ASSEMBLY 39TH SESSION

Similar documents
How ATFM Assists with Disaster Recovery

TSUNAMI ~The Great East Japan Earthquake~

Tremendously heavy rainfall 復旧へ has occurred, twice as much as at any previously recorded time.

TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22)

Japan earthquake and tsunami Situation Report No March 2011 As of 1830 hrs Manila Time

International Civil Aviation Organization REVIEW OF STATE CONTINGENCY PLANNING REQUIREMENTS. (Presented by the Secretariat) SUMMARY

ASSEMBLY 39TH SESSION

Head of Aviation Medicine Department ICAO/MID CAPSCA Team Leader Deputy

Information Concerning the Tohoku District/Pacific Coast Earthquake

Photos courtesy of the Japanese Ministry of Foreign Affairs: Flooding at Sendai International Airport

JAL Group Announces Consolidated Financial Results for Full Fiscal Year 2011

COMMISSION REGULATION (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management

Earthquake. 2. MLIT s emergency response to the Great East Japan Earthquake. 3. Recent policy changes regarding tsunami

(Presented by IATA) SUMMARY S

Airmen s Academic Examination

Japan s Current Status and Challenges Towards Recovery

Air Law and ATC Procedures Subject: AIR LAW AND ATC PROCEDURES

International Civil Aviation Organization ASSEMBLY 37TH SESSION EXECUTIVE COMMITTEE RECENT EFFORTS IN THE ASIA AND PACIFIC REGION AFTER APAM-AVSEC

REGIONAL CARIBBEAN CONTINGENCY PROCEDURES FOR HURRICANES

ATM Contingency Plan for Male FIR, Maldives. (Presented by MALDIVES) SUMMARY

(Presented by Japan) SUMMARY

Damage and Provision of Aid of Water Supply in Disaster-hit Areas, the Great East Japan Earthquake and Tsunami

Airports and Airlines Winter Operations Economic Policy Aspects. Narjess Teyssier Chief Economic Analysis & Policy Section

REPORT 2014/065 INTERNAL AUDIT DIVISION. Audit of air operations in the United. Nations Assistance Mission in Afghanistan

Fort Wayne-Allen County Airport Authority

Keflavik International Airport Airport Charges

ASSEMBLY 39TH SESSION

Aerodrome Emergency Plan and Public Health Emergencies

Post tsunami Recovery of Port and Harbor areas in Japan from the 2011 Great East Japan Earthquake Tsunami

Japan Academic Network for Disaster Reduction (JANET-DR) and interdisciplinary collaboration. Science Council of Japan

Airmen s Academic Examination

International Airport Assistance Visit Checklist

KLHQ Fairfield County Emergency Response Plan (August 13, 2012)

GREAT EARTHQUAKE DISASTER NILIM, JAPAN

OPERATIONS MANUAL TABLE OF CONTENTS CHAPTER 7: SEARCH AND RESCUE FACILITIES IN THE AREA OVER WHICH THE AIRPLANE IS TO BE FLOWN

KNOWLEDGE NOTE 4-1. Infrastructure Rehabilitation. CLUSTER 4: Recovery Planning. Public Disclosure Authorized. Public Disclosure Authorized

Air Traffic Control System Command Center (ATCSCC) Crisis Management. Federal Aviation Administration 1

6 th CAPSCA Asia Pacific Meeting. Business Continuity Management Systems: Implementation Guidelines for Airports

Signaling System and Communication System on Shinkansen of JR-EAST

Olympics Managing Special Events Brendan Kelly, Head of Operational Policy

Situation and response of JAEA to the Earthquake in Northeastern Japan (Outline of activities on March 11-18)

The Ever Evolving Naha Airport (Outline of Naha Airport Passenger Terminal Building) Naha Airport Building Co., Ltd.

Operation of Evacuation Center and Support for non-japanese

JR East: Earthquake Measures

REGULATIONS OF THE CIVIL AVIATION BOARD NUMBER 75 ON PRIVILEGES OF HOLDERS OF PILOT, AIR TRAFFIC CONTROLLER

Collaborative Decision Making at JCAB ATMC

Construction of Pyongyang International Airport IP6

Commission on the Promotion of Business Jets. Interim Report

Glossary. Part I Acronyms/Data Terminology. AIFSS -- Automated International Flight Service Station.

UPS Airlines. Randy Baker UPS Airlines Senior Meteorologist

INTERNATIONAL CIVIL AVIATION ORGANIZATION COOPERATIVE ARRANGEMENT FOR THE PREVENTION OF SPREAD OF COMMUNICABLE DISEASE THROUGH AIR TRAVEL (CAPSCA)

Emergency Relief Efforts of 2008 China Extreme Ice-snow Storms

US $ 1,800 1,600 1,400 1,200 1,000

Checklist. Has the State established a national committee for Public Health Emergency planning? IHR Annex 1, A, 3

Great East Japan Earthquake Kimiaki Nagashima

National Air Transport Facilitation Program Kingdom of Bahrain

AA AIRCRAFT ACCIDENT INVESTIGATION REPORT FIRST FLYING CO., LTD. J A

TPA Emergency Planning and Response

Supplemental section. Response to The 2016 Kumamoto Earthquake

EO Contribution to Recovery Activities - A case study on the experience of the Great East Japan Earthquake -

TWELFTH AIR NAVIGATION CONFERENCE

Irregular Operations (IROPS) Contingency Plan

Windmills & Airspace Can We Work Together?

Basic Policies on Operation of National Airports Utilizing Skills of the Private Sector

Contents. Subpart A General 91.1 Purpose... 7

REGULATIONS (10) FOREIGN AIR OPERATORS

A conversation with David Siegel, CEO, US Airways

Emergency Preparedness of the Chinggis Khaan International Airport. Airport Operations Manager

ASSEMBLY 39TH SESSION

ANA Reports Record Profits for FY2012

Ganbarou! TOHOKU. to the Great East Japan Earthquake

5 th CASPCA Americas Meeting. Mr. Vivian Bijnaar Senior Policy Advisor JAPI Airport, Suriname

Circular 330-AN/189 Civil/Military Cooperation in Air Traffic Management. Sven Halle ICAO- Paris

Circular 330-AN/189 Civil/Military Cooperation in Air Traffic Management

PART F SECTION 2 RESPONSIBILITIES AND ACTIONS

Population Movement in the Tohoku Region after the Great East Japan Earthquake Disaster

Agenda Item 6-ATM Coordination (ATM Contingency Plan- Level 1 and Level 2)

8.4.9 Fatigue Management. Republic of Korea

What is safety oversight?

GUYANA CIVIL AVIATION REGULATION PART X- FOREIGN OPERATORS.

The 2011 off the Pacific coast of Tohoku Earthquake. (immediate version)

Content. Part 91 General Operating and Flight Rules 5

SPECIAL AFRICA-INDIAN OCEAN (AFI) REGIONAL AIR NAVIGATION (RAN) MEETING

30th IBSC Conference - Stavanger, Norway June, Takahiro TOKUI

Public Safety Management

MARCH 2011, TSUNAMI DISASTER IN JAPAN

PBN IMPLEMENTATION IN INDONESIA

Operational implementation of new ATM automated systems and integration of the existing systems ADS-B IMPLEMENTATION IN GUYANA. (Presented by Guyana)

Effectiveness of Electrical Safety Management Service proven by the Great East Japan Earthquake

FLIGHT OPERATIONS PANEL (FLTOPSP)

8 April 2015 Terminal 3 to Open! - Easy Low Cost Air Travel from Narita -

Flight Regularity Administrative Regulations

(a) it has been licensed for the purpose, and save in accordance with the conditions prescribed in such licence; or

P. Gaubert, A. Funayama and H. Moriya (School of Engineering, Tohoku University)

Cooperation Agreements for SAR Service and COSPAS-SARSAT SEARCH AND RESCUE AGREEMENTS: OVERVIEW. (Presented by United States)

Concept of Waterworks in Disaster Relief based on the 2016 Kumamoto Earthquake

Airport Capacity Improvement, Operation Efficiency and Passenger Satisfaction

GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP SAFDURJUNG AIRPORT, NEW DELHI

(3 rd CAPSCA AFRICA Meeting)

REPUBLIC OF LATVIA. State Joint-stock Company Latvijas Gaisa Satiksme Aeronautical Information Service Riga Int. Airport, LV-1053, Latvia

Transcription:

International Civil Aviation Organization WORKING PAPER 30/8/16 ASSEMBLY 39TH SESSION EXECUTIVE COMMITTEE Agenda Item 28: No Country Left Behind Initiative QUICK RESPONSE AFTER EARTHQUAKE IN KUMAMOTO AIRPORT (Presented by Japan) EXECUTIVE SUMMARY The Asia and Pacific Region has experienced natural disasters, such as earthquakes, and therefore, it is essential to take advance measures in preparation for combating disasters. This paper details the best practices for quick response undertaken in Kumamoto after the earthquake hit the area. The instances cited are from the Kumamoto Earthquake and highlight the importance of the air transport in case of natural disasters. Action: The Assembly is invited to: a) note the information contained in this paper; and b) encourage States to consider preparing their emergency responses based on the experiences of natural disasters striking Japan. Strategic Objectives: Financial implications: References: This working paper relates to the Air Navigation Capacity and Efficiency and Security & Facilitation Strategic Objectives. Not applicable None

- 2-1. INTRODUCTION 1.1 The gigantic tectonic plates which make up Earth s outermost layer are always on the move, sliding past and colliding with each other. This creates plenty of seismic activities, especially in the area around the Pacific Ocean known as the Ring of Fire, which accounts for some 90% of the world s earthquakes. Japan is located in this Ring of Fire and has experienced a lot of earthquakes, like the Great East Japan Earthquake, which occurred in 2011. 1.2 On April 14th, an earthquake with a magnitude of 6.5 shook Kumamoto Prefecture*1 and neighbouring areas in Kyushu, Japan. Then, in the early morning on April 16th, a 7.3 magnitude earthquake struck the same areas. The powerful quakes caused damage to the buildings and other facilities of Kumamoto airport*2, which was near the epicenter of the strong quakes. Although the Kumamoto airport was unable to conduct normal operations due to the damage done by these quakes, special operations for disaster recovery were quickly undertaken at the airport. *1) Kumamoto Prefecture: 181 million (population), 7,405 square kilometres (area) *2) Kumamoto airport: 3000m x 45m (Single Runway), Air Traffic Control by the government 1.3 This paper details the chain of events in the week after two earthquakes struck the area. The emergency responses by relevant parties are described in sections 2 and 3. Besides, the lessons learned out of this disaster and the required actions to be taken are detailed in sections 4 and 5. 2. THE CHAIN OF EVENTS 2.1 On April 14th, at 09:26p.m., an earthquake with a magnitude of 6.5 struck the airport. But luckily, the runway, radar and communication facilities were not damaged. After the end of normal operations at 09:30p.m., the air traffic information was continuously provided to helicopters in order that aviation activities such as search and rescue (SAR) operation could be undertaken.

- 3-2.2 On April 15th, a 24-hour relief operation for delivering supplies were started in Kumamoto city, following SAR. Some air carriers were forced to delay or cancel their flights one after another since flight crews at hotels were unable to take enough rest required before their duties. At other airports in Kyushu, operations were carried out as usual, because no damage was done to the airport facilities by the earthquakes. As the main land transport system in Kumamoto Prefecture such as the train network and highways were cut off, the relief air services between Fukuoka and Kagoshima were undertaken and continued by air carriers. 2.3 On April 16th, at 01:25a.m., an earthquake with a magnitude of 7.3 occurred. Although the runway was not damaged, the terminal building was closed due to the damage and all passenger flights were canceled. Air traffic controllers were evacuated from the Air Traffic Control (ATC) tower and the aircraft engaged in rescue operations were provided with necessary instructions from a separate room. Support related to transportation was given to Disaster Medical Assistance Team (DMAT). The relief supplies by Self-Defense Forces (SDF) aircraft were provided. A 24-hour relief operation was started at the neighboring Oita airport, which was continued until April 19th. 2.4 On April 17th, all passenger flights were canceled in Kumamoto airport. On the other hand, cargo relief services for relief supplies were carried out by Japan Airlines (JAL). Kumamoto airport 2.5 On Monday, April 18th, all passenger flights were canceled in Kumamoto airport. US Armed Forces Osprey arrived and distributed relief supplies. 2.6 On April 19th, at 07:30a.m., services at the ATC tower were resumed and at 07:43a.m., the first passenger flight after restarting operations arrived from Tokyo international airport at Haneda (total 19 flights arrived during the day). At 03:00p.m., departure flights from Kumamoto airport resumed operations (6 departure flights in total in the day) and at the same time, partial operation was started again at the terminal building. 3. SWIFT RESPONSES 3.1 Responses by the Headquarters in Tokyo; 3.1.1 Immediately after the earthquakes struck on April 14th and 16th, the crisis management officer made an emergency call to the executives of the Civil Aviation Bureau (CAB) and checked the damage situation of the surrounding area of the airport including Kumamoto airport and other airports. Quite a variety of information as listed below was gathered and sorted out. a) Any abnormalities of the runway, aeronautical lights, radio facilities, air traffic control facilities, air traffic control services and the terminal building; b) Safety of the airport staff, operating situation of the airport;

- 4 - c) Any damage to aircraft of the air carriers, safety of the staff and operation schedules. 3.1.2 The above information was reported to the senior executives of the Ministry by the executives of CAB. 3.1.3 After the overall damage situation was checked, actions were taken toward the full recovery of airport operations. The operation of the airport to support the restoration activities in the devastated area was implemented, as below; a) Since misunderstanding on the closure of the airport spread and a number of inquiries about the airport operations were received even from SDF, the headquarters asked for cooperation of the mass media to report on TV that the airport was continuously used for transportation of relief supplies by SDF and other organizations in order to clear such misunderstanding. b) In order to properly manage issues in relation to rescue activities and cargo transportation by SDF, the US, Korea and others, the headquarters decided to provide ATS on 24-hour schedules at Kumamoto airport (usually 14-hour operation from 07:30a.m. to 09:30p.m.) and at neighboring Oita airport (usually 15-hour operation from 07:30a.m. to 10:30p.m). In addition, in order to materialize the 24-hour operation schedules at the airports, ATS staff were dispatched to Kumamoto and Oita from around the country. 3.2 Responses by the Air Navigation Service Provider (ANSP); 3.2.1 While the runway and air navigation facilities of Kumamoto airport were not damaged and ANSP was able to operate them normally, some equipment fell down and documents scattered in the ATC tower and the services were suspended for a while. The emergency risk discriminators were immediately dispatched to inspect the ATC tower facilities and identified that those facilities were usable. However, as a series of aftershocks occurred intermittently, the aerodrome control services from the ATC tower were forced to discontinue. To take care of this situation, the flight information services were provided from the meteorological office located at another low rise building for four days. Furthermore, ATC light gun signals and portable radio equipment were used at the first stage, then simplified communication equipment which ensures usual quality level of radio communication for air-to-ground and ground-to-ground communication and recording of all communications was installed. [Control Tower] [Temporary Flight Information Service]

- 5 - [Simplified Communication Equipment] [Delivery of EVA] 3.2.2 On the other hand, an Emergency VFR system for ATC (EVA) was transported from Fukuoka airport to Kumamoto airport in preparation for coping with any further contingency situation. 3.3 Responses by the Airport Operator and Airlines; 3.3.1 As mentioned above, a part of the terminal building for domestic passengers was damaged by the earthquakes, all passenger flights were canceled from April 16th to 18th. Because it was difficult to repair and fully restore the existing terminal building in a short period of time, efforts were made to resume the operation of civil aviation using temporary alternative facilities. More specifically, the operations restarted only for arrival flights from the morning of April 19th and the corridors and exits different from the usual ones were used after their arrivals and then the operations for departure flights restarted as well from 03:00p.m. on the same day. Temporary check in counters and baggage inspection area were located at the parking lot of the airport. 3.3.2 On April 19th, thanks to quick recovery work, it became possible to resume services partially at the terminal building after confirmation of safety requirements. 4. LESSONS LEARNED 4.1 It was critical to restore the air transportation in shortest possible period of time, because, in this case, the railways and highways were immensely damaged by the earthquakes. In addition, it was reaffirmed that the airports played an extremely important role in the disaster recovery operation as the base for relief and life-saving activities, SAR, emergency transport of relief supplies and personnel. 4.2 Japan has been taking essential countermeasures, such as swift and accurate information gathering on the disaster, preparation of emergency equipment and conducting training programs to operate such equipment. This was done on the basis of the lessons learned from the Great East Japan Earthquake, which occurred in 2011. Such preliminary measures taken beforehand enabled us to resume the air transportation so early. END