Release Notes Business Rules Version 10x Up to Spring 2019 Release for SIBR/BSAP/RC-BSAP

Similar documents
MYOB EXO OnTheGo. Release Notes 1.2

New Distribution Capability (NDC)

CASS & Airline User Manual

Concur Travel: User Supplied Hotels

ELOQUA INTEGRATION GUIDE

Sabre: Refund and Exchange Customer Questions

MARKETO INTEGRATION GUIDE

Advisory Circular. 1.1 Purpose Applicability Description of Changes... 2

Special Pricing Rule Updates

Request for Information No OHIO/INDIANA UAS CENTER AND TEST COMPLEX. COA and Range Management Web Application. WebUAS

DATA APPLICATION CATEGORY 25 FARE BY RULE

E: W: avinet.com.au. Air Maestro Training Guide Flight Records Module Page 1

E-Enabled Vision & Strategy

InHotel. Installation Guide Release version 1.5.0

FRAMEWORK TRACK ACCESS AGREEMENT FOR PASSENGER SERVICES. Dated August Between HS1 LIMITED. and EUROSTAR (U.K.) LIMITED

Product information & MORE. Product Solutions

Navitaire GoNow Day-of-departure services

ultimate traffic Live User Guide

FLICA Training! Horizon Air Flight Attendants!

AirFrance KLM - FlightPrice

Certificate of Airworthiness

How to Integrate CA SiteMinder with the Barracuda Web Application Firewall

SUPPLEMENT OCTOBER CITATION PERFORMANCE CALCULATOR (CPCalc) MODEL AND ON REVISION 8 68FM-S17-08

Configuring a Secure Access etrust SiteMinder Server Instance (NSM Procedure)

PRIVACY POLICY KEY DEFINITIONS. Aquapark Wrocław Wrocławski Park Wodny S.A. with the registered office in Wrocław, ul. Borowska 99, Wrocław.

7. Demand (passenger, air)

Surveillance and Broadcast Services

Amadeus e-travel Management Release Notes Highlights

A New Way to Work in the ERCOT Market

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 10 P-1 Line #47

Airworthiness Directive

Additional Boarding Setup and Daily Operations Guide

Target Off-Block Time (TOBT)

EMD ELECTRONIC MISCELLANEOUS DOCUMENT

Aircraft Maintenance Prof. A.K Ghosh Prof. Vipul Mathur Department of Aerospace Engineering Indian Institute of Technology, Kanpur

GENERAL ADVISORY CIRCULAR

[Docket No. FAA ; Product Identifier 2016-NM-208-AD; Amendment ; AD ]

Aviation Software. DFT Database API. Prepared by: Toby Wicks, Software Engineer Version 1.1

The EUROCONTROL CNS dashboard - User Manual -

AGENCY AGREEMENT. The definitions used in this agreement have the same meaning as those used in the ATOL Regulations 2012.

United Global Performance Commitment 2017

FAQs Optional Payment Charge (OPC)

GUERNSEY AVIATION REQUIREMENTS. (GARs) CONTINUING AIRWORTHINESS PART 39 REQUIREMENTS

CruisePay Enhancements for 2005 Training Guide Version 1.0

OVERVIEW OF THE FAA ADS-B LINK DECISION

SAMPLE. If your competent authority requires you to hand in a signed paper copy of the report, please use the space below for signature:

REGULATION On application of Discount coefficients to the Airport charges to be collected at Boryspil International Airport

WHAT S NEW in 7.9 RELEASE NOTES

In-Service Data Program Helps Boeing Design, Build, and Support Airplanes

FareStar Ticket Window Product Functionality Guide

EXPORT AIRWORTHINESS APPROVALS

Help Document for utsonmobile - Windows Phone

FAA Technical Documentation Requirements

C A P E T O W N C O N V E N T I O N N O W L A W I N A U S T R A L I A - 6 M O N T H S O N

Concur Travel User Guide

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES

PSS MVS 7.15 announcement

FRA CDM. Airport Collaborative Decision Making (A-CDM) Flight Crew Briefing FRANKFURT AIRPORT. German Harmonisation

Making bookings for travellers with accessibility considerations

Cvent Passkey Glossary

Incentive Discounts Programme for Traffic Development at Sofia Airport 2018

ARINC Project Initiation/Modification (APIM)

General Aviation Economic Footprint Measurement

Asia Pacific Regional Aviation Safety Team

ANNEX I. Annex I (Part-M) to Regulation (EU) No 1321/2014 is amended as follows:

AIRWORTHINESS ADVISORY CIRCULAR

Notification of a Proposal to issue an Airworthiness Directive

1.2. This working procedure regards IATA Season Winter 2018 (W18). This season starts at October 28, 2018 and ends at March 30, 2019.

New Distribution Capability

Integrated Modular Avionics. The way ahead for aircraft computing platforms?

Schedule Compression by Fair Allocation Methods

SUPPLEMENT AUGUST CITATION PERFORMANCE CALCULATOR (CPCalc) MODEL THRU FM-S51-00 S51-1 U.S.

FLIGHT TAX SYSTEMS Users Guide to Features and Reporting Advanced Topics

MATL Reference. MATL Path 83 Transfer Capability with Seasonal SOL Effects. Document. 1. Purpose

SUPPLEMENT 3 11 APRIL CITATION PERFORMANCE CALCULATOR (CPCalc) MODEL AND ON 510FM-S3-00 S3-1 U.S.

TransAction Overview. Introduction. Vision. NVTA Jurisdictions

U.S. Department of Homeland Security Customs and Border Protection (CBP) Transportation Security Administration (TSA)

FAST FERRY RESERVATION SYSTEM

GUERNSEY AVIATION REQUIREMENTS. (GARs) CERTIFICATION OF AIRCRAFT PART 21

Booking flights At the restaurant Wiki. Triggers. February 24, Grégoire Détrez Tutorial 4

myldtravel USER GUIDE

PSS VM 7.15 announcement

User Reference Manual

The type rating of test pilots having flown the aircraft for its development and certification needs to be addressed as a special case.

M A T L Reference. MATL Path 83 Transfer Capability with Seasonal SOL Affects. Document. 1. Purpose

1.2. This working procedure regards IATA Season Summer 2019 (S19). This season starts at March 31, 2019 and ends at October 26, 2019.

CAR AIR CONTINUING AIRWORTHINESS (GENERAL AVIATION OPERATIONS)

[Docket No. FAA ; Product Identifier 2017-NM-095-AD; Amendment ; AD ]

Airport/FBO View - Overview

FOR SMALL AND MEDIUM SIZED AIRPORTS Velocity FIDS

Advisory Circular. 1.1 Purpose Applicability Description of Changes... 2

UPA Extension Overview

Aircraft Maintenance Organisations - Certification. Contents

Level Crossings Configuration Standards

INSTRUCTIONS FOR USING THIS SAMPLE FLIGHT MANUAL SUPPLEMENT

SERVICE BULLETIN FLIGHT CONTROLS - INSPECTION FOR CONTROL COLUMN INTERFERENCE WITH WIRING BEHIND THE INSTRUMENT PANEL

VARIBLE COMMISSIONS OVERVIEW

General Information on 24-Month OPT Extension Based on Degree in Science, Technology, Engineering, or Math (STEM)

Crosswind dependent separations and update on TBS concept (transitional step)

Concur Travel: View More Air Fares

Transcription:

Release Notes Business Rules Version 10x Up to Spring 2019 Release for SIBR/BSAP/RC-BSAP Revision History Date Version By Description 11/27/2018 1.0 WT Initial Draft for Spring 2019 set. RC Base Schedule addition 1

For the Release Notes version 1.0 this will be the Baseline Release and is referenced in the revision history as the Initial Draft. For modifications and adjustments of the Business Rules(BR) for SIBR/BSAP/RC-BSAP that come after the Baseline Release the revision history will show an Incremental change with the new BR(vX.X.x). The incremental changes will be listed on top of the baseline. The Baseline Release will identify all the Projects associated with the SIBR/BSAP/RC-BSAP Release and if there are any changes to the UI or API web services. Changes to the UI will be documented in the SIBR SC Users Guide, BSAP Users Guide, or the RC-BSAP Users Guide. Web services changes will be documented in the Technical Specifications and posting of the related artifacts on the Release Planning page or Application Access page for the respective changes. Contents /////////////////////////////////////////////// Baseline Release /////////////////////////////////////////////////////... 2 Spring 2019 Release Impacts... 3 Business Rules Spring Release Projects (included Independent Projects)... 4 Revision History for Rules: (10.0)... 4 Revision of Terms for Spring 2019 Release:... 5 Business Rules Impacted Spring 2019 Release:... 6 /////////////////////////////////////////////// Baseline Release ///////////////////////////////////////////////////// This set of Release Notes covers the changes going forward from the Business Rules Version 10.0 2

Spring 2019 Release Impacts Business Rule changes within a release may force changes to the User Interfaces or Web Services depending on the requirement changes that are needed to support new or modified functionality within system applications. The following elements defined below give a quick overview of expected changes to the systems that interface with the Business Rules. Application Element Change Comment SIBR SIBR UI NO SIBR Web Services NO SIBR Rules NO BSAP BSAP UI NO BSAP Web Services NO BSAP Rules NO RC-BSAP RC-BSAP UI YES New UI RC-BSAP Web Services YES New Web Services RC-BSAP Rules YES New Rules Please visit the relevant user documentation on the Release Planning page for the updates to the documents associated to a specific Release. http://www.caiso.com/informed/pages/releaseplanning/default.aspx SIBR User Guide UI changes will be documented in this document. SIBR Interface Specifications - all web service (wsdl, xsd, xml) changes will be documented in this document. BSAP User Guide UI changes will be documented in this document. Base Schedule Interface Specification Web Services - all web service (wsdl, xsd, xml) changes will be documented in this document. RC-BSAP User Guide UI changes will be documented in this document. 3

RC Base Schedule Interface Specification Web Services - all web service (wsdl, xsd, xml) changes will be documented in this document. Business Rules Spring Release Projects (included Independent Projects) The 2019 Spring Release rules capture changes associated with the following projects targeted for implementation near April/May 2019 timeframe. http://www.caiso.com/informed/pages/releaseplanning/default.aspx this set may also include updates to rule modifications not tied to a release. The full set of the Business Rules promoted to Production can be seen under the SIBR user documentation under the Application Access/ in SIBR user documentation for all rules related to SIBR/BSAP/RC-BSAP. http://www.caiso.com/participate/pages/applicationaccess/default.aspx Revision History for Rules: (10.0) Version Date Changes Reference 10.0 8/24/2018 Removed deleted rules. RC 10.0 8/24/2018 Modified Base Schedule and Base Schedule Coordinator terms and added terms for RC Aggregate Non-Generator Resource, Aggregate Resource, Reliability Coordinator, RC Entity, RC Entity BSC, RC Inter-Tie, and RC Resource. 10.0 8/24/2018 Modified 28001, to use the general Aggregate Resource term. RC 10.0 8/24/2018 Modified 38101 and 48101 to use the general Aggregate Resource term and deleted RC 38105 and 48102. 10.0 8/24/2018 Generalized the Real-Time Base Schedule and Real-Time Demand Forecast Cutoff Time terms to apply to both EIM and RC Resources and added terms for a Fourth and a Fifth Cutoff Time. RC 4

10.0 8/24/2018 Added 10068-10069 to initialize Real-Time Base Schedule Fourth and Fifth Cutoff RC Times. 10.0 8/24/2018 Add RC Entity in 10018. RC 10.0 8/24/2018 Added 30045-30047 for RC Resource Base Schedule Content. RC 10.0 8/24/2018 Added 38057-38061 for RC Resource Base Schedule Validation. RC 10.0 8/24/2018 Added 58009-58010 for RC Resource Base Schedule Final Processing. RC 10.0 8/24/2018 Added DRC and RRC rule flows. RC Revision of Terms for Spring 2019 Release: Name Acronym Definition Aggregate Non-Generator Resource A Non-Generator Resource that is a group of Non-Generator Resources scheduled or dispatched as a single Non-Generator Resource. Aggregate Resource An Aggregate Generating Resource or an Aggregate Non-Generator Resource. Base Schedule BS The Energy or Ancillary Service Schedule of a RC Resource or an EIM Resource before the EIM. Base Schedule Coordinator BSC A Market participant authorized by the CAISO to submit Base Schedules for an EIM or RC Resource. Reliability Coordinator RC The entity providing reliability services (CAISO). RC BAA A non-eim BAA that joins the RC. RC Entity A BAA operator for one or more non-eim BAAs that join the RC. RC Entity BSC The BSC of an RC Entity for a RC BAA. It is the BSC for all RC Resources in that BAA and all Intertie Transactions from/to non-eim BAAs to/from that RC BAA. RC Inter-Tie An Inter-Tie from a RC BAA to a non-eim BAA. RC Resource A Resource in a RC BAA. Real-Time Base Schedule Fifth Cutoff The fifth and final cutoff time when Base Schedules can be submitted in the RTM for the Active 5

Time Real-Time Base Schedule Fourth Cutoff Time Hour. Used only for RC Resources. The fourth cutoff time when Base Schedules can be submitted in the RTM for the Active Hour. Used only for RC Resources. Business Rules Impacted Spring 2019 Release: Rule changes for the Version 10.0x are located below. Modified Text in red, new rules will be all red. New rules 10.0 are as follows: Market Business Rule ID Description RTM 10068 The configurable Real-Time Base Schedule Fourth Cutoff Time must be initialized to 25 minutes before the start of the Active Hour. RTM 10069 The configurable Real-Time Base Schedule Fifth Cutoff Time must be initialized to 15 minutes before the start of the Active Hour. ALL 10018 Users may submit Bids, submit Trades, generate Reports, and receive notices and warnings, only on behalf of Scheduling Coordinators or RC Entities for which they are authorized. BS 28001 The Base Schedule must include a Base Energy Schedule (MW); it must also include a Base Generating Resource State, if and only if the Resource specified in the Base Schedule is a Generating Resource registered as a MSG for the Base Schedule Period specified in the Base Schedule; if the Resource specified in the Base Schedule is a Generating Resource not registered as an ETSR or a DSR for that Base Schedule Period, the Base Schedule may also include any of the following: 1) a Base Regulation Up Schedule (MW); 2) a Base Regulation Down Schedule (MW); 3) a Base Spinning Reserve Schedule (MW); 4) a Base Non-Spinning Reserve Schedule (MW); and 5) at most one Distribution Bid Component, if and only if the Resource specified in the Base Schedule is registered as an Aggregate Resource for the Base Schedule Period specified in the Base Schedule. RRC 30045 A Base Schedule for the Active Hour may not be submitted after the Real-Time Base Schedule Fifth Cutoff Time. Comments T 25' RC Base Only T 15' RC Base Only MFR: ETSR and DSR registration; ETSR/DSR are System Resources defined in mirrored pairs (Import to an Export and vice-versa). A non-zero Base Energy Schedule for an Online Base Generating Resource State indicates self-commitment. Applies to RC Resources. 6

RC 30046 A valid Base Schedule with the same Base Schedule Coordinator, Resource, and Base Schedule Period, with an earlier valid Base Schedule, must make the earlier Base Schedule obsolete. RRC 30047 A valid Base Schedule may be canceled by the Base Schedule Coordinator that submitted that Base Schedule at any time before the Real-Time Base Schedule Fifth Cutoff Time that corresponds to that Trading Hour. RC 38057 If the Resource specified in a Base Schedule is a Registered Resource, it must be registered as a RC Resource for the Base Schedule Period specified in that Base Schedule. RC 38058 If the Resource specified in a Base Schedule is an Inter-Tie Transaction, its Primary Inter-Tie must be registered as a RC Inter-Tie for the Base Schedule Period specified in that Base Schedule. RC 38059 The Base Schedule Coordinator specified in a Base Schedule for a Registered Resource must be the RC Entity BSC of the RC Entity of the RC BAA of that Resource. RC 38060 The Base Schedule Coordinator specified in a Base Schedule for an Inter-Tie Transaction must be the RC Entity BSC of the RC Entity of the RC BAA at the sending end of the Primary Inter-Tie of that Inter-Tie Transaction. RC 38061 The Base Schedule Coordinator specified in a Base Schedule for a Registered Resource must be authorized to submit Base Schedules for that Resource and Trading Hour. BS 38101 The Resource specified in a Base Schedule that has a Base Schedule Distribution Bid Component must be registered as an Aggregate Resource for the Base Schedule Period specified in the Base Schedule. DEL 38105 The Non-Generator Resource specified in a Base Schedule that has a Base Schedule Distribution Bid Component must be registered as an Aggregate Non- Generator Resource for the Base Schedule Period specified in the Base Schedule. BS 48101 If there is no Distribution Bid Component for a Trading Hour in a Base Schedule, but the Resource specified in that Base Schedule is registered as an Aggregate Base Schedule obsolescence. Applies to RC Resources. Base Schedule canceling. Applies to RC Resources. MFR: RC Resource designation in Resource registry (MO=N, EIM=N, RC=Y). Base Schedules may be submitted only for RC Resources. MFR: Inter-Tie registry. RC Inter-Tie designation in Inter-Tie registry. Base Schedules for Intertie Transactions may be submitted only on RC Inter-Ties. Only the RC Entity BSC may submit Base Schedules for its RC Resources. Only the RC Entity BSC may submit Base Schedules for Inter-Tie Transactions on its RC Inter-Ties. Covered by 38101. GDF Library Requirement: Distribution Pairs (Distribution 7

Resource for that Trading Hour, a Distribution Bid Component must be generated for that Trading Hour in that Base Schedule with the applicable Distribution Pairs from the GDF Library for that Aggregate Resource and Trading Hour. DEL 48102 If there is no Distribution Bid Component for a Trading Hour in a Base Schedule, but the Non-Generating Resource specified in that Base Schedule is registered as an Aggregate Generating Resource for that Trading Hour, a Distribution Bid Component must be generated for that Trading Hour in that Base Schedule with the applicable Distribution Pairs from the GDF Library for that Non-Generating Resource and Trading Hour. DRC 58009 The system must broadcast all Base Schedules after the Day-Ahead Base Schedule Cutoff Time. RRC 58010 The system must broadcast all Base Schedules after each Real-Time Base Schedule Cutoff Time. Location, Distribution Factor) for Aggregate Resources. Covered by 48101. The full set of the Business Rules can be seen under SIBR user documentation under the Application Access/ in SIBR user documentation for all rules related to SIBR/BSAP/RC-BSAP. http://www.caiso.com/participate/pages/applicationaccess/default.aspx END Document 8