Arkansas State Highway and Transportation Department. Fayetteville Commerce District

Similar documents
Arkansas State Highway and Transportation Department. Bella Vista Rotary Club

Dick Trammel. Senior Democrats of Northwest Arkansas. Chad Adams. Chairman, Arkansas Highway Commission. District 4 Engineer

Arkansas State Highway and Transportation Department. Riverside Rotary Club North Little Rock

Arkansas State Highway and Transportation Department. Hot Springs National Park Rotary Club

Arkansas State Highway and Transportation Department

Arkansas State Highway and Transportation Department. Rotary Club of West Pine Bluff Pine Bluff Country Club

Arkansas State Highway and Transportation Department. Rotary Club of Little Rock Little Rock

Scott E. Bennett, P.E. Director of Highways and Transportation ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT. Fifty for the Future

FNORTHWEST ARKANSAS WESTERN BELTWAY FEASIBILITY STUDY

Arkansas State Highway and Transportation Department

NWARPC Congestion Management Process - January 16, 2014

ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT TABULATION FOR BID NO

ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT CONTRACTS AWARDED FROM THE LETTING OF FEBRUARY 18, 1998

Northwest Arkansas Heritage Trail Plan

ARKANSAS 2003 TRAFFIC CRASH STATISTICS

Current Corridor Characteristics

DULLES AREA HIGHLIGHTS. Gary Garczynski Commonwealth Transportation Board Northern Virginia District. Committee for Dulles August 4, 2016

Scott E. Bennett, P.E. Director of Highways and Transportation. FHWA DFS South Leadership Meeting

2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016

Arkansas Department of Transportation JOB HWY. 49B - HWY. 242S (HELENA - WEST HELENA) (S) FEDERAL AID PROJECT STPC-9200(7)

ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT 2012 ANNUAL REPORT

FAYETTEVILLE, ARKANSAS

2016 FTBA ANNUAL CONFERENCE FDOT WORK PROGRAM OVERVIEW THE RITZ CARLTON ORLANDO, GRANDE LAKES August 4-7, 2016

District Construction Progr am. John R. Kasich, Ohio Governor Jerry Wray, ODOT Director Steve Mary, P.E., District Deputy Director

FHWA Actions on Past Interstate Requests that were approved by the USRN were presented and conditions were lifted. FHWA Approval Date

Selection of a Locally Preferred Alternative for the Interstate 405 Improvement Project Between State Route 55 and Interstate 605.

Independence: overview

Northwest Arkansas Heritage Trail Plan

El Dorado County / Tahoe Roadwork Schedule Sunday through Saturday September 9 September 15, 2012

Major Projects Overview

ANNUAL. Report ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT

Arkansas State Highway and Transportation Department JOB DITCH NO. 43-WEST (S)

Arkansas Tourism Ticker

South of Fraser Transportation Priorities March 2017 Engagement

Project Location. Connects I-10 in Duval County to I-95 in St. John County Four lane limited access toll facility. Jacksonville

Providing public transportation since 1999 between Washington and Milwaukee Counties

The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP).

Arkansas Department of Transportation JOB DITCH AT L.M STR. & APPRS. (S) FEDERAL AID PROJECT NHPP-0074(34)

KDOT announces approved November bids

The US 69 Corridor - Challenges and Opportunities at a Glance

I-94 East Corridor Performance

Presented By: Deputy Executive Director February 17, 2011

DRAFT. Public Meetings November 7, 9, 15, Year UTP Planning Effort Cost/Revenue Matrix FY FY 2026

REPORT TO THE STRATEGIC PLANNING AND DEVELOPMENT COMMITTEE

POLICY COORDINATING COMMITTEE

Experience the environment

ARKANSAS FREE TAX CENTERS in 2017

NDOT MAJOR PROJECTS AND INNOVATIVE DELIVERY 2017 NEVADA TRANSPORTATION CONFERENCE COLE MORTENSEN, PE ASST. CHIEF OF PROJECT MANAGEMENT

MEMORANDUM. FROM: John A. Bishop, AICP, Assistant Director - Transportation. May 22, 2017 Transportation Committee Meeting

APPENDIX A DATA COLLECTION BIBLIOGRAPHY SANTA CLARA COUNTY I-680 CORRIDOR STUDY

FOURTH QUARTER 2017 VOLUME XXV DISCOVER THE FACTS

Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd

City of Grand Island Tuesday, December 12, 2017 Council Session

INVESTMENT SUMMARY. RESIDENTIAL COMMERCIAL ** *

Two townships received top

Project Deliverable 4.1.3d Individual City Report - City of La Verne

6. HIGHWAY MATTERS A. U.S. ROUTE 58 CORRIDOR STUDY

Imperial County Transportation Commission OVERVIEW. March 2015

Sierra Roadwork Schedule Sunday through Saturday, October 1-7, 2017 LONG-TERM PROJECTS

BRISBANE INDUSTRIAL MARKET OVERVIEW API State of the Market Brisbane Industrial 22 nd of March 2018

Hearts of Hope Red Hatters FOR YOUR SAFETY

Construction Update. Local Officials Briefing March 2016

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications

2018 Investment in Infrastructure Expo February 27, 2018 Jason Jonas, P.E. Public Works Director

TEXAS BORDER DISTRICT TRADE TRANSPORTATION ACTIVITIES

Route 29 Solutions Projects

1. Hotel Trends Occupancy Rate

Waco July 8, 2017

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications

Arkansas Department of Transportation JOB BB0406 HWY HWY. 64 (SEL. SECS.) (F) FEDERAL AID PROJECT NHPP-5401(84)2

1.2 Corridor History and Current Characteristics

2014 STATEWIDE COMPREHENSIVE OUTDOOR RECREATION PLAN

THE RICHMOND REGION Transportation Priority Projects

Route 141 and I-44 Design-Build Project Community Involvement Group. March 21, 2016

29 June Eastern Region 15/16 Program Presentation

FORT WORTH DISTRICT. Springtown Area Projects. Loyl C. Bussell, P.E. Acting District Engineer. Thursday, February 8, 2018 Date.

Feb 6 th, 2007 Japan Airlines Corporation

Susan Jones Moses Susan Jones Moses and Associates Glen Weisbrod Economic Development Research Group

Attachment A - FY 2018 Revenue Sharing Program Allocations - Approved

Park System Development Charge Update Investment Plan

VDOT Culpeper District John Lynch, P.E. District Administrator December 12, 2013

ALBERTA CAPITAL REGION Transportation Plan ( )

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications. FY TIP Project Title/Location

NAIOP. Marcia McAllister Metropolitan Washington Airports Authority

Fourth Quarter NEVADA 2013 VOLUME XXI COMMISSION ON TOURISM. A Digest of Statistical Information on the Nevada Tourism Industry.

4. Tuesday, August 19, :00 pm, Human Services Advisory Committee, 800 Exchange St., Conf. Rm. 430

Most people notice when ODOT builds something

CONTACT: Nichole Lawrence CELL: FOR IMMEDIATE RELEASE Wednesday March 28, 2018

RW Bruhn Bridge and Approaches Project

90 I-90 Snoqualmie Pass East September Annual Mega-Project Report. Project Benefits

Media Release For Immediate Release Tuesday, April 17, 2018

2009 Seat Belt Usage Survey

Transportation TRANSPORTATION PROJECTS

Florida Department of TRANSPORTATION. First Coast Expressway

DRAFT FY16 to FY21 RSTP Allocation Recommendations, Recommended by TAC on 3/17/2015

WELCOME! TSPE DFW MID-CITIES. January Chapter Meeting

Airport Planning Area

FRIENDS OF AMERICA S BYWAYS

B. Congestion Trends. Congestion Trends

STRATHCONA COUNTY YELLOWHEAD NORTH ARTERIAL ROAD FUNCTIONAL DESIGN STUDY

Transcription:

Arkansas State Highway and Transportation Department Fayetteville Commerce District Thursday, May 14, 2015

Arkansas Highway & Transportation AHTD Quick Facts 3rd Largest State Agency (3,634 employees) Maintain 16,416 miles of highway and 7,335 bridges Central Offices in Little Rock; 10 Districts Statewide Mission: Provide a safe, efficient, aesthetically pleasing and environmentally sound intermodal transportation system for the user.

Arkansas Highway & Transportation Highway Districts District Headquarters

Arkansas Highway & Transportation Other Programs/Activities State Aid Programs for Cities and Counties Game & Fish Roads State Park Roads Institutional Roads Airport Access Roads Welcome Centers & Rest Areas Arkansas Recreational Trails Transportation Alternatives Program

Arkansas Highway & Transportation Other Programs/Activities Arkansas Commercial Truck Safety and Education Program Historic Bridge Program Adopt-A-Highway Program Litter Hotline Public Transportation Programs Wildflower Program Research Grants to State Universities Scholarships for Engineering Students

Major NW Arkansas Projects Jason Hughey District 4 Construction Engineer Crawford, Franklin, Logan, Polk, Scott, Sebastian, Washington counties

2011 2012

Interstate Rehabilitation Program Complete 16 Under Const. 13 Scheduled 53

Connecting Arkansas Program 0 Complete 3 Under Const. 35 Scheduled

Benton & Washington County Construction Projects Number Cost Complete 195 $380 million Under Construction 33 $280 million Scheduled 103 $659 million Total 331 $1.3 billion 10

Hwy. 72 S.- Hwy. 72 N. Bella Vista Bypass Complete: April 2014 Co. Rd. 34-Missouri Bella Vista Bypass Scheduled: TBD Hwy. 72 North-Co. Rd. 34 Bella Vista Bypass Est. Complete: June, 2015 Hwy. 71B Hwy. 72 S. Bella Vista Bypass Est. Complete: Mid 2016 Hwy.62/102 Hwy. 72 Widening/Interchange Impvts Scheduled: Mid 2016 Hwy. 71 Interchange Bella Vista Bypass Scheduled: TBD Projects Northwest Arkansas New Hope Rd. Hwy. 62/102 Widening (Rogers) Est. Complete: Nov 2015 Hwy.62/102 Interchange Impvts. 8 th St. Widening (Bentonville) Scheduled: Mid 2016 Hwy. 71B Interchange Impvts. Scheduled: Mid 2016 Scheduled Under Construction Complete

Bella Vista Bypass Roundabout Projects Northwest Arkansas

Hwy. 264 New Hope Rd. Widening Scheduled: Mid 2016 Springdale Bypass Hwy. 112 - I-49 Complete: Mid 2020 Wagon Wheel Rd. Hwy. 264 Widening Complete: Oct 2014 Wagon Wheel Rd. Interchange Impvts. Complete: Feb 2015 Hwy. 71B Interchange Impvts. Scheduled: Mid 2016 Hwy. 264 Interchange Impvts. Complete: Mid 2016 Elm Springs Rd. Interchange Impvts. Scheduled: Late 2015 Projects Northwest Arkansas Hwy. 412 Wagon Wheel Rd. Widening Scheduled: Early 2016 Elm Springs Rd. Interchange Temp Signal I-49 (Springdale) Complete: Mid 2015 Scheduled Under Construction Complete

Hwy. 71B Hwy. 412 Widening Scheduled: Mid 2015 Porter Rd. Hwy. 112/71B Widening & Intchng Impvts Scheduled: Mid 2016 Hwy. 16-Porter Road Widening Complete: Mid 2015 Hwy. 62/180 Hwy. 16 Widening Fayetteville Interim Improvements Complete: December 2012 I-540/Don Tyson Pkwy. Interchange (Springdale) Complete: July 2014 Johnson Mill Boulevard Interchange Improvements Complete: October 2014 Hwy. 16/112 Spur Interchange Improvements Scheduled: 2016 I-540/Hwy. 62/180 Interchange Interim Improvements (Fayetteville) Complete: October 2012 Projects Northwest Arkansas Hwy. 62 Interchange Improvements Scheduled: 2016 Scheduled Under Construction Complete

Construction Springdale Bypass Hwy. 112 - I-49 $100 million Complete: Mid 2019 Projects Northwest Arkansas

Hwy. 412 Wagon Wheel Rd Widening $19.2 million Est. Bid: Early 2016 Construction Projects Northwest Arkansas

Construction Hwy. 412 Hwy. 71B Widening 27 million Est. Bid: June 2015 Projects Northwest Arkansas

Proposed 3-Lane Proposed 3-Lane Proposed 4 & 5 Lane (Partial New Location Eastern N-S Corridor Construction Fayetteville-E. Joyce Blvd. Complete Under Construction Scheduled Programmed New Location Existing 4 & 5 Lanes 4 Lanes Under Construction Existing 4 & 5 Lanes

Widen to 4 lanes Armstrong Ave-Stone Bridge Rd. Widen-4 Lanes $6.2 million Est. Complete: Late 2015

Widen to 4 lanes College Ave.- Huntsville Rd. College Ave-Huntsville Rd. Est. Cost: $5.5 million Est. Award Date: TBD Armstrong Ave-Stone Bridge Rd. Widen-4 Lanes $6.2 million Est. Complete: Late 2015

Middle Fork-White River Bridge Bridge Replacement/Widening Est. Cost: $8 million Est. Award: :Late 2015 Middle Fork-White River Bridge

West Fork-White River Bridge Bridge Replacement/Widening $5.2 million Est. Complete: Mid 2015 Armstrong Ave-Stone Bridge Rd. Widen-4 Lanes 6.2 million Est. Complete: Late 2015

White River Bridge Bridge Replacement $3.8 million Est. Complete: Late 2015 Elkins Armstrong Ave-Stone Bridge Rd. Widen-4 Lanes 6.2 million Est. Complete: Late 2015

ity Projects Road Widening 4 & 5 Lanes Widening Armstrong Ave-Stone $2.2 million Bridge Rd. Est. Widen-4 Complete: Lanes Mid 2015 6.2 million Est. Complete: Late 2015

ity Projects Road Widening 4 & 5 Lanes Widening Armstrong Ave-Stone $2.2 million Bridge Rd. Est. Widen-4 Complete: Lanes Mid 2015 6.2 million Est. Complete: Late 2015

Winter Weather Improvements Belly Plows Added to Fleet Snow & Ice Removal Guide

AHTD Funding Concerns Dick Trammel AHTD Commission Chairman

Costs Revenue

Arkansas Travel Trends 2007-2014 Gas & diesel Consumption Gas & diesel Revenue Miles Traveled 2007 2014 Difference 2.095 billion $454 million 32.4 billion 1.980 billion $392 million 33.8 billion 115 million $62 million 1.4 billion

Arkansas Highway & Transportation State General Revenue vs. AHTD Net Highway Revenue Net Highway Revenue

Arkansas Highway & Transportation Challenges $100,000,000 Widening Program $10,000,000 Overlay Program 37 200 15 54 93 94 95 96 97 98 99 00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 93 94 95 96 97 98 99 00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 69 $25,000,000 Bridge Program 26 93 94 95 96 97 98 99 00 01 02 03 04 05 06 07 08 09 10 11 12 13 14

1993 Hwy. Funding Breakdown Fed 36% State 64%

2014 Hwy. Funding Breakdown Fed 56% State 44%

HIGHWAY TRUST FUND

2015 Projects Removed

Ramifications Projects pulled Highway system deterioration Lost economic development Lost jobs Compromised safety Higher operating costs

The Bottom Line Highway funding system is flawed Spending inconsistent with expectations Infrastructure must be a higher priority

@AHTD Litter Hotline 866-811-1222