ScienceDirect. Possibilities of Increasing Territorial Coverage and Operational Performance of the Tatra Electric Railways

Similar documents
Presentation of preliminary financial results of fiscal year 2010/2011

Shared cultural and natural heritage

TMR posts an 18.1% revenue growth for 2016/17

ScienceDirect. Prediction of Commercial Aircraft Price using the COC & Aircraft Design Factors

TATRY MOUNTAIN RESORTS, A.S.

Available online at ScienceDirect. Procedia Economics and Finance 6 ( 2013 )

Advanced Flight Control System Failure States Airworthiness Requirements and Verification

REGION OF WATERLOO INTERNATIONAL AIRPORT AIRPORT MASTER PLAN EXECUTIVE SUMMARY MARCH 2017

UNESCO HERITAGE. castles caves towns

Narrow-gauge railways in Slovakia and their use for tourism purposes

The results of the National Tourism Development Strategy Assessments

Research on Design Assurance System with the Development of CAAC s Design Organization Management

STRATEGY OF DEVELOPMENT 2020 OF THE CCI SYSTEM IN UKRAINE


Available online at ScienceDirect. Procedia Economics and Finance 23 ( 2015 )

Project Data Sheet BASIC PROJECT DATA

Provincial Railway Technical Standards

visits4u Case Studies: Historical Centre of Athens Athens, Greece

Analysis of the impact of tourism e-commerce on the development of China's tourism industry

PERTH-ADELAIDE CORRIDOR STRATEGY

Annual General Meeting of TMR 28 April 2017 Grandhotel Praha**** Tatranská Lomnica

Available online at ScienceDirect. Procedia Economics and Finance 6 ( 2013 )

VIP Trip to Germany, Czech Republic and Poland Regional Innovation and Competitiveness November PROGRAMME (Final Version

SIM Selection and peer-review under responsibility of SIM 2013 / 12th International Symposium in Management.

SLOVAK CONVENTION BUREAU

1. Title of your regional initiative: Carpathian Wetland Initiative (CWI)

Investor Presentation

The Analysis and Countermeasures toward the Inbound Tourist Market of the Silk Road on Land

Lake Balaton Recreational Area

LIST OF BENEFICIARIES OF THE CROSS-BORDER COOPERATION PROGRAMME POLAND-SLOVAK REPUBLIC

Company Profile Division of special systems

Investor Presentation

Ministry of Communications and Transport

DaHar Danube Inland Harbour Development

To be honest the situation is so fluid that there s every chance this presentation could be out of date by the time I have finished speaking!

TERMS AND CONDITIONS OF CARRIAGE FOR IC TRAINS IN ZSSK

Air transport in The Conditions of The Slovak Republic

IMPACT OF EU-ETS ON EUROPEAN AIRCRAFT OPERATORS

Roadmapping Breakout Session Overview

N4 Carrick-on-Shannon to Dromod Road Project. 2.1 Introduction

Carpatho-Balkan-Dinaric Conference on Geomorphology

CHAPTER 4: ALTERNATIVES

Investor Presentation

ScienceDirect. Aircraft parking stands: proposed model for Indonesian airports

Project Data Sheet BASIC PROJECT DATA. Rehabilitation and Development of Transport and Navigation on the Sava River Waterway. Full project title:

SIMULATION OF BOSNIA AND HERZEGOVINA AIRSPACE

ANA HOLDINGS Announces Mid-Term Corporate Strategy for FY ~Strengthening the foundations of the business and looking into the future~

SECTOR ASSESSMENT (SUMMARY): Transport, and Information and Communication Technology - Air Transport 1

Official Journal of the European Union L 337/43

L. Issaia - Keramida Consultant to the Managing Director of ERGOSE

Will? Can? What? Event. Where? Place. When? Time. Which? Choice. Who? Person. Why? Reason. How? Meaning. Would? Could? Might? Should? Is? Does? Are?

The role of recreation demand and supply information in monitoring outdoor recreation sustainability. Joel Erkkonen and Liisa Kajala

Alternative solutions to airport saturation: simulation models applied to congested airports. March 2017

From rail timetables to regional and urban indicators on rail passenger services

FEDERAL BUDGET PRIORITIES FOR THE SOUTH WEST METROPOLITAN REGION 2018 TO 2022

CRITICAL FACTORS FOR THE DEVELOPMENT OF AIRPORT CITIES. Mauro Peneda, Prof. Rosário Macário AIRDEV Seminar IST, 20 October 2011

1. INTRODUCTION 2. OTAS AND THE MFN CLAUSE

The Sunshine Coast is part of the global community and generates wealth through export, high-value industries and new investment.

Project of E-763 Motorway Construction, Section: Belgrade Ostružnica - Požega Boljare/ Border of Montenegro

ECTRI FEHRL FERSI Young Researchers Seminar June 17 19, 2015 Rome, Italy

How many tourists can Galapagos accomodate? 1 Bruce Epler a & María Eugenia Proaño a

WELCOME TO SLOVAKIA THE 72 ND IIW ANNUAL ASSEMBLY AND INTERNATIONAL CONFERENCE 2019 BEING HELD. 7 th 12 th July 2019

Present-Day. History. Future. Contents. References

TOP TEN. TOP TEN 10 must see spots of the Prešov Region. 10 must see spots of the Prešov Region

This Bulletin may be updated, as necessary, as progress is made toward the start date for Phase 2b of the NAT DLM.

The Government s Aviation Strategy Transport for the North (TfN) response

Need a world-class aviation keynote speaker? Phone Patrick Dixon now or .

NATIONAL AIRSPACE POLICY OF NEW ZEALAND

NATIONAL BACKGROUND REPORT ON TRANSPORT FOR KOSOVO *

9 CONSTRUCTION OF BATHURST STREET FROM GREEN LANE WEST TO SOUTH OF HIGHWAY 11, TOWN OF EAST GWILLIMBURY AND TOWNSHIP OF KING

COMMISSION OF THE EUROPEAN COMMUNITIES COMMUNICATION FROM THE COMMISSION. Developing an EU civil aviation policy towards Brazil

Transport infrastructure in the Danube region ROAD LINKS. Slovenko Henigman Metod Di Batista

Views of London Forum of Amenity and Civic Societies to the House of Commons Environmental Audit Committee on the Airports Commission report

The Role of Slovak Airports in Tourism Development

Water quality management in the Lake Baikal region of Russia

High-speed rail and European transport policy

reviewed paper Sustainability via Soft Natural Resource Management. The Coastal Area of Vouliagmeni Agisilaos Economou

Comparison on the Ways of Airworthiness Management of Civil Aircraft Design Organization

SIAFI Europe 2005 Paris, Passenger Rights: Problems at issue and latest developments (passenger charter, etc.)

From: OECD Tourism Trends and Policies Access the complete publication at:

Egnatia Odos: An axis for development and co-operation

BNA Master Plan Update Community Advisory Committee Meeting No. 5

Protection of Ulcinj Saline

Network of International Business Schools

UGANDA S URBAN DEVELOPMENT; A SCRUTINY OF TRANSPORT PLANNING AND MOBILITY IN TOWNS AND CITIES

The Austrian Federal Economic Chamber. Representing the Interests of Business

Lake Erie Commerce Center Traffic Analysis

Scientific Support to the Danube Strategy

MAXIMUM LEVELS OF AVIATION TERMINAL SERVICE CHARGES that may be imposed by the Irish Aviation Authority ISSUE PAPER CP3/2010 COMMENTS OF AER LINGUS

Submission to. Southland District Council on. Draft Stewart Island/Rakiura Visitor Levy Policy and Bylaw

HEATHROW COMMUNITY NOISE FORUM

Discussion on the Influencing Factors of Hainan Rural Tourism Development

SWOT Analysis Religious Cultural Tourism

CHANGES OF ROAD ADMINISTRATION IN HUNGARY

HELLENIC REPUBLIC Voluntary National Review on the Implementation of the 2030 Agenda for Sustainable Development. 16 July 2018

ScienceDirect. The Role of SPA Tourism in the Development of Local Economies from Romania

Research on Management of Ecotourism Based on Economic Models

Research on Controlled Flight Into Terrain Risk Analysis Based on Bow-tie Model and WQAR Data

Study on the Consumption of Agritourism in China

EU MACRO-REGIONAL STRATEGY FOR THE CARPATHIAN REGION. Gabriela Szuba Ministry of the Environment, Poland Modra, June 2017

Transcription:

Available online at www.sciencedirect.com ScienceDirect Procedia Engineering 91 (2014 ) 441 446 XXIII R-S-P seminar, Theoretical Foundation of Civil Engineering (23RSP) (TFoCE 2014) Possibilities of Increasing Territorial Coverage and Operational Performance of the Tatra Electric Railways Libor Ižvolt a, Michal Šmalo a * a Department of Railway Engineering and Track Management, FCE, University of Žilina, Univerzitná 8215/1, 010 26 Žilina, Slovak Republic Abstract In the context of requirement of environmental protection in the Tatra National Park (TANAP) and the territorial coverage solution primarily with ecological railway transport becomes current demand of extending the current network of Tatra Electric Railways (TER) and possibly to connect Slovak and Polish side of the mountains. The basic prerequisite for a functional, safe and attractive operation of the Tatra Electric Railways is modernization of existing lines, because current state causes not only high maintenance costs, but also significantly reduces the speed, safety, reliability and operational efficiency. The paper suggests ways to reconstruct the existing network and upgrade it to achieve the required technical parameters in case of attractiveness of rail transport in the High Tatras. 2014 The The Authors. Authors. Published Published by Elsevier by Elsevier Ltd. This Ltd. is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/3.0/). Peer-review under responsibility of organizing committee of the XXIII R-S-P seminar, Theoretical Foundation of Civil Peer-review Engineering under (23RSP). responsibility of organizing committee of the XXIII R-S-P seminar, Theoretical Foundation of Civil Engineering (23RSP) Keywords: infrastructure; railway; territorial coverage; narrow-gauge lines; operational performance. 1. Introduction Infrastructure in the region of High Tatras represents a unique transport system, where in addition to shipping, exists or existed perhaps all that it was possible to transport. There was a electrobus over 100 years ago running in the High Tatras, there are tracks of normal and narrow gauge, narrow gauge adhesive cog track, cableways and funicular railway. There is located the highest situated airport near Poprad for airliners in Central Europe providing mainly charter flights in the winter and summer season. High Tatras welcomed the first visitors already in the 16 th century and the first foreign explorers and scientists began to be interested in the mountains in the 18 th century. They found paths in the forest from the Tatra villages used by hunters, herbalists, shepherds, and treasure hunters. The first log cabin was built in acid springs under the Slavkovský Peak up in 1793 [1]. * Corresponding author. Tel.: +421-041-513 5849. E-mail address: michal.smalo@fstav.uniza.sk 1877-7058 2014 The Authors. Published by Elsevier Ltd. This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/3.0/). Peer-review under responsibility of organizing committee of the XXIII R-S-P seminar, Theoretical Foundation of Civil Engineering (23RSP) doi:10.1016/j.proeng.2014.12.019

442 Libor Ižvolt and Michal Šmalo / Procedia Engineering 91 ( 2014 ) 441 446 Nearly one hundred years later in 1871 there was opened a 139 km long section of Košice-Bohumín Railway (hereinafter referred to as KBR ) from Poprad to Žilina, which resulted in a breakthrough in the development of tourism. The connection of the highest station of KBR Štrba and Štrbské Pleso with cog railway was established in 1876. In spite of the rapid development of settlements, the construction of the luxury grand hotels and bathhouses, adequate connection was still missing. Tatra settlements were connected with each other by narrow paths, roadways led only to "parent" villages in Poprad basin. Due to competitive reasons, some of them even resisted the road connection with neighbouring settlements. Also for these reasons, the first motorists from Poprad arrived in Starý Smokovec in 1900. Electrobuses pioneering three-axle vehicles on wooden wheels - were running on this route from 1904. They proved to be unreliable and slow on the steep road with uneven surface they overcame 12 km long route in 75 minutes. For these reasons, the operation was inflexible, but still an attractive tourist line, completed in 1906, and there started the preparatory work for the construction of electric railway connecting Tatra settlement with Poprad. Already in 1906 there were initiated measuring works and a year later the actual construction of narrow gauge railway track. Transport at the first, 12.8 km long section of electric railway from Poprad to Starý Smokovec, was launched on 20 th December 1908. Number of defects in a newly installed railway claimed to take radical measures to build a network of electric railways by the construction of a railway connection Starý Smokovec Tatranska Lomnica and Starý Smokovec Štrbské Pleso, and the realization of extensive reconstruction of existing electric railway (comprising mainly replacement of the superstructure, route changes of some sections, modernization of power facilities, construction of a new depot in Poprad and later the station building in Starý Smokovec). The reconstruction work was initiated in March 1910 and the most important building structures were put into use three months later. The construction of other track sections ran together with the reconstruction of the first section. Public operation in the section Starý Smokovec Tatranska Lomnica (section length of 6.0 km) was iniciated on 16 th December, 1911 and the first train visited from Starý Smokovec to Štrbské Pleso on 13 th December, 1912 (section length of 16.6 km) [1]. The Tatra railway network should have expanded even further and although the section from Štrbské Pleso to Podbanské, with a possible extension to Liptovský Hrádok, branching-off to Popradské Pleso and railway from Tatranská Lomnica to Tatranská Basin and Levo a. However, all of these bold plans at that time were frustrated by the beginning of World War I and the railway tracks remained at approximately the extent that we know them today [2]. In the mid-50 years of the last century, narrow gauge tracks in the High Tatras were threatened by extinction. Accumulating problems in keeping the operation of unsafe vehicles on the tracks with poor maintenance, which led to many emergency situations, resulted in the need to find a definitive solution to the future of the Tatra railway. Government Transport Design Institute (Státní ústav dopravního projektování SUDOP) in Prague and Košice subsequently developed extensive reconstruction studies for standard gauge railway from Poprad to Tatranská Lomnica and its extension through Starý Smokovec to Nižné Hágy and its connection to the main track in Štrba [3]. The decision to hold the FIS Nordic World Ski Championships in 1970 opened consideration of reconstruction of Tatra transport system, with a number of solutions proposed. One of them was even complete cancellation of TER and its replacement by road transport. However, the proposals to rebuild the "Cesta slobody" (Road of Freedom) on four-lane road did not meet with understanding of Tatra National Park Administration (TANAP). The environmentalists requirements were heard and the invasion of cars, at least for some time, was averted [4]. Another design should be the realization of monorail of ALWEG type, which should replace the existing narrow gauge railways and connect Poprad with Štrbské Pleso. Monorail sparked controversy among experts in the field of transport, but perhaps the whole Republic discussed about the pros and cons of this overhead railway. Bold plans then counted with the extension of the track to Ždiar, Lysá Po ana, but also its connection with the Polish side of mountains. After careful consideration of the advantages and disadvantages of the possible alternatives of transport service of the High Tatras, there were eventually proposed to continue the reconstruction of TER, modernize funicular Starý Smokovec Hrebienok and restore earlier cancelled cog railway Štrba Štrbské Pleso [1]. Narrow gauge railway is the central transport system in the High Tatras for over 100 years. During this long development, many parameters of tracks gradually changed due to reconstructions, relocation and other modifications. The biggest building interventions during the existence of tracks include relocation bypassing the urban part of Poprad-Ve ká with a new entry site in Poprad-Tatry railway station, construction of a new depot in Poprad and Štrbské Pleso railway station in a new location close to the existing station of cog railway to Štrba.

Libor Ižvolt and Michal Šmalo / Procedia Engineering 91 ( 2014 ) 441 446 443 2. Possibilities for TER extension and interconnection As it was already mentioned in the introduction, narrow gauge railways are verified transport system on the Slovak side of the High Tatras over a century. However, technical progress is unstoppable and increasing demands for the speed, safety, environmental protection and attractiveness of railway operations put on the TER tracks new targets that can only be achieved by reconstructing and modernizing of their tracks or their double-tracking, extending or even connecting with the Polish part of the High Tatras. A reliable operating railway transport in the High Tatras on both sides of national borders of Slovak Republic and Poland (hereinafter referred to as "SR", "PL") is not only a good option to increase the attractiveness of this location for its visitors, but also the only possible competition-capable alternative of still expanding individual car transport. The issue of future of the TER tracks and attractiveness of the transport system in the High Tatras region by increasing the speed, compacting interval between trains and better connections to rail service on the main line Bratislava Žilina Košice, or creating a connection of Poprad Airport, is a current problem in relation to the requirement of environmental protection in TANAP and solutions of serviceability of the area for the ecological railway transport. There were already efforts to extend the current network of TER in the territory of the High Tatras, or its connection with the Polish side in the past, and this idea is not new at all. However, its implementation is more current not only for the above reasons, but also because of the increased mobility of the population resulting of the existence of the borders of the Schengen area and promoting the ideas of the necessary cross-border cooperation in order to create new jobs and increase tourism in the area of the Slovak-Polish border. From the rest of the period there is known more than one study, where dealt with the possibility of extension of the TER network, or connection of two neighbouring State territories. There were prepared two variants of informative proposal of a new route in [5] considering the connection of the existing TER platform in railway station in Poprad-Tatry with Poprad Airport and the subsequent conduction of the route through the village Batizovce and Gerlachov to existing passing loop Tatranská Polianka. The first variant assumes the connection of a new section of the connecting track to RD Poprad- Tatry TER and subsequent routing to the main railway line Žilina Košice. The second variant is considering with the beginning of the section approximately km 3.000 (right-hand directional curve with a radius of 300 m) of the existing track, and parallel direction with the motorway section D1 Mengusovce Jánovce to Poprad Airport. The remaining section of the new railway track is identical to the first variant. The connection of TER network with Poprad Airport would significantly attract the connection of a significant railway intersection and the highest airport for transport aircraft in Central Europe, which, during the winter, but also the summer tourist season accepts a number of Charter flights. Other bold plans include connection of TER track system with the Polish side of the High Tatras. The connection of both border territories of mountains is the current issue from the fifties of the last century and they did not come into focus only before the FIS Nordic World Ski Championships (1970), but also in relation to the candidacy of Poprad for the Olympic Winter Games (2006) and this chance has opened again in connection with the candidacy of Poland to the Winter Olympics in 2022. The extension of TER network through the villages of Ždiar and Tatranská Javorina should connect the centers of tourism of Slovak side of mountains with the Polish, especially with Zakopané, or Nowy Targ and Krynica. Preliminary study of the possible extension of the TER network to the Polish side of the High Tatras is shown in Fig 1. It may be seen that the new railway would connect to the existing route in Tatranska Lomnica railway station and continue through the settlements of Vysoké Tatry Tatranské Matliare and Tatranská Kotlina to the village Ždiar, where this route follows the horizontal and vertical alignment of existing roads II/537 and I/67 to the extent possible. In section Ždiar Podspády Lysá Po ana (state border SR/PL), the railway track continues to copy morphologically difficult terrain of Belianské Tatry and is parallel with state road I/67. On the Polish side of the High Tatras, the railway track would follow again the roads no. 960 (section ysa Polana Bukowina Tatrza ska) and no. 961 (section Bukowina Tatrza ska - Poronin) to the extent possible. There is proposed a route in parallel with the railway track no. 135 Kraków G ówny Chabówka Zakopane in the section Poronin - Zakopane. With the support of EU funds, there were already developed two conceptual proposals in 2003 related to rail transport solutions not only in the High, but also Low Tatras: Tatra transport system and nature protection, Study on the tourist route around the Western Tatras from Zakopané to Liptovský Mikuláš.

444 Libor Ižvolt and Michal Šmalo / Procedia Engineering 91 ( 2014 ) 441 446 The project "Tatra transport system and nature protection" was prepared by a group of experts led by the representatives of the Municipal authorities in Zakopané and Poprad. The project pointed out to deficiencies and non-systemic connection of transport systems on both sides of the Tatras. There was developed a proposal of transport system within the project in accordance with the principles of equal development following the principles of the protection of the environment. In the same period, there was prepared Study on the tourist route around the Western Tatras from Zakopané to Liptovský Mikuláš. This project included cooperation of company Belasá planéta, MO Zakopané and DO Žilina. There is a proposal of transport system in the area of Tatras in Fig. 2 resulting from both of the projects, where an important element of this proposal, which are tracks, is obvious. It is assumed that urban development axis allows spatial integration of at least 40 municipalities and 2 cities with targeted development of tourism. Fig. 1. Prefeasibility study of extension of the Tatra Electric Railway tracks. In this context, it is certainly an interesting idea that PKP PLK S.A. has been planning reconstruction of canceled track section Nowy Targ Podczerwone Trstená since 2006, which is part of the track connecting Kraków and Vienna. The reconstruction of this route is of a great importance in freight transport. Informative term of implementation of reconstruction section Nowy Targ Podczerwone Suchá Hora is scheduled for 2020. The railway superstructure in the section Nowy Targ Podczerwone was dismantled in 1991 and 1992 and the lands were handed over to the local government administration. At present, the property fell into ruins, and unfortunately, most of the railway structures on the track were damaged. Given that there is intense truck traffic in this area, many Members of the Polish Parliament support the reconstruction of the track in question. Before the interconnection of the track network TER to interesting locations of the Polish side of the High Tatras is necessary to reconstruct and modernize the existing sections.

Libor Ižvolt and Michal Šmalo / Procedia Engineering 91 ( 2014 ) 441 446 445 Fig. 2. The intent of interconnection of border areas Orava, Liptov and Zakopane [6]. Given the hard horizontal and vertical alignment of the TER tracks, sudden changes in routing parameters, difficult geomorphological and climatic conditions, it is necessary to approach the design of reconstruction or modernization of these tracks particularly sensitively and professionally. The infrastructure manager identified for the most serious weaknesses in the structure of railway superstructure and substructure the following [7]: failures in track geometry, which have origin in freezing subgrade structure, respectively in inadequate drainage, directional shifts in curves (especially during winter and summer), suggesting a lack of rigidity of track skeleton, wear of the check rail Kn 60, rail corrugations and spreading of the rail head, weathered rocks falling, inconvenient condition of culverts, supporting and retaining walls, incomplete recovery of platforms for new power units, inconvenient structural elements of railway level crossings. There has not yet been applied the structure of continuously welded rail track (hereinafter referred to as "CWR track") on the TER tracks, now established element in the structure of railway superstructure around the world, providing several benefits. The structure of CWR track does not only reduce the maintenance cost of tracks and rail vehicles, but also contributes to increasing the safety and reliability of rail transport, comfort for passengers, where it is possible to characterize the operation as more environmental [8]. The objectives of a possible modernisation of the TER tracks are to increase the speed, comfort and safety of traveling. In addition to providing the necessary reconstruction, the basic requirement is, therefore, change of some parameters of the tracks in order to meet these objectives. Considering the modernisation it is necessary and appropriate to increase track speed of today's 60 km.h -1 to 80 km.h -1 in the selected sections depending on parameters of track geometry (hereinafter referred to as "TG"). It is possible to increase the radius of directional curves R in some directional curves (in particular in sections passing through Poprad basin) and adjust the TG parameters so these curves can be used for higher track speed. The track parameters adjusted are then necessary to adapt security and communication device for the future increase of the total track permeability and the introduction of attractive time-keeping transport for passengers. It is possible to

446 Libor Ižvolt and Michal Šmalo / Procedia Engineering 91 ( 2014 ) 441 446 double-tracking the selected sections (eg. Ve ký Slavkov Pod lesom) in the future as well, thereby increasing capacity of the track [9]. In terms of construction of railway substructure it is necessary to reconstruct (or modernize) in particular drainage structures. Culverts are necessary to purify and reconstruct, some of them substitute for new to ensure their full functionality again. Particular attention should be paid to supporting and retaining walls, and especially in areas of potential landslides. There should be even considered the modification of bridges for example in conjunction with the construction of CWR track. From the railway substructure devices, it is necessary to pay attention in particular to platforms. Platforms topped with a solid edge are needed to rebuild so to have the solid surface and strong edge to ensure barrier-free access for passengers to low-floor electrical units. Access roads are also necessary to adjust for barrier-free access. Attention must also be paid to the level crossings with roads state roads of 2 nd and 3 rd class, special-purpose and local roads, country and forest roads and foot paths. 3. Conclusions It is clear from the above activities that the issue of attractiveness and approach of the territory of Tatras on both sides to their better and more ecological use in recent years is alive not only in Slovakia, but also in Poland. A considerable undersize of road transport between regions gives evidence in the benefit of construction of railway connestion between Slovak and Polish part of the Tatras, when the number of vehicles is above the acceptable limit and motorists must overcome great distances or often use problematic drive-through mountain passages in winter. In addition, road transport loads significantly down the environmentally valuable region. An extension of the original TER network, or railway connection of both sides of the State border SR/PL would assess both regions and open new possibilities for mutual cooperation not only in the field of tourism. It is clear, however, that achieving this goal will not be easy. The problem of the implementation of the extension of the TER, connection of the Slovak and Polish part of the High Tatras, or even more generous connections, and therefore economic use of mountain and submontane regions of Orava and Liptov, following the area of Zakopané in Poland is not only costly, but it is difficult to create conditions for the extension of the TER infrastructure, which lies in overcoming legal and conservation measures in relation to the construction on the territory of the National Park. It is understood that the implementation of these ideas must precede development of transport and economic studies, documenting problems, proposals and solution phases, but mainly a way of achieving the necessary transport capacities with the proposal of financing the operation of the rail system, with the support of the business community, region and state. Acknowledgements The contribution originated within the framework of OP Education for the project "Promoting quality education and research in the field of transport, as the engine of the economy" (ITMS: 26110230076), which is co-financed from the resources of the European Social Fund. References [1] Kuba ek et al.: The history of railways in Slovakia (in Slovak). Košice: OTA, 2007. ISBN 798-80-968864-5-6. [2] I. Bohuš: Changes of settlements in High Tatras (in Slovak: Premeny tatranských osád). Poprad: I & B Bohuš, 2008. ISBN 80-96901-76-0. [3] V. Borek: Electric units EMU 89.0 (in Slovak). Praha: Nakladatelství Corona, 2006. ISBN 80-86116-36-0. [4] D. Lichner: Through Tatras by tram (in Slovak). Žilina: EDIS-vydavate stvo ŽU. ISBN 978-80-554-0780-7, 2013. [5] L. Salenka: Use of Tatra Electric Railway to connect recreational centers in the High Tatras to Airport Poprad, Bachelor thesis (in Slovak) University of Žilina, The Faculty of Operation and Economics of Transport and Communications, Department of Railway Transport, Žilina, 2010. [6] www.hearth.sk, 06/2014 [7] R. Novak: Reconstruction of infrastructure TER and cog railway. Prefeasibility study (in Slovak: Rekonštrukcia infraštruktúry TEŽ a OŽ. Výh adová štúdia). STRAHOS 14th seminar, Poprad, 2010. [8] M. Šmalo: Analysis of the Possibilities of the Establishment of Continuously Welded Rail Track on the Tatra Electric Railway. In: STRAHOS 2014 16th seminar, Žilina, EDIS vydavate stvo ŽU, 2014. - ISBN 978-80-554-0860-6, s. 143-150. [9] M. Šmalo, L. Ižvolt: The possibility of the establishment of continuously welded rail track on the Tatra Electric Railway. In: EURO-ŽEL 2014, Recent Challenges for European Railways: Žilina: Tribun EU, 2014. ISBN 978-80-263-0700-6, 2014.