Hydraulic Report. Trail 5 Snowmobile Trail Over Mulligan Creek. Prepared By: COLEMAN ENGINEERING COMPANY Karisa V. Falls, P.E.

Similar documents
Thirteenth International Water Technology Conference, IWTC , Hurghada, Egypt 1249

International Osoyoos Lake Board of Control Annual Report to the International Joint Commission

Version Isolated & Non-Waters Only 1 of 3

HYDROLOGY OF GLACIAL LAKES, FORT SISSETON AREA

FLOW REDUCTION IMPACTS ALONG RIVER NILE IN EGYPT

c. 1 inch = 0.6 miles e. 1:100,000 f. 1:250,000 f. 1 inch = 4.0 miles

Duncan Hastie, P.E. Dewberry

SECTION 3 GENERAL DESCRIPTION OF THE RIVER BASIN

Introduction. The System. Model Limitations, Assumptions, and Parameters. Optional Services Tech Memo

GILBERT & WEST TOWN INTERCOUNTY DRAIN Windsor Township, Eaton County and City of Lansing, Delhi Township, Ingham County, Michigan

Final Drainage Letter Pikes Peak Community College Downtown Parking Lot Colorado Springs, Colorado

Budi Hadi Narendra Harris Herman Siringoringo Chairil Anwar Siregar. Research and Development Center for Forest

HYDRAULIC DESIGN OF THE TOURISTIC BERTHING IN ASWAN CITY

Lake Wissota Access Locations within the LaFayette Township. By Chad Martin

Chapter 4.0 Alternatives Analysis

Topographic Maps. Background Sheet

Common Ground Drainage Channel Diversion. Design Report

Wilts & Berks Canal. Appendix E: Hydrology and Hydraulics CONTENTS 1. INTRODUCTION 2 2. HYDROLOGY 2 3. HYDRAULIC MODEL 2 4.

Composite CN Value Based on Hydrologic Soil Group and Estimated Future Land Cover

Flood History. Floodplain Descriptions

Waukegan & Calumet Rivers. All Hands Meeting

Bear Creek Habitat Improvement Project

Appendix A Appendix A (Project Specifications) Auk Auk / Black Diamond (Trail 44) Reroute

TABLE OF CONTENTS. Coral Springs Charter High School and Middle School Job No Page 2

Table 1: Iron Mountain Communication Site. Latitude 1 Longitude 1 Elev 2 Address T/R/S 3 APN 4 USGS Quadrangle

Access to the site is obtainable from the paved driveway leading to the MWD facility.

Natural Factors Affecting the Level of Osoyoos Lake

BIG HORN RIVER. Big Horn Canal Bluff Fritz Highland Hanover Kirby Lower Hanover Lucerne Tillard Upper Hanover

David Magney Environmental Consulting

MORGAN CREEK GREENWAY Final Report APPENDICES

Agenda Report. Spruce Street Outlet Drainage Improvements Tower Road Relief Sewer

Annual Report to the. International Joint Commission. from the. International Osoyoos Lake Board of Control for

USGS Methods of Collecting High Water Marks (HWMs)

Introduction. Background MEMORANDUM

Enhancing hydrological data management and exchange procedures

Note that the steepest 8 direction pour point model slope in direction 64 is: 10.0

Appendix E. System Issues

II. THE BOULDER CREEK DRAINAGE BASIN

Runway Length Analysis Prescott Municipal Airport

Hydrological study for the operation of Aposelemis reservoir Extended abstract

Design and Construction of the Lake St. Martin Emergency Outlet

Boardman River Dams Implementation Team. DRAFT Meeting Minutes

Preliminary Site Evaluation

Photographic Log Client: Project Number: Site Location: Site Name: Photograph ID: Date: Location: Direction: Comments: Photograph ID:

Table 1: Margarita (MWD) Communication Site. Latitude 1 Longitude 1 Elev 2 Address T/R/S 3 APN 4 USGS Quadrangle

Cofferdam Performance Hurricanes Harvey & Irma

Trail Feasibility Study

Hydrology Input for West Souris River IWMP

APPENDIX D: SUSTAINABLE TRAIL DESIGN. APPENDICES Town of Chili Parks and Recreation Master Plan Update

David Johnson. Tom, Attached please find the final scoping letter and figures for your review. David

LITTLE LOST MAN CREEK (LLM) (formerly USGS Gaging Station No )

United States Department of the Interior National Park Service. Boundary Expansion Listed in National Register January 11, 2017

Initial OPW Designation APSR AFRR IRR Co-ordinates Easting: Northing: River / Catchment / Sub-catchment Type of Flooding / Flood Risk

"Transboundary coordination according to the FD Directive in the shared river basins of Greece

Long term morphological analysis and simulations

METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN Phone (651) TDD (651)

CENTER PIVOT TRACK MANAGEMENT OPTIONS

1803 West Hwy 160 Monte Vista, CO (719) TTY (719)

Figure 1 shows the evaluation area around Tailings Basin Cells 2E/1E. Two areas were evaluated for potential wetland impacts including:

Reduction of Wave Runup on a Revetment by Addition of a Berm

CHAPTER 3 ALTERNATIVES CONSIDERED

GARFIELD BRIDGE. Building A Bridge to No-Where

Phoenix Habitat Restoration Projects

International Osoyoos Lake Board of Control Annual Report to the International Joint Commission

Table 1: Glen Avon Communication Site. Latitude 1 Longitude 1 Elev 2 Address T/R/S 3 APN 4 USGS Quadrangle

Daisy Dean Trail 628/619 ATV Trail Construction

Mark West Creek Flow Study Report

4. Hydrology of the Olentangy River Watershed

Table 1: Margarita (SDSU) Communication Site. Latitude 1 Longitude 1 Elev 2 Address T/R/S 3 APN 4 USGS Quadrangle

White Oak Creek. Recreational Use Attainability Analysis Summary of Findings. Texas Institute for Applied Environmental Research Stephenville, Texas

Finn Creek Park. Management Direction Statement Amendment

Northeast Stoney Trail In Calgary, Alberta

International Osoyoos Lake Board of Control Annual Report to the International Joint Commission

MINUTES. Additional Stakeholders including CU, CDOT, Town of Erie, and Weld County have been contacted and invited to the recurring progress meetings.

Citrus Heights Creek Corridor Trail Project. Trail Advisory Group Meeting #3 July 8, 2013

RULES OF TENNESSEE DEPARTMENT OF TRANSPORTATION AERONAUTICS DIVISION CHAPTER LICENSING AND REGISTRATION OF AIRPORTS TABLE OF CONTENTS

Miner & Silverstein Appraisal Company Division of Miner & Silverstein, LLP

Demand Patterns; Geometric Design of Airfield Prof. Amedeo Odoni

Shrubs and alpine meadows represent the only vegetation cover.

Triangle Land Conservancy Conservation Area Monitoring Report Carolina North

Introduction to Topographic Maps

Mr. Michael Malone CPS Energy 145 Navarro Street San Antonio, Texas Project No

HILLSBOROUGH COUNTY, FLORIDA AND INCORPORATED AREAS

Triangle Land Conservancy Conservation Area Monitoring Report Carolina North

Prediction of fluvial processes change within mountain streams on the example of the Porębianka stream

MANAGING FRESHWATER INFLOWS TO ESTUARIES

MINUTES OF THE SPECIAL MEETING OF THE LADY LAKE TOWN COMMISSION LADY LAKE, FLORIDA June 20, 2016

Climate Change Impact on Water Resources of Pakistan

HARBOR INFRASTRUCTURE INVENTORIES Erie Harbor, PA

Table 1: Black Eagle Communication Site. Latitude 1 Longitude 1 Elev 2 Address T/R/S 3 APN 4 USGS Quadrangle

$6.60 NEW SOUTH WALES. Both METRIC and Feet and Inches TIMES: am/pm Sunrise/Sunset Moon Phases Moon Rise/Set DIARY NOTES.

State Level Historic Documentation Report. John Blue Bridge Hampshire County

Development of SH119 BRT Route Pattern Alternatives for Tier 2 - Service Level and BRT Route Pattern Alternatives

RECREATION. Seven issues were identified that pertain to the effects of travel management on outdoor recreation within portions of the project area.

GLOFs from moraine-dammed lakes: their causes and mechanisms V. Vilímek, A. Emmer

Flying Cloud Airport (FCM) Zoning Process: Informing a Mn/DOT Path Forward

ECLIPSE AIR HEAT BURNERS Series AH-O & TAH-O

Lake Manitou Dam and Spillway Upgrade

Section CHAPTER 1 LEGAL STATUS OF WATER COURSES NOVA SCOTIA DEPARTMENT OF NATURAL RESOURCES REGIONAL OFFICES

Non-motorized Trail Plan & Proposal. August 8, 2014

Transcription:

Prepared for: Prepared by: Marquette County Road Commission Coleman Engineering Company Marquette, Michigan Iron Mountain, MI December 2011 Hydraulic Report Trail 5 Snowmobile Trail Over Mulligan Creek Prepared By: COLEMAN ENGINEERING COMPANY Karisa V. Falls, P.E. 906-774-3440

Contents 1.0 Introduction... 1 2.0 Method of Analysis... 1 3.0 Variables and Coefficients... 1 4.0 Starting Point... 1 5.0 Discussion... 1 6.0 Conclusion... 2 List of Appendices Appendix A HEC-RAS Computations Appendix B Profile Sheets Appendix C Topographic Map and HEC-RAS Section Map Appendix D Bridge Plans Appendix E Cross Sections: Existing Channel, Proposed Bridge Appendix F Damage Wavier Appendix G Flow Rate Data Appendix H Site Photographs Appendix I USGS Quadrangle Map and River Gradient Calculation

CEC 1 1.0 Introduction This Hydraulic report has been prepared for the Marquette County Road Commission to analyze the crossing of the Mulligan Creek for the proposed Trail 5 Snowmobile Trail relocation. The site is located in Section 27 of Township 50N, Range 29W (Lat. 46.699052/Long. -87.907946) in Michigamme Township, Marquette County. This proposed alignment location requires a new bridge as there is no existing bridge at this site. 2.0 Method of Analysis The hydraulic analysis was performed using U.S. Army Corps of Engineers Hydraulic Engineering Centers River Analysis System (HEC-RAS) computer program, Version 4.1.0. Steady state flow data was obtained from The Michigan Department of Environmental Quality (MDEQ). 3.0 Variables and Coefficients Manning s n-values were selected from Table 3.1 of the HEC-RAS Hydraulic Reference Manual. The main channel is fairly uniform with some weeds and stones; therefore, a coefficient of 0.035 was selected. The overbanks were given a coefficient of 0.1 due to the fact these areas are swampy with dense brush and vegetation. Representative photographs of Mulligan Creek at the proposed crossing site are located in Appendix H. Expansion and contraction coefficients of 0.30 and 0.50 were selected in accordance with Table 3.3 of the HEC-RAS Hydraulic Reference Manual. 4.0 Starting Point The starting water surface elevation was calculated by the Slope-Conveyance Method performed by HEC-RAS. An average Channel slope of 0.0021 was calculated using a USGS quadrangle map and used for the normal depth boundary condition. Calculations are included in Appendix I. The starting point of the stream analysis is a surveyed cross section approximately 1,180 feet downstream of the proposed crossing. This location is far enough downstream to be outside of the influence of the proposed bridge. 5.0 Discussion The main channel of Mulligan Creek is variable in width and well defined. Above the 10- year flood event a large portion of the flow is carried by the overbanks. The river gradient is relatively flat and the flow is sub-critical for all flood events.

CEC 2 The river cross sections are placed in HEC-RAS at distances measured along the center line of the channel. In some cases, the surveyed cross sections near the proposed bridge were adjusted up or downstream as required to accurately model the bridge. A plan view of the sections is shown in Appendix C. Ineffective flow areas were added to the sections that show a pool or low area that is not part of the main flowing channel, but become part of the flowing area during larger flood events. The proposed bridge is a 40-foot long by 14-foot wide prefabricated steel structure with wood decking. The approach ramps are wood, the north ramp is 25 feet long and the south ramp is 15 feet long. The concrete abutments for the bridge will be placed on the natural soil and the stream banks will be stabilized with heavy rip rap; sized and placed in accordance with the Michigan Department of Transportation current Standard Specifications for Construction. The proposed bridge spans the entire width of the main channel without restrictions. The abutments, ramps, and approach cut off a portion of the overbank flow area and ineffective flow areas have been added in the overbank portions of the cross sections upstream and downstream of the proposed bridge, as suggested in Chapter 5 of the HEC-RAS Hydraulic Reference Manual. Placement of the proposed trail and bridge structure across the flood plain and stream reduces the overbank conveyance which increases the energy gradient elevation upstream of the proposed bridge. In order to find the extent of impact, additional cross sections were extrapolated upstream using the last surveyed cross section and the estimated river gradient. The limit of the impact was found to be 916 feet upstream of the proposed bridge. At this point there is no increase in the 100-year flood stage. A summary of these results for both the existing channel and the proposed 40-foot bridge are shown in Table 1. The impact is contained within one parcel and a damage waiver has been obtained and is included in Appendix F. 6.0 Conclusion An increase of 0.14 feet in energy gradient elevation for the 100-year flow event is seen at the first surveyed cross section upstream of the proposed bridge. This increase in energy gradient elevation is reduced to zero at 916 feet upstream of the bridge. Additionally, there is an increase of 0.06 feet per second in channel velocity for the 100- year flow event at the proposed bridge.

Hydraulic Computations of Bridge Option Trail 5 Snowmobile Trail Mulligan Creek 11/28/2011 Table 1 HEC RAS Analysis Results Velocity in Channel at Bridge Flow Through Bridge Water Surface Elevation at Upstream Face of Bridge Energy Gradient Elevation at Upstream Face of Bridge Energy Gradient Elevation at 233' Upstream of Bridge Energy Gradient Elevation at 425' Upstream of Bridge Energy Gradient Elevation at 566' Upstream of Bridge Energy Gradient Elevation at 916' Upstream of Bridge (ft/sec) (cfs) (feet) (feet) (feet) (feet) (feet) (feet) River Station 1280* River Station 1289 River Station 1289 River Station 1522 River Station 1714 River Station 1855 River Station 2205 100 year 100 year 10 year 100 year 500 year 100 year 100 year 100 year 100 year 100 year (340cfs) Model Configuration (340cfs) (130 cfs) (340cfs) (550 cfs) (340cfs) Change (340cfs) Change (340cfs) Change (340cfs) Change (340cfs) Change Existing Conditions 3.87 3.50 1686.22 1686.85 1686.33 1686.64 1686.77 1686.91 1687.65 Proposed Bridge 3.93 2.36 340 1686.28 1686.99 1686.47 0.14 1686.79 0.15 1686.89 0.12 1687.00 0.09 1687.65 0.00 *The River Station 1280 is the station location for the proposed bridge. River Station 1280 does not occur in the Exsiting Conditions calculations because there is no bridge. The values for the Existing Conditions were taken from the higher values of the cross sections upstream and down stream (Stations 1289 and 1271) of where the proposed bridge is located.

APPENDIX A HEC-RAS COMPUTATIONS

Computations The HEC-RAS data files are included in electronically as called file called: HEC-RAS_Trail 5_Mulligan Creek.zip A Profile Output Table of the analysis results for the existing and proposed conditions are included on the following pages to provide a brief summary.

HEC-RAS Plan: Existing River: Mulligan Reach: Trail 5 Crossing Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) Trail 5 Crossing 2205 10 Year 130.00 1683.61 1686.97 1687.05 0.001634 2.52 114.58 336.39 0.33 Trail 5 Crossing 2205 100 Year 340.00 1683.61 1687.55 1687.65 0.002067 3.39 310.15 346.39 0.38 Trail 5 Crossing 2205 200 Year 420.00 1683.61 1687.73 1687.83 0.002036 3.53 373.19 349.55 0.39 Trail 5 Crossing 2205 500 Year 550.00 1683.61 1688.03 1688.12 0.001858 3.63 478.33 354.76 0.38 Trail 5 Crossing 1855 10 Year 130.00 1682.87 1685.57 1685.22 1685.91 0.008595 4.70 30.07 34.31 0.71 Trail 5 Crossing 1855 100 Year 340.00 1682.87 1686.80 1686.91 0.002075 3.40 309.60 346.36 0.39 Trail 5 Crossing 1855 200 Year 420.00 1682.87 1687.10 1687.18 0.001593 3.21 411.91 351.48 0.34 Trail 5 Crossing 1855 500 Year 550.00 1682.87 1687.50 1687.57 0.001243 3.12 556.01 358.57 0.31 Trail 5 Crossing 1714 10 Year 130.00 1682.32 1685.67 1685.69 0.000305 1.22 136.86 118.02 0.15 Trail 5 Crossing 1714 100 Year 340.00 1682.32 1686.72 1686.77 0.000470 1.94 262.43 122.05 0.19 Trail 5 Crossing 1714 200 Year 420.00 1682.32 1686.99 1687.05 0.000528 2.16 295.64 123.09 0.21 Trail 5 Crossing 1714 500 Year 550.00 1682.32 1687.36 1687.44 0.000616 2.49 342.26 124.54 0.23 Trail 5 Crossing 1522 10 Year 130.00 1680.42 1685.56 1685.61 0.000637 1.99 150.73 173.42 0.19 Trail 5 Crossing 1522 100 Year 340.00 1680.42 1686.58 1686.64 0.000838 2.73 336.32 186.04 0.23 Trail 5 Crossing 1522 200 Year 420.00 1680.42 1686.84 1686.91 0.000905 2.95 385.42 186.75 0.24 Trail 5 Crossing 1522 500 Year 550.00 1680.42 1687.21 1687.29 0.001006 3.27 454.00 187.75 0.26 Trail 5 Crossing 1289 10 Year 130.00 1682.55 1685.10 1685.27 0.004933 3.50 66.48 112.26 0.53 Trail 5 Crossing 1289 100 Year 340.00 1682.55 1686.22 1686.33 0.002122 3.41 251.80 218.70 0.39 Trail 5 Crossing 1289 200 Year 420.00 1682.55 1686.48 1686.59 0.001960 3.51 311.85 233.93 0.38 Trail 5 Crossing 1289 500 Year 550.00 1682.55 1686.85 1686.96 0.001821 3.68 400.01 249.89 0.37 Trail 5 Crossing 1271 10 Year 130.00 1681.59 1685.12 1685.21 0.001075 2.46 77.78 73.62 0.26 Trail 5 Crossing 1271 100 Year 340.00 1681.59 1686.10 1686.28 0.001747 3.87 187.88 142.96 0.36 Trail 5 Crossing 1271 200 Year 420.00 1681.59 1686.34 1686.54 0.001963 4.27 222.25 152.91 0.38 Trail 5 Crossing 1271 500 Year 550.00 1681.59 1686.65 1685.64 1686.90 0.002266 4.83 272.57 164.56 0.41 Trail 5 Crossing 1160 10 Year 130.00 1681.70 1684.40 1684.40 1684.88 0.012023 5.70 30.33 52.75 0.84 Trail 5 Crossing 1160 100 Year 340.00 1681.70 1685.29 1685.29 1685.85 0.010054 6.96 102.47 118.90 0.83 Trail 5 Crossing 1160 200 Year 420.00 1681.70 1685.51 1685.51 1686.09 0.009590 7.26 133.13 150.80 0.82 Trail 5 Crossing 1160 500 Year 550.00 1681.70 1685.79 1685.79 1686.41 0.009615 7.81 179.11 179.83 0.84 Trail 5 Crossing 1068 10 Year 130.00 1679.80 1683.52 1681.85 1683.60 0.001106 2.32 55.98 42.08 0.27 Trail 5 Crossing 1068 100 Year 340.00 1679.80 1685.03 1682.97 1685.11 0.000978 2.57 297.67 292.57 0.26 Trail 5 Crossing 1068 200 Year 420.00 1679.80 1685.44 1683.27 1685.50 0.000763 2.46 419.84 302.70 0.23 Trail 5 Crossing 1068 500 Year 550.00 1679.80 1685.99 1683.78 1686.05 0.000593 2.40 591.07 312.51 0.21 Trail 5 Crossing 884 10 Year 130.00 1678.51 1683.45 1683.48 0.000329 1.44 90.58 46.99 0.15

HEC-RAS Plan: Existing River: Mulligan Reach: Trail 5 Crossing (Continued) Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) Trail 5 Crossing 884 100 Year 340.00 1678.51 1684.90 1684.97 0.000564 2.17 218.73 265.67 0.21 Trail 5 Crossing 884 200 Year 420.00 1678.51 1685.32 1685.39 0.000500 2.21 348.46 334.52 0.20 Trail 5 Crossing 884 500 Year 550.00 1678.51 1685.89 1685.95 0.000415 2.22 551.18 365.11 0.19 Trail 5 Crossing 700 10 Year 130.00 1681.11 1683.34 1682.23 1683.39 0.000972 1.64 79.22 69.32 0.24 Trail 5 Crossing 700 100 Year 340.00 1681.11 1684.80 1682.88 1684.85 0.000634 1.89 248.29 227.65 0.21 Trail 5 Crossing 700 200 Year 420.00 1681.11 1685.24 1683.10 1685.29 0.000490 1.86 357.21 251.57 0.19 Trail 5 Crossing 700 500 Year 550.00 1681.11 1685.83 1683.37 1685.87 0.000387 1.87 508.12 261.05 0.18 Trail 5 Crossing 526 10 Year 130.00 1679.56 1683.32 1683.33 0.000133 0.84 154.14 65.00 0.10 Trail 5 Crossing 526 100 Year 340.00 1679.56 1684.77 1684.79 0.000159 1.25 443.95 369.80 0.11 Trail 5 Crossing 526 200 Year 420.00 1679.56 1685.22 1685.24 0.000144 1.28 610.14 378.67 0.11 Trail 5 Crossing 526 500 Year 550.00 1679.56 1685.81 1685.83 0.000132 1.34 837.83 390.49 0.11 Trail 5 Crossing 411 10 Year 130.00 1680.36 1682.95 1682.64 1683.25 0.007458 4.79 48.20 64.28 0.64 Trail 5 Crossing 411 100 Year 340.00 1680.36 1684.70 1684.75 0.001052 2.85 425.64 327.29 0.27 Trail 5 Crossing 411 200 Year 420.00 1680.36 1685.17 1685.21 0.000705 2.54 595.62 408.51 0.23 Trail 5 Crossing 411 500 Year 550.00 1680.36 1685.78 1685.80 0.000490 2.33 912.41 623.36 0.19 Trail 5 Crossing 248 10 Year 130.00 1679.40 1682.78 1682.83 0.000972 1.99 85.48 57.00 0.25 Trail 5 Crossing 248 100 Year 340.00 1679.40 1684.54 1684.62 0.000629 2.46 216.93 105.05 0.23 Trail 5 Crossing 248 200 Year 420.00 1679.40 1685.00 1685.09 0.000629 2.66 267.39 113.67 0.23 Trail 5 Crossing 248 500 Year 550.00 1679.40 1685.60 1685.70 0.000631 2.92 352.95 161.74 0.24 Trail 5 Crossing 100 10 Year 130.00 1678.69 1682.47 1680.99 1682.62 0.002103 3.11 41.79 19.31 0.36 Trail 5 Crossing 100 100 Year 340.00 1678.69 1684.16 1682.36 1684.44 0.002102 4.38 102.75 54.89 0.39 Trail 5 Crossing 100 200 Year 420.00 1678.69 1684.59 1682.76 1684.91 0.002100 4.70 132.04 81.53 0.40 Trail 5 Crossing 100 500 Year 550.00 1678.69 1685.17 1683.34 1685.52 0.002101 5.11 189.28 116.45 0.41

HEC-RAS Plan: Proposed Bridge River: Mulligan Reach: Trail 5 Crossing Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) Trail 5 Crossing 2105 10 Year 130.00 1683.61 1686.96 1687.04 0.001704 2.56 110.02 335.56 0.33 Trail 5 Crossing 2105 100 Year 340.00 1683.61 1687.54 1687.65 0.002077 3.40 309.47 346.35 0.39 Trail 5 Crossing 2105 200 Year 420.00 1683.61 1687.74 1687.84 0.001966 3.49 378.56 349.82 0.38 Trail 5 Crossing 2105 500 Year 550.00 1683.61 1688.08 1688.16 0.001691 3.50 495.72 355.62 0.36 Trail 5 Crossing 1855 10 Year 130.00 1682.87 1685.69 1685.97 0.006704 4.27 34.29 36.30 0.63 Trail 5 Crossing 1855 100 Year 340.00 1682.87 1686.93 1687.00 0.001529 3.02 352.78 348.53 0.33 Trail 5 Crossing 1855 200 Year 420.00 1682.87 1687.21 1687.28 0.001254 2.93 452.22 353.48 0.31 Trail 5 Crossing 1855 500 Year 550.00 1682.87 1687.64 1687.69 0.000985 2.86 605.24 360.96 0.28 Trail 5 Crossing 1714 10 Year 130.00 1682.32 1685.77 1685.79 0.000258 1.15 148.58 118.41 0.14 Trail 5 Crossing 1714 100 Year 340.00 1682.32 1686.85 1686.89 0.000403 1.84 278.64 122.56 0.18 Trail 5 Crossing 1714 200 Year 420.00 1682.32 1687.11 1687.17 0.000462 2.07 311.27 123.58 0.19 Trail 5 Crossing 1714 500 Year 550.00 1682.32 1687.52 1687.59 0.000533 2.37 361.30 125.13 0.21 Trail 5 Crossing 1522 10 Year 130.00 1680.42 1685.68 1685.72 0.000510 1.83 171.89 175.78 0.17 Trail 5 Crossing 1522 100 Year 340.00 1680.42 1686.74 1686.79 0.000677 2.51 365.99 186.47 0.21 Trail 5 Crossing 1522 200 Year 420.00 1680.42 1686.99 1687.05 0.000751 2.75 413.91 187.17 0.22 Trail 5 Crossing 1522 500 Year 550.00 1680.42 1687.39 1687.46 0.000827 3.04 487.85 188.24 0.24 Trail 5 Crossing 1289 10 Year 130.00 1682.55 1685.18 1685.41 0.005715 3.87 37.75 120.46 0.58 Trail 5 Crossing 1289 100 Year 340.00 1682.55 1686.28 1686.47 0.003031 4.14 200.46 222.79 0.46 Trail 5 Crossing 1289 200 Year 420.00 1682.55 1686.55 1686.73 0.002633 4.14 263.39 237.27 0.44 Trail 5 Crossing 1289 500 Year 550.00 1682.55 1686.99 1687.14 0.002070 4.05 371.06 255.43 0.40 Trail 5 Crossing 1286 10 Year 130.00 1681.59 1685.25 1683.34 1685.33 0.000874 2.30 87.19 84.13 0.24 Trail 5 Crossing 1286 100 Year 340.00 1681.59 1686.29 1684.90 1686.44 0.001411 3.59 206.60 151.55 0.32 Trail 5 Crossing 1286 200 Year 420.00 1681.59 1686.55 1685.21 1686.72 0.001560 3.94 245.62 159.65 0.34 Trail 5 Crossing 1286 500 Year 550.00 1681.59 1686.91 1685.63 1687.11 0.001782 4.45 301.72 178.47 0.37 Trail 5 Crossing 1280 BR U 10 Year 130.00 1681.59 1685.25 1683.35 1685.32 0.000910 2.34 82.70 74.28 0.21 Trail 5 Crossing 1280 BR U 100 Year 340.00 1681.59 1686.25 1684.83 1686.43 0.001669 3.88 188.24 140.60 0.28 Trail 5 Crossing 1280 BR U 200 Year 420.00 1681.59 1686.48 1685.16 1686.70 0.001902 4.31 221.99 146.86 0.30 Trail 5 Crossing 1280 BR U 500 Year 550.00 1681.59 1686.83 1685.62 1687.10 0.002200 4.89 274.49 161.93 0.32 Trail 5 Crossing 1280 BR D 10 Year 130.00 1681.59 1685.23 1683.35 1685.31 0.000929 2.36 81.78 72.42 0.21 Trail 5 Crossing 1280 BR D 100 Year 340.00 1681.59 1686.22 1684.83 1686.41 0.001733 3.93 184.10 139.50 0.29 Trail 5 Crossing 1280 BR D 200 Year 420.00 1681.59 1686.45 1685.16 1686.68 0.001985 4.37 216.86 145.93 0.31 Trail 5 Crossing 1280 BR D 500 Year 550.00 1681.59 1686.78 1685.62 1687.06 0.002313 4.98 267.33 159.66 0.33 Trail 5 Crossing 1271 10 Year 130.00 1681.59 1685.23 1685.31 0.000899 2.32 85.87 82.56 0.24 Trail 5 Crossing 1271 100 Year 340.00 1681.59 1686.23 1686.39 0.001532 3.70 197.24 149.58 0.33

HEC-RAS Plan: Proposed Bridge River: Mulligan Reach: Trail 5 Crossing (Continued) Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) Trail 5 Crossing 1271 200 Year 420.00 1681.59 1686.47 1686.65 0.001724 4.09 233.11 156.95 0.36 Trail 5 Crossing 1271 500 Year 550.00 1681.59 1686.81 1685.62 1687.03 0.001964 4.61 288.84 173.09 0.39 Trail 5 Crossing 1160 10 Year 130.00 1681.70 1684.46 1684.46 1684.94 0.011843 5.74 31.43 50.99 0.84 Trail 5 Crossing 1160 100 Year 340.00 1681.70 1685.36 1685.36 1685.92 0.009741 6.98 105.28 122.58 0.82 Trail 5 Crossing 1160 200 Year 420.00 1681.70 1685.58 1685.58 1686.16 0.009449 7.32 135.78 149.30 0.82 Trail 5 Crossing 1160 500 Year 550.00 1681.70 1685.83 1685.83 1686.48 0.010165 8.08 175.22 176.06 0.86 Trail 5 Crossing 1068 10 Year 130.00 1679.80 1683.52 1681.85 1683.60 0.001106 2.32 55.98 42.08 0.27 Trail 5 Crossing 1068 100 Year 340.00 1679.80 1685.03 1682.97 1685.11 0.000977 2.57 297.74 292.58 0.26 Trail 5 Crossing 1068 200 Year 420.00 1679.80 1685.44 1683.27 1685.50 0.000763 2.46 419.84 302.70 0.23 Trail 5 Crossing 1068 500 Year 550.00 1679.80 1685.99 1683.78 1686.05 0.000594 2.40 590.91 312.50 0.21 Trail 5 Crossing 884 10 Year 130.00 1678.51 1683.45 1683.48 0.000329 1.44 90.58 46.99 0.15 Trail 5 Crossing 884 100 Year 340.00 1678.51 1684.90 1684.97 0.000563 2.17 218.80 265.98 0.21 Trail 5 Crossing 884 200 Year 420.00 1678.51 1685.32 1685.39 0.000500 2.21 348.46 334.52 0.20 Trail 5 Crossing 884 500 Year 550.00 1678.51 1685.89 1685.95 0.000416 2.22 551.00 365.09 0.19 Trail 5 Crossing 700 10 Year 130.00 1681.11 1683.34 1682.23 1683.39 0.000972 1.64 79.22 69.32 0.24 Trail 5 Crossing 700 100 Year 340.00 1681.11 1684.80 1682.88 1684.85 0.000634 1.89 248.34 227.75 0.21 Trail 5 Crossing 700 200 Year 420.00 1681.11 1685.24 1683.10 1685.29 0.000490 1.86 357.21 251.57 0.19 Trail 5 Crossing 700 500 Year 550.00 1681.11 1685.83 1683.37 1685.87 0.000387 1.87 507.99 261.04 0.18 Trail 5 Crossing 526 10 Year 130.00 1679.56 1683.32 1683.33 0.000133 0.84 154.14 65.00 0.10 Trail 5 Crossing 526 100 Year 340.00 1679.56 1684.77 1684.80 0.000159 1.25 444.04 369.80 0.11 Trail 5 Crossing 526 200 Year 420.00 1679.56 1685.22 1685.24 0.000144 1.28 610.14 378.67 0.11 Trail 5 Crossing 526 500 Year 550.00 1679.56 1685.81 1685.83 0.000132 1.34 837.64 390.48 0.11 Trail 5 Crossing 411 10 Year 130.00 1680.36 1682.95 1682.64 1683.25 0.007458 4.79 48.20 64.28 0.64 Trail 5 Crossing 411 100 Year 340.00 1680.36 1684.70 1684.75 0.001052 2.85 425.72 327.30 0.27 Trail 5 Crossing 411 200 Year 420.00 1680.36 1685.17 1685.21 0.000705 2.54 595.62 408.51 0.23 Trail 5 Crossing 411 500 Year 550.00 1680.36 1685.78 1685.80 0.000491 2.34 912.11 623.31 0.19 Trail 5 Crossing 248 10 Year 130.00 1679.40 1682.78 1682.83 0.000972 1.99 85.48 57.00 0.25 Trail 5 Crossing 248 100 Year 340.00 1679.40 1684.54 1684.62 0.000629 2.46 216.94 105.05 0.23 Trail 5 Crossing 248 200 Year 420.00 1679.40 1685.00 1685.09 0.000629 2.66 267.39 113.67 0.23 Trail 5 Crossing 248 500 Year 550.00 1679.40 1685.60 1685.70 0.000631 2.92 352.89 161.72 0.24 Trail 5 Crossing 100 10 Year 130.00 1678.69 1682.47 1680.99 1682.62 0.002103 3.11 41.79 19.31 0.36 Trail 5 Crossing 100 100 Year 340.00 1678.69 1684.16 1682.34 1684.44 0.002102 4.38 102.76 54.89 0.39 Trail 5 Crossing 100 200 Year 420.00 1678.69 1684.59 1682.76 1684.91 0.002100 4.70 132.04 81.53 0.40 Trail 5 Crossing 100 500 Year 550.00 1678.69 1685.17 1683.32 1685.52 0.002102 5.11 189.24 116.44 0.41

APPENDIX B PROFILE SHEETS

1688 1686 1684 1682 1680 1678 Trail 5 Mulligan Plan: Existing 11/28/2011 Mulligan Trail 5 Crossing 0 500 1000 1500 2000 Main Channel Distance (ft) Legend EG 500 Year WS 500 Year EG 100 Year WS 100 Year Crit 500 Year EG 10 Year WS 10 Year Crit 100 Year Crit 10 Year Ground Elevation (ft)

1690 1688 1686 1684 1682 1680 1678 Trail 5 Mulligan-bridge extended Plan: Proposed Bridge 11/29/2011 Mulligan Trail 5 Crossing 0 500 1000 1500 2000 2500 Main Channel Distance (ft) Legend EG 500 Year WS 500 Year EG 200 Year WS 200 Year EG 100 Year WS 100 Year Crit 500 Year Crit 200 Year EG 10 Year WS 10 Year Crit 100 Year Crit 10 Year Ground Elevation (ft)

APPENDIX C TOPOGRAPHIC MAP AND HEC-RAS SECTION MAP

Mulligan Creek

Mulligan Creek

APPENDIX D BRIDGE PLANS

Mulligan Creek

APPENDIX E CROSS SECTIONS

Cross Sections Cross sections for the existing and proposed bridge conditions are included.

EXISTING CHANNEL

PROPOSED BRIDGE

APPENDIX F DAMAGE WAVIER

APPENDIX G FLOW RATE DATA

Karisa Falls From: deq-wrd-qreq [deq-wrd-qreq@michigan.gov] Sent: Tuesday, November 15, 2011 2:00 PM To: Karisa Falls Subject: RE: flood or low flow discharge request (ContentID - 168812) Follow Up Flag: Flag Status: Follow up Flagged This reply is being sent via email only. We have estimated the flood frequency discharges requested in your email of November 8, 2011 (Process No. 20110415), as follows: Mulligan Creek at Proposed road 550 feet upstream of east section line, Section 27, T50N, R29W, Michigamme Township, Marquette County, has a drainage area of 2.6 square miles. The 50%, 10%, 2%, 1%, 0.5%, and 0.2% chance peak flows are estimated to be 40 cubic feet per second (cfs), 130 cfs, 260 cfs, 340 cfs, 420 cfs, and 550 cfs, respectively. (Watershed Basin No. 45 Dead). Please include a copy of this letter with your application for permit and indicate whether or not the project is funded under Act 51. These estimates should be confirmed by our office if an application is not submitted within one year. If you have any questions concerning the discharge estimates, please contact Ms. Susan Greiner, Hydrologic Studies and Dam Safety Unit, at 517 241 1210 or by email to GreinerS@michigan.gov. Any questions concerning hydraulic and/or environmental permit issues should be directed to Mr. Jerry Fulcher, Water Resources Division, Transportation and Flood Hazard Management Unit, at 517 335 3172 or by email to FulcherG@michigan.gov. Original Message From: Karisa V. Falls, P.E. [mailto:kfalls@coleman engineering.com] Sent: Tuesday, November 08, 2011 3:07 PM To: deq wrd qreq Subject: flood or low flow discharge request (ContentID 168812) Requestor: Karisa V. Falls, P.E. Company: Coleman Engineering Company Address: 635 Circle Drive City: Iron Mountain, MI Zip: 49801 Phone: 906 774 3440 Date: 11/8/2011 F10percent: Yes F2percent: Yes F1percent: Yes F0.5percent: Yes F0.2percent: Yes ContactAgency: None Selected ContactPerson: Watercourse: Mulligan Creek LocalName: CountyLocation: Marquette CityorTownship: Michigamme 1

Section: 27 Town: 50N Range: 29W Location: 46.699112 Lat, 87.908008 Long FFR1: County Road Project Content Length: 4038535 2

APPENDIX H SITE PHOTOGRAPHS

River Station 1271 looking northwest upstream at crossing River Station 1271 looking southwest upstream at crossing 1

River Station 1289 looking northeast downstream at crossing River Station 1280 looking north at crossing from south bank 2

River Station 1280 looking south at crossing from north bank River Station 1289 looking east downstream at crossing standing on south bank 3

APPENDIX I USGS QUADRANGLE MAP AND RIVER GRADIENT CALCULATION

Proposed Bridge Location Trail 5 Mulligan Creek Stream Slope Calculation: 30 /14467 =0.0021 or 0.21% 1700 1670