal on the slip ramp and an advance hazard identification overhead flashing warning sign. In addition, sidewalk reconstruction may be needed to complete the project. SHA will construct the improvements; the City will reimburse SHA for 50% of the cost. JUSTIFICATION: Safety along US 40 will be enhanced for pedestrians by the construction countdown pedestrian signals. The crosswalk and signal will create another way for pedestrians to cross US 40 at a controlled crosswalk rather than crossing mid-block. Page 17

Expressed in Thousands EXPENDITURES TOTAL TO-DATE FY12 FY13 FY14 FY15 FY16 FY17 PLANNING/ENG. - - - - - - - - LAND/R.O.W. - - - - - - - - UTILITIES - - - - - - - - CONSTRUCTION 68.052 268.052 (200.000) - - - - - EQUIPMENT - - - - - - - - MISCELLANEOUS - - - - - - - - TOTAL EXPENDITURES 68.052 268.052 (200.000) - - - - - REVENUES TOTAL TO-DATE FY12 FY13 FY14 FY15 FY16 FY17 CITY OPERATING 68.052 68.052 - - - - - - DEBT ISSUE - - - - - - - - SPECIAL ASSESSMENT - - - - - - - - IMPACT FEES - - - - - - - - FEDERAL GRANT - - - - - - - - STATE GRANT - - - - - - - - COUNTY GRANT - - - - - - - - OTHER - 200.000 (200.000) - - - - - TOTAL REVENUES 68.052 268.052 (200.000) - - - - - ESTIMATED OPERATING BUDGET IMPACT: REVENUE EXPENSE NET 0 0 0 0 0 0 Pedestrian Signal at US40 and Waverly Drive 340005 Fund 306 - General CIP Page 18

THE CITY OF FREDERICK, MARYLAND CAPITAL IMPROVEMENTS PROGRAM FY 2012-2017 CIP NUMBER: 340006 PROJECT NAME: Streetlight Replacement - ARRA PROJECT MANAGER: Superintendent of Lights/Signals SCOPE: This multi-year project allows the City's Street Light and Traffic Control Department to upgrade all streetlights currently powered by direct-bury series circuits. All of these streetlights will be converted to parallel circuits routed in conduit and their present lamp systems, both incandescent and high-pressure-sodium will be converted to QL induction lamps (low pressure mercury discharge). As a minimum, the City must procure materials and contracted services according to the following responsibilities: City Provided Services: Management (project management, procurement, inspection), demolition (removal and disposal of existing pole bases), and installation (refurbish existing poles, pulling underground wires in conduit, install poles and heads). Contractor Provided Services: Excavate existing direct-bury wire, trench and install new PVC conduits, fabricate new concrete pole bases, grade and seed, and repair any damaged surfaces. The first round of construction will be the Carrollton area and will consist of installing approximately 71 concrete pole foundations (including anchor bolts); 13,500 feet of 1 ½ of PVC conduit; SCH 40 to be furnished and installed; 2000 feet of trenching, backfilling and compaction; restoration; 11,000 feet of boring; and ten roadway borings @ 60 feet each. JUSTIFICATION: The City s upgrade of the existing high-voltage, series street lighting circuits will improve system safety and availability, and will reduce operating and maintenance costs. This project also generally satisfies the direction set forth in the Frederick City Comprehensive Plan (Chapter 8) that recommends that the City increase its energy efficiency to reduce the overall consumption of energy. Page 19

Expressed in Thousands EXPENDITURES TOTAL TO-DATE FY12 FY13 FY14 FY15 FY16 FY17 PLANNING/ENG. - - - - - - - - LAND/R.O.W. - - - - - - - - UTILITIES - - - - - - - - CONSTRUCTION 455.494 455.494 - - - - - - EQUIPMENT - - - - - - - - MISCELLANEOUS - - - - - - - - TOTAL EXPENDITURES 455.494 455.494 - - - - - - REVENUES TOTAL TO-DATE FY12 FY13 FY14 FY15 FY16 FY17 CITY OPERATING 250.346 250.346 - - - - - - DEBT ISSUE - - - - - - - - SPECIAL ASSESSMENT - - - - - - - - IMPACT FEES - - - - - - - - FEDERAL GRANT 205.148 205.148 - - - - - - STATE GRANT - - - - - - - - COUNTY GRANT - - - - - - - - OTHER - - - - - - - - TOTAL REVENUES 455.494 455.494 - - - - - - ESTIMATED OPERATING BUDGET IMPACT: REVENUE EXPENSE NET 0 0 0 0 0 0 Streetlight Replacement - ARRA 340006 Fund 306 - General CIP Page 20

THE CITY OF FREDERICK, MARYLAND- CAPITAL IMPROVEMENTS PROGRAM FY 2012-2017 CIP NUMBER: 340102 PROJECT NAME: Sidewalk Retrofit PROJECT MANAGER: Deputy Director of Engineering SCOPE: This project is part of an on-going initiative to utilize State Highway Administration matching funds to construct sidewalks in urbanized areas along state highways. Funding sources vary in terms of the need for pedestrian improvements; either for safety or for access to transit facilities. Future sections will include missing links along the north and south sides of MD26 east of Monocacy Blvd to Waterside/Sebastian Ct, and the east and west sides of Baughman s Lane north of West Patrick Street. This project will address various sections each year depending on needs and SHA funding levels. New sidewalks, curbs, ramps, crosswalks, and walk lights will be constructed to create an integrated pedestrian handicap accessible network. JUSTIFICATION: Currently many gaps in sidewalk exist throughout the City of Frederick along state highways. This project will work to connect sidewalks, upgrade existing sidewalk in to meet ADA requirements for handicap accessibility, and to create new pedestrian access to transit facilities. Page 21

Expressed in Thousands EXPENDITURES TOTAL TO-DATE FY12 FY13 FY14 FY15 FY16 FY17 PLANNING/ENG. 43.500 43.500 - - - - - - LAND/R.O.W. - - - - - - - - UTILITIES - - - - - - - - CONSTRUCTION 549.796 550.481 (0.685) - - - - - EQUIPMENT - - - - - - - - MISCELLANEOUS - - - - - - - - TOTAL EXPENDITURES 593.296 593.981 (0.685) - - - - - REVENUES TOTAL TO-DATE FY12 FY13 FY14 FY15 FY16 FY17 CITY OPERATING 190.524 198.819 (8.295) - - - - - DEBT ISSUE - - - - - - - - SPECIAL ASSESSMENT - - - - - - - - IMPACT FEES - - - - - - - - FEDERAL GRANT - - - - - - - - STATE GRANT 301.114 301.114 - - - - - - COUNTY GRANT - - - - - - - - OTHER 101.658 94.048 7.610 - - - - - TOTAL REVENUES 593.296 593.981 (0.685) - - - - - ESTIMATED OPERATING BUDGET IMPACT: REVENUE EXPENSE NET 0 0 0 0 0 0 Sidewalk Retrofit 340102 Fund 306 - General CIP Page 22

THE CITY OF FREDERICK, MARYLAND-CAPITAL IMPROVEMENTS PROGRAM FY 2012-2017 CIP NUMBER: 340401 PROJECT NAME: New Traffic Signal Construction PROJECT MANAGER: Deputy Director of Engineering SCOPE: This project will provide funding for new traffic signals as the need arises throughout the year. It will also upgrade existing signals detection, controllers, interconnect capability, and will provide battery backup at key locations. This project will also include safety improvements to address pedestrian deficiencies at intersections. Anticipated upcoming projects may include the following: o E. Patrick St at Monroe Ave o E. South St at S. East St signal upgrades o 7 th St and Schley pedestrian upgrades o 9 TH St and East St. - Equipment Upgrades o 7 TH St. and Tollhouse - Equipment Upgrades o 7 TH St and Fairview Ave - Equipment Upgrades o South Market St and Clarke Pl -Equipment Upgrades o Rosemont Ave and 2 ND St - Equipment Upgrades o Oppossumtown Pike and Rosehill Plaza - Equipment Upgrades o Oppossumtown Pike and Amber Drive - Equipment Upgrades o Patrick St and Catoctin Ave - Equipment Upgrades o Center St at Madison Ave utility pole relocates o Center St at Washington St utility pole relocates JUSTIFICATION: The objective of this project is to have funds available to construct new traffic signals and or enhance existing signals should the City s Engineering or Public Works Department determine the need. This provides the resources necessary for the City to respond promptly to traffic safety and efficiency issues that can be solved with new signals or improvements to existing signals and intersections. This project is consistent with the 2004 City Comprehensive Plan Policies CF.3 enhance public safety, T.1.2 maintain a road network with a level of service D or better, T.7.7 improve pedestrian safety problem areas downtown, and T.8 maximize safety and efficiency through roadway improvements and design. Page 23

Expressed in Thousands EXPENDITURES TOTAL TO-DATE FY12 FY13 FY14 FY15 FY16 FY17 PLANNING/ENG. 150.000 70.000-40.000-40.000 - - LAND/R.O.W. 5.000 5.000 - - - - - - UTILITIES 5.000 5.000 - - - - - - CONSTRUCTION 984.420 554.420 30.000 185.000 30.000 185.000 - - EQUIPMENT - - - - - - - - MISCELLANEOUS - - - - - - - - TOTAL EXPENDITURES 1,144.420 634.420 30.000 225.000 30.000 225.000 - - REVENUES TOTAL TO-DATE FY12 FY13 FY14 FY15 FY16 FY17 CITY OPERATING 1,144.420 634.420 30.000 225.000 30.000 225.000 - - DEBT ISSUE - - - - - - - - SPECIAL ASSESSMENT - - - - - - - - IMPACT FEES - - - - - - - - FEDERAL GRANT - - - - - - - - STATE GRANT - - - - - - - - COUNTY GRANT - - - - - - - - OTHER - - - - - - - - TOTAL REVENUES 1,144.420 634.420 30.000 225.000 30.000 225.000 - - ESTIMATED OPERATING BUDGET IMPACT: REVENUE EXPENSE NET 0 0 0 0 0 0 New Traffic Signal Construction 340401 Fund 306 - General CIP Page 24

THE CITY OF FREDERICK, MARYLAND-CAPITAL IMPROVEMENTS PROGRAM FOR FY 2012-2017 CIP NUMBER: 340402 PROJECT NAME: Traffic Light Conversion - ARRA PROJECT MANAGER: Deputy Director of Engineering SCOPE: This project will assist the City in reducing energy costs by replacing old incandescent light bulbs with light emitting diodes (LEDs) in traffic signals. There are currently 68 traffic signals to be replaced within the City s boundaries. All installation/labor will be completed by the City s Lighting Division with an expected completion date of one year after grant is received. JUSTIFICATION: The objective of this project is to reduce energy costs but will also add the following benefits: Traffic signals will work longer without failing. The typical led light will last from five to ten years while the incandescent light burns out at least once per year. This will reduce the City s maintenance costs as well as the price of incandescent bulbs. LED traffic signals are clearer, sharper and more distinct which creates a safer driving environment. This project is in compliance with the methodology provided in the Homeland Security Emergency Preparedness. All of the above factors are in compliance with the City s Comprehensive Plan. Page 25

Expressed in Thousands EXPENDITURES TOTAL TO-DATE FY12 FY13 FY14 FY15 FY16 FY17 PLANNING/ENG. - - - - - - - - LAND/R.O.W. - - - - - - - - UTILITIES - - - - - - - - CONSTRUCTION 164.732 148.132 16.600 - - - - - EQUIPMENT - - - - - - - - MISCELLANEOUS - - - - - - - - TOTAL EXPENDITURES 164.732 148.132 16.600 - - - - - REVENUES TOTAL TO-DATE FY12 FY13 FY14 FY15 FY16 FY17 CITY OPERATING 38.580 38.580 - - - - - - DEBT ISSUE - - - - - - - - SPECIAL ASSESSMENT - - - - - - - - IMPACT FEES - - - - - - - - FEDERAL GRANT 109.552 109.552 - - - - - - STATE GRANT - - - - - - - - COUNTY GRANT - - - - - - - - OTHER 16.600-16.600 - - - - - TOTAL REVENUES 164.732 148.132 16.600 - - - - - ESTIMATED OPERATING BUDGET IMPACT: REVENUE EXPENSE NET 0 0 0 0 0 0 Traffic Light Conversion - ARRA 340402 Fund 306 - General CIP Page 26

THE CITY OF FREDERICK, MARYLAND CAPITAL IMPROVEMENTS PROGRAM FY 2012-2017 CIP NUMBER: 380001 PROJECT NAME: Shared Use Path Plan PROJECT MANAGER: Deputy Director of Parks and Recreation SCOPE: This project is to provide a 10 Shared Use Path from Bentz Street through Baker Park to Route 15 and ultimately up to the Whittier development. It has been divided into three (3) phases. Phase I: This phase involves the widening of the existing asphalt path in Baker Park and adjacent to Carroll Creek and extended from Fairview to Rosemont Ave. Phase II: This phase involves the construction of a new path and tunnel underneath the southbound US15 ramps from Schifferstadt to the existing path in Waterford Park. Phase III: The phase will follow Carroll Creek from US15 through several neighborhoods ultimately connecting the development of Whittier to the Carroll Creek and downtown Frederick. JUSTIFICATION: This would provide a connector of our Shared Use Path to the Rock Creek Trail and to the Whittier Development and allow for a more safe access for bicycles and pedestrians from the west to the east of US15. Page 27

Expressed in Thousands EXPENDITURES TOTAL TO-DATE FY12 FY13 FY14 FY15 FY16 FY17 PLANNING/ENG. 40.000 40.000 - - - - - - LAND/R.O.W. - - - - - - - - UTILITIES - - - - - - - - CONSTRUCTION 1,025.009 635.009 30.000-120.000 120.000 120.000 - EQUIPMENT - - - - - - - - MISCELLANEOUS - - - - - - - - TOTAL EXPENDITURES 1,065.009 675.009 30.000-120.000 120.000 120.000 - REVENUES TOTAL TO-DATE FY12 FY13 FY14 FY15 FY16 FY17 CITY OPERATING 420.009 150.009 - - 90.000 90.000 90.000 - DEBT ISSUE 80.000 80.000 - - - - - - SPECIAL ASSESSMENT 350.000 350.000 - - - - - - IMPACT FEES - - - - - - - - FEDERAL GRANT - - - - - - - - STATE GRANT 215.000 95.000 30.000-30.000 30.000 30.000 - COUNTY GRANT - - - - - - - - OTHER - - - - - - - - TOTAL REVENUES 1,065.009 675.009 30.000-120.000 120.000 120.000 - ESTIMATED OPERATING BUDGET IMPACT: REVENUE EXPENSE NET 0 0 0 0 0 0 Shared Use Path Improvements 380001 Fund 306 - General CIP Page 28

THE CITY OF FREDERICK, MARYLAND CAPITAL IMPROVEMENTS PROGRAM FY 2012-2017 CIP NUMBER: 380006 PROJECT NAME: Way Finding Signage Program PROJECT MANAGER: Director of Public Works SCOPE: The scope of this project is to identify old signs to be removed, design a new consistent signage program in conjunction with the state s Tourism Area and Corridor Sign Program (TAC) program, develop a plan to install and remove the signage in a coordinated effort in the downtown area. JUSTIFICATION: In the Fall of 2009 a new gateway into the City will be opened from I-70 via East Street, the tourism center will be relocated to a prominent location on East Street near the Transit Center, and the new signage will provide for better service to the visitors and residents a like who are coming into the city. Page 29

] Expressed in Thousands EXPENDITURES TOTAL TO-DATE FY12 FY13 FY14 FY15 FY16 FY17 PLANNING/ENG. - - - - - - - - LAND/R.O.W. - - - - - - - - UTILITIES - - - - - - - - CONSTRUCTION 640.000 640.000 - - - - - - EQUIPMENT - - - - - - - - MISCELLANEOUS - - - - - - - - TOTAL EXPENDITURES 640.000 640.000 - - - - - - REVENUES TOTAL TO-DATE FY12 FY13 FY14 FY15 FY16 FY17 CITY OPERATING 360.000 360.000 - - - - - - DEBT ISSUE - - - - - - - - SPECIAL ASSESSMENT - - - - - - - - IMPACT FEES - - - - - - - - FEDERAL GRANT - - - - - - - - STATE GRANT - - - - - - - - COUNTY GRANT - - - - - - - - OTHER 280.000 280.000 - - - - - - TOTAL REVENUES 640.000 640.000 - - - - - - ESTIMATED OPERATING BUDGET IMPACT: REVENUE EXPENSE NET 0 0 0 0 0 0 Wayfinding 380006 Fund 306 - General CIP Page 30

THE CITY OF FREDERICK, MARYLAND CAPITAL IMPROVEMENTS PROGRAM FY 2012-2017 CIP NUMBER: 410001 PROJECT NAME: Carroll Creek Linear Park PROJECT MANAGER: Deputy Director of Parks & Recreation SCOPE: To construct Carroll Creek Park improvements along the 1.3 mile long flood control corridor through historic Downtown Frederick using the appointed Carroll Creek Task Force, urban design and engineering consultants, and construction firms as follows: (1) Schematic design, design development, and construction documents and specifications for the creekscape improvements along Carroll Creek Park including but not limited to lighting, landscaping, planters, furniture, pedestrian and bicycle facilities, street crosswalks, and water features, etc (2) Prepare Carroll Creek Park Overlay District Development Design Regulations for all properties along Carroll Creek Park and the adjacent properties on S. East Street to ensure the highest quality design, materials, character, function, and aesthetics of infill development as called for in the City Comprehensive Plan and small area plans - Carroll Creek Master Plan and Phase I East Street Corridor Plan; (3) Construct public park improvements as called for in the 1991 Carroll Creek Master Plan and the 2003 Carroll Creek Park Schematic Design. JUSTIFICATION: The City of Frederick seeks to complete a creekside park through historic Frederick, providing unique opportunities for commercial, residential, cultural and recreational development, enhancing the quality of life for the entire Frederick community (1991 CC Master Plan). Recently completed public improvements along Carroll Creek in downtown Frederick include the first $10.69 million phase of park, $65 million flood control project, extension of East Street, construction of MARC station and rail service, renovation and expansion of the C. Burr Artz Library, and expansion of the Court House. Private development of key opportunity sites along Carroll Creek Park and East Street together with construction of public park improvements along the length of the park is critical to bring the vision to fruition. The park improvements are to be completed through public and private participation. Private contributions from owners and developers of adjacent property are critical to the overall financing of the park improvements. The City has a unique opportunity to create a vital public space in downtown Frederick that is valued by and accessible to everyone in the community. Currently more than $155 million in private investment is planned or underway along Carroll Creek Park. Public/private partnership to complete the park will provide development opportunities, create jobs and services and enhance the tax base of the City. It is estimated that more than 1,500 jobs will be created along the park. Page 31

Expressed in Thousands EXPENDITURES TOTAL TO-DATE FY12 FY13 FY14 FY15 FY16 FY17 PLANNING/ENG. 4,659.300 4,659.300 - - - - - - LAND/R.O.W. - - - - - - - - UTILITIES - - - - - - - - CONSTRUCTION 18,272.700 18,122.700 (150.000) 100.000 100.000-100.000 - EQUIPMENT 137.000 137.000 - - - - - - MISCELLANEOUS - - - - - - - - TOTAL EXPENDITURES 23,069.000 22,919.000 (150.000) 100.000 100.000-100.000 - REVENUES TOTAL TO-DATE FY12 FY13 FY14 FY15 FY16 FY17 CITY OPERATING 250.000-250.000 - - - - - DEBT ISSUE 13,329.421 13,329.421 - - - - - - SPECIAL ASSESSMENT 2,793.081 2,793.081 - - - - - - IMPACT FEES - - - - - - - - FEDERAL GRANT - - - - - - - - STATE GRANT 4,662.000 4,662.000 - - - - - - COUNTY GRANT 900.000 1,000.000 (400.000) 100.000 100.000-100.000 - OTHER 1,134.498 1,134.498 - - - - - - TOTAL REVENUES 23,069.000 22,919.000 (150.000) 100.000 100.000-100.000 - ESTIMATED OPERATING BUDGET IMPACT: REVENUE EXPENSE NET 0 0 0 0 0 0 Carroll Creek Linear Park 410001 Fund 306 - General CIP Page 32

THE CITY OF FREDERICK, MARYLAND CAPITAL IMPROVEMENTS PROGRAM FY 2012-2017 CIP NUMBER: 410007 PROJECT NAME: Riverside Center Park PROJECT MANAGER: Deputy Director of Parks & Recreation SCOPE: This is a phased project for this existing park that will ultimately provide an access road and parking spaces as well as additional multi-use field space for activities. The park resides entirely in the 100-year flood plain so obtaining environmental permit is a critical step in the design approval process. New asphalt parking lot 100 spaces, 7 pavement thickness Fill-in of existing borrow pit area (370,900 sf) and grade for new multi-purpose playing field use Reconfiguration of large existing storm water management outfall previously built by the Wal-Mart developer on northern side of the project to increase efficiency of pond outfall flow New pavilion 80 long x 40 wide (4 thick concrete floor, wood post support system) with thirty-two (32) recessed lights. A standard multi-aged playground tot-lot that meets all playground safety standards. Install field lighting on four (4) existing field and new fields being built in this phase. JUSTIFICATION: This project serves two purposes. We can use the borrow pit / pond as a rubble fill, thus saving the landfill costs and when complete the new filled area can be used for ball fields, which are much needed. This is a perfect location - no residential area to disturb and the park provides plenty of parking. Page 33