Meeting Notes Public Open House

Similar documents
Lake Tahoe Airport Master Plan

Addendum - Airport Development Alternatives (Chapter 6)

October 2014 BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN PRESENTATION

Chapter 5 Airport Development Alternatives

Appendix 6.1: Hazard Worksheet

MASTER PLAN UPDATE. Planning Advisory Committee (PAC) FRESNO YOSEMITE INTERNATIONAL AIRPORT. Meeting #4

RECONSTRUCT/REHABILITATE TRANSIENT APRON AND TAXIWAY 'A' PHASING PLAN - PHASE 1

FORECASTING FUTURE ACTIVITY

Raleigh Executive Jetport Master Plan Update MPAC MEETING #3 NOVEMBER 1, 2018

1 PURPOSE AND NEED 1.1 INTRODUCTION

Airport Master Plan Open House Front Range Airport February 23, 2017

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015

Chapter The All-new, World-class Denver International Airport Identify Describe Know Describe Describe

Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3

2018 Airport Master Plan Overview of Development Concepts. Greg Ballentine (WSP)

Lopez Island Airport Master Plan Update. Public Meeting June 15, 2017

SOPs for Cedar Valley Airport UT10

2009 Muskoka Airport Economic Impact Study

KSBP HIGH. San Luis County Rgnl Airport San Luis Obispo, California, United States

PREFERRED PLAN Kahului Airport Master Plan and Noise Compatibility Program Update

Airport Master Plan for. Brown Field Municipal Airport PAC Meeting #3

HILLSBORO AIRPORT MASTER PLAN UPDATE Planning Advisory Committee Meeting 1

Wyoming Valley Airport Proposed Improvements. Presented June 26, 2012 By The WBW Airport Advisory Board & FBO

General Aviation Master Plan Update

Chapter 4 Airport Facility Requirements

JUNEAU RUNWAY INCURSION MITIGATION (RIM) PROGRAM. April 10 th 2017

Appendix D Airfield Ongoing Projects Alternatives

Ref. AIM Para AOPA Air Safety Foundation Supported by the FAA Ref. AIM Para Supported by the FAA

Input Efforts Online survey of tenants and users Focus group meetings with Tenants and users Agencies and stakeholders General Aviation Pilot

Punta Gorda Airport Master Plan Update

Chapter 2 FINDINGS & CONCLUSIONS

TABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved

Inauguration 2017 Dulles Tower

AIRFIELD OPERATIONAL INSTRUCTION 26 GENERAL AVIATION OPERATIONS

Dallas/Fort Worth International Airport Winter Weather Season Kick-Off Meeting

TO: Planning Advisory Committee (PAC) Members RE: Pangborn Airport Master Plan PAC Meeting #4 Presentation Material DATE: July 18, 2017

PORT OF PORTLAND. Chapter Six AIRPORT PLANS

MEETING MINUTES Page 1 of 5

Grants Pass Airport Master Plan & Airport Layout Plan Update

Safety, Infrastructure, and Tenant Improvement Project. Public Hearing Informational Brochure February 26, 2013

Airlake Airport 2035 Long Term Comprehensive Plan (LTCP)

Preferred Alternative Summary

JUNEAU RUNWAY INCURSION MITIGATION (RIM) PROGRAM JANUARY 25, 2017

Hartford-Brainard Airport Potential Runway Closure White Paper

Yolo County Airport. ALP Narrative Report. April Prepared by Mead & Hunt, Inc. for the County of Yolo, California

ArcadiaMunicipalAirportislocatedonthesoutheast sideofarcadia,southofstateroute70,westofstate Route31,andisaccessiblefrom AirportRoad.

print materials visit information on free live seminars, online courses, and

Preliminary Findings of Proposed Alternative

Chapter 8.0 Implementation Plan

CHICO MUNICIPAL AIRPORT NON-MOVEMENT AREA DRIVER TRAINING PROGRAM

Vista Field Airport. Master Plan Update. February, Prepared for: Port of Kennewick One Clover Island Kennewick, Washington

BUSINESS OF THE CITY COUNCIL CITY OF MERCER ISLAND, WA

PIERCE COUNTY-THUN FIELD AIRPORT MASTER PLAN MASTER PLAN ADVISORY COMMITTEE (MPAC) AIRPORT TOUR RD AVE. E., PUYALLUP, WA WEDNESDAY,

JWN Runway Safety Area Project Summer 2015 Closure

LOS ANGELES COUNTY DEPARTMENT OF PUBLIC WORKS AVIATION DIVISION

New PFC Application #13

PORT OF PORTLAND. Chapter Seven CAPITAL IMPROVEMENT PROGRAM

CHAPTER 3 ALTERNATIVES CONSIDERED

Regional Jets ,360 A319/ , , , ,780

TECHNICAL ADVISORY COMMITTEE MEETING 3 SEPTEMBER 10, Airport Master Plan

105 SKY KING TAXI-WAY - SPICEWOOD, TEXAS

Table of Contents. Overview Objectives Key Issues Process...1-3

Appendix D Project Newsletters. Tacoma Narrows Airport. Master Plan Update

FRENCH VALLEY AIRPORT (F70) Sky Canyon Dr. Murrieta, CA. Phone: Riverside FAA FSDO Complaint Line: (951)

JACIP-AIRPORT PROJECT DETAIL REPORT August 15, 2007

PULLMAN-MOSCOW REGIONAL AIRPORT Runway Realignment Project

Technical Memorandum. Synopsis. Steve Carrillo, PE. Bryan Oscarson/Carmen Au Lindgren, PE. April 3, 2018 (Revised)

SANTA MONICA AIRPORT VISIONING PROCESS: PHASE III FINDINGS AND NEXT STEP RECOMMENDATIONS APRIL 30, 2013

STUDY WORK GROUP MEETING No. 4. July 12, 2017

Chapter Four ALTERNATIVES

MERRILL FIELD AIRPORT

Regular Board Meeting August 4, 2015

BNA Master Plan Update Community Advisory Committee Meeting No. 5

Waterfront Concept Plan: Community Survey Summary

Relevant Andrews Transmissions (all times EDT) Work Complete Feb 17-18, 2004 Miles Kara

Airfield Design OVERVIEW BASIC DESIGN FACTORS. Airport Role

Planning & Development Group

The Ohio State University Airport Master Plan Update Public Meeting 2

WELCOME TO YOUR REGIONAL AIRPORT AUTHORITY MEETING OF THE CITY OF MERCED AGENDA SPECIAL MEETING

Hutchinson Regional Airport Request for Proposals for Hangar Lease RFP #15-163

INDEPENDENCE STATE AIRPORT (7S5)

Technical Advisory Committee Meeting February 29, 2016

BELFAST MUNICIPAL AIRPORT OVERVIEW

TRUCKEE TAHOE AIRPORT DISTRICT BOARD OF DIRECTOR STAFF REPORT

CHAPTER 1: INTRODUCTION

Cuyahoga County Airport Master Plan Update Draft Final Report APPENDIX E AIRPORT SURVEY RESULTS

4.0 Context for the Crossing Project

Aviation Planning in Maine and Our Region. Stacie Haskell Aviation Coordinator & Study Manager Maine Department of Transportation April 27, 2011

These fee changes have been established in order to establish base fee recoveries for expanding infrastructure and ongoing annual maintenance.

Planned Procurement Opportunities Report. June 2017

COMMERCIAL AND GENERAL AVIATION

Notice and Opportunity to Comment on New Proposed Passenger Facility Charge (PFC) New Application

Meeting Summary ABE Master Plan Project Advisory Group (PAG) Meeting #3 August 15, Shannon Eibert, C&S Companies

Master Plan Update Community Advisory Committee Kick-off Meeting

The Future of Tipton Airport in Anne Arundel County

LANCASTER AIRPORT DRIVER TRAINING PROGRAM

Stephanie Sinnott, Executive Director, Finance, Office of the City Manager

Session Best Practices Amendments From Annex14, Volume I Annex 15. Runway Incursions Runway Excursions

Eugene Airport Master Plan Update Executive Summary

Milton. PeterPrinceAirportislocatedinSantaRosaCounty, approximatelythreemileseastofmilton.

Transcription:

Meeting Notes Public Open House, 5:30-8:00 pm Fairbanks Pipeline Training Center, 3605 Cartwright Court, Fairbanks, Alaska= Agenda: Open House: 30 minutes Presentation: 45 minutes Question and Answers: 30 minutes Post Open House Rankings: 45 minutes Number of Public that signed in: 29 Number of Advisory Committee Members that signed in: 6 Number of Project Team: 6 Presentation Summary: Tom Middendorf presented the purpose and schedule of the master plan, results of the user survey, explained each alternative, and invited feedback via ranking the importance of each of the alternatives after the presentation. Attached are the slides from the presentation. Summarized Public Comments: Public funding for the proposed GA facility should be considered. Response: The team has investigated multiple funding options, public private partnerships, and AIDEA funding. The airport currently has publicized a Request for Interest for private development of the facility. The option of moving transient parking to block taxiway B is flawed and lots of times the row is empty. Transient parking location should be reconsidered. Response: The team agreed and will consider this in the location for transient parking. Campground The road access road through the campground will make the campground less attractive and could drive away potential campers. Response: The team will look into moving the access road so that it does not interfere with campground usage. Campground Usage was requested: See below for response: January April 2018: 0 May August 2018: September October 2018: January April 2017: 0 May August 2017: 101 September December 2017: 22 January April 2016: 0 May August 2016: 131 September December 2016: 6 January April 2015: 0 May August 2015: 120 September December 2015: 8 January April 2014: 1 May August 2014: 166 September December 2014: 16 Two floatplane pullout ramps are better than one. Closing the floatplane ramp may not eliminate the congestion but moving the fueling facility will. There is congestion during hunting season. Response: The team will investigate a second location for a floatplane ramp. A comment was made that some float pond users move to a tie down spot for the winter to use skis and tires and that the team needs to consider float pond trailer traffic. PAGE 1 OF 2 PROJECT WEBSITE: www.faieastsidemasterplan.com

Meeting Notes Public Open House A comment was made that if Taxiway C is controlled all the way, it will force all pilots to have a radio and some pilots will be unhappy with the idea. Also, the north portion of Taxiway C is not used much for vehicles. A comment was made by the FAA tower that the FAA is looking for solutions to help keep pilots safe and making Taxiway C fully controlled may be one way. Also, the tower would prefer to be able to see all taxiways. A comment was made that Taxiway C control should not extend the entire length. A comment was made that it is hard for ski equipped aircraft to make 90 degree turns. C3A Helicopter use area A comment was made that the suggested area for helicopter use is too large and that five helicopters can be parked on less than ½ acres. Response: The area could be used by DNR Forestry, which predicts the need for a large area for helicopters and support facilities. A comment was made that snow impacts is a huge deal for the tenants and when there is a large dump of snow the Eastside tenants would like to keep their tiedown and apron spaces free of snow. Response: The team and FAI understand that this is an important issue and the plan has a designated a tenant snow storage location. A comment was made about what the purpose of a master plan was and how future demand was gauged. Response: Tom explained that the purpose of a master plan is to look at current and future airport needs. Future demand is gauged by gathering data from many sources: tiedown rentals, floatpond slip rentals, lease lot and hanger demand, numbers of and average age of pilots, and user interviews overall the short answer is that long term demand is hard to gauge, slip demand and hangar demand appear to be growing and tie down demand has been flat or declining. The owner of ProFlight stated that Taxiway R is used by their students as an exit point. A question was made as to why the helicopters are unable to keep using the grass area that they currently use. Response: Lease lots have been created in that spot and FAI is in the process of leasing them out. Question about what was going on at Taxiway D. Response: GVEA will be installing electric in that area. It is unknown when the project will start and end. FAI will try to get an update on the progress and minimize impacts to users. A comment was made that parts of the floatpond are too deep and causes wave action and bank erosion. A comment was made that the floatpond lot fingers help reduce wave action. A comment was made to remove Taxiway B. A comment was made to extend the floatpond south. After the question and answer period the public where given dot stickers to evaluate each of the groups of alternatives. The choices the public were able to vote on were:, Least and Don t Want. Attached are the final rankings and comments made. PAGE 2 OF 2 PROJECT WEBSITE: www.faieastsidemasterplan.com

Alternative A: Runways and Waterlane A1 A2A A2B A3 Close South Floatplane Ramp to Eliminate Waterlane Conflicts Relocate Floatplane Fueling (for Ski and Floatplane Aircraft) to Float pond Extension Relocate Floatplane Fueling (for Ski and Floatplane Aircraft) to Gravel Tie Down Reserve Land for Future GA Facilities and Add Selective Fencing Overall Comments N/A, Tenant N/A, Tenant 1 5 3 3 4 7 1 $ 3 2 3 Remove southern most fingers to allow more space for aircraft waiting to depart 2W and eliminate waiting south of the waterway. Controlled waterlane should be shown extending from north bank to south bank. No slips at the ends of the float pond slips near the water lane. A1 - Keep it open. A2B - More favorable if additional fingers added. Congestion C ramp is because of fueling more than from people trying to use the ramp. Moving fuel will solve problem more than removing ramp. Alternative B: Taxiways and Incursions B1 Align Aircraft Parking to Block Direct Access from Roads/ Apron to Runways (Inset A) Part of C1 3 B2 Taxiway B - Delete Access from Float Pond Road $ 1 2 B3 B4 Taxiway C - Extend ATCT Controlled Surface to Full Length Taxiway C Taxiway D - Straighten Taxiway and Add Adjacent Apron Vehicle Lanes 1 3 Part of C1 3 1 B5 Taxiway R - Exit Only, Shift or Delete Taxiway $ 1 9 B6 B7 Taxiway S Exit Only, Remove Direct Access to Apron, or Delete Taxiway Taxiway T Shift Taxiway South and Narrow Taxiway to Align with Threshold, Remove Direct Access to Apron, Adjacent Runup Area $ 1 7 $ 5

B8 Taxiway U Remove Direct Access to Apron Part of C1 B9 Taxiway V Remove Direct Access to Apron, Exit Only, Shift Connector to Float Pond Road $ 1 1 3 B10 Reconfigure Float Pond Road as a Taxilane $$$$ 6 1 B11 New South End Taxiway Connector at Taxiway Q (Long Term) $$$$$ 1 2 B12 Reduce Vehicle Incursions Alternatives B12A Relocate Float Pond Access Road, Add Gate $$$ 1 1 7 B12B Repair Inoperable Road Gate Arms $ 7 3 Reduce Number of Apron Access Roads on B12C $ 1 1 South University Ave B12D Add Security Gates and Complete Fencing to All Lease Lots Along South University Ave $$ 1 10 B13 Delete Compass Rose (Not on Drawing) 4 Overall Comments: Extend asphalt surface from Smith Aero Road to Taxilane Y Move gates back to NOT impede business access Control Charlie, put barriers up appropriately All lease lots do NOT need fencing Removing Taxiway R has the great possibility of reducing runway capacity/ causing delays Suggest shifting Taxiway S south to avoid direct access Paving float pond roads/taxiways to reduce prop wash Rotate tiedowns on pond so A/C point into wind Please keep both R & S open, exit only if necessary, but don't eliminate them - doing so would cause a lot of congestion problems A run-up apron for the access end of 20L is a VERY good idea and badly needed

Alternative C: Tie Down Apron and Slips C1 C1A C1B Resurface and Reconfigure East Ramp Consolidate Ski Tie Downs Adjacent to Ski Strip (numbers TBD) Increase Pull Through Tie Downs (numbers TBD) $$$$$$ (funding committed in 2020) Part of C1 7 1 Part of C1 5 1 C1C C1D C1E C2 C3 C3A Increase Tie Down Electrical Service with Power Recovery Fees or User Meters Existing Transient Parking / Fueling Site Shifted West and North to Block Taxiway B Access Relocate Transient Parking to South End of Ski Tie Downs New Privately Developed General Aviation (GA) Facility (Where?) Transient Helicopter Parking Relocate Transient Helicopters to East of University with Large Helicopter Lease Area Part of C1 2 1 Part of C1 1 4 1 Part of C1 1 1 1 N/A, Private s 6 4 $ 1 1 3 C3B Relocate Transient Helicopters to West Side or East Side Ave Lease Lot (Not on Drawing) N/A, Private 1 C4 Increase Approximately 24 Slips (Inset A) $$$ 4 1 1 C5 Provide Slip Electrical Service with Power Recovery Fees or User Meters Overall Comments C3A - No demand $$$ 5 1 C3A - Even though they're far more maneuverable, it's not a good idea to locate a large/ busy helicopter area directly below the path of the traffic pattern on the GA side. C1D - Moving transient parking north to help block visual access to Taxiway B won't work because there are extended periods when transient parking is empty. Place permanent tiedowns in line with B instead.

Alternative D: Lease Lots, Roads and Parking D1 D1A D1B Add Lease Lots Float Pond Commercial Lease Lots North of Float pond Extension Float Pond Commercial Lease Lots East of Float pond Extension $$$ 1 6 $$$ 9 D1C Commercial Lease Lots East of Campground $$$ 2 7 D1D D1E D2 D3 Shift University Avenue South to Create Commercial Lease Lots (Long Term) Commercial Lease Lots East of University (Long Term) Public Aircraft Viewing Area (Where?) Resurface University Avenue; Provide Pedestrian Path $$$$ 5 4 $$$$ 5 N/A, FHWA 5 1 8 1 1 D4 Expanded Public Parking; Provide Electrical Service $$$$ 5 2 D5 Designated Snow Storage Area $$ 9 D6 Improve Ground Transportation Between East and West Sides of Airport (not on drawing) N/A, Borough or Private 10 1 1 Overall Comments D1D - Would be a great space for a larger East Ramp Terminal, Parking would also need to be developed for this Develop behind D4 - Joslyn for commercial development Pedestrian Path - Walkers sometimes have luggage - Bicycles Provide formal bus stop across from Wrights to support FNSB bus service Provide pedestrian and bike path for entirety of University Ave. South D2 - Large deck west side, 2nd level of East Ramp Pizza Need to add location for wash facility/ wash rack Regulated taxi cabs. Bring FNSB bus service to East Ramp/ Run the FMATS (FNSB) bus on the East Ramp. Put power in for the parking lots!