MID Region Air Navigation Strategy

Similar documents
ATFM/CDM ICAO s Perspective

Third Meeting of the Air Navigation System Implementation Group (ANSIG/3) Cairo, Egypt, 3 5 July Saudi Arabia

International Civil Aviation Organization. Fifth Meeting of MID Region AIM Database Task Force Fourth Meeting of MIDANPIRG AIM Sub-Group

Second Meeting of the Air Navigation System Implementation Group (ANSIG/2)

AIR NAVIGATION REPORT ICAO Middle East Region

Preparation for ASBU B1 (PBN)

Aviation System Block Upgrades (ASBU), Blocks 0 and 1

INTERNATIONAL CIVIL AVIATION ORGANIZATION REPORT OF THE FIRST MEETING OF THE AIR NAVIGATION SYSTEMS IMPLEMENTATION GROUP ANSIG/1

NORTH ATLANTIC (NAT) AIR NAVIGATION PLAN

NACC/WG/4 IP/27 17/03/14 Fourth North American, Central American and Caribbean Working Group Meeting (NACC/WG/4) Ottawa, Canada, 24 to 28 March 2014

APPENDIX L PRIORITY SAFETY TARGETS AND ASSOCIATED METRICS FOR THE ICAO EUR REGION

(Presented by United States) EXECUTIVE SUMMARY

Date Planned/Implemented December Status Developing. Date Planned/Implemented Before May Status Implemented

SAMPLE TEMPLATE APPENDIX 3.5C-1

Block 0 to Block 1 Vaughn Maiolla

MID AIR NAVIGATION PLAN VOLUME III

INTERNATIONAL CIVIL AVIATION ORGANISATION (ICAO) WORSHOP ON ASBU. (Dakar, SENEGAL, September 2017) STATUS OF IMPLEMENTATION OF ICAO ASBU

PROPOSED AMENDMENT OF THE RPBANIP. (Prepared by Canada and United States) EXECUTIVE SUMMARY

Welcome to AVI AFRIQUE IFEANYI Ogochukwu, Chief Technology Strategist; Debbie Mishael Group

Asia Pacific Seamless ATM Plan and Implementation of ATFM in Asia Pacific

ASBU Block 0 Implementation and Regional ANPs

ICAO ASBU Implementation/ Surveillance and ATS Automation

APAC AIR NAVIGATION PLAN VOLUME III

Date Planned/Implemented Status Not commenced. Status Details Planned for m new MMMX airport 2 Element Description: Airport CDM tools

Approach to implementation Process and checklist

AIM in support of ATM

WORLD INTERNATIONAL CIVIL AVIATION ORGANIZATION 18/7/14 REPORT ON. Fifteenth Session. the

GUATEMALA State Air Navigation Plan

Russian Federation ATM modernization program

APIRG/20. Air Navigation System Implementation Action Plan (aligned with ASBU Methodology) Yamoussoukro, Cote d Ivoire 30 November 2 December 2015

Packaging Tomorrow s Aviation System

Overview of the Aviation System Block Upgrades (ASBUs) Concept and PBN

International Civil Aviation Organization AIR NAVIGATION SYSTEMS IMPLEMENTATION GROUP

TWELFTH AIR NAVIGATION CONFERENCE

BELIZE Air Navigation Plan

AFI AIR NAVIGATION SYSTEM IMPLEMENTATION ACTION PLAN FOR THE AFRICA-INDIAN OCEAN (AFI) REGION

New Barbados State Air Navigation Plan

Connecting ASBU with your State Air Navigation Plan

Performance Framework for MID Region Air Navigation Planning and Implementation MEAUSE SURVEYS. (Presented by IATA and CANSO) SUMMARY

THE Aviation System Block Upgrades THE FRAMEWORK FOR GLOBAL HARMONIZATION (DRAFT 2016)

MET/SG/12-WP/05 REV2-23/11/14

AIR NAVIGATION SYSTEMS IMPLEMENTATION GROUP DEVELOPMENTS RELATED TO AIR NAVIGATION CAPACITY AND EFFICIENCY IN OTHER ICAO REGIONS

International Civil Aviation Organization. Performance Framework for AIM implementation in the MID Region

Connecting ASBU with your State Air Navigation Plan

Objective. To show how the aviation system block upgrades (ASBUs) can help to improve safety at airport level and some regional initiatives.

NAM ASBU Handbook Supporting analysis and implementation reporting of the ICAO ASBU Modules

GANP 2019/ASBUs. Olga de Frutos. Marrakesh/10 th December Technical Officer Air Navigation

GANP ASBU Symposium 2017

ATM processes automatization for Runway (Airport) Throughput Enhancement

Workshop on the Performance Enhancement of the ANS through the ICAO ASBU framework. Dakar, Senegal, September 2017 presented by Emeric Osmont

AFI/MID Workshop on Aviation System Block Upgrades (ASBUs)

AIR NAVIGATION SYSTEM IMPLEMENTATION PLAN FOR THE AFI REGION

B0 FRTO, B0-NOPS, B0-ASUR and B0-ACAS Implementation in the AFI and MID Regions

ICAO GANP Requirements and Evolution

The ICAO Global Air Navigation Plan and the monitoring of ASBU implementation

Aviation System Block Upgrades

INTERNATIONAL CIVIL AVIATION ORGANIZATION

2018 LSSIP Event. ASBU monitoring in the ICAO European Region Using the Master Plan reporting mechanism for ASBU monitoring

ASBU-Bloc0 Moroccan achievements and planned activities

Aviation System Block Upgrades

SAMPLE TEMPLATE. Regional and National planning for ASBU Modules

ASBU modules mapped to Work Programme

INTERNATIONAL CIVIL AVIATION ORGANIZATION. SIXTH MEETING OF DIRECTORS GENERAL OF CIVIL AVIATION (DGCA/6) (Brazzaville, Congo, 2 4 November 2016)

Bits to Blocks Aviation System Block Upgrades (ASBU)

TWELFTH WORKING PAPER. AN-Conf/12-WP/137. International ICAO. developing RNAV 1.1. efficiency. and terminal In line.

INTERNATIONAL CIVIL AVIATION ORGANIZATION

Implementation of the Performance-Based Air Navigation Systems for the CAR Region ICAO Regional TC Project RLA/09/801 Agenda Item 6 WP/14

MET/SG REPORT FOR THE PREPARATION OF THE MET RELATED AFI REGIONAL AIR NAVIGATION IMPLEMENTATION ACTION PLAN

INTERNATIONAL CIVIL AVIATION ORGANIZATION

SERVICE DEVELOPMENT ROADMAP

ASBU Implementation Monitoring Report

NAM/CAR Regional Performance-based Air Navigation Implementation Plan (RPBANIP) Luis Sanchez ICAO NACC Regional Office

INTERNATIONAL CIVIL AVIATION ORGANIZATION

APPENDIX D IDENTIFICATION AND DEVELOPMENT OF AERONAUTICAL METEOROLOGY PROJECTS. Programme Title of the Project Start End

Workshop Exercise, EGYPT Air Navigation Plan 10 /12/2010

The evolving air navigation system and the impact on avionics

Ted Thrasher ICAO Environmental Modelling Unit

Prosper Zo o Minto o

International Civil Aviation Organization. Sixth Meeting (MSG/6) (Cairo, Egypt, 3-5 December 2018) MID Region Air Navigation Priorities and Targets

TWELFTH AIR NAVIGATION CONFERENCE

International Civil Aviation Organization

NAM/CAR Regional Performance-Based Air Navigation Implementation Plan (RPBANIP) v3.1 April 2014 International Civil Aviation Organization

TWELFTH AIR NAVIGATION CONFERENCE

2012 Performance Framework AFI

Singapore s Journey to Implement ASBU B-0 & B-1 Modules in PIA-2

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit

ICAO framework for LPV

TRINIDAD AND TOBAGO PIARCO FIR/NATIONAL ASBU PLAN

THE UGANDA ASBU PLAN- HIGHLIGHTS ASBU WORKSHOP 18 TH TO 22 RD SEPT, DAKAR

International Civil Aviation Organization

ASBU ACTIONS UNDERTAKEN BY THE ALGERIAN CIVIL AVIATION AUTHORITY IN AIR NAVIGATION FIELD

FAA: ASBU Deployment Status. ASBU Prepared by: Midori Tanino, ATO International NextGen Lead Date: August, 2016

Regional Air Navigation Plan - Planning Methodologies and Tools. H. Sudarshan

ICAO ASBU Implementation Monitoring Questionnaire. Reference period 2017

METEOROLOGY PROJECT.1. Programme Title of the Project Start End

International Civil Aviation Organization. Second Meeting (AIM SG/2) (Kish Island, Iran, 31 August-2 September 2015)

IATA User Requirements for Air Traffic Services (URATS) NAVIGATION. MIDANPIRG PBN SG/3 Meeting Cairo, Egypt, February 2018

NACC/WG/4 WP/16 17/03/14 Fourth North American, Central American and Caribbean Working Group Meeting (NACC/WG/4) Ottawa, Canada, 24 to 28 March 2014

MIDANPIRG ATM SG/4 Meeting Amman, Jordan, 29 April 3 May 2018

SURVEILLANCE PROJECT Coordinator: Ghana DOMAIN: IIM (Infrastructure & Information Management)

Transcription:

MID Region Air Navigation Strategy Mohamed Smaoui ICAO Deputy Regional Director Middle East Office, Cairo Cairo/23 26 November 2015

Outline Background Strategy Main Objectives MID ASBU Block 0 Modules Prioritization Monitoring Mechanism

Background The Strategy was endorsed by MSG/4 meeting (Cairo, 24-26 November 2014), based on the outcome of the relevant MIDANPIRG subsidiary bodies and inputs received from stakeholders. The Strategy was further reviewed and updated by MIDANPIRG/15 meeting, Bahrain, 8-11 June 2015, and endorsed as ICAO MID Doc 002, which is available on the MID Office website.

The MID Region air navigation objectives are set in line with the global air navigation objectives and address specific air navigation operational improvements identified within the framework of the Middle East Regional Planning and Implementation Group (MIDANPIRG) to: realize sound and economically-viable civil aviation system in the MID Region that continuously increases in capacity and improves in efficiency with enhanced safety while minimizing the adverse environmental effects of civil aviation activities; and maintain regional harmonization. Strategy Main Objectives

Main Objectives of the Strategy The Strategy presents a 15 year rolling approach for the implementation of the ASBU Modules in the MID Region in accordance with GANP (2013-2028) as follows: Near-term (2013-2017): ASBU Block 0 Mid-term (2018-2022): ASBU Block 1 Long-term (2023-2028): ASBU Block 2 and 3

The MID Region Air Navigation Strategy includes 11 ASBU Block 0 Modules identified as priority for implementation in the MID Region.

Performance Improvement Areas (PIA) Module Priority Module Name PIA 1: APTA 1 Optimization of Approach Procedures including vertical guidance Airport Operations WAKE 2 Increased Runway Throughput through Optimized Wake Turbulence Separation PIA 2: Globally Interoperable Systems and Data Through Globally Interoperable System Wide Information Management PIA 3: Optimum Capacity and Flexible Flights Through Global Collaborative ATM PIA 4: Efficient Flight Path Through Trajectorybased Operations MID ASBU Block 0 Modules Prioritization RSEQ 2 Improved Traffic Flow through Sequencing (AMAN/DMAN) SURF 1 Safety and Efficiency of Surface Operations (A SMGCS Level 1 2) ACDM 1 Improved Airport Operations through Airport CDM FICE 1 Increased Interoperability, Efficiency and Capacity through Ground Ground Integration DATM 1 Service Improvement through Digital Aeronautical Information Management AMET 1 Meteorological information supporting enhanced operational efficiency and safety FRTO 1 Improved Operations through Enhanced En Route Trajectories NOPS 1 Improved Flow Performance through Planning based on a Network Wide view ASUR 2 Initial Capability for Ground Surveillance ASEP 2 Air Traffic Situational Awareness (ATSA) OPFL 2 Improved access to Optimum Flight Levels through Climb/Descent Procedures using ADS B ACAS 1 ACAS Improvements SNET 2 Increased Effectiveness of Ground based Safety Nets CDO 1 Improved Flexibility and Efficiency in Descent Profiles (CDO) TBO 2 Improved Safety and Efficiency through the initial application of Data Link En Route CCO 1 Improved Flexibility and Efficiency Departure Profiles Continuous Climb Operations (CCO)

Performance Improvement Areas (PIA) PIA 1: Airport Operations PIA 2: Globally Interoperable Systems and Data Through Globally Interoperable System Wide Information Management PIA 3: Optimum Capacity and Flexible Flights Through Global Collaborative ATM PIA 4: Efficient Flight Path Through Trajectorybased Operations Module Priority Module Name APTA 1 Optimization of Approach Procedures including vertical guidance WAKE 2 Increased Runway Throughput through Optimized Wake Turbulence Separation RSEQ 2 Improved Traffic Flow through Sequencing (AMAN/DMAN) SURF 1 Safety and Efficiency of Surface Operations (A SMGCS Level 1 2) ACDM 1 Improved Airport Operations through Airport CDM FICE 1 Increased Interoperability, Efficiency and Capacity through Ground Ground Integration DATM 1 Service Improvement through Digital Aeronautical Information Management AMET 1 Meteorological information supporting enhanced operational efficiency and safety FRTO 1 Improved Operations through Enhanced En Route Trajectories NOPS 1 Improved Flow Performance through Planning based on a Network Wide view ASUR 2 Initial Capability for Ground Surveillance ASEP 2 Air Traffic Situational Awareness (ATSA) OPFL 2 Improved access to Optimum Flight Levels through Climb/Descent Procedures using ADS B ACAS 1 ACAS Improvements SNET 2 Increased Effectiveness of Ground based Safety Nets CDO 1 Improved Flexibility and Efficiency in Descent Profiles (CDO) TBO 2 Improved Safety and Efficiency through the initial application of Data Link En Route CCO 1 Improved Flexibility and Efficiency Departure Profiles Continuous Climb Operations (CCO)

B0 APTA: Optimization of Approach Procedures including vertical guidance Elements Applicability Performance Indicators/Supporting Metrics Targets States PBN Implementation Plans All Indicator: % of States that provided updated PBN implementation Plan Supporting metric: Number of States that provided updated PBN implementation Plan 80 % by Dec. 2014 100% by Dec. 2015 LNAV All RWYs Ends at International Aerodromes Indicator: % of runway ends at international aerodromes with RNAV(GNSS) Approach Procedures (LNAV) Supporting metric: Number of runway ends at international aerodromes with RNAV (GNSS) Approach Procedures (LNAV) All runway ends at Int l Aerodromes, either as the primary approach or as a backup for precision approaches by Dec. 2016 LNAV/VNAV All RWYs ENDs at International Aerodromes Indicator: % of runways ends at international aerodromes provided with Baro VNAV approach procedures (LNAV/VNAV) Supporting metric: Number of runways ends at international aerodromes provided with Baro VNAV approach procedures (LNAV/VNAV) All runway ends at Int l Aerodromes, either as the primary approach or as a back up for precision approaches by Dec. 2017

B0 SURF: Safety and Efficiency of Surface Operations (A SMGCS Level 1 2) Elements Applicability Performance Indicators/Supporting Metrics Targets A SMGCS Level 1* OBBI, HECA, OIII, OKBK, OOMS, OTBD, OTHH, OEDF, OEJN, OERK, OMDB, OMAA, OMDW Indicator: % of applicable international aerodromes having implemented A SMGCS Level 1 Supporting Metric: Number of applicable international aerodromes having implemented A SMGCS Level 1 70% by Dec. 2017 A SMGCS Level 2* OBBI, HECA, OIII, OKBK, OOMS, OTBD, OTHH, OEJN, OERK, OMDB, OMAA, OMDW Indicator: % of applicable international aerodromes having implemented A SMGCS Level 2 Supporting Metric: Number of applicable international aerodromes having implemented A SMGCS Level 2 *Reference: Eurocontrol Document Definition of A SMGCS Implementation Levels, Edition 1.2, 2010 50% by Dec. 2017

B0 ACDM: Improved Airport Operations through Airport CDM Elements Applicability Performance Indicators/Supporting Metrics Targets A CDM OBBI, HECA, OIII, OKBK, OOMS, OTBD, OTHH, OEJN, OERK, OMDB, OMAA, OMDW Indicator: % of applicable international aerodromes having implemented improved airport operations through airport CDM Supporting metric: Number of applicable international aerodromes having implemented improved airport operations through airport CDM 40% by Dec. 2017

B0 FICE: Increased Interoperability, Efficiency and Capacity through Ground Ground Integration Elements Applicability Performance Indicators/Supporting Metrics Targets AMHS capability All States Indicator: % of States with AMHS capability Supporting metric: Number of States with AMHS capability 70% of States with AMHS capability by Dec. 2017 AMHS implementation /interconnection All States Indicator: % of States with AMHS implemented (interconnected with other States AMHS) Supporting metric: Number of States with AMHS implemented (interconnections with other States AMHS) 60% of States with AMHS interconnected by Dec. 2017 Implementation of AIDC/OLDI between adjacent ACCs All ACCs Indicator: % of FIRs within which all applicable ACCs have implemented at least one interface to use AIDC/OLDI with neighboring ACCs 70% by Dec. 2017

B0 DATM: Service Improvement through Digital Aeronautical Information Management Elements Applicability Performance Indicators/Supporting Metrics Targets 1 National AIM Implementation Plan/Roadmap All States Indicator: % of States that have National AIM Implementation Plan/Roadmap Supporting Metric: Number of States that have National AIM Implementation Plan/Roadmap 80% by Dec. 2016 90% by Dec. 2018 2 AIXM All States Indicator: % of StatesthathaveimplementedanAIXM based AIS database Supporting Metric: Number of States that have implemented an AIXM based AIS database 3 eaip All States Indicator: % of States that have implemented an IAID driven AIP Production (eaip) Supporting Metric: Number of States that have implemented an IAID driven AIP Production (eaip) 4 QMS All States Indicator: % of StatesthathaveimplementedQMS for AIS/AIM Supporting Metric: Number of States that have implemented QMS for AIS/AIM 60% by Dec. 2015 80% by Dec. 2017 100% by Dec. 2019 60% by Dec. 2016 80% by Dec. 2018 100% by Dec. 2020 70% by Dec. 2016 90% by Dec. 2018

B0 DATM: Service Improvement through Digital Aeronautical Information Management Elements Applicability Performance Indicators/Supporting Metrics Targets 5-WGS-84 All States Indicator: % of States that have implemented WGS-84 for horizontal plan (ENR, Terminal, AD) Supporting Metric: Number of States that have implemented WGS-84 for horizontal plan (ENR, Terminal, AD) Indicator: % of States that have implemented WGS-84 Geoid Undulation Supporting Metric: Number of States that have implemented WGS-84 Geoid Undulation 6-eTOD All States Indicator: % of States that have implemented required Terrain datasets Supporting Metric: Number of States that have implemented required Terrain datasets Indicator: % of States that have implemented required Obstacle datasets Supporting Metric: Number of States that have implemented required Obstacle datasets 7-Digital NOTAM* All States Indicator: % of States that have included the implementation of Digital NOTAM into their National Plan for the transition from AIS to AIM Supporting Metric: Number of States that have included the implementation of Digital NOTAM into their National Plan for the transition from AIS to AIM Horizontal: 100% by Dec. 2017 Vertical: 90% by Dec. 2018 Area 1 : Terrain: 50% by Dec. 2015, 70% by Dec. 2018 Obstacles: 40% by Dec. 2015, 60% by Dec. 2018 Area 4: Terrain: 50% by Dec. 2015, 100% by Dec. 2018 Obstacles: 50% by Dec. 2015, 100% by Dec. 2018 80% by Dec. 2016 90% by Dec. 2018

B0 AMET: Meteorological information supporting enhanced operational efficiency and safety Elements Applicability Performance Indicators/Supporting Metrics Targets SADIS 2G and Secure SADIS FTP All States Indicator: % of States having implemented SADIS 2G satellite broadcast or Secure SADIS FTP service Supporting metric: number of States having implemented SADIS 2G satellite broadcast or Secure SADIS FTP service 90% by Dec. 2015 100% by Dec. 2017 QMS All States Indicator: % of States having implemented QMS for MET Supporting metric: number of States having implemented QMS for MET 60% by Dec. 2015 80% by Dec. 2017

B0 FRTO: Improved Operations through Enhanced En Route Trajectories Elements Applicability Performance Indicators/Supporting Metrics Targets Flexible use of airspace (FUA) All States Indicator: % of States that have implemented FUA Supporting metric*: number of States that have implemented FUA 40% by Dec. 2017 Flexible routing All States Indicator: % of required Routes that are not implemented due military restrictions (segregated areas) 60% by Dec. 2017 Supporting metric 1: total number of ATS Region Routes in the Mid Supporting metric 2*: number of required Routes that are not implemented due military restrictions (segregated areas)

B0 NOPS: Improved Flow Performance through Planning based on a Network Wide view Elements Applicability Performance Indicators/Supporting Metrics Targets ATFM Measures implemented in collaborative manner All States Indicator: % of States that have established a mechanism for the implementation of ATFM Measures based on collaborative decision Supporting metric: number of States that have established a mechanism for the implementation of ATFM Measures based on collaborative decision 100% by Dec. 2017

B0 ACAS: ACAS Improvements Elements Applicability Performance Indicators/Supporting Metrics Targets Avionics All States Indicator: % of States requiring carriage of ACAS (TCAS v 7.1) for aircraft with a max certificated takeoff mass greater than 5.7 tons Supporting metric: Number of States requiring carriage of ACAS (TCAS v 7.1) for aircraft with a max certificated take off mass greater than 5.7 tons 80% by Dec. 2015 100% by Dec. 2016

B0 CDO: Improved Flexibility and Efficiency in Descent Profiles (CDO) Elements Applicability Performance Indicators/Supporting Metrics Targets PBN STARs In accordance with States implementation Plans Indicator: % of International Aerodromes/TMA with PBN STAR implemented as required. 100% by Dec. 2016 for the identified Aerodromes/TMAs Supporting Metric: Number of International Aerodromes/TMAs with PBN STAR implemented as required. 100% by Dec. 2018 for all the International Aerodromes/TMAs International aerodromes/tm As with CDO In accordance with States implementation Plans Indicator: % of International Aerodromes/TMA with CDO implemented as required. 100% by Dec. 2018 for the identified Aerodromes/TMAs Supporting Metric: Number of International Aerodromes/TMAs with CDO implemented as required.

B0 CCO: Improved Flexibility and Efficiency Departure Profiles Continuous Climb Operations (CCO) Elements Applicability Performance Indicators/Supporting Metrics Targets PBN SIDs In accordance with States implementation Plans Indicator: % of International Aerodromes/TMA with PBN SID implemented as required. 100% by Dec. 2016 for the identified Aerodromes/TMAs Supporting Metric: Number of International Aerodromes/ TMAs with PBN SID implemented as required. 100% by Dec. 2018 for all the International Aerodromes/TMAs International aerodromes/tmas with CCO In accordance with States implementation Plans Indicator: % of International Aerodromes/TMA with CCO implemented as required. 100% by Dec. 2018 for the identified Aerodromes/TMAs Supporting Metric: Number of International Aerodromes/TMAs with CCO implemented as required.

Monitoring Mechanism Progress report on the status of implementation of the different priority 1 Modules should be developed by the Air Navigation System Implementation Group (ANSIG) and presented to the MIDANPIRG Steering Group (MSG) and/or MIDANPIRG on regular basis. The MIDANPIRG and its Steering Group (MSG) will be the governing body responsible for the review and update of the MID Region Air Navigation Strategy. The MID Region Air Navigation Strategy will guide the work of MIDANPIRG and its subsidiary bodies and all its member States and partners.

Monitoring Mechanism Progress on the implementation of the MID Region Air Navigation Strategy and the achievement of the agreed air navigation targets will be reported to the ICAO Air Navigation Commission (ANC), through the review of the MIDANPIRG reports; and to the stakeholders in the Region within the framework of MIDANPIRG. MIDANPIRG through its activities under the various subsidiary bodies will continue to update and monitor the implementation of the ASBU Modules and take necessary measures to achieve the air navigation targets. The monitoring tables are included in the MID eanp Volume III. The status of implementation is reflected also in the Regional Performance Dashboard.

Monitoring Mechanism Module Code Main Monitoring Supporting Remarks B0 APTA PBN SG ATM SG, AIM SG, CNS SG B0 SURF ANSIG CNS SG Coordination with RGS WG B0 ACDM ANSIG CNS SG, AIM SG, ATM SG Coordination with RGS WG B0 FICE CNS SG ATM SG B0 DATM AIM SG B0 AMET MET SG B0 FRTO ATM SG B0 NOPS ATM SG B0 ACAS CNS SG B0 CDO PBN SG B0 CCO PBN SG

Monitoring Mechanism 100 100 100 Results as of June 2015 Targets 2017 2016 2015 Current Status 100 60 80 48 80 70 60 60 50 25 70 70 60 60 46 50 40 29 80 70 60 53 80 40 PBN Plans LNAV LNAV/VNAV Completed Phase A SMGCS level II AIDC/OLDI MET QMS ACAS 1 Transition from AIS to AIM

MIDANPIRG ORG. STRUCTURE Back