ATTACHMENT 2 ADDITIONAL AIRSPACE ALLOCATION PROCEDURES

Similar documents
DOCUMENT CHANGE RECORD. The following table records the complete history of the successive editions of amendments to the present document;

Flexible Use of Airspace. in ITALY. EUROCONTROL, 11 December 2018

LSSIP Year 2011 Cyprus Part III - Chapter 15-1 Released Issue

Operational Instruction

FUA TEMPORARY INSTRUCTION Doc. ID : FTI/17-013

- Define temporary airspace structures and procedures to offer multiple airspace

REG ASP MIL APO USE INT IND NM

AirSpace Management. Airspace Use Plan (AUP) / Updated airspace Use Plan (UUP)

FUA Workshop COL Christophe HINDERMANN French Military ATM Directorate Head of Airspace Sub-Division

- Establish criteria and procedures providing for the creation and use of adjustable lateral and vertical limits of the airspace

L 342/20 Official Journal of the European Union

Enter here your Presentation Title 1

Towards a Global ATFM Manual. Brian Flynn Head Network Operations

Airspace Management Operations Manual

ENR 1 GENERAL RULES AND PROCEDURES ENR 1.1 GENERAL RULES

Agenda. Institutional Arrangements Structures Procedures Example of TSA200 FUA at Regional Level

REGIONAL CARIBBEAN CONTINGENCY PROCEDURES FOR HURRICANES

Civil-Military Cooperation. Advanced Flexible Use of Airspace

Responsibilities Document for the application of Air Traffic Flow Management (ATFM)

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT

Airspace Management Operations Manual

Introducing Free Route Airspace: Summary Paper from NEFAB Customer Consultation Days Helsinki, October 21, 2014 and Oslo, October 23, 2014

EUROCONTROL REVIEW OF CIVIL MILITARY COORDINATION AND COOPERATION ARRANGEMENTS

Civil and military integration in the same workspace

Chapter 7 - Annual Report on the Application of FUA

Airspace Organization and Management

Civil-Military ATM Coordination. Edgar REUBER EUROCONTROL/DECMA/CMC/ARD September, 12th 2018

DANUBE FAB real-time simulation 7 November - 2 December 2011

FUA AMC CADF OPERATIONS MANUAL. NO Handbook

EUROCONTROL. An introduction to the EUROCONTROL Network Manager Operations Centre

The following flights always take priority over all other air traffic and airspace structures:

Civil/Military Coordination Workshop Havana, Cuba April 2015

Civil/Military Cooperation ICAO Workshop. Civil/Military Cooperation in Ukraine

The situation before the FUA

What is Flexible Use of Airspace (FUA)?

EUROCONTROL Responsibilities Document for the application of Air Traffic Flow Management (ATFM)

CENTRAL AIR TRAFFIC FLOW MANAGEMENT ( C-ATFM ) INDIA CATFM. ATFM Global Symposium /22/2017 ATFM Global Symposium 2017

LETTER OF AGREEMENT BETWEEN BODØ FIR AND MURMANSK FIR

International Civil Aviation Organization. Agenda Item 6: Free Route Airspace Concept implementations within the EUR Region FREE ROUTE AIRSPACE DESIGN

ATFM IMPLEMENATION IN INDIA PROGRESS THROUGH COLLABORATION PRESENTED BY- AIRPORTS AUTHORITY OF INDIA

REG ASP MIL APO USE INT IND NM

The following flights always take priority over all other air traffic and airspace structures:

DIRECTORATE CIVIL-MILITARY ATM COORDINATION. FLEXIBLE USE of AIRSPACE in EUROPE «Challenges»

UK Airspace Management Policy

ICAO ATFM SEMINAR. Dubai, UAE, 14 December 2016

Agenda Item 6-ATM Coordination (ATM Contingency Plan- Level 1 and Level 2)

The presentation to Externals of the NM22.5 Release via video-conference took place on the 18 th of September 2018.

Any queries about the content of the attached document should be addressed to: ICAO EUR/NAT Office:

Sharing the Airspace- Effectively The UK Approach to FUA

NEFAB Project Feasibility Study Report Operational Concept

Cross-border Free Route Airspace Implementation Workshop Conclusions and Recommendations

Agenda Item 3: Performance framework for Regional Air Navigation Planning and Implementation

Luxembourg TMA Contingency measures. Clear the sky procedure & Agreement on service continuity

CONTROLLED AIRSPACE CONTAINMENT POLICY

ATFM IMPLEMENATION IN INDIA PROGRESS THROUGH COLLABORATION PRESENTED BY- AIRPORTS AUTHORITY OF INDIA

Multi Profile Training Areas. Col Azmi Al Abaddi Royal Jordanian Air Force

ATM REGIONAL CONTINGENCY PLAN FOR.. CTA/UTA/FIR

AIR TRAFFIC FLOW MANAGEMENT INDIA S PERSPECTIVE. Vineet Gulati GM(ATM-IPG), AAI

Official Journal of the European Union L 186/27

NEFAB Annual Report 2016

Free Route Airspace ASM Dimension. Giuseppe Acampora

Subject : Correct application of the strategic lateral offset procedures

CATFM CENTRAL AIR TRAFFIC FLOW MANAGEMENT ( C-ATFM ) INDIA. ATFM TF 1 Meeting September 2018

Performance Review Body 18

GENERAL REPORT. Reduced Lateral Separation Minima RLatSM Phase 2. RLatSM Phase 3

Workshop Exercise, EGYPT Air Navigation Plan 10 /12/2010

FREE ROUTE AIRSPACE IMPLEMENTATION IN ARMENIA (ARMFRA)

Free Route Airspace Definitions

Advanced Flexible Use of Airspace (AFUA) Kris DELCOURTE, EUROCONTROL Davide BARDELLI, LUFTHANSA SYSTEMS

Hosted by General Civil Aviation Authority (GCAA)

Capacity declaration Amsterdam Airport Schiphol; winter 2017/2018. Environmental capacity; available number of slots for Commercial Aviation

Temporary Airspace Allocation TAA & setting the scene for Egyptian Civil/Military Cooperation

Terms of Reference CYR301 Airspace Modification TERMS OF REFERENCE. Airspace Modification CYR301. Camp Dundurn, SK

EUR/SAM corridor airspace concept

ICAO Bay of Bengal ATS Coordination Group ATFM Task Force

EUROCONTROL. Centralised Services Workshop. Peter Matern CS#5 EAIMS 5 March 2014

ICAO - ACAC Civil Military Workshop

Centralised Services 4 Advanced Flexible Use of Airspace Service

Recurrent capacity flaws: a matter of fate? Giovanni Lenti Head of Network Operations 28/01/2015

International Civil Aviation Organization REVIEW OF STATE CONTINGENCY PLANNING REQUIREMENTS. (Presented by the Secretariat) SUMMARY

Network Manager Adding value to the Network 29 September 2011

International Civil Aviation Organization COMMON FORMAT LOA BETWEEN ATS UNITS. (Presented by United Arab Emirates) SUMMARY

Dynamic Management. of the. European Airspace Network. ADR Data Catalogue. Annex A: Supported Services

GUIDANCE FOR THE IMPLEMENTATION OF FLEXIBLE USE OF AIRSPACE (FUA) CONCEPT IN THE SOUTH AMERICAN REGION

Letter of Agreement between the UHPC and NATS

ATFM Update - EUROCONTROL Day 1-16h45

Amendment of Restricted Areas R-2907A and R-2907B, Lake George, FL; and R-2910, Pinecastle, FL

Civil and Military Use of Airspace in France

CHAPTER 6 FLIGHT FOLLOWING

Flight Efficiency Initiative

Letter of Agreement. Between Jacksonville ARTCC and Virtual United States Navy Effective Date: Sept 1, 2008

European Route Network Improvement Plan

STRUCTURE. Arnis Muiznieks Ministry of Transport, Latvia

Follow up to the implementation of safety and air navigation regional priorities XMAN: A CONCEPT TAKING ADVANTAGE OF ATFCM CROSS-BORDER EXCHANGES

Guidelines for NOTAM Workflow and Allocation of Responsibilities

LETTER OF AGREEMENT. between. and

Air Traffic Flow & Capacity Management Frederic Cuq

COMMISSION REGULATION (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management

Letter of Agreement. between. and

International Virtual Aviation Organisation. Letter of Agreement. between. and. Effective: 15/05/2017 Edition: 1

Transcription:

ATTACHMENT 2 ADDITIONAL AIRSPACE ALLOCATION PROCEDURES 1. General Training areas are designed to allow military training without reducing safety or creating significant disadvantages for civil traffic. When operational factors such as weather or available crew/aircraft/sar have changed after AUP publication, AA or CRC/ACU may request area changes. Such changes shall, as far as practicable, be allocated at ASM Level 2 or 3 on the day of operation, see paragraph 6. Activation on ASM Level 3 is not restricted by vertical limitations or time slots as long as traffic permits. Unless otherwise specified all areas can be requested and allocated H24. Training areas only comprise controlled airspace. For operations below an activated area, see Attachment 3 paragraph 5. 2. Timetable The time reference in the European Route Network Improvement Plan (ERNIP), Part 3, Airspace Management Handbook, Guidelines for Airspace Management, Section 4, paragraph 4.8.2.1 shall for Norway read Before 13:00 local time on the day before operations (13:00 local time D-1) 3. Military Airspace Requests 3.1 Military Airspace users Military airspace users shall on D-1 confine their airspace requests to what actually are required (number and vertical extent of areas) based on: type of mission; operational factors such as: o weather forecast; and o available crew/aircraft/sar Airspace requests shall take into account the limitations set forth in this agreement. On the day of operations the AUP shall be followed as long as operational requirements will be met. Before requesting any change to the AUP the above factors shall be evaluated again. 12.11.2015 Attachment 2 - Agreement on use of AMC manageable areas Page 1 of 12

Changing airspace after promulgation of the AUP disrupts the planning for both ATC and civil airspace users. Changes shall therefore be kept to a minimum, keeping the above described procedure in mind. If, however, a change is needed, the described procedures shall be followed. As a part of the continuous work to document and improve the FUA in Norway, each change shall be recorded and reported to Inspectorate of Air Operations as described by them. 3.2 Airspace Request 3.2.1 AA shall submit an Airspace Utilization and Allocation Request (AUAR) which shall consist of the following elements: a) requested airspace including vertical limitations b) date and period (UTC) of planned activity c) type of activity d) responsible Coordinating unit(s) e) use of other areas not covered by the FUA agreement f) other information as necessary AUAR shall be submitted through the LARA ASM tool, or by email as a backup procedure. 3.2.2 AA shall: Deconflict all military airspace requests Ensure that the AUAR takes into account the limitations set forth in this agreement Use paragraph e) or f) to indicate needs not covered by the agreement on Use of AMC Manageable Areas, such as tactical needs which cannot be promulgated by the AUP, use of CAS areas or transition flights to training areas outside Norway 4. Allocation of AMC manageable areas 4.1 Different vertical limits Caution shall be exercised by all parties involved when military aircraft are utilizing adjacent areas with different vertical limits. 4.2 Utilization of areas The allocation rules applicable for AMC at Level 2 do not preclude activation for CRC/ATC at Level 3. 4.3 Request and allocation rules The following paragraphs define the rules for requesting and allocating multiple areas. The figures are only examples. Until further notice, training areas in Bodø Oceanic FIR (A8, B1/4/7, C1/5/9, D1/4/7, E1/4/7 and F1) cannot be requested nor allocated in accordance with this agreement due to unresolved regulatory issues. 12.11.2015 Attachment 2 - Agreement on use of AMC manageable areas Page 2 of 12

4.3.1 Areas A1 to A8 will only be used for operations utilizing the firing range Halkavarre or for aircraft deployed to ENNA. Depending on the size of operations, the number of areas used and their vertical extent shall be negotiated between the military and the ANSP in each case. Exercises shall be coordinated in accordance with the agreement paragraph 2.4. 12.11.2015 Attachment 2 - Agreement on use of AMC manageable areas Page 3 of 12

4.3.2 Three adjacent rows of areas in the NE/SW direction (a row comprises of e.g. C1/2/3/4 or E1/2/3), can be requested and allocated simultaneously to FL660 in AUP/UUP. The next adjacent area/row of areas can only be requested and allocated to maximum FL300 or below to allow transiting traffic. With non-participating traffic unable to fly at or above FL320 the area/row of areas shall be lowered as necessary to allow this traffic. Simultaneous use of both D8/9 and E2/3 above FL300 shall not be combined with areas D5/6 or E5/6 above FL300. Pictures below present examples on how to combine some areas. 12.11.2015 Attachment 2 - Agreement on use of AMC manageable areas Page 4 of 12

4.3.3 Areas B1 to B12 and G1/2/3 can only be requested and allocated for pre-planned exercises. Depending on the size of operations, the number of areas requested and allocated and their vertical extent shall be negotiated between the military and the ANSP in each case. Areas B7, B8 (including D478 Sveinsgrunnen) and B9 (ENAN TMA) can be requested and allocated for daily training provided the vertical extent are agreed between the military and the ANSP before the AUAR is submitted. 12.11.2015 Attachment 2 - Agreement on use of AMC manageable areas Page 5 of 12

4.3.4 The areas in red (B11/12 and C4/8) cannot be requested nor allocated at the same time as the areas in blue (G4/5/6/7/8). 12.11.2015 Attachment 2 - Agreement on use of AMC manageable areas Page 6 of 12

4.3.5 In order to allow for traffic in the north/south direction, the areas in red (D3/6/9 and E3) cannot be requested nor allocated at the same time as the areas in blue (H1/2/3/4/5). 12.11.2015 Attachment 2 - Agreement on use of AMC manageable areas Page 7 of 12

4.3.6 When the areas in blue (J2/3/4/7/8) are requested and allocated above FL300 the areas in red (E4/5/6) cannot be requested nor allocated at the same time above FL300 and vice versa. 12.11.2015 Attachment 2 - Agreement on use of AMC manageable areas Page 8 of 12

4.3.7 Areas in green (J1/5/6, I1, K1) can only be requested and allocated for exercises, see the agreement paragraph 2.4. 12.11.2015 Attachment 2 - Agreement on use of AMC manageable areas Page 9 of 12

4.3.8 Simultaneous use of more than two blocks* of connected areas in Norway ACC, Oslo shall be avoided, unless special activities so requires and subject to prior coordination with Norway ACC, Oslo. * One block of connected areas is regarded as being the unity of more than one area, which are connected and thus forming a block of adjoining areas, e.g. areas within J are one block of connected areas. 12.11.2015 Attachment 2 - Agreement on use of AMC manageable areas Page 10 of 12

5. Reallocation of a AMC manageable area If needed, in relation to hospital flights or flights in state of emergency, the allocated area shall be handed back to ATC. An adjusted area will be allocated to military, ensuring that the relevant flights remain segregated from the training area. Detailed procedures shall be described at Level 3. 6. Airspace request not in accordance with AUP and allocation by UUP Any changes to the AUP shall be promulgated through UUP in accordance with ERNIP Part 3. Airspace change requests from AA (prior to start of operation) shall be forwarded to AMC. Airspace change requests from Coordinating Unit (during operations) shall be forwarded to the relevant supervisor at Norway ACC. Requests for areas exceeding AUP/UUP shall not be activated at Level 3 with a vertical dimension that affects non-participating traffic. 7. Air Traffic Flow and Capacity Management (ATFCM) 7.1 General Nothing in paragraph 7 precludes ATC to take all measures needed to secure flight safety. This will be the base for the process which shall be followed when regulations are needed. This procedure describes two different scenarios, one when immediate action is required and one when regulations are planned. 7.2 Ad hoc regulations 7.2.1 ATC (FMP) shall first regulate civilian traffic as necessary to allow for the continued use of military training areas. 7.2.2 The supervisor of the relevant ACC shall then coordinate with AMC to search for flexible solutions in order to increase the capacity. AMC shall include AA in this process. This may include a reduction in the number of activated areas, the vertical or horizontal extent of the areas or reallocation of military activity to other areas within the same AoR or to another AoR. 7.2.3 Based on the outcome of 7.2.2, the restrictions on the civilian traffic in 7.2.1 may be revised. 12.11.2015 Attachment 2 - Agreement on use of AMC manageable areas Page 11 of 12

7.3 Planned regulations Each ACC shall, as soon as possible, coordinate with AMC any known problems which may affect upcoming AUPs and search for flexible solutions in order to minimize the impact on civil and military operations. AMC shall include AA in this process. 8. Post analysis As stated in EUROCONTROL Specification for the Application of the Flexible Use of Airspace (FUA), L2-AAOP-01-01 o) AMC shall participate in a post analysis of airspace allocation. In order to meet the requirement the AMC shall receive and archive data on the requests, allocation and actual use of airspace structures as forwarded by Norway ACC, for further analysis and planning activities. 12.11.2015 Attachment 2 - Agreement on use of AMC manageable areas Page 12 of 12