MIDAD Project IDS Vision

Similar documents
INTERNATIONAL CIVIL AVIATION ORGANIZATION AFI REGION AIM IMPLEMENTATION TASK FORCE. (Dakar, Senegal, 20 22nd July 2011)

AERONAUTICAL INFORMATION DIGITAL DATBASES INTERGATION AND QUALITY MANAGED MIGRATION

User Forum AIM/EAD Evolutions. Thanos PAPAVRAMIDIS, Head of Airspace and AIS Data Management EUROCONTROL Network Management

From AIS to AIM. COMSOFT AIS to AIM Lima, Peru Context and Overview Isabel Zambrano Rodriguez

QMS for AIS/MAP Service Implementation Workshop

AIS Basics - NOTAM, AIP, Amendments, Supplements, Circulars, Charts, and NOTAM Putting the basics in place

Simone Gabriele. Digital NOTAM The Digital Age for Air Navigation

Singapore s Journey to Implement ASBU B-0 & B-1 Modules in PIA-2

ICAO GANP Requirements and Evolution

Curriculum for AIM Training Module 2: ARO Officer

AIM in support of ATM

Introduction to Amendment 40 to Annex 15

Managing Aeronautical Data

AIS/AIM System in South Africa (ATNS)

Aeronautical Information Management

The Importance of AIM and the Operational Concept

30 SEP - 02 OCT, 2014

Technical Resources - Automation European AIS Database (EAD)

Avitech GmbH AIXM Capabilities & Experiences

Airport AIM as a Service Presented at World ATM Congress 2016

NCLB-AIM Workshop (Cairo, Egypt, September 2017) Your complete AIS/AIM Training baseline

TWELFTH AIR NAVIGATION CONFERENCE

Airspace User Forum 2012

Development of the Global AIM Strategy (AIM Projects)

EUROCONTROL. Centralised Services Workshop. Peter Matern CS#5 EAIMS 5 March 2014

AIS-AIM Study Group Working Status

EUROCONTROL Guidance for Military Aeronautical Information Publications Consistency with ICAO Annex 15 EUROCONTROL

AERONAUTICAL INFORMATION SERVICES-AERONAUTICAL INFORMATION MANAGEMENT STUDY GROUP (AIS-AIMSG)

Topic / Sub-topic L Content Ref. Material. ICAO Doc Recognise the need for

AIXM/WXXM CONFERENCE 2010

AIXM Coding guidelines for the ICAO data sets

This working. Action by the - AIS/MAP. TF/6 Report Report changes as. monopoly 1.3. The establishment SUMMARY REFERENCES.

The D-AIM Project and Trials. Roger Li, D-AIM Project Manager LFV AIXM/WXXM Conference Washington DC, May 13, 2009

10+ years of EAD: picking the low-hanging fruit. guido HAESEVOETS EAD Customer Management 29/01/2015

From AIS to AIM. Paul Bosman, Head of Aviation Cooperation and Strategies, EUROCONTROL

DP-7 The need for QMS controlled processes in AIS/AIM. Presentation to QMS for AIS/MAP Service Implementation Workshop Dakar, Senegal, May 2011

Providing the Context Air Navigation Integrated Work Programme

ATIEC Presented by: D. Cowell (FAA) & E. Porosnicu (EUROCONTROL)

WORLDWIDE SYMPOSIUM ON ENABLING THE NET-CENTRIC INFORMATION ENVIRONMENT:

TWELFTH AIR NAVIGATION CONFERENCE

SWIM: An ANSP Perspective. Jan-Philipp LAUER, MSc CANSO AIMWG SC Member

Global Air Navigation Planning

LATVIAN AIP DATA SET

From AIS To AIM. Agenda. Agenda. Jack Hsu Mark Varellas

On Time. Total Airspace Management. 8 th Global ATFM Conference Cancun - Mexico. 12/30/2014 Commercial-in-Confidence 1

Sharing UAE experience in. AIM implementation

SESAR Active ECAC INF07 REG ASP MIL APO USE INT IND NM

EAD 2019 Annual Plan

ICAO ATFM SEMINAR. Dubai, UAE, 14 December 2016

EAD 2018 Annual Plan

TWELFTH AIR NAVIGATION CONFERENCE

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit

SAMPLE TEMPLATE APPENDIX 3.5C-1

Quality Management System (QMS)

RECOMMENDED GUIDANCE FOR FPL AND RELATED ATS MESSAGES

AIM AUTOMATION. Raul Martinez, RO/AIM International Civil Aviation Organization North American, Central American and Caribbean Office

SWIM: An ANSP Perspective. Jan-Philipp LAUER, MSc CANSO AIMWG SC Member

MID Region AIM SG/2. AIS-AIM Study Group 31 August Paul Bosman - EUROCONTROL Chair ICAO AIS-AIMSG

Lufthansa Systems AIM from a navigation data house perspective

TWELFTH AIR NAVIGATION CONFERENCE

Information Management towards SWIM

International Civil Aviation Organization. Second Meeting (AIM SG/2) (Kish Island, Iran, 31 August-2 September 2015)

FLIGHT PLAN FILING PROCEDURES IN THE SAM REGION

Amendment 37,38 to Annex 15 Amendment 57 to Annex 4

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES

The DFS perspective on safe and fair integration of UAS into the national airspace system

Civil-Military Cooperation. Advanced Flexible Use of Airspace

Aeronautical Information Services Issue 1 30 May 2012

Work Programme of ICAO Panels and Study Groups

2012 Performance Framework AFI

International Civil Aviation Organization. Performance Framework for AIM implementation in the MID Region

WORKING PAPER IVATF/2-WP/21 10/6/11. International UPDATEDD ASH RELATED SUMMARY. At the 1.1. to 30. first meeting. Coordination Group to. (e.g. 1.

Implementation of PBN in Armenian airspace

ADQ Aeronautical Data Quality

TWELFTH AIR NAVIGATION CONFERENCE DRAFT REPORT OF THE COMMITTEE ON AGENDA ITEM 4

IRELAND SAFETY REGULATION DIVISION

AFI Plan Aerodromes Certification Project Workshop for ESAF Region (Nairobi, Kenya, August 2016)

Experience with Digital NOTAM

What is safety oversight?

Block 0 to Block 1 Vaughn Maiolla

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT

AERONAUTICAL INFORMATION SERVICES-AERONAUTICAL INFORMATION MANAGEMENT STUDY GROUP (AIS-AIMSG)

GANP 2019/ASBUs. Olga de Frutos. Marrakesh/10 th December Technical Officer Air Navigation

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /2010

AMXM Airport Mapping picking-up SWIM

STAIRWAY IDS ATC SIMULATION ENVIRONMENT - SWIM COMPATIBLE SYSTEM

Advisory Circular. File No.: Z U Issue No.: 01

PENS Symposium How to join PENS

Civil-Military Cooperation in Germany. Roland Mallwitz German Air Navigation Services Head of Surveillance Services

Screening Chapter 14 Transport. Single European Sky (SES) 18 December Transport

ECOsystem: MET-ATM integration to improve Aviation efficiency

Continuous Improvement of the Global Air Traffic Management System

REGULATION No. 10/2011 ON APPROVAL OF FLIGHT PROCEDURES INCLUDING SID-s AND STAR-s. Article 1 Scope of Application

ATC automation: facts and steps ahead

Basic Building Block (BBB) Framework DRAFT APRIL 2018

Aeronautical METeorology in Europe

LR IFP REGULATION DRAFT INESE LIEGE

SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT

EUROCONTROL. Centralised Services concept. Joe Sultana Director Network Manager 1 July 2013

Transcription:

MIDAD Project IDS Vision Cairo July, 2013 Ramy El-Jabi

Outline MIDAD Scope Solution High Level Architecture IDS Air Navigation Suite Proposed Implementation Schedule 2

MIDAD Scope Drawbacks related to the current operational structure and provision of AIS/AIM services in the MID Region were identified including: inconsistent quality of data; lack of cross border aeronautical information coherence checking; duplicated, redundant and dispersed investments in the development and maintenance of systems by both Aeronautical Information Services and the end users; no single integrated aeronautical information database has been implemented; no regional or sub-regional AIS database has been established; high maintenance costs for each State and end users; and lack of interoperability between systems. 3

MIDAD Scope For such reason the MIDAD shall provide to Data Providers and Data Users: a reliable source of aeronautical information; improved data quality enabled by constant data checking, including NOTAM validation and cross-border data coherence verification; ensure data integrity a secure channel for timely and efficient electronic distribution of aeronautical information to all users; reduced workload throughout the complete AIS process; reduced investment costs in the development and maintenance of local systems by both AIS Units and airspace users; increased availability of data through easy access. 4

MIDAD High Level Architecture Users Data Services Access Modes 5

MIDAD Users Data/Service Providers AIS Offices, NOTAM Offices, ARO Units; AIP Production Departments, MAP Production Departments; Procedures Design Departments; Military Authorities (AIS, ARO, AIP/MAP, TWR, APP, FIS); Data/Service Consumers NavData Integrator companies ATM Systems (TWR, APP, ACC, FIC, FIS); Airline Systems (Briefing, AOC); General Aviation (Briefing); Aerodrome operators; Metrology offices; and 6

MIDAD Data The MIDAD System will manage the following data: Aeronautical Static Data (AIXM 4.5, 5.1 scope, extensions) Aeronautical Obstacle Data Aerodrome Mapping Data Digital Terrain Data Topographic Data (rivers, cities, road, etc.) NOTAM, SNOWTAM, ASHTAM, BIRDTAM OPMET Data, WAFS Data (later BUFR) AIP according to ICAO Annex 15 and AIS Manual (Doc 8126) MAPs and Charts according to ICAO Annex 4 and Aeronautical Chart Manual 7

MIDAD Services/Functions Data Validation Data Derivation Data Collection Data Quality Data Validation Data Management Airspace\Route Design Flight Procedure Design Ground Validation Web Forms Web Services Monitoring Help Desk System Management Aeronautical Data AIXM 5.1 Topographic Data Terrain Data FPL Data Meteo Data Auditing WORKFLOW Business Process Business Rules Message Store Documents Repository Access Control Training Notam Publishing Charting Digital Output Pubication Library Web Feature Service Web Map Service FPL Validation Service Meteo Data Distribution Production Data Originators External Systems Internet AFTN/AMHS External Systems Data Consumers 8

Information Distribution Services MIDAD Access Modes External Service Provider National AIM System Data Exchange Centralized MIDAD AIM System Information Consumers Remote Access Hosted National AIM System Hosted Service Provider Supervision MIDAD AIM Office Outsourced Service Provider 9

MIDAD Key Features Electronic Connection with Data Originators. Necessary to guarantee that data comes from the right source, at the right time and having the required quality. Workflow Engine. Key component for the definition, implementation and tracking of the Aeronautical Data Process. Static & Dynamic Data Integration: The system shall allow to manage within the same framework all the Aeronautical Events disregarding if they are temporary or permanent and if they shall be Published via NOTAM, Supplement or AIRAC amendment. Digital NOTAM. Implementation of Digita NOTAM is a key step for the transition to AIM as it enables: NOTAMs graphic visulization NOTAMs automatic management validation More Accurate Briefing 10

MIDAD Key Features Scalability: Necessary to manage the evolution of the system in terms of: Number of Users Amount of Data Services Provided Implemetation Flexibility: The system shall allow a very flexible configuration of the Air Service Providers access mode. It shall be possible for Service Providers to host or outsource both single services and the full national system. 11

AIS to AIM Roadmap 12

Functional Architecture 13

Service Oriented Architecture 14

Implementation Phases Phase 0 - System Setup Business Process Analysis System Requirements & Constraints Identification System Detailed Design System Implementation Testing Acceptance Phase 1 Data Collection Data Collection/Migration Data Validation Data Correction Agreements With Data Originators Phase 2 Data Maintenance and Publication Aeronautical Data Exchange Workflow Data Quality Management Electronic AIP Charting NOTAM Phase 3 Information Management Terrain Aerodrome Mapping Interoperability with meteorological products Electronic aeronautical charts Digital NOTAM Phase 4 - SWIM FIXM WXXM Enterprise Service Bus Centralized Services: WFS WMS PUB Services MET FPL epib 15