Pollution Incident Response Management Plan

Similar documents
LEGAL REQUIREMENTS FOR STORING AND TRANSPORTING FLAMMABLES AND CHEMICALS

Cooking Booth Construction and Location (See Figure 1 and 2 for diagrams):

ES Aircraft Deicing Document Identification Number Date: March 15, ) Activity Description:

Marin County Fire Department. Fire Protection Standard 119. Tents and Awnings

[Owner s or Custodian s Company Name] VGP Annual Towing Vessel Inspection Report Form

PART E SECTION 5 AVIATION FUEL SUPPLY SYSTEM

FIRE REGULATIONS FOR OUTDOOR FESTIVALS CONCESSION BOOTHS (See Tents and Canopies Information Bulletin)

TENTS, CANOPIES AND TEMPORARY MEMBRANE STRUCTURES

EDINBURGH AIRPORT LTD COACHPARK

Freezer Vessel Hygiene Checklist

INTERNATIONAL FIRE TRAINING CENTRE

Permittees under Sector S are primarily engaged in the following types of activities:

Form No. OPS-20 Issue No. 01 Airport Safety Induction Revision No. 01

Inspection Check-off Sheet

Storm Water Pollution Prevention Plan. Anchorage Station Anchorage International Airport Anchorage, Alaska

Chemical Spill Response Guide

General Metal Shop Safety

Therme storage water heater. Table of contents. Symbols used. Symbols used Symbol indicates a possible hazard. Installation instructions

Marine Protection Rules Part 141 Ship Design, Construction, Equipment and Operation Noxious Liquid Substances in Bulk

DEVILS LAKE MUNICIPAL AIRPORT AERIAL APPLICATOR OPERATING PERMIT

Current Rules Part 175 Aeronautical Information Service Organisations - Certification Pending Rules

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs)

Flammable and Combustible Liquids. OSHA Office of Training and Education 1

Cruise Industry Perspective on OWS and Waste Management

Railway Passenger Handling Safety Rules. March 31st, 2000 (TC O-0-16)

Part 145. Aircraft Maintenance Organisations Certification. CAA Consolidation. 10 March Published by the Civil Aviation Authority of New Zealand

Hotels and Inns. Green Purchasing Network (GPN)

Technical Guidance Material for Aerodromes Rescue & Fire Fighting Services Advisory Circular

LITTLEHAMPTON HARBOUR BOARD

Vancouver Airport Authority. Contractor Safety Management Program [CSMP] Airside Contractor & Construction Safety

Community College of Philadelphia. Department of Chemistry

Karuah Hard Rock Quarry. Summary of Environmental Monitoring Data

Hydraclaw Jacks. *dimensions are in mm. Powerful: 5 tonne capacity on head or toe. High Lift: 178mm. Fast Operation: 5.5mm lift per stroke

Health and Safety Tenant/User

NZQA registered unit standard version 4 Page 1 of 5. Maintain safety standards on the apron area of an airport. Aviation > Airport Operations

B. HANDLING OF EXPLOSIVES AND OTHER HAZARDOUS MATERIALS

YMA TRAINING CATALOG 2017

The purpose of this procedure is to establish guidelines for the response of Fire Department personnel and equipment to an aircraft emergency.

HOSE ASSEMBLY CLEANLINESS

FACT SHEET HUNTERS POINT SHIPYARD Parcel E-2 PCB Hot Spot Time-Critical Removal Action: 2010

AYR and TROON. Information for Visiting Vessels. To the Master, Officers and Crew. Welcome to the Ports of Ayr and Troon. Local time: GMT / GMT +1

Part 149. Aviation Recreation Organisations - Certification. CAA Consolidation. 1 February 2016

Marine Protection Rules Part 101B: Surveys and Inspections Noxious Liquid Substances Carried in Bulk

FIRST AMENDMENT AIRLINE OPERATING AGREEMENT AND TERMINAL BUILDING LEASE. between. City Of Manchester, New Hampshire Department Of Aviation.

THE TARIFF OF PORT FEES AND CHARGES SZCZECIN AND ŚWINOUJŚCIE SEAPORTS AUTHORITY

INTERNATIONAL RULES AND INDUSTRY _ ISSUES OF OHS

LP Grill and Gas Hose

Permit Application Requirements For Temporary Tents, and Membrane Structures

San Bernardino International Airport Authority Building 795

St. Mary s Harbour. Port Waste Management Plan

STANDARD DETAILS & SPECIFICATIONS

ANNUAL REPORT DALLAS LOVE FIELD AIRPORT. April 23, 2008

Simplified Guide to Fire Prevention - Exhibition. March 2014 issue

Fire safety in camping sites. CFPA-E Guideline No 20:2012 F

OPERATIONAL SAFETY POLICY TRANSFER OF EXPLOSIVE CARGO MARCH This document is uncontrolled when printed

City of Redding Airports

Yamhill Fire Protection District

Keeping your Workplace Safe for Foodservice Employees

Porter Fk. #1. All unauthorized items removed as per FS & Rec Res guidelines. Footbridge may be needed for wheel chair access and for safety

ANNUAL REPORT DALLAS LOVE FIELD AIRPORT. March 14, 2006

Lit Table Top Firepit Bio-Ethanol Fireplace. User Manual. Model: GF301650

RESPIRATORY & FIRST AID

LIGHT AIRCRAFT ASSOCIATION

Tents and Air Supported Membrane Structures

SINGLE BURNER STOVE IMPORTANT OPERATING INSTRUCTIONS COOKING & STORAGE POSITION PARTS IDENTIFICATION

Carnarvon Station Reserve, Qld Camping Information

AIC Series A MAY 18

EXCELSIOR FIRE DISTRICT

Code of Practice for filming in East Lothian

AIC Series A APR 17

Osceola County Department of Fire Rescue and Emergency Medical Services

OPERATING DIRECTIVE Number: D Aviation Authority Revised: 03/26/13

Review of Environmental Factors

Aviation Environmental Protection (AEP)

CA AUGUST 2018 Page 1 of 5

DEPARTMENT OF CIVIL AVIATION ANNEX 1 REPUBLIC OF MAURITIUS

APPENDIX 9. PESTICIDE EMERGENCY SPILL PLAN

WASTE + WATER MANAGEMENT AUSTRALIA OCTOBER 2015 V42.3 ENVIRONMENT SUSTAINABILITY PUBLIC HEALTH SINCE 1973 PRINT POST APPROVED

Tent /Membrane Structure Permit Application

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs)

MEMORANDUM Thomas J. Kaminski

Oil-only Absorbent Pads Because everyone needs a pad! Specialized for oil and other petroleum-based spills; repels water

WELCOME. Living on Water offers a vibrant and exciting way of life that opens up a whole host of opportunities.

2018 Goldwedge Mines Inc. Licence of Occupation Management Plan. Photo: xxxx. Goldwedge Mines Inc.

Order on the transfer of bunker products between ships, etc. in Danish and Greenland territorial waters

F I R E D E P A R T M E N T SANTA CLARA COUNTY

WE ARE MANUFACTURER!

Clovis Fire Department

Steve Parry has left for pastures new and you can contact Richie Gallagher on Steve s old mobile number

Tent Policy & Procedures for Washington University in St. Louis

AQUAVALVE THROUGH BULKHEAD

Part I Approval of Dangerous Goods Training Programs Checklist. Date 17 FEB 2017 Issue 00 Page 1 of 12 Form / CAAT-DGD-310

Fire Department HEADQUARTERS Cathedral Oaks Road Santa Barbara, CA (805) FAX: (805) CODE SUMMARY

Self Inspection Check List Developed for use by Operators of Summer Camps by Department of Agriculture & Fisheries

Foam Systems Engineering Design Manual

Porini Amboseli Camp has been awarded a Gold Eco-Rating. See below for Ecotourism Kenya's full report:

Single Decontamination Shower. Product Manual

GUIDELINES ON BUNKERING OPERATIONS AND SHIP TO SHIP CARGO TRANSFER OF OILS, SUBJECT TO ANNEX I OF MARPOL 73/78, IN THE BALTIC SEA AREA

DEPARTMENT OF CIVIL AVIATION Airworthiness Notices EXTENDED DIVERSION TIME OPERATIONS (EDTO)

Approval of Dangerous Goods Training Programs Checklist Part I Part I Approval of Dangerous Goods Training Programs Checklist

Transcription:

Baines Masonary Blocks Pty Ltd (Baines Masonry) 900 Wilton Rd, Appin, NSW 2560 Pollution Incident Response Management Plan Page 1 of 7

Table of Contents 1. Purpose and Scope 3 2. Process 3 3. Definition of Pollution Incident 3 4. Description and Likelihood of Hazards 3 5. Pre-emptive Actions to be Taken 4 6. Inventory of Pollutants 4 7. Safety Equipment and Minimising Risk 5 8. Contact Details 5 9. Training, Testing and Review 6 10. Testing Records 6 11. Maps 6 Page Document Control Version Date Amendment 1 15/8/2012 Original Document 2 15/3/2013 Amendment to 8.2, Fire and Rescue Contact Details 3 18/3/2014 Amendment to 8.2, Ministry of Health Contact Details (previous typing error) Amendment to 5. (non-flammable chemicals), grammatical error Addition of Document Distribution List 4 2/9/2015 No amendments required 5 30/9/16 No amendments required 6 6/7/17 Amendment to 7. to include risk minimisation Addition of 10.Testing Records Make document available on website for public reference 7 12/9/18 Update 6. Inventory of Pollutants Update Site Map to include proposed factory and larger storage areas Document Distribution Allan Baines Adam Baines Koby Cannon Chief Wardens Emergency Folder Master Emergency Folder Page 2 of 7

1. Purpose and Scope This Pollution Incident Response Management Plan (PIRMP) has been developed to describe Baines Masonry s response to a potential pollution incident and to meet the requirements of the Protection of the Environment Operations Act (POEO Act 1997) The PIRMP covers the property at 900 Wilton Road Appin with an Environmental Protection Licence (EPL). The plan covers description of potential hazards, actions to be taken to prevent additional environmental harm and details of communication required in the event of an incident. The plan is based on a risk assessment of the site. 2. Process In the event of a pollution incident: STEP 1: Follow Emergency Response Procedures and Notify the Chief Warden. STEP 2: Contain the incident where possible. STEP 3: The Chief Warden will notify the Personnel Responsible from section 8.1 in listed order. STEP 4: The most senior of the Personnel Responsible in section 8.1 that is contacted, will complete the notification required in section 8 if the pollution incident meets the definition in section 3. The remainder of this document is set out to meet the requirements of the legislation. 3. Definition of Pollution Incident A pollution incident means an incident or set of circumstances during or as a consequence of which there is or is likely to be a leak, spill or other escape or deposit of a substance, as a result of which pollution has occurred, is occurring or is likely to occur. It includes an incident or set of circumstances in which a substance has been placed or disposed of on premises, but it does not include an incident or set of circumstances involving only the emission of any noise. A pollution incident is required to be notified if there is a risk of material harm to the environment, which is defined in section 147 of the POEO Act as: a) harm to the environment is material if: i. it involves actual or potential harm to the health or safety of human beings or to ecosystems that is not trivial, or ii. it results in actual or potential loss or property damage of an amount, or amounts in aggregate, exceeding $10,000 (or such other amount as is prescribed by the regulations), and b) Loss, including the reasonable costs and expenses that would be incurred in taking all reasonable and practicable measures to prevent, mitigate or make good harm to the environment. 4. Description and Likelihood of hazards Potential Hazard Release of Cement Products Release of Oils and Flammable Liquids Release of Non Flammable Chemicals Release of Diesel Fuel Release of Liquid Natural Gas (LNG) Release of Contaminated Water Release of Dust Likelihood Page 3 of 7

5. Pre-emptive actions to be taken Cement Products All cement products are stored onsite in silos that have protection from spillage. The silo s are in a location that is ideal for dealing with any spillage. Multiple catchment silt traps are located near the silos in order to catch more than the capacity of each silo. In situations where personnel need to come into contact with cement dust the appropriate PPE is used. Oils and Flammable Liquids There is a quantity of oil products used in each of the manufacturing plants, both plants of which have either a bund area or catchment pit should there be any spill. All other stores of Oils and Flammable liquids are stored in a dedicated hazardous materials shed, located in an area away from most ignition sources. The shed has a bund wall around surrounding it that has the capacity to catch any spill that may occur. Non Flammable Chemicals These are stored in the raw materials and cement storage area behind a bund and covered by an awning. The area has sufficient capacity to catch any spill. Diesel Fuel Diesel fuel is stored in an underground storage tank with the bowser mounted almost directly above it. The bowser is fitted with a stop switch to stop any flow from the nozzle. A main switch to stop the pump is located nearby. The bowser is fitted with a counter to measure the amount of Diesel used from the tank and this enables the tracking of any spillage through leaking. The tank is inspected regularly for leaks as per legislation. Liquid Natural Gas Liquid Natural Gas is supplied via the town supply and piped from the boundary to both manufacturing plants. All appliances onsite have a shut off valve. If an incident was to occur within the site the main line has a shut off valve at the boundary. Contaminated Water All stormwater runoff will be directed to the relevant sediment control or water treatment devices for the site. Most of the rainwater is captured, stored in a dam and used on the site. An extensive recycled water system is setup to treat and reuse any water where possible. Dust Dust mitigation controls include sealed entry and exit roads and a water cart and/or sprinklers to provide dust suppression on unsealed surfaces as required. A road sweeper is scheduled to clean sealed surfaces on a regular basis. Raw materials are stored in material storage bins. Tarps are used to cover raw materials when they are not in use to reduce the chances of wind or water distributing it out of the material storage bins. Each material storage bin has a screen attached to capture windblown material if the bin is uncovered for a period of time. 6. Inventory of Pollutants Pollutant Type Maximum Quantity Location(s) HES Cement Cement Product 60 Tonne Batching Plant Off White Cement Cement Product 60 Tonne Batching Plant Activated Fly Ash (AFA) Cement Product 30 Tonne Batching Plant Tech Dry Block Emulsion Non Flammable Chemical 1000 Litres 2000 Litres Batching Plant Storage Shed Quantec PL - 433 Non Flammable Chemical 3000 Litres Batching Plant Diesel Fuel Diesel 205 Litres Storage Shed 2200 Litres MAX Ultramax 46 Oil/Flammable Liquid 410 Litres 1100 Litres Underground Tank Storage Shed Plant 1 (new) Page 4 of 7

800 Litres Plant 2 (old) Ultramax 68 Oil/Flammable Liquid 205 Litres Storage Shed Waste Oil Oil/Flammable Liquid 800 Litres Storage Shed Waste Oil Filters Oil/Flammable Liquid 205 Litres Storage Shed Unleaded Petrol Oil/Flammable Liquid 60 Litres Storage Shed Transmax M Oil/Flammable Liquid 20 Litres Storage Shed Perfecto T32 Oil/Flammable Liquid 20 Litres Storage Shed Monograde SAE30 Oil/Flammable Liquid 80 Litres Storage Shed Textran Oil/Flammable Liquid 100 Litres Storage Shed Meropa 220 Oil/Flammable Liquid 80 Litres Storage Shed Thuban EP 85w/140 Oil/Flammable Liquid 60 Litres Storage Shed Sigma Fluid Oil/Flammable Liquid 20 Litres Storage Shed Aircol PD 46 Oil/Flammable Liquid 60 Litres Storage Shed LSD SAE 90 Oil/Flammable Liquid 20 Litres Storage Shed Easyshift 75w/90 Oil/Flammable Liquid 20 Litres Storage Shed Waste Hydraulic Oil Oil/Flammable Liquid 40 Litres Storage Shed Delo Gold 15w/40 Oil/Flammable Liquid 410 Litres Storage Shed BIO Mould Release Oil Oil/Flammable Liquid 205 Litres Storage Shed Hydrochloric Acid Non Flammable Chemical 30 Litres Storage Shed Degreasers Non Flammable Chemical 80 Litres Storage Shed Mineral Turpentine Oil/Flammable Liquid 20 Litres Storage Shed Havoline Super 2T Oil/Flammable Liquid 12 Litres Storage Shed Ultra Duty Grease 2 Oil/Flammable Liquid 220 kg Storage Shed Ultra Duty Grease 2 Oil/Flammable Liquid 120 Cartridges Storage Shed Liplex EP2 Oil/Flammable Liquid 55 kg Storage Shed Liplex EP2 Oil/Flammable Liquid 72 Cartridges Storage Shed Thinners Oil/Flammable Liquid 20 Litres Storage Shed Paints Oil/Flammable Liquid 200 Litres Storage Shed Coolant Non Flammable Chemical 300 Litres Storage Shed Castrol Grease Oil/Flammable Liquid 10 kg Storage Shed 7. Safety Equipment and Minimising Risk Spill kits are available in each factory on site to use in case of localised spills. Earthmoving equipment and sands are available onsite to create additional bundying in the event of runoff or a fuel spill. High pressure water is available for dust control and wash-down of cement spillage into silt traps. Silt traps are designed to catch any potential spill event should it not be contained with spill control measures. Safety Data Sheets (SDS) is made available to reference PPE, emergency and 1 st aid procedures for each substance if and when required. All PPE required is readily available. Hazardous material store is accessed only by persons who are knowledgeable on hazardous substance use. Evacuation Procedures and emergency assembly points are provided, training is undertaken by all workers in site induction. 8. Contact Details 8.1. Personnel responsible for the site The following table outlines the personnel responsible for the site Title Name Contact Number Production Manager Allan Baines 0404 038 766 Assistant Production Manager Adam Baines 0414 499 203 Supervisor (also Chief Warden) Koby Cannon 0414 411 187 Page 5 of 7

8.2. Notification of external parties The following table outlines the contact details and correct sequence for notification in the event of a notifiable pollution incident. The personnel responsible will carry out the notifications required by the table below. Emergency Services (if dealing with an emergency) Police Fire Ambulance Environmental Protection Authority Environmental Line 131 555 Ministry of Health NSW 9391 9000 Work Cover NSW 131 050 Wollondilly Shire Council 4677 1100 Fire and Rescue NSW For incidents that are not an emergency NOTE: Phone numbers are current as at the date of this document. 000 1300 729 579 8.3. Communicating with neighbours and local community In the event of a notifiable incident neighbouring properties will be door knocked and/or phoned to communicate the situation. 8.4. Minimising harm to persons on the premises Refer to the Emergency Procedures for the site. At all times minimising harm to persons shall be the priority. 9. Training, Testing and Review Baines Masonry will review the PIRMP annually. Desktop updating of the plan will be carried out at the time of review. Practical testing should be carried out simultaneously with Evacuation Drills in Emergency Response Procedures. All Emergency Wardens will be trained in the PIRMP. A copy of this plan will be given to personnel responsible for the site, the Chief Warden and copies will be kept in the Master and Chief Warden s Emergency Procedures folder. 10. Testing Records Date Carried Out Conducted By Comments/Suggestions 5/7/17 Adam Baines Update document to suit EPA recommendations DOC17/345922 12/9/18 Adam Baines Update document and check contact details 11. Maps See Site and area maps on the following pages. Page 6 of 7