Part II contains an incomplete collection of appraisal report files received from the Milwaukee County Expressway Commission during 1978 and 1979.

Similar documents
Folder Heading Box # Folder # Annual/ Biennial/ Quadrennial Reports, Milwaukee County Park

Title: Dretzka, Jerome Papers. Reference Code: Mss Inclusive Dates: Quantity: 10 cu. ft. Location: NE, Sh.

PRELIMINARY DRAFT ALTERNATIVE PLAN I RAPID TRANSIT LINES AND STATIONS M I L W A U K E E C O. MILWAUKEE WAUWATOSA WAUKESHA CO.

PROJECTS OBLIGATED FOR FEDERAL HIGHWAY ADMINISTRATION FUNDING IN THE SOUTHEASTERN WISCONSIN REGION: 2016

1.2 Corridor History and Current Characteristics

ORANGE COUNTY TRANSPORTATION AUTHORITY. Go Local Fixed-Guideway Program History and Project Update. PowerPoint 3

District Construction Progr am. John R. Kasich, Ohio Governor Jerry Wray, ODOT Director Steve Mary, P.E., District Deputy Director

Guide to the Las Vegas City Engineering and Planning Department Records

Transportation TRANSPORTATION PROJECTS

A History of the Construction of the Radial Expressway System in Cook County

APPENDIX A DATA COLLECTION BIBLIOGRAPHY SANTA CLARA COUNTY I-680 CORRIDOR STUDY

LANCASTER CORRIDOR REDEVELOPMENT ROSEDALE STREET REDESIGN PEACH STREET RAILROAD CROSSINGS

CITY OF BROOKFIELD Capital Improvement Fund Budget

I-94 East Corridor Performance

DOWNTOWN BRT ALTERNATIVE - 19th AVE

Add-A-Lane Contract V. along a Section of I-95 includes 6 Bridges

Table of Contents. Summary Information... 3 Scope and Content... 4 Arrangement... 4 Administrative Information... 4 Controlled Access Headings...

Community Development Committee

Administration and Projects Committee Meeting STAFF REPORT July 3, 2014 Page 2 of 2 Agreement Consultant Project General Scope CT 107 URS Corporation

Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd

PUBLIC TRANSIT IN KENOSHA, RACINE, AND MILWAUKEE COUNTIES

Public Notice for Waiver of Aeronautical Land-Use Assurance. AGENCY: Federal Aviation Administration (FAA), DOT

IMPLEMENTATION OF COMPREHENSIVE DEVELOPMENT AGREEMENT (CDA) PROJECTS:

CITY COUNCIL AGENDA MEMORANDUM

I-579 Urban Open Space CAP Project. Final Land Development Plan (FLDP) Pittsburgh Department of City Planning

PUBLIC INFORMATION SESSION #2

Memo. Orange City Trail Plan Becky Mendez, AICP Jamie Krzeminski, PE, PTOE Matt Wiesenfeld, PE, AICP. Development of the Existing and Proposed Network

Madison Metro Transit System

25 th Avenue Grade Separation. September 13, 2017

Presented By: Deputy Executive Director February 17, 2011

Sylvan Park Neighborhood Survey, ca. 1983

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts

Philadelphia (Pa.). City Council. Petitions to the Select and Common Councils

Chicago St. Louis High-Speed Rail. Braidwood Construction. Local Officials Briefing August 7, 2014

I-3 DFW Extension Public Hearing. June 2, 2011

REQUEST FOR PLANNING COMMISSION ACTION

APPENDIX K RURAL ENVIRONMENTAL CLEARANCE PROJECTS

TOURISM OFFICE An Inventory of Its Subject Files

David H. Steinberg Papers, ca

BOND PROGRAMS PROJECTS SCHEDULE AND DELIVERY

FY Regional Transportation Improvement Program Basic Project List (All Values in Thousands of Dollars) All costs in current dollars

Main Line System Recommendations

2017: The Year of Corporate Investment

Construction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013

RAILROAD AND WAREHOUSE COMMISSION An Inventory of Its Chief Engineer s Case Files

METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN Phone (651) TDD (651)

The Dulles Loop. Route 606. Route 28. Route 50

ACADIA PLANTATION RECORDS (Mss 4906) Appendix E Oversized materials from Series V. Maps, Plats, and Photographs Location: Room B6-OS:A

DULLES AREA HIGHLIGHTS. Gary Garczynski Commonwealth Transportation Board Northern Virginia District. Committee for Dulles August 4, 2016

I-75 in Hamilton County Project Termini

Folder 7 Folder Title Description (including date) Date Richard C. Proposed Humble & Pan AM Thibodaux meter Dec. 5, 1958

Finding aid for the Charles Merrill photo collection Collection 070

Connectivity is the new currency. -Mayor Pete Buttigieg, South Bend

Minutes of the Third Meeting THE WASHINGTON COUNTY TRANSIT DEVELOPMENT PLAN ADVISORY COMMITTEE

ISGS Data/Information for The Boring Company - Chicago Project

FNORTHWEST ARKANSAS WESTERN BELTWAY FEASIBILITY STUDY

NDOT MAJOR PROJECTS AND INNOVATIVE DELIVERY 2017 NEVADA TRANSPORTATION CONFERENCE COLE MORTENSEN, PE ASST. CHIEF OF PROJECT MANAGEMENT

25 th Avenue Grade Separation. December 13, 2017

Finding Aid to the Bullion and Exchange Bank Records, No online items

CHAPTER FOUR RECOMMENDED NOISE COMPATIBILITY PROGRAM MEASURES

Finding aid for the Charles W. Darling photographs Collection 184

TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS

New Jersey Department of Transportation

THE RICHMOND REGION Transportation Priority Projects

John Dennison fonds. Original inventory (1985, 1998) Revised by Erwin Wodarczak (2004) University of British Columbia Archives

STAGE 2 & 3 Pavement reconstruction within viaduct footprint, pavement widening and resurfacing N/S of viaduct footprint, sidewalk

Date State County Project Description Joint Size NY Kings Shore (Belt) Parkway Bridge over Mill Basin D-160 & 320

Guide to MS 28. City of Phoenix Transportation Records, Bulk Dates linear feet, 6 inches. Prepared by Lisa Gezelter June 1998

VISTA AZUL- APPROVED 20 LOT TENTATIVE MAP

Additional Economic Development Strategy submissions- Klickitat County

Route 29 Solutions Projects

National Register of Historic Places Multiple Property Documentation Form

CITY OF COACHELLA CAPITAL IMPROVEMENT PROGRAM TOTAL PROJECTS REVENUE SUMMARY TABLE ES-1

ZOO INTERCHANGE PROJECT GET AROUND GUIDE

Dulles Corridor Metrorail Project Update Dulles Area Transportation Association August 25, 2009

FINDING AID TO GORDON M. ANDERSON ESTATE PAPERS

DHS Consolidation at St. Elizabeths Master Plan Amendment. Transportation Interstate 295 / Malcolm X Avenue Interchange

Section 106 Update Memo #1 Attachment D. Traffic Diversion & APE Expansion Methodology & Maps

IRONTON-RUSSELL BRIDGE REPLACEMENT

Corridor Management Committee Meeting. April 2, 2014

APPENDIX C TRANSPORTATION PLANNING DOCUMENTS

METRO Orange Line Update Metro Transit, BRT/Small Starts Projects Christina Morrison & Natalie Westberg Transportation Committee July 10, 2017

MEMORANDUM. Honorable Mayor and City Councilmembers William S. Joynes, Sr., City Administrator

MINUTES SOUTHEASTERN WISCONSIN REGIONAL PLANNING COMMISSION PLANNING AND RESEARCH COMMITTEE MEETING. Tuesday, August 1, 2017

Lincoln Village Pedestrian Bicycle Bridge Community Meeting September 13th, 2016

PFC Quarterly Status Report September 30, 2016

Finding Aid for the Monrovia (California) Records, No online items

State Auditor's Office Local Government Services 1. Worksheet Budget Monitoring File Tab

Section II. Planning & Public Process Planning for the Baker/Carver Regional Trail began in 2010 as a City of Minnetrista initiative.

TRAFFIC COMMISSION, VILLAGE OF LINCOLNWOOD 6900 N. Lincoln Avenue, Lincolnwood, IL 60712

GO 10 is planning to switch I 10 Eastbound traffic lanes after Sunland Park. The switch is set for Sunday, April 2. Details continue to develop.

CITY OF PALMDALE. REPORT to the Mayor and Members of the City Council from the City Manager

For Immediate Release Christine Girardin January 19, 2018 SUMTER COUNTY FLORIDA S TURNPIKE AND I-75 INTERCHANGE IMPROVEMENTS

EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015

Gulf Coast MPO Obligated Projects

FY TIP Fiscal Constraint 2017 Total Commitments. agencies (the Michigan Department of programmed in the Kalamazoo Area

2 ROADS CAPITAL CONSTRUCTION PROGRAM UPDATE

Evaluation of Significant Transportation Projects in Northern Virginia Transportation District

Mission Statement. Spur 601 Project Highlights

SECTION 106 ACTIVITIES ANNUAL REPORT

Transcription:

Title: Milwaukee County Expressway Commission Reference Code: Mss-2002 Inclusive Dates: 946-980 Bulk: 70.8 cu. ft. total Location: WHW, Sh. CL60A-CL7 (52.5 cu. ft.) GV, Sh. 52 (7.8 cu. ft.) LM, Sh. 88-89 (4.8 cu. ft.) HH, Sh. 023-024 (3.4 cu. ft.) MV, F9 and F35 (.0 cu. ft.) LS, Sh. 077 (.3 cu. ft.) OS SM M ( item) Abstract: The Milwaukee County Department of Public Works provided staff and services for the Milwaukee County Expressway Commission during its 26 years of existence (953-980). Scope and Content: The collection consists of preliminary plans, progress reports, various traffic surveys and studies for the Milwaukee metropolitan area, as well as studies, surveys, and reports specific to sections of the county freeway system, including Lake, Park, Stadium, Bay, and Belt Freeways and their interchanges, extensions, and bridges. Part I of this finding aid consists of plans, progress reports, surveys, and studies prepared for or about the Metropolitan Milwaukee area freeway system. There are also photos and slides taken during the freeway construction. Part II contains an incomplete collection of appraisal report files received from the Milwaukee County Expressway Commission during 978 and 979. Part III deals with unprocessed project numbered boxes received from the Milwaukee County Department of Public Works. Notes: Collection added to by Steve Daily, May 2, 996, and updated by Kevin Abing, June 9, 999 & August 3, 2002 Arrangement: Folder Heading Box # Divider # NOTE: Boxes 4 located at LM, Sh. 88-89 PRELIMINARY PLANS 946-52 - Origin-Destination Traffic Study Milwaukee Metropolitan Area 946 - Major Trafficways Milwaukee Metropolitan Area 949 ANNUAL REPORTS 953-78 2

- MCEC First Annual Report 954 - Milwaukee County Department of Public Works 955 Report - MCEC Second Annual Report 955 - MCEC Third Annual Report 956 - MCEC Fourth Annual Report 957 - MCEC Annual Report 958 - MCEC Interim Progress Report //58-3/3/58 - MCEC Interim Report on Proposed Extensions of Expressway System - MCEC Annual Report 959 - MCEC Downtown Expressways Supplementary Report 959 - MCEC Annual Report 960 - MCEC Annual Report 96 - MCEC Quarterly Report 4//6-6/30/6 - MCEC Annual Report 962 - Report to Legislative Committee MCE System Progress - MCEC 0th Annual Report 963 - MCEC Annual Report 964 - MCEC Annual Report 965 - MCEC Annual Report 966 - MCEC Annual Report 967 - MCEC Annual Report 968 - MCEC Annual Report 969 - MCEC Annual Report 970 - MCEC Annual Report 97 - MCEC Annual Report 972 - MCEC 20 th Annual Report 973 - MCEC Annual Report 974 - MCEC Annual Report 975 - MCEC Annual Report 976 - MCEC Annual Report 977 - MCEC 25 th Anniversary Annual Report 978 - MCEC 26 th Annual Report 979 GENERAL TRAFFIC ANALYSIS - MCEC Traffic Analysis July 957 - MCEC Interstate Distribution Loop Study December 962 - MCEC 990 Milwaukee Freeway Traffic Analysis June 965 AIRPORT SPUR - Airport Spur Location Study Report June 20 969 - Noise Impact Study of the Airport Spur Vol. I - Air Terminal 977 Traffic Forecast. April 968 LAKE FREEWAY AND SOUTHERLY EXTENSION - MCEC Lake Front Expressway March 963 - MCEC Lake Freeway Southerly Extension Location Report October 966 - Lake Freeway Boring Logs 3 4 5

- MCEC Station 25+00 to Station 6+50 Preliminary Plan - MCEC Station 25+00 to Station 08+85 Preliminary Design Report 967 - Report on Proposed Use of Low Level Lighting on the Lake Freeway - Special Study For Embankment at E. Lincoln Ave to S. Conway St - Supplement to Study For Embankment at E. Lincoln Ave to S. Conway St - MCEC Lake Freeway Layton Ave to Kinnickinnic Ave - Federal Highway Administration Lake Freeway Evaluation Study 972 - MCEC E. Holt Ave to E. Iron St Master Plans December 969 LAKE FREEWAY AND SOUTHERLY EXTENSION (CONTINUED) - MCEC Site Investigation Report Carferry Drive Overpass - MCEC Architectural and Environmental Concerns January 973 - Railroad Alternate Preliminary Soils Investigation - Railroad Alternative Plans and Environment Assessment Report - Preliminary Environmental Impact Analysis Railroad Alternatives II - Economic Impact Study Addenda for Railroad Alternate Phase - Lakefront Expressway Clippings - The Lake Freeway Plan: An Interstate Connection to the Port of Milwaukee, July 965 WAR MEMORIAL AREA - Master Plans - War Memorial Bridge Preliminary Plans HOAN (HARBOR) BRIDGE - Boring Logs Milwaukee Harbor Bridge - Drainage System Plan - Study of Low-Level Lighting - Supplemental Report A Study of Low-Level Lighting - Test Pile Driving and Loading Program - Study of Illumination - Port Facilities Interface Study - (Article) Civil Engineering - Daniel Webster Hoan Memorial Bridge LAKE INTERCHANGE - Master Plans - High Mast Lighting System ISLAND INTERCHANGE - Iron Street to Harbor Bridge - Station 25+00 to Station 08+85 Supplemental JUNEAU INTERCHANGE - Master Plan - Roadway Soils Report A 5 2 2 2 2 3 2 4 2 5

- Alternative Retaining Walls Treatments - Study of Lighting Systems LAKE AND PARK FREEWAY - Study Plans October 965 - Preliminary Plans April 966 - Preliminary Plans Traffic Analysis - Federal Highway Administration Draft Environmental/Section 4 (f) Statement - Alternative Preliminary Plans and Environmental Impact Statement - Historical Site Eligibility Study - Public Hearing, April 976 PARK FREEWAY AND NORTH BELT - North Ave and North Belt Location Report June 958 - North Belt Expressway 4th-6th Streets Interchange Preliminary Design Report - Specifications and Contract Documents For Subsurface Exploration & Soil Testing - 2th St to 5st St Study Plans - 2th St to Sherman Blvd Preliminary Plans September 966-2th St to Sherman Blvd Preliminary Plans July 967 PARK FREEWAY AND NORTH BELT (contd.) - 2th St to Sherman Blvd Roadway Soil Survey Report - WI Dept of Transportation Draft Environmental Statement Administrative Action - 4 th St to Prospect Ave - Jackson to Prospect Revised Master Plan - Report of Preliminary Subsurface Exploration and Soil Testing, 965 MARQUETTE INTERCHANGE - Central Interchanges and Approaches Preliminary Design Report June 957 - Milwaukee's Downtown Freeway Loop - A Study of Land Use and Planting Concepts - Dedication STADIUM FREEWAY - Study Plan Report October 966 - UW Dept Landscape Architecture-Environment Awareness Center - Soil Borings and Soil Properties Greendale Interchange to Stadium Interchange - Special Report Establishing a Route Location between Dean Road and County Line Road - Study 970 - Bikeway Study For Stadium Freeway and Electric Co Lands 2 6 2 7 3 3 2 3 3

- Location Study Report, 97 - Review of 35th St Route - Summary Report Economic Impact of Proposed Stadium Freeway Northerly Extension on Milwaukee County - Federal Highway Administration Draft Environmental/Section 4(f) Statement Administrative Action - Federal Highway Administration Final Environmental/Section 4(f) Statement Administrative Action - South Demapping Study - Federal Highway Administration Draft Environmental Impact Statement, 97 - Economic Impact of Proposed Stadium Freeway Northerly Extension on Milwaukee County Wisconsin, 97 NOTE: Boxes 4 4D Located at GV, Sh. 052 BAY AND STADIUM FREEWAY - Route Location Study - SEWRPC Areawide Planning Considerations Involved in the Location of the Proposed Stadium and Bay Freeways - MCEC Route Location Study Interim Report July 969 - Bay Freeway Mill Rd Corridor Route Location Study Status Report January 97 ARTERIES - W. Mill Rd RR Grade Separation Analysis, Quantities & Cost Estimates - Arterial Street Maps 963 - Federal Highway Administration Draft Environmental Impact Statement East Locust St. - North-South Expressway South Sixth Street Route. November 956 MISCELLANEOUS - Miscellaneous folder - Interstate Connection to Port of Milwaukee 963 - Belt Freeway Location Report December 969 - Preliminary Notes Multiple Use Corridor Study East-West Freeway - MCEC Downtown Expressways Supplementary Report, 959 - MCEC Design Criteria for Milwaukee County Freeways, 956 - MCEC Design Criteria for Milwaukee County Freeways, 958 - MCEC Design Criteria for Milwaukee County Freeways, 969 - City Plan Commission Milwaukee Wisconsin Master Plan, 970-990 - Department of City Development and Department of Public Works, City of Milwaukee Planning Guide for the Urban Highway and Street System, ca. 960 - Operating System Map fall, 963 4 4 2 4 3

- Papers: Wisconsin Highway Conference 964-978 (not inclusive) - New Directions in Transportation Planning for the Milwaukee Area, 977 - Silver Spring Extension-MC624 958. Request for information - Request for bus service-city of Glendale 953 - Staff Memorandum: Southeastern Wisconsin Regional Planning Commission- Area Wide Planning Considerations Involved in the Location of the Proposed Stadium and Bay Freeways. April, 969 - Southeastern Wisconsin Regional Planning Commission: Land Use Transportation Study- Forecast and Alternative Plans 990, Volume Two. June, 966 Road Record Book File 8-C-7 4 4 Binder: Expressway Project Directory 4 Loose TRANSPORTATION DIVISION (FINANCIAL MATERIAL) Project # - East-West X-way - #00 80- Bills Paid - #002 (Right of Way) - #003 UI5725 (4) - #004 Bills Paid - #005 Bills Paid - #008 Project T-5725 (4) 80(8) - 80(6) Proj. IN94-4(4)307 Old No. UI5725(7) 006-80-8 Bills Paid - 009 80(9) Bills Paid - 04-80-02-06-07-08 - 09-020-02-022 - 026-027-028-03-032 80-(26) Proj. IN94-4(6)308-034-039 80-(34) Proj. I-94-4(24)306-80-(35) I94-4(30)308 R.O.W. 7 th to 3 th 035-036-037-038 - 04-042-040 Thru 050-034-039 Project #2 - North-West X-way - 0202 (Right of Way Expenditures) - 0202 R.O.W. Expenditures Billed to State - U03-(53) 0203 (Recapitulation 957-959) - 0204-0205 - 802-(6) 0206 - U-03-(58) 0207-0208-0209 020-02 - 022-023-024-025-026-027-028-029-0220 4A 4A 4A 2

- 0299 Project #3 - North-South X-way - 0302 #2 thru 959-803- 030-0303-0304-0305-0306 - U-077-(3) 0302-0307-0308-0309-030-03 - 032-033-034-035-036-037 - 0397-0398-0399 Project #4 - East-West X-way - 0403 I94-4(25) - 804-3 0403 Bills Paid - 804-4 0404 Bills Paid - 804-4 Auction - Receipts from Sale of Buildings, 952-965 - Auctions, 957-96 - Auctions, 962-963 - Auctions, 964-968 - Performance Bond Receipts, 954-967 4A 3 4A 4 4A 5 TRANSPORTATION DIVISION (FINANCIAL/DUMPSITE 4B RECORDS) Incidental Labor Costs-Expressways, 963-975 4B Incidental Labor Costs-Highways, 963-975 4B 2 Weekly Dump Reports, 966-97 4B 3 Weekly Dump Reports, 972-975 4B 4 Weekly Landfill Load Reports, 976-978 4B 5 Reconciliation Dumpsite Revenue, 978 4B 6 Weekly Landfill Load Report, 979 4B 7 Dumpsite, 979 4B 8 Landfill - Reconciliation, 2/3/79 4B 9 TRANSPORTATION DIVISION (DUMPSITE RECORDS) 4C Weekly Landfill Load Reports, Jan.-June 980 4C Weekly Landfill Reports, June 30-Dec. 3, 980 4C 2 Dumpsite Report & Reconciliation, 980 4C 3 Weekly Landfill Reports, 98 4C 4 Dumpsite, //98 thru 6/5/98 4C 5 Dumpsite - June 8, 98 4C 6 Dumpsite Report & Reconciliation, 98 4C 7 Dump Loads & Revenue, 973-98 4C 8 Dump Site, 982 4C 9 TRANSPORTATION DIVISION (FINANCIAL RECORDS) 4D

Project I-94-4(27)305 0405-804-5 Bills Paid (right of way) - 0405 I94-4(27) (Reconciliation, 2/3/66) - 0406 I94-4(4)30 (Reconciliation, 2/3/65) - I-94-4(4)30-04 (Reconciliation 2/3/66) - 044-045-046-047-048-049 (Letters from State for Payment Issued) - 0420-042-0422-0423-0424-0425 (Letters from State for Payment Issued) - 0426-0427-0428-0429-0430 (Federal Aid Reimbursement to County) - 043-0432-0433 (Letters Regarding Request for County Share for Project from the State) - 804-() Project I-94-4()30 804-(2) (Reconciliation, 957) - 804-2 (Right of Way & Reconciliation, 2/3/66) - 0407 (Reconciliation with Current Billing Report) - 0408-0409-040-042-043 (Letter Regarding County Share of Money for the Project) - 0497-0499 (Reconciliation, 2/3/60) - 04-050 (Right of Way) Project I-894-7()303 050-805-2 0502 (Reconciliation, 2/3/66) - Paid Bills 0504-0504 (Reconciliation, 2/3/66) Project I-894-7(3)303 0505-805-5 (Construction & Right of Way Expenditures) - 0506-0507-0508-0509-050 (Letters from State for Payment Issued to County) - 05-052-053-054-056-057 - 806- (Parcel Listing of Land Acquisition/Construction & Right of Way Expenditures) - 0602-0603-0604-0605-0606 (Reconciliation) - 0607-0608-0609-060-06-062 (Reconciliation, 2/3/60) - 063 (Letter Stating the Breakdown Cost of Project T-03- (73) of both the State and County Share) - 0696-0697-0698-0699 (Certificate for Payment) Project I-94-5(4)30 070-07 (Detailed Statement of Expenditures) - 807-2 - 0703 (Reconciliation, 2/3/66) - 0704 (Detailed Statement of Expenditures) - 0705-0706-0707-0708-0709-070 (Reconciliation, 2/3/66) - 074 (Detailed Statement of Expenditures) - 075-076-077-078-079-0720 - 072-0722-0723-0724-0725 (Letters re: Bids Approved) - 0726-0727-0728-0729-0730-0599 (Reconciliation, 2/3/60) 4D 4D 2 4D 3 4D 4

- 060 (Holding) - 0903 (Billed but Holding) Project U-027-(29) 40 4D 5-40 (Appraisals) Project U-077-(37) 403 4D 6 Project U-077-(36) 404 4D 7-405 (Appraisals - Titles) Project U-077-(28) 006 4D 8-007-008-009-0 (Federal Aid Reimbursement to County) Project U-027-(27) 00 4D 9-02-03-04-05-06-07-08 (Federal Aid Reimbursement to County) - 097-098-099 (Reconciliation, 2/3/6) Project T-03-(57) 0 4D 0-0 (Reconciliation, 2/3/65) - 0-03-04-05-06-07-08 Project I-794-8(3)30 203 4D Project U-027-(30) 30 4D 2-30 (Appraisals & Titles) Project U-027-(29) 40 4D 3 Project U-077-(37) 403 4D 4-403 (Construction & Right-of-way Expenditures) Project U-077-(36) 404 4D 5-405 (Construction & Right-of-way Expenditures) Project U-03-(02) 50 4D 6-50 (Construction & Right-of-way Expenditures) - 50 (Appraisals & Titles) - 227 (Construction & Right-of-way Expenditures) - Future Use NS-R7 900 - NB-R-7 9007 North Branch Future Use - Future Use EW-R7-9009 (Parcel Listing of Land Acquisition) - 890-900-90-8999-9099 (January Expenditures) Project I-894-7(2)306 080 4D 7-808- (Construction & Right-of-way Expenditures) - Paid Bills - 0803-0804 - 0808-0809-080-08-082-083-084-085-086-087 (Federal Aid Reimbursement to County) - 088-089-0820-082 - 0803-0804-0805-0806 (Reconciliation, 2/3/66) Project I-94-4(46)308 090 090 (Construction & Right-of-way Expenditures) (0) (Detailed Statement of Expenditures) 090 (Billed & Holding) 0902 (Reconciliation, 2/3/66) 4D 8

Project U-077-(8) 0903 4D 9 Project U-06-(36) 0904 4D 20 Project U-077-(27) 0906 4D 2-0905-7-8-9-0--2-3 (Reconciliation, 2/3/66) - 094-095-096-097-098-099-0920 (Federal Aid Reimbursement to County) - 092-0922-0923-0924-0925-0926 (Federal Aid Reimbursement to County) - 0927-0928-0929-0930-093-0932 - 0933-0934-0935-0936-0937-0938-0939-0940-094-0942-0943-0944-0945-0946-0947-0948-0949-0950 - 0997-0998-0999.00,.00T Journal Transfer Detail, Org. Unit 226-Advance Row to Active Projects - Job Nos. 9002 & 9008 003 (Reconciliation, 2/3/6) 002 (Detailed Statement of Expenditures) 006-00 (Right-of-way Expenditures) Paid Bills 004 Journal Transfer Detail, Org. Unit 226, 2/3/66 Right-of-way Future Use Journal Transfer Detail, Org. Unit 226, 2/3/66 Journal Transfer Detail, Org. Unit 226, 2/3/66 4D 22 RELOCATION AND ACQUISITION FILES (52.5 cu. ft.): WHW, CL60A-CL7 (See Expressway Database in Z: Research Data Databases Other Databases) OVERSIZE ITEMS MCE System General Plan February 955 (2 copies) Central Interchange and Approaches Summary of Preliminary Design Studies 958 Multiple Use Opportunities For the East-West Freeway I-794 District 2 Freeway & State Trunk Highways Maintenance Jurisdiction Maps Milwaukee County 968 MCEC Milwaukee Harbor Bridge Type Study Report Sept. 965 (2 copies) Packet of Freeway opening dates and Freeway mileage maps, 955-976 Award of excellence from Milwaukee Art Commission for highway bridge at Wood, Wisconsin, n.d. Blueprint. Guardrail Construction Details, 959 Blueprint. Design Criteria for Typical Bridge Roadway Sections, 962 Blueprint. Design Criteria for Typical Access Ramp Details, 963 Blueprint. Park East Freeway, Grading & Drainage, Water-Milwaukee LOCATION MV, F35 MV, F35 MV, F35 MV, F35 MV, F35 MV, F35 OS SM M OS XX LG M OS SM M OS LG M OS XX LG M

Streets. 968 Blueprint. Proposed Parking Lot plan on N Water Street OS XX LG M PHOTOS EXPRESSWAY PHOTOS IN MV, F9 File # Aerial Views MV, F9 Construction of Hillside Interchange North-South Expressway Aerial Views of Construction MV, F9 2 Civic Center and Courthouse Aerial Views - Milwaukee Harbor MV, F9 3 Milwaukee Harbor Bridge MV, F9 4 Artist Drawings Aerial Views - Misc. MV, F9 5 Construction - 2 folders A & B MV, F9 6 Central Interchange MV, F9 7 East-West Freeway MV, F9 8 Fond du Lac Expressway Highway 4 MV, F9 9 Menomonee Valley - Misc. MV, F9 0 Mitchell Airport MV, F9 Airport Construction Spur - Aerial View Stadium Expressway - Misc. Photos MV, F9 2 Misc. Photos MV, F9 3 Zoo Interchange County Line I-94 S. 76 th Project SU0344(9) W. Forest Home Ave.-Oklahoma Ave. Sec. MV, F9 4 EXPRESSWAY PHOTOS:.4 cu. ft. (LM, Sh.88-89) Box File Misc. Grandville Interchange Models of Layton School of Art Various Misc. Photosw Lake Freeway Lake Freeway Construction (Hoan Bridge) Aerial Views - Hoan Bridge Lakefront Aerial Views Hoan Bridge Dedication Artist Drawings Models - Hoan Bridge Model Park Freeway Aerial Views Model Plans and Artist Drawings North - South Freeways Hillside Interchange Civic Center and Courthouse - Artist Models and Drawings Aerial Views

Aerial Views and Construction Courthouse and Civic Center Construction East - West Freeway Aerial Views Parking Structure Construction Misc. Stadium Freeway Misc. and Model of Proposed Expressway Construction - Artist Drawings Cemetery Bridge Stadium Aerial and Construction Zoo Expressway Construction - Interchange - Misc. I-94/County Line Misc. Marquette Interchange (Central Interchange) Misc. Expressway Opening Construction Aerial Views Menomonee Valley Mitchell Interchange Airport Freeway Misc. Photos Mitchell Fond du Lac Freeway Fond du Lac Expressway Construction - Misc. 2 Aerial Views - Misc. Various Misc. Photos & Negatives Printed Material Outside of Milwaukee, Wisconsin EXPRESSWAY PHOTOS: 3.4 cu. ft. (HH, Sh. 023-024) Box File Aerial Shots 3 Airport 3 2 Beloit Rd West / S 92 nd to Oklahoma 3 3 Beloit Rd West / S 95 th to Oklahoma 3 4 Beloit Rd West / Hwy 00 to Expressway 3 5 Brown Deer Rd/ Granville/ RR Crossings 3 6 Brust Ave 3 7 Burnham at 43 rd 3 8 Burleigh Street 3 9 Chicago & Northwestern R.R. 3 0 College Ave East / General 3 College Ave East of Howell 3 2 College Ave East / Pennsylvania to Packard 3 3

College Ave East at Pine 3 4 College Ave (Lowering at Van Beck property) 3 5 College Ave West/ North Shore Line East of 6 th Street 3 6 College Ave West /20 th to 27 th 3 7 College Ave West / 27 th and Loomis 3 8 County Line Rd at Silver Spring (24 th Street) 3 9 Court House (Safety Bldg Area) 3 20 Displays and Public Meetings (slides) 3 2 Displays and Public Meetings 3 22 East West R.O.W. / 5 th to 7 th 3 23 East West R.O.W. / 7 th to 25 th 3 24 East West R.O.W. / 25 th to 27 th 3 25 East West R.O.W. / 28 th to 35 th 3 26 East West R.O.W. / 43 rd to 76 th 3 27 East West R.O.W. / at Geuder, Paschke & Frey 3 28 East West R.O.W. / at Red Star Yeast 3 29 East West R.O.W. / Stadium 3 30 East West R.O.W. / at WEPCO 3 3 East West R.O.W. / Utility relocation 3 32 East West R.O.W. / Valley Overpass 3 33 East West R.O.W. / West line of V.A. 3 34 East West R.O.W. / at County Line 3 35 Equipment 3 36 Expressways not Milwaukee 3 37 Fire / 908 N th Street/ 8 Mar 960 3 38 Flooding 3 39 Fond du Lac Ave St H. 45 / at US 4 45 3 40 Good Hope Rd / 43 rd to 76 th 3 4 Good Hope Rd / 76 th to 07 th 3 42 Good Hope Rd / Green Bay Ave Port Washington Rd 3 43 Good Hope Rd / General 4 44 Good Hope Rd / 800 W to 4200 W 4 45 Good Hope Rd / St John s Evangelical Lutheran at 38 th 4 46 Good Hope Rd / at Bender Rd 4 47 Good Hope Rd / at Green Tree 4 48 Good Hope Rd / at Kletzsch Park 4 49 Good Hope Rd / at Pierron Rd 4 50 Good Hope Rd / at Range Line Rd 4 5 Good Hope Rd / at Teutonia 4 52 Grange Ave / at Howell (St H. 38) 4 53 Granville Rd 4 54 Green Bay Rd 4 55 Hale Interchange 4 56 Hampton Rd / at Lincoln Creek 4 57 Hampton Rd / at 24 th Street 4 58

Highway 4 / at Racine County Line 4 59 Highway 4 / Mill Rd to Good Hope 4 60 Highway 00 4 6 Highway 75 4 62 Hillside Interchange from Schuster s (253 N 3 rd ) 4 63 Hoan Bridge / Negatives and some prints 4 64 Hoan Bridge / Slides 4 65 Hoan Bridge / Prints 4 66 Home & Garden Show / 962 4 67 Hopkins / at Green Bay 4 68 Hopkins Rd (General) 4 69 Hopkins Rd / at Bradley 4 70 Honey Creek Parkway 4 7 I-43 North 4 72 I-43 South 4 73 I-794 Lake Parkway 4 74 I-894 4 74A Juneau Park 4 75 Kilbourn / Civic Center 4 76 Kinnickinnic Ave 4 77 Layton Ave (General) 4 78 Layton Ave East / at C&NW RR Bridge 4 79 Layton Ave West / Culverts Hwy 36 to Hwy 00 4 80 Layton Ave West / at Loomis 4 8 Lincoln Memorial Dr 4 8A Lincoln Park 4 8B Loomis Rd / at 5 st St 4 82 Loomis Rd / Sanitary Landfill at 76 th 4 83 Marquette (Central Interchange) / at 0 th & St. Paul 4 84 Marquette (Central Interchange) / at 9 th & Wisconsin (YMCA) 4 85 Marquette (Central Interchange) / at 0 th & Wisconsin 4 86 MATC 4 87 Miller Parkway 4 88 North-South Expressway 5 89 North Ave 5 90 Old Smokey 5 9 Oklahoma Ave / 99 th to 08 th 5 92 Park and Ride Lots 5 93 Park East / Parcel 279 Apartment Move 5 94 Park East (General) 5 95 Photo Information 5 96 Project ID photos 5 97 Property Auctions 5 98 Proposed Freeways (Photos & Negs) 5 99 Proposed Freeways (slides) 5 00

Rawson Ave 5 0 Ryan Rd / at 68 th Street 5 02 Snow Removal 5 03 Staff Photos 5 04 Story Parkway Overpass 5 05 Zoo Freeway 5 06 Zoo Model 5 07 Miscellaneous Mystery Negatives 5 08 Miscellaneous Mystery Photos 5 09 Miscellaneous Mystery Photos 5 0 Box # Env. # Capitol Drive/Glendale Ave. Bridge 6 East-West Freeway 6 2 East-West Freeway: 25 th St. Bridge/Retaining Walls Red Star Yeast 6 3 Bridge Construction Milwaukee RR (Hampton & Port Rd?) 6 4 Chicago & Northwestern Railroad (Lexington Blvd & Keefe Ave.) 6 5 North to South Overpass & East to South Overpass (Menomonee Valley) 6 6 East to West Overpass (Near County Stadium) 6 7 State Street Bridge 6 8 W. Washington Boulevard Underpass 6 9 Vliet Street Underpass 6 0 Construction, Bluemound Road Relocation 6 Right-of-Way, Hawley Rd 44 th St. Section 6 2 Stadium Interchange 6 3 East-West Freeway: N. Story Parkway to N. 35 th /35 th St. Bridge 6 4 Stadium Freeway and Stadium Interchange 6 5 Relocation & Alter Utilities (S. Hawley to N. 3 th Street) 6 6 Milwaukee River Bridges 6 7 Wells Street Bridge/Underpass 6 8 Wisconsin Avenue Bridge & Underpass 6 9 Right-of-Way, Wisconsin Ave. to Garfield (moving Goethe-Schiller 6 20 Statue) Construction, State Street to Lloyd Street 6 2 Stadium Interchange to Menomonee River 6 22 Story Parkway Overpass 6 23 C.M. & St. Paul RR Overpass 6 24 Schlinger Avenue Overpass 6 25 Infrastructure near Zoo Interchange 6 26 East-West Freeway: Paving & Grading, N. 6 th to N. 35 th 6 27 SEE ALSO: Questionable Identified Streets River Scenes LOCATION MV, M-22

Courthouse Aerial Views Stadium Area Unidentified Streets MV, M-23 Slides - Library stacks Sh. 77 - Unprocessed 4 boxes of Milwaukee County expressway slides