SUB:- Information of Tenders Status of CP Division May 2011

Similar documents
CONSTRUCTION PROJECT. INFORMATION REGARDING STATUS OF R/A/FINAL BILL PAYMENT OF CONTRACTOR'S BILL (November MONTH)

SUB:- Status of Tenders dealt by CP Division for month of September, Nos and names of parties qualified after Technical evaluation

SUB:- Status of Tenders dealt by CP Division for month of October, Nos and names of parties qualified after Technical evaluation

SUB:- Status of Tenders dealt by CP Division for month of December, Nos and names of parties not qualified after Technical evaluation

DETAILS OF CONTRACTORS CONCLUDED DURING THE MONTH TO Tende r No.

16 Edition Friday, 5 to Monday, 8 April 2013 Himachal Bhawan, Madhya Marg, Sector 28 B, Chandigarh RETROSPECT

ROC, GURGAON S&T SBU, DETAILS OF CONTRACTS MORE THAN 02 (TWO) CRORES IN VALUE

Introducing. CODISSIA Trade Fair Complex, Coimbatore, India. 9 th 11 th April 2010, CODISSIA Trade Fair Complex, Coimbatore, India

Table-A: List of Qualified Bidders, Bidding Route & Washeries of interest. Name of Bidder Bidding Route Name of Washeries. ii) Kusmunda Kolkata

INVITATION FOR EXPRESSION OF INTEREST

Mumbai Metro Line-3 (Colaba-Bandra-SEEPZ) Civil work contracts awarded to five contractors Mumbai, July 5, The Mumbai Metro Line-3

RITES LIMITED RPO LUCKNOW

MORMUGAO PORT TRUST ENGINEERING MECHANICAL DEPARTMENT

Akshara Lotus Garden

Details of Contracts during the Month November '2013 Ref: No: RITES/CO/VIG/Policy/G-10, Dated

Central Power Research Institute Civil Engineering Division. Monthly Vigilance Report for the month of JULY 2014

S.No 1. 4 Gujarat. JJ PV Solar Pvt Ltd 1000 Amogeo Ites India Limited Haryana Artheon Electronics Pvt Ltd 1000

AN ICONIC BUSINESS ADDRESS

SmartCity (Kochi) Infrastructure Private Limited SEZ

RPO/North SBU. Details of Contracts Awarded by RITES/in progress during Month-DEC, Tender No.

Details of Contracts during the Month March'2013 Ref: No: RITES/CO/VIG/Policy/G-10, Dated

EIA for Development of New Civil Enclave at Air Force Base. Annexure 2

COMPANY PROFILE. Quality & Work, Speaks.

Designed Built Ecosystem for Smart Living. New Chennai Township Private Limited

Company Profile DEAR SIR,

PROJECT INFORMATION. Place of the Project Bangalore City District. Bangalore Urban Sector. 30 years (concession period)

Puri Pratham Project Highlights

S. No. State Name of the Field Office Nodal Office I. Uttar Pradesh 1) Agra Kanpur. II. Uttarakhand 9) Dehradun Dehradun

MEMBERS OF THE GOVERNING COUNCIL

KROSNO. Krosno District 61.3% % PLN % % PLN

RITES LTD RPO KOLKATA

LIST OF ESIC HOLIDAY HOME

BHEL:PSWR DETAILS OF CONTRACT (WORKS CONTRACT) CONCLUDED DURING MAY-2017

Railways in India 2012

Nos. of Tenders Reeived. Nos. and Name of parties not qualified after technical bid

Perception of the Tourist Regarding Pilgrimage Tour in Tamil Nadu

University of Mumbai

S b Sky Brother Designer, Developer & Interior Decorators Sher singh complex, Sector-49,Noida Phone , ,

Varanasi. Cultural soul of INDIA. Raj Group of Companies

Domestic LPG Stove INTRODUCTION MARKET POTENTIAL

Central Power Research Institute Civil Engineering Division. Quarterly Progress Report for the period ending February 2012

Industrial Training & Industrial Visits Academic Year ( to ) Nature of From To. Name of the. Students

EMAMI LTD Statement showing Shareholding Pattern as on 31/12/2011 No of

Bangalore zonal Office 15, Police Station Road Basavangudi, BENGALURU Ph /221

SUPREME COURT OF INDIA NOTIFICATION

same. Thanking you, Yours faithfully Deputy Registrar (P) Dr. S.K. Balasundaram Deputy Registrar (Purchase)

Affix recent Passport size coloured photograph (Self attested) Page 1 of 6. For Office Use Only. Remarks : ELIGIBLE / NOT-ELIGIBLE.

No /2003-VAS Dated the 11th Nov., SUB: GUIDELINES FOR UNIFIED ACCESS(BASIC & CELLULAR) SERVICES LICENCE.

Affix recent Passport size Colored photograph (Self attested)

INAUGURATION DIGNITARIES

Hoshangabad Road, Bhopal, Madhya Pradesh.

SECTOR 89, FARIDABAD. Lavender Floors A T A M A N V I L A S, F A R I D A B A D

QUARTER III (JULY SEPTEMBER, 2018)

North Block, New Delhi Dated January, 2018 OFFICE MEMORANDUM

TOP 100 SWAYAM-NPTEL LOCAL CHAPTERS (July - October 2018) By default, Top 100 Local Chapters will be considered as ACTIVE Local Chapters

New Faridabad One of the most planned and fast developing areas in Delhi NCR. Faridabad At the epicentre of Delhi NCR AMANVILAS.

Name of Trust and Chairman

Date: Dear Sirs,

ROAD DEVELOPMENT IN INDIA 2015

SPORTSWOOD ARCADE SECTOR-79, NOIDA

Visit to METSO Alwar (22Mar.2014) A Brief Review

3 Day s of Intense Business Networking. VENUE : D.D.A Ground, Behind Japanese Park, Near Rithala Metro Station, Sector-10, Rohini, New Delhi

AMANVILAS PLOTS A T A M A N V I L A S, F A R I D A B A D

Knowledge of homemakers regarding base materials used for cooking utensils

MANOMAV SHOWCASE PROJECTS PORTFOLIO

Development of Convention-cum-Trade Zone in Bhubaneswar PRE-PROPOSAL MEETING

North Block, New Delhi Dated January, 2018 OFFICE MEMORANDUM

CIVIL AVIATION REQUIREMENTS SECTION 7 FLIGHT CREW STANDARDS TRAINING AND LICENSING SERIES I PART V 28 th July 1999 EFFECTIVE: FORTHWITH

APPENDIX I ROADMAP FOR INTEGRATION OF TOURISM SECTOR

Ravindra Nath Tagore Boys Hostel Devi Ahilya University, Indore

Inauguration of Police Station at GVK CSIA Hon ble CM of Maharashtra Shri Prithviraj Chavan and Dr. GVK Reddy do the honours

PRESS RELEASE. First residential project in Guangzhou Knowledge City

TENDER NO: KCAA/038/ EXPRESION OF INTEREST (EOI)

List of the projects to be taken-up in the 102 nd meeting of SEIAA held on at 12:00 PM

23 25 February India Exposition Mart Ltd. (IEML) Greater Noida, Delhi/NCR

Bridge & Roof Co.(India) Ltd. COMPANY PROFILE

Faridabad At the epicentre of Delhi NCR. New Faridabad One of the most planned and fast developing areas in Delhi NCR.

CITY COMMISSION MEETING

Third scorpene submarine 'Karanj' was launched from Mazgaon Badargaon

POST SHOW REPORT. November 28 - December 2, 2012 Race Course Ground, Rajkot, Gujarat

STATEMENT ON COMPANY-WISE DETAILS OF FDI EQUITY INFLOWS RECEIEVED BY ACQUISITION OF EXISTING SHARES ROUTE DURING OCTOBER, 2012.

Notification No. 25/2018-Customs (N.T./CAA/DRI) New Delhi, dated the 16 th November, 2018

We Shine Study Circle TNPSC. elg;g epfo;tfs; (CURRENT AFFAIRS) MARCH Main

PAN GULF STEEL IS ONE OF THE REPUTED AND LEADING STOCKIEST & PROCESSOR OF WIDE RANGE OF STEEL PRODUCTS

Information for Investors

DAY - 1 (29/06/2017)

PUBLIC HEARING. 1. Purpose of Public Consultation

YONGNAM HOLDINGS LIMITED (Company Registration No N) (Incorporated in the Republic of Singapore on 19 October 1994)

Connectivity continues to remain one of the biggest concerns for north Chennai residents with thousands of commuters struggling every day

Evaluation Study on Construction of Hostels For SC Boys & Girls ALL INDIA (REPORT)

Shri N.S. Kang, IAS Addl. Secy & DG (CGHS) Dr. D.C.Joshi, Director (CGHS)

VOLUME AND PRICE OF ELECTRICITY TRADED BY TRADING LICENSEES ( RTC )

Ports in India 2014 Dredging in India 2014

Conference on. October 11-13, 2017 at ITC Kakatiya, Hyderabad, Telangana. Mr. Devender Surana Managing Director Bhagyangar India Limited Hyderabad

ACHARYA NAGARJUNA UNIVERSITY

Reference List for Cathodic Protection of LPG Mounded Bullets using AnodeFlex

Minutes of the Meeting of Shilton & Barnacle Parish Council held on 11 th November, 2014 in the Parish Council Room, Church Road, Shilton at 7.

Issue - 10, October Olympia s quarterly newsletter. Aspiration soar with. Olympia

SECTOR 89, FARIDABAD PLOTS A T A M A N V I L A S, F A R I D A B A D

Challenges with recruiting small business for USCG Ship Repair Contracts in USCG District 8

Transcription:

SUB:- Information of s Status of CP Division May 2011 S. Name of Work Opening of 1 RITES/CP/TC/MFCs- Rly/Kurukshtera/12/1R/2 010 One Packet System (Limited ) Const. of MFCs at Kurukshetra, Haryana. 2 RITES/CP/TC/MFCs- Const. of MFCs at Rly/Vishakhapatnam/11/1 Vishakhapatnam,A.P.. R/2011 One Packet System 3 RITES/CP/TC/MFCs- Rly/Ranchi/9/1R/2011 One Packet System Const. of MFCs at Ranchi,Jharkhand. 02.05.2011 i) M/s Sood & Sood ii) M/s Garg Builders iii) M/s Raj Kv Gupta iv) M/s BCC Devlopers & Promoters i) M/s Ch. Rama Raju ii) M/s R. Gangiah & Co. iii) M/s S. Muthu Ram iv) M/s Avdesh Mishra & Co. 02.05.2011 Rs 67.24 Lacs 30.07.2011 LOA issued on 30.05.2011 Rs. 69.66 lacs 28.05.2011 Letter of Award issued on 10.05.2011 i) M/s. Avdesh Mishra & Co. Rs 76.25 28.06.2011 LOA to be issued ii) M/s. Akara Construction iii) M/s G. S. Malhotra iv) M/s Apcon India v) M/s Adarsh Construction vi) M/s ACE Engineering Co. Vii) M/s Kumar & Kumar Associates 4 RITES/CP/TC/MFCs- Construction of Multi Rly/Rameshwaram/16/1R Functional Complex at /2011 One Packet Rameshwaram, Tamil Nadu. System 5 RITES/CP/TC/MFCs- Rly/Tiruchirapalli/17/1R/ 2011 One Packet System 6 RITES/CP/TC/MFC- Rly/Ernakulam/15/1R/20 11 One Packet System Construction of Multi Functional Complex at Tiruchirapalli, Tamil Nadu. Construction of Multifunctional Complex at Ernakulam, Kerala. 27.01.2011 i) M/s. M/s Avdesh Mishra & Co. Ii) M/s S Muthuraman iii) M/s Ganesh windpower Engineering Pvt. i) M/s. M/s Avdesh Mishra & Co. Ii) M/s S Muthuraman iii) M/s Ganesh windpower Engineering Pvt. Iv) Abari Construction. Rs 83.03 Lacs 28.05.2011 Letter of Award dated 28.04.2011 issued to M/s Sri Ganesh Windpower Engineers Pvt Bidder refused Rs 82.47 Lacs 28.05.2011 Letter of Award issued on 10.05.2011 i). M/s Malayil Builders (P) 27.01.2011 Rs 123.14 lacs 26.04.2011 Discharged due to bidder did not qualify for the prequalification criteria.limited being called from RPO Sikanderabad.GM(UT) to pursue

Name of Work Opening of 7 RITES/CP/TC/DTEH/ST P/2010 Supplying and Installing Sewage treatment plants of 100Cum/day in Government Polytechnics at Sampla (Rohtak District) and Chika (Kaithal District) in Haryana. 20.12.2010 1) M/s Eco Paryavaran 2 )M/s Shubham Hydrotech Engineers Pvt Ltd 3)M/s Sombansi Enviro Engg & Consultants 4)M/s Dolphin Aqua Cure Pvt Ltd 23.03.2011 Rs 90.00 lacs 19.05.2011 Letter of Award issued. on 09.05.2011 8 RITES/CP/TC/MDBP/B UILDING/NSIC/Pkg- I/2010 Construction Of Marketing Development Cum Business Park (MDBP) Including Lifts and Ancillary works At NSIC Complex,Okhla, New Delh 14.01.2011 i) M/s Unity Infra Projects ii) M/s SAM India Builtwell (P) iii) M/s IVRCL Infrastructure & Projects iv) M/s Nagarjuna Construction Co. Lt. v) M/s Ahluwalia Contracts(India). 23.03.2011 Rs 81.89 Crore 18.05.2011 Letter of Award issued on 12.05.2011 9 RITES/CP/TC/PQ/PU/Po ndi/auditorium/civil Package/2010 PQ of Contractors for Construction of conventional Centre having Auditorium of 2500 seating capacity & ancillary building for P.U. at Pondicherry. Bid 22.12.2010 1. M/s Cosolidated Constucrtion Consortium 2. M/s B.E. Billinoria & Co. 3. M/s East Coast Constructions & Industies 4. M/s Ramky Infrastructure 5. M/s RPP Selvan Infrastructure Pvt. Prequalification of Rs. 24.00 crores Pre-qualification process, therefore not applicable. under 10 RITES/CP/TC/JNU- Convention Centre FF/2011 Fire Fighting works for Convention Centre in JNU, New -67. 10.02.2011 1. M/s SRS Engineers 2. M/s CROMA Engineers (P) Ltd 3. M/s Alert Enterprises 4. M/s Surakshaa Engineers(India), 5. M/s Bavaria Fire Appliances, 6. M/s Such Raj Safety System (P), 7. M/s Migrani Envitech Engineers (P) ltd. 8. M/s S.K.Engineers. 10.02.2011 Rs 12.30Lacs 11.03.2011 LOA issued on 11.05.2011

Name of Work Opening of 11 RITES/CP/JNU (Ph- II)/STP/2011 Construction of STP (Capacity 300 cum/day for the upcoming Dwelling Units & New Hostel Building at JNU, New. 10.02.2011 1) M/s Pollucon Technologies Ltd 2)M/s Sombansi Enviro Engg & Consultants 3) M/s Shubham Hydrotech Pvt Ltd 4)M/s Eco Paryavaran 5) M/s Integrated Environtech Pvt Ltd Rs. 100.6 lacs 15.05.2011 under evaluation 12 RITES/CP/TC/DTEH/Ins titutional Campur- Rohtak/Interior/2011 Interior works in Institutional Campus, Rohtak, Haryana. 17.02.2011 Rs. 1043.27 lacs 17.06.2011 under evaluation 13 RITES/CP/TC/CUK- Gulbarga/Phase-II/2011 Construction of Buildings for various Schools including site development and bulk services for Central University of Karnatka at Gulbarga. 15.02.2011 i) M/s IVRCL Infrastructures & Projects Limited, ii) M/s B.E. Billimoria & Co. Limited, iii) M/s URC Consturction (P), iv) M/s Nagarjuna Construction Company, v) M/s Sahapoorji Pallonji & Co. vi) M/s Era Infra Engineering Limited, vii) M/s Engineering Projects (India) viii) M/s JMC Projects (India), ix) M/s Unity Infraproject x) M/s KCP Project ltd. 25.04.2011 Rs14149.00 lacs 15.05.2011 LOA isssued on 10.05.2011 14 RITES/CP/JNU (Ph- II)/UGT-EXT W/S/2010 Construction of underground water tank & Pump room including External Water Supply works and Pumps for upcoming Hostel & Housing at Jawaharlal Nehru University, New 27.01.2011 1) M/s Khairati Lal 25.04.2011 Rs 240.34 Lacs 27.05.2011 Financial Bid under 2) M/s Ranjeet Singh Chaudhary 3)M/s Water power Engg Enterprises

Name of Work Opening of 15 RITES/CP/TC/DTEH/Ins Rohtak/Kitchen/2011 Providing & Fixing Kitchen Equipments in Institutional Campus, Rohtak, Haryana. 14.03.2011 1) M/s KLAS Products Pvt., 2) M/s Astor INC 3) M/s LL Equipment & Machines Pvt. Ltd 4) M/s Continental Equipment India Pvt., Rs 121.70 Lacs 12.06.2011 under 16 RITES/CP/TC/CUP/BHA TINDA-BWALL/2001 Construction of Boundary Wall for campus of Central University of Punjab at Bhatinda To be 07.04.2011 i) M/s RSB Projects Limited, ii) M/s Dharamraj Contracts (I) Pvt. iii) M/s Jaihind Infratech Projects Pvt. iv) M/s DMR Builders (P) v) M/s Ashish Kumar Jindal vi) M/s Gupta Engerprises 252-G, vii) M/s IVRCL Infrastructures & Projects, Rs. 861.68 Lacs 05.07.2011 under 17 RITES/ CO/ CP/ DP/PP/Motibagh/8855-53/2011 Construction of Police Post for Police at Moti Bagh,New 03.03.2011 Rs 1068.07 Lacs 01.06.2011 under 18 RITES/CP/PU- Puducherry/MS- BIO/2011 Construction of Madanjeet Singh School of green energy technology building and Bio informatics building including water supply and electricity 23.02.2011 Rs 17.92 Crore 23.05.2011 under

Name of Work Opening of 19 RITES/CP/TC/PQ/ICAR/ Auditorium/2011 Construction of Convention centre/auditorium at NASC complex,pusa road,new 18.03.2011 i) M/s JMC Projects (India), ii) M/s B.E. Billimoria & Co. Limited iii) M/s NCC iv) M/s Sahapoorji Pallonji & Co. v) M/s Era Infra Engineering Limited vi) M/s Unity Infraproject vii) M/s Ahluwalia Contracts (India) viii) M/s Wig Brithers Const. P. ix) M/s Ktech Engineers Builders Co. Pvt. Rs 70.00 crores Pre-qualification process, therefore not applicable. PQ Bid under 20 Rail Tel Internal furnishing work in /UT/Co/NTP/2010- Railtel' Office complex at 11/166 Plot no 14,Sector-44 Gurgaon,haryana -122001 07.04.2011 1) M/s Modern Office Systems 2) M/s Aswin Enterprises 3) M/s Godrej & Boyce Mfg Co ltd 4)M/s B.P Ergo,Okhla Indl Estate-III Rs 188.38 Lacs 04.08.2011 under 21 RITES/CP/TC/DTEH/Ins Rohtak/STP/2011 Construction of sewage Treatment plant for 320 KLD capacity based on SAFF in Institutional campus Rohtak(Haryana) 22 RITES/CP/TC/DTEH/Ins Horticulture works in Institutional Campus at Rohtak/Horticulture/2011 Rohtak, Haryana 15.04.2011 21.03.2011 Rs 113.40 Lacs 14.07.2011 under Rs. 75.87 lacs 19.06.2011 under 23 RITES/CP/TC/DP- PSBKR- FURNITURE/2011 Supply and fixing of furniture in Police Station at Barakhamba Road,New 09.05.2011 1) M/s U M Enterprises 2) M/s Nsic New 3) M/s B.P Ergo Ltd 4) M/s Ashwin Enterprises 5) M/s Godrej & Boyce Co Ltd Rs 21609433.00 08.08.2011 under

Name of Work Opening of 24 RITES/CP/TC/MNIT- Allahabad/Kitchen/Pkg- I/2011 (Limited ) Supply and installation of Kitchen equipments at newly constructed Boy's Hostel at MNIT Allahabad 10.05.2011 1) M/s Continental Equipment India Pvt Ltd 2)M/s Klas Products Ltd 3)M/s Unique Kitchens 4)M/s Astor Inc 5)M/s Himalayan Equipment Manufacturing Co Rs 36.47 Lacs 09.08.2011 LOA issued on 31.05.2011 25 RITES/CP/TC/MNIT- Strenghtening of external Allahabad/DF/Pkg-I/2011 stone cladding by fixing stainless steel dash fastener including ancillary works in the Administrative Block of MNIT Allahabad to be 02.06.2011 Rs 43.17 Lacs 26 RITES/CP/TC/DTEH/Ins Rohtak/AVS/2011 Supply,Installation,testing & Commissioning of Audio Video facility comprising of Data/Video projection,sound Reinforcement,Conference System and stage Lightining to be installed in Institutional Campus at Rohtak,Haryana 12.05.2011 Rs 397.08 Lacs 11.08.2011 Technical bid under 27 RITES/CP/JNU/NHB (Furniture)/2011 Fabrication Supply,Fixing,Placement of hostel Furniture of new Hostel Building aat JNU,New 27.04.2011 1) M/s Kings Furnishings & Safe Company 2) M/s Duaco Equipments Pvt Ltd 3)M/s Sarvodaya Furnishers Pvt Ltd Rs 77.75 Lacs 25.07.2011 LOA to be issued 28 RITES/CP/TC/MNIT- Allahabad/Furniture/Pkg- I/2011 Supply and Installation of Furnitures at newly constructed Boy's hostel at Motilal Nehru National Institute of Technology Allahabad 04.05.2011 1) M/s Nalanda & Company 2)M/s Godrej & Boyce Mfg Co Ltd 3)M/s Rajdhani Enterprises 4) M/s Jamuna Mktg (P) Ltd Not Applicable 03.08.2011 LOA issued on 30.05.2011

Name of Work Opening of 29 RITES/CP/TC/Consultant /ICAR/Auditorium/2011( Limited ) Appointment of lead Consultant/facilitator for obtaining Platinum rating certification by IGBC under green building category for convention centre /Auditorium at NASC complex,pusa road,new 19.04.2011 1)M/s Environmental design Centre 19.04.2011 Rs 23.00 Lacs 18.07.2011 under 2) M/s Spectral service consultant Pvt Ltd 3)M/s lead Consulatnt Pvt Ltd 4)M/s Blue Star 5)M/s Ela Green Building 6)M/s AB Initio