DEVELOPMENT OF ROAD INFRASTRUCTURE BY NHIDCL 25 t h MAY, 2018
NATIONAL HIGHWAYS & INFRASTRUCTURE DEVEOPMENT CORPORATION LTD. FAST PACE CONSTRUCTION OF NATIONAL HIGHWAYS AND OTHER INFRASTRUCTURE IN NE REGION AND STRATEGIC AREAS CONSOLIDATE SOUTH SOUTH EAST ASIA LINKS AND TRADE
BASIC FACTS INCORPORATED ON 18.7.2014 AUTHORISED CAPITAL RS. 100 CR. PAID UP CAPITAL RS. 1 CR. FUNCTIONAL ON 01.01.2015
PROJECTS OVERVIEW AS ON DATE, NHIDCL ENTRUSTED WITH 271 PROJECTS IN 13 STATES & NEPAL (INCLUDING INTERNATIONAL ROAD CONNECTIVITY, BORDER ROAD AND NER ECONOMIC CORRIDOR) COVERING 13075 KM COSTING RS 2,13,015 CR WHICH ARE AT VARIOUS STAGES OF PROJECT DEVELOPMENT (CONSTRUCTION, DPRS, LA AND OTHER CLEARANCES)
In Nepal, NHIDCL is undertaking PMC works of 14 Packages. Work is in Progress. S.No 1 2 State Andaman & Nicobar Island Arunachal Pradesh Civil works (Roads & Bridges ) Length (in Km ) OVERVIEW OF ALL NHIDCL PROJECTS [01.05.2018] Tunnel civil work Cost Length (Rs in Cr) (in Km ) Cost (Rs in Cr) Rehabilitation work under NH(O) Length (in Km ) Cost (Rs in Cr) Total Civil works in progress Length (in Km ) Cost (Rs in Cr) Tunnel DPR work Length (in Km ) Cost (Rs in Cr) DPR other than BMP Length (in Km ) Cost (Rs in Cr) Bharatmala DPR Lengt h (in Km ) Cost (Rs in Cr) NH-in principle Length (in Km ) Cost (Rs in Cr) Total DPR works in progress Length (in Km ) Cost (Rs in Cr) Total Nos. Overall Total Length (in Km ) 237 1803 0 0 0 0 237 1803 2 2000 0 0 91 1315 93 3315 14 330 5118 691 9494 0 0 0 0 691 9494 229 3021 0 0 228 3306 457 6327 38 1148 15821 Cost (Rs in Cr) 3 4 5 6 7 8 9 10 11 12 13 Assam 403 11207 0 0 0 0 403 11207 149 6416 1341 19445 1253 18168 2743 44029 85 3146 55236 Himachal Pradesh Jammu & Kashmir 0 0 0 0 0 0 0 0 198 4696 0 0 0 0 198 4696 3 198 4696 117 653 20.8 9489 124 94 262 10236 36 8640 425 5609 0 0 0 0 461 14249 14 723 24485 Manipur 1.2 141 0 0 381 418 382 559 1009 12681 925 13181 0 0 1934 25861 34 2316 26420 Meghalaya 52 520 0 0 0 0 52 520 640 9663 599 8686 0 0 1239 18349 19 1290 18869 Mizoram 0 0 0 0 0 0 0 0 351 6168 492 7134 0 0 843 13302 10 843 13302 Nagaland 343 5937 0 0 0 0 343 5937 75 2022 333 4829 84 840 492 7691 16 834 13628 Sikkim 77 1451 0 0 10 24 87 1475 539 7604 165 2393 0 0 704 9997 17 791 11471 Tripura 124 1693 0 0 0 0 124 1693 21 364 352 5533 0 0 373 5897 7 497 7590 Uttarakhand 95 1095 0 0 3.2 300 98 1395 4.86 1441 0 0 745 10407 0 0 750 11848 10 848 13243 West Bengal 41.00 1101 0 0 0 0 41 1101 69 2035 0 0 0 0 69 2035 4 110 3136 Grand Total 2181 35096 20.8 9489 518 835 2720 45420 41.16 10081 3707 62279 4952 71605 1656 23629 10355 167595 271 13075 213015
PROJECTS TO BE AWARDED IN 2018-2019 SI. NO. STATE NO. LENGTH (IN KM) CIVIL COST (IN CR.) 1 ARUNACHAL PRADESH 1 56.11 841.65 2 ASSAM 3 186.00 6534.00 3 HIMACHAL PRADESH 1 14.00 196.00 4 JAMMU & KASHMIR 1 200.00 3000.00 5 MANIPUR 6 303.00 4545.00 6 MEGHALAYA 4 403.00 6037.00 7 MIZORAM 4 269.00 4035.00 8 NAGALAND 3 196.00 3120.00 9 SIKKIM 5 123.00 1659.00 10 TRIPURA 3 293.00 4395.00 11 UTTRAKHAND 4 333.00 5445.00 12 WEST BENGAL 3 115.00 1725.00 TOTAL 38 2491.00 41533.00
NEW BRIDGES ACROSS RIVER BRAHMAPUTRA IMPLEMENTATION OF 4 NEW BRRIDGES KALIABHOMORA BRIDGE, NEAR TEZPUR(3.125 KM): NEW BRIDGE 80MTR DOWNSTREAM OF EXISTING BRIDGE, COSTING RS. 590 CR. TO BE COMPLETED BY 2020. DHUBRI PHULBARI BRIDGE (20 KM): LONGEST RIVER CROSSING IN COUNTRY. LIKELY TO BE AWARDED DURING THE CURRENT YEAR. BRIDGE BETWEEN NUMALIGARH & GOHPUR (9 KM): DPR UNDER PREPARATION. JOGIGHOPA BRIDGE: A NEW 2 LANE BRIDGE ADJACENT TO EXISTING 2 LANE BRIDGE PLANNED. DPR TO BE PREPARED.
KALIA BHOOMRA BRIDGE
ZOZILA TUNNEL TO PROVIDE ALL WEATHER CONNECTIVITY BETWEEN SRINAGAR, KARGIL AND LEH; ALL WEATHER CONNECTIVITY OF THE ROAD IS IMMENSELY IMPORTANT FROM STRATEGIC POINT OF VIEW; ECONOMIC AND SOCIO-CULTURAL INTEGRATION OF SRINAGAR, KARGIL AND LEH REGIONS WHICH REMAINS CUT- OFF FROM REST OF THE COUNTRY DURING WINTERS DUE TO HEAVY SNOWFALL; 2-LANE BI-DIRECTIONAL TUNNEL ALONG WITH PARALLEL ESCAPE TUNNEL; FOUNDATION STONE LAID BY HON BLE PRIME MINISTER ON 19.05.2018.
ZOJILA TUNNEL PROJECT LOCATION AND ALIGNMENT
EXISTING ZOJILA PASS
Z-MORH TUNNEL 6.5 KM LONG TUNNEL BEING CONSTRUCTED BETWEEN THE VILLAGES REZAN AND SHETKARI ON SRINAGAR LEH HIGHWAY (NH- 1D); BYPASSING AVALANCHE PRONE AREAS IN AND AROUND SONAMARG; PART OF WORKS PROVIDING ALL WEATHER CONNECTIVITY BETWEEN SRINAGAR, KARGIL AND LEH; ESTIMATED COST RS. 2011 CR.
Z-MORH TUNNEL
BHARATMALA PARIYOJNA IN NER BHARATMALA PH-1 DEVELOPMENT OF 24,800 KM NH IN COUNTRY; 5800 KM (22%) IN NER REGION AND UTTARAKHAND ENTRUSTED TO NHIDCL. ABOUT 2500 KM LENGTH PERTAINS TO BORDER AND INTERNATIONAL CONNECTIVITY ROADS. NHIDCL ONLY IMPLEMENTING AGENCY FOR BORDER CONNECTIVITY MULTI-MODAL FREIGHT MOVEMENT VIA. 7 WATERWAYS TERMINAL ON RIVER BRAHMAPUTRA
BHARATMALA PARIYOJNA IN NER BHARATMALA PH-1 DEVELOPMENT OF 24,800 KM NH IN COUNTRY; 5800 KM (22%) IN NER REGION AND UTTARAKHAND HAS BEEN ENTRUSTED TO NHIDCL. ABOUT 2500 KM LENGTH PERTAINS TO BORDER AND INTERNATIONAL CONNECTIVITY ROADS. NHIDCL ONLY IMPLEMENTING AGENCY FOR BORDER CONNECTIVITY
BHARTMALA PARIYOJNA PHASE-I S.NO. CCEA APPROVAL FOR BHARATMALA PARIYOJNA PHASE-I COMPONENTS LENGTH (IN KM) OUTLAY IN CRORES ENTRUSTED TO NHIDCL LENGTH (IN KM) OUTLAY IN CRORES 1 ECONOMIC CORRIDORS DEVELOPMENT 2 INTER- CORRIDOR & FEEDER ROADS 3 NATIONAL CORRIDORS EFFICIENCY IMPROVEMENTS 4 BORDER & INTERNATIONAL CONNECTIVITY ROADS 9000 1,20,000 3246 64,920 6000 80000 302 6,040 5000 1,00,000 - - 2000 25,000 2491 49,820 5 COASTAL & PORT CONNECTIVITY 2000 20,000 - - 6 EXPRESSWAYS 800 40,000 - - TOTAL 24800 3,85,000 6039* 1,20,780 * Including Uttrakhand State.
MULTI-MODAL LOGISTIC PARK MMLP SITE IDENTIFIED BY GOVT. OF ASSAM LOCATED IN VILLAGE KOREA, NEAR JOGIGHOPA; INDUSTRIAL DEVELOPMENT GIVEN A RENEWED FOCUS IN ASSAM AND THE NORTH EAST AND EXPECTED TO DRIVE CONSUMPTION. CONNECTIVITY OF THE REGION IS EXPECTED TO IMPROVE WITH INVESTMENTS IN ROAD, RAIL & WATERWAYS. RAILWAY CONNECTIVITY TO MMLP- 3 KMS SPUR FROM JOGIGHOPA STATION ON THE NEW BONGAIGAON-GOALPARA RAILWAY LINE ROAD CONNECTIVITY TO MMLP FROM NH 17-3 KM (4 LANE) UPGRADED FROM CURRENT SINGLE LANE ALONG EXISTING ALIGNMENT FROM NH 17 TO MMLP, 3 KM (2 LANE) FROM EXISTING RIVER PORT TO NH 17 AND INTERCHANGE TO ALLOW FOR THE CONNECTION FROM NH 17 (INCLUDING PORT CONNECTION) TO MMLP OVER THE RAILWAY LINE. REDEVELOPMENT OF THE RIVER PORT AT MMLP, JOGIGHOPA- THE EXISTING PORT IS PROPOSED TO BE DEVELOPED AS PERMANENT TERMINAL WITH MECHANIZED HANDLING FACILITIES.
NHIDCL & Act East Policy ONLY TRANSPORT LINK THROUGH CHICKEN-NECK OF NORTH-WEST BENGAL, INADEQUATE TRANSPORT CONNECTIVITY OF NER; MINIMAL TRADE WITH OUR NEIGHBOR ON THE EAST. POLICY TO GIVE A FLIP TO DEVELOPMENT OF HIGHWAY INFRASTRUCTURE IN NER. THE OBJECTIVES OF THIS POLICY: I) INCREASED TRADE WITH ASEAN & BBIN COUNTRIES INCLUDING CREATING INDUSTRIAL CORRIDORS AND STATE OF ART BORDER TRADE CENTERS; II) SEAMLESS CONNECTIVITY WITH ASEAN & BBIN; III) SOCIO-CULTURAL EXCHANGES; IV) EASIER MOVEMENT OF PEOPLE;
NHIDCL & Act East Policy (Contd ) INTERNATIONAL CORRIDORS BEING CONSIDERED FOR DEVELOPMENTARE 1) AGARTALA DHAKA - KOLKATA; SILCHAR DHAKA KOLKATA: DPR FOR 4-LANING OF SILCHAR-AGARTALA (NH-53 & NH-44), ALONG WITH SPUR FROM KARIMGANJ TO SUTARKHANDI (NH-151), CONNECTING SYLHET IN BANGLADESH IS BEING PREPARED; GUWAHATI - SHILLONG DHAKA KOLKATA: DEVELOPMENT OF NH-40 FROM SHILLONG TO DAWKI UNDER LOAN ASSISTANCE OF JICA; 2) AGARTALA SABROOM CHITTAGONG: SUBSTANTIAL COMPLETION OF AGARTALA- SABROOM; BRIDGE ACROSS RIVER FENI (INDO- BANGALDESH BORDER) IN PROGRESS 3) GOLAGHAT MOREH (INDO - MAYANMAR BORDER IN MANIPUR): THIS ROAD WILL PROVIDE CONNECTIVITY WITH INDIA-MYANMAR-THAILAND TRILATERAL HIGHWAY. THE WORK ON TRILATERAL HIGHWAY ACROSS THE BORDER IN MAYANMAR FROM YAGI TO KALEWA (120 KM) IS BEING IMPLEMENTED BY NHAI, WHICH IS BEING FUNDED BY MINISTRY OF EXTERNAL AFFAIRS, GOVT. OF INDIA; 4) STILLWELL ROAD(NH-153): FROM LEKHAPANI IN ASSAM TO PANGSU PASS ON INDIA MYANMAR BORDER IN ARUNACHAL PRADESH; 5) SILCHAR JIRIBAM MOREH: 4- LANNING FROM SILCHAL TO IMPHAL; 6) IMPHAL MAO IN MANIPUR: DPR FOR 4-LANING OF THIS 97 KM. LONG ROAD IS UNDER PREPARATION.
PMC FOR NEPAL S POSTAL ROAD PROJECTS NHIDCL ENTRUSTED BY GOI TO SUPERVISE WORKS OF POSTAL HIGHWAYS PROJECT FOR PROJECT MANAGEMENT CONSULTANCY (PMC). PROJECT FUNDED BY MEA, GOVT. OF INDIA MOU BETWEEN DEPARTMENT OF ROADS, GOVT. OF NEPAL AND NATIONAL HIGHWAYS & INFRASTRUCTURE DEVELOPMENT CORPORATION LIMITED (NHIDCL) FOR PMC SERVICES FOR 10 ROADS (14 CONTRACTS) HAVING LENGTH 305 KM. OUT OF 14 PROJECTS, 12 PROJECTS IN PROGRESS. NODAL OFFICE IN NEPAL IS LOCATED IN KATHMANDU, HEADED BY A GENERAL MANAGER (P) CUM TEAM LEADER ASSISTED BY ENGINEER, SURVEYOR, ACCOUNTANT AND SUPPORTING STAFF. 4 SITE OFFICES LOCATED AT THE STRATEGIC LOCATIONS SITUATED AT JANAKPUR, BIRGUNJ, ITAHARI AND LAMAHI HEADED BY MANAGER/ENGINEER ASSISTED BY SUPPORTING STAFF.
DIGITAL INITIATIVES- e-tools NHIDCL s DIGITAL INITIATIVES TO ESTABLISH NEW TWO E-PORTALS: INAM PRO: A MARKET PLACE FOR SELLING AND BUYING CEMENT, STEEL AND CONSTRUCTION EQUIPMENTS & OTHER HIGHWAY CONSTRUCTION MATERIALS FACILITATING THE ROAD INFRASTRUCTURE INDUSTRY. INFRACON: A NATIONAL PORTAL FOR PROCUREMENT OF CONSULTANCY SERVICES, ADOPTED BY MINISTRY OF ROAD TRANSPORT & HIGHWAYS & ITS EXECUTING AGENCIES FOR NH WORKS. RESULTED IN ELIMINATION OF PAPER WORK DURING BIDDING AND EVALUATION. IMPARTED TOTAL OBJECTIVITY & TRANSPARENCY TO THE BIDDING PROCESS. REGISTRATION FACILITIES TO INDIVIDUAL HIGHWAY INFRASTRUCTURE PROFESSIONALS HAS OPENED A SINGLE WINDOW FOR THEM TO SHOWCASE THEIR EXPERIENCE AND CONTRIBUTE TO NATION BUILDING.
SKILL DEVELOPMENT NHIDCL S SKILL DEVELOPMENT TRAINING PROGRAM AS SPECIAL PROJECT UNDER PRADHAN MANTRI KAUSHAL VIKAS YOJANA (PMKVY) IN ASSOCIATION WITH NATIONAL SKILL DEVELOPMENT CORPORATION (NSDC) FOR THE UNEMPLOYED / UNSKILLED YOUTH OF NORTH EASTERN REGION (NER). SKILL DEVELOPMENT TRAINING PROGRAM FOR EQUIPMENT SECTOR HAS BEEN CONDUCTED AT 4 LOCATIONS IN THE STATES OF TRIPURA, ARUNACHAL PRADESH AND ASSAM. THE TRAINING PROGRAM COMPRISED CLASSROOM TEACHING AND HANDS ON EXPOSURE WITH TOTAL DURATION OF 200 HOURS FOR THE MOST DEMANDED JOB ROLES VIZ. JUNIOR BACKHOE LOADER OPERATOR AND JUNIOR EXCAVATOR OPERATOR. 102 YOUTH GOT TRAINED IN THE CONDUCTED TRAINING PROGRAMS DURING 2017-18. FURTHER, DURING THE CURRENT FINANCIAL YEAR 2018-19, NHIDCL INTENDS TO TRAIN ABOUT 300 YOUTH BELONGING TO OTHER NORTH EASTERN STATES.
WORKS IN J&K
WORKS IN MANIPUR
WORKS IN TRIPURA
WORKS IN ASSAM
WORKS IN ASSAM
WORKS IN ASSAM
WORKS IN ASSAM
WORKS IN ASSAM
WORKS IN ASSAM