HEATHROW NIGHT MOVEMENT AND QUOTA ALLOCATION PROCEDURES Version 3

Similar documents
GATWICK NIGHT MOVEMENT AND QUOTA ALLOCATION PROCEDURES

GATWICK NIGHT MOVEMENT AND QUOTA ALLOCATION PROCEDURES

In this document the following words shall have the following meanings: Airport Coordination Limited, the Coordinator of London City Airport

Pre-Coordination Runway Scheduling Limits Winter 2014

Runway Scheduling Limits Summer 2015

Classification: Public

Operation of the UK Traffic Distribution Rules in relation to all-cargo services at London Gatwick Airport. Consultation paper by BAA Gatwick

All aviation except commercial aviation. Including but not limited to business aviation, air taxi operations and technical flights.

Capacity declaration Amsterdam Airport Schiphol; winter 2017/2018. Environmental capacity; available number of slots for Commercial Aviation

STAGE 2 RESPONSE OF AIRPORT COORDINATION LIMITED

Restricted Hours Operating Policy

STANSTED COORDINATION COMMITTEE CONSTITUTION. Coordination Committee Constitution January

Department of Transportation, Federal Aviation Administration (FAA). SUMMARY: Under this notice, the FAA announces the submission deadline of

GUIDE TO THE DETERMINATION OF HISTORIC PRECEDENCE FOR INNSBRUCK AIRPORT ON DAYS 6/7 IN A WINTER SEASON. Valid as of Winter period 2016/17

1.2. This working procedure regards IATA Season Winter 2018 (W18). This season starts at October 28, 2018 and ends at March 30, 2019.

NIGHT NOISE POLICY

1.2. This working procedure regards IATA Season Summer 2019 (S19). This season starts at March 31, 2019 and ends at October 26, 2019.

ANA Traffic Growth Incentives Program Terms and Conditions

Aer Rianta Submission to the Commission for Aviation Regulation On The Consideration of the Full Coordination of Dublin Airport.

Changi Airport A-CDM Handbook

MISUSE OF SLOTS ENFORCEMENT CODE ANNUAL REPORT 2014/15

Subject: Night Flight Restriction Program Winter 2017 (2017-October-30 to March-31) and Summer 2018 (2018-April-1 to 2018-October-29)

Incentive Discounts Programme for Traffic Development at Sofia Airport 2018

Act on Aviation Emissions Trading (34/2010; amendments up to 37/2015 included)

STANSTED AIRPORT PLANNING APPLICATION UTT/18/0460/FUL SECTION 106 CONDITIONS TO BE REQUIRED IF PLANNING APPLICATION IS APPROVED

AIR TRAFFIC FLOW MANAGEMENT INDIA S PERSPECTIVE. Vineet Gulati GM(ATM-IPG), AAI

Interpretation of Force Majeure

Subject: Night Flight Restriction Program Winter 2015 (2015-October-25 to March-26) and Summer 2016 (2016-March-27 to 2016-October-29)

GUIDELINES FOR THE ADMINISTRATION OF SANCTIONS AGAINST SLOT MISUSE IN IRELAND

The Commission invited respondents to comment on the The assumptions, conclusions, analysis and factual basis of the SH & E report.

ANA Traffic Growth Incentives Programme Terms and Conditions

Important Note regarding Peak Season dates for 2014 point 1K in Appendix A - Group Booking Confirmation

NATS LTD. - IN CONFIDENCE

Government consultations : Airports National Policy Statement, UK Airspace Policy, Night Flights

Session 2: CORSIA MRV System: Monitoring of CO 2 Emissions

Impact Assessment (IA)

Recommendations on Consultation and Transparency

March 2015 Version 1

Intentionally left blank

The American Express Airpoints Platinum Reserve Card Benefits Terms and Conditions.

The Coordinator s Activity Report

EXTENDED-RANGE TWIN-ENGINE OPERATIONS

The Coordinator s Activity Report

PPR REGULATIONS FOR BUSINESS AND GENERAL AVIATION AT EINDHOVEN AIRPORT

Worldwide Slot Guidelines

COMMISSION REGULATION (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management

> Aircraft Noise. Bankstown Airport Master Plan 2004/05 > 96

Frequently Asked Questions. Free allocation from the Special Reserve (Art 3f ETS Directive 1 )

Worldwide Scheduling Guidelines Effective January 2010

Annex 1 to letter 0426(DPRM.REM)1035 of 16 April I. Articles 28 and 29 of the UPU Convention. Article 28 Terminal dues. General provisions

Part 129. Foreign Air Transport Operator - Certification. CAA Consolidation. 18 May Published by the Civil Aviation Authority of New Zealand

Short-Haul Operations Route Support Scheme (RSS)

AMERICAN EXPRESS QANTAS BUSINESS REWARDS CARD POINTS TERMS AND CONDITIONS

OPERATING LIMITATIONS AT NEW YORK LAGUARDIA AIRPORT. SUMMARY: This action extends the Order Limiting Operations at New York LaGuardia

Aircraft Leasing. United Kingdom Overseas Territories Aviation Circular OTAC Issue 1 7 October Effective: on issue

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs)

San Mateo County Airports Policies and Procedures for Hangars, T-Shades, Tiedowns and Waiting Lists

1.2 An Approach Control Unit Shall Provide the following services: c) Alerting Service and assistance to organizations involved in SAR Actions;

NEW AND IMPROVED. ROYAL CARIBBEAN Scope & Changes DEPOSITS AND FINAL PAYMENTS DEFINITIONS, SIZE REQUIREMENTS AND LIMITS

Aeronautical Studies (Safety Risk Assessment)

Part 121 CERTIFICATION AND OPERATIONS: AIR

Azerbaijan AAR-OPS-1 SUBPART Q. 21-Nov-2014

Airways New Zealand Queenstown lights proposal Public submissions document

Schedule Compression by Fair Allocation Methods

AVIA INVEST LLC. The Airlines Attraction Policy

GUIDANCE MATERIAL CONCERNING FLIGHT TIME AND FLIGHT DUTY TIME LIMITATIONS AND REST PERIODS

COUNCIL OF THE EUROPEAN UNION. Brussels, 12 March /09 Interinstitutional File: 2009/0042 (COD) AVIATION 41 CODEC 349 PROPOSAL

Air Traffic Management during VTBS RWY 01R/19L Maintenance

Summary How air passengers and aviation businesses would be affected if the UK leaves the EU in March 2019 with no deal.

REPUBLIC OF SINGAPORE AERONAUTICAL INFORMATION SERVICES CIVIL AVIATION AUTHORITY OF SINGAPORE SINGAPORE CHANGI AIRPORT P.O. BOX 1, SINGAPORE

Worldwide Slot Guidelines. 5 th Edition. Effective August 2013 ENGLISH VERSION

THE RENTER PILOT UNDERSTANDS AND AGREES TO COMPLY WITH THE FOLLOWING:

Fly Quiet Report. 3 rd Quarter November 27, Prepared by:

Jordan Civil Aviation Requlatory Commission (CARC) JCAR-OPS-1 - SUBPART- Q. FLIGHT AND DUTY TIME LIMITATIONS AND REST REQUIREMENTS 01-Jun-2014

AIR SERVICE INCENTIVE PROGRAM

FRAMEWORK TRACK ACCESS AGREEMENT FOR PASSENGER SERVICES. Dated August Between HS1 LIMITED. and EUROSTAR (U.K.) LIMITED

Route Support Cork Airport Route Support Scheme ( RSS ) Short-Haul Operations Valid from 1st January Introduction

Canada CAR s FTDT. Part VII - Commercial Air Services Subpart 0 - General Division III. Flight Time and Flight Duty Time Limitations and Rest Periods

Worldwide Scheduling Guidelines Effective December 2008

Aircraft landing fees for the Paris - Orly and Paris - Charles-de-Gaulle airports:

NATIONAL BUSINESS AVIATION ASSOCIATION (NBAA) CONVENTION

MEMBERS TRAVEL GUIDE

INTRODUCTION OF AIRPORT COLLABORATIVE DECISION MAKING (A-CDM) AT SINGAPORE CHANGI AIRPORT

PART 210 NOISE ABATEMENT AND RUNWAY PROCEDURES NOISE ABATEMENT AND PREFERENTIAL RUNWAY USE PROCEDURES

Rushmoor Local Plan 6 July 2017 Louise Piper Planning Policy & Conservation Manager Richard Ward Environment & Airport Monitoring Officer

Aer Credit Card Travel Rewards Terms and Conditions

Official Journal of the European Union. REGULATION (EC) No 793/2004 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL.

1) Complete the Queuing Diagram by filling in the sequence of departing flights. The grey cells represent the departure slot (10 pts)

ACI EUROPE POSITION. on the revision of. EU DIRECTIVE 2002/30 (noise-related operating restrictions at community airports)

Questions on Access to Slots and Facilities at Mexican Airports

ACL Company Profile. Aviation, Optimised.

ACL Company Profile. Aviation, Optimised.

Environmental charging review of impact of noise and NOx landing charges: update 2017

VCP FACILITATION RULES. Facilitate Airport/IATA Level 2 Interest. Aeroportos Brasil Viracopos

HONDURAS AGENCY of CIVIL AERONAUTICS (AHAC) RAC-OPS-1 SUBPART Q FLIGHT / DUTY TIME LIMITATIONS AND REST REQUIREMENTS. 01-Jun-2012

Responsibilities Document for the application of Air Traffic Flow Management (ATFM)

DECISION TO DESIGNATE DUBLIN AIRPORT AS A COORDINATED AIRPORT

FUEL MANAGEMENT FOR COMMERCIAL TRANSPORT

Passengers with Reduced Mobility Policy.

I R UNDERGRADUATE REPORT. National Aviation System Congestion Management. by Sahand Karimi Advisor: UG

Transcription:

LOCAL RULE 1 HEATHROW NIGHT MOVEMENT AND QUOTA ALLOCATION PROCEDURES Version 3 1. POLICY All Night Flights require the prior allocation of a slot and corresponding Night Quota (movement and noise quota). Late departures during the Night Quota Period, 2330-0600 local time, of flights that are not planned night flights are by prior permission of Heathrow Airport Ltd (HAL). 2. OBJECTIVES To reliably manage night flying within Department for Transport declared seasonal Night Quota To make best use of the Night Quota limits To accurately forecast and control Night Quota use To ensure the method of allocating Night Quota is transparent and fair To respect the historic rights of night flights from the previous equivalent season To provide for off-schedule operations beyond an airlines control To provide for new operators or operations, including ad hoc services, where Night Quota permits 3. DEFINITIONS In these procedures the following words shall have the following meanings: Night Quota Period: 2330 to 0600 local time Night Planning Period: Departures 2320-0550 local time Arrivals 2330-0615 local time Night Shoulder Period: Departures 2250-2315 local time Arrivals 2300-2325 local time Arrivals 0620-0630 local time Night Movement: An aircraft takeoff or landing during the Night Quota Period Night Flight: An arrival or departure scheduled during the Night Planning Period Historic Night Flight: A Night Flight allocated slots within the Night Planning Period on the basis of historic precedence Movements Limit: The maximum permitted number of night movements in a season Noise Quota: The maximum permitted sum of Quota Count of all night movements in a season Version 3 1 September 2007

Night Quota: Available Night Quota: Quota Count: Pool: Predicted Use: Minimum Pool Size The combination of the Movements Limit and Noise Quota The total Night Quota available for allocation in a season The amount of quota (QC points) assigned to an individual night movement as specified by NOTAM The proportion of Available Night Quota in a season not allocated The forecast utilisation of Night Quota by an airline in a forthcoming season, as calculated by the Coordinator and agreed with the airline concerned The Minimum Pool Size is set at 5% of the movementselement of the Available Night Quota and a Noise Quota pool equivalent to the number of pool movements multiplied by the typical Quota Count per pool movement. 4. ALLOCATION OF NIGHT QUOTA 4.1 Night Quota is determined by the Department for Transport from time to time. HAL is responsible for managing the Night Quota, including approval of unplanned night movements, and monitoring its use. Airport Coordination Ltd (ACL) administers the allocation of Night Quota for planned operations. 4.2 The Night Quota Period (2330-0600 local time) is based on runway takeoff and landing times. Schedules are based on on/off stand times. To take account of typical taxi times, the Night Planning Period is: Departures: Arrivals: 2320-0550 local time 2330-0615 local time 4.3 Operators are expected to make all reasonable efforts to prevent flights scheduled outside of the Night Planning Period from operating within the Night Quota Period. 4.4 Requests for new night flights or changes to historic night flights (eg, timing or aircraft type changes) will only be approved where a sufficient Night Quota allocation is available to meet the Predicted Use. 4.5 HISTORIC NIGHT FLIGHTS 4.5.1 An airline with historic night flights will receive a Night Quota allocation equivalent to its Predicted Use in the forthcoming season. Such allocations will be reviewed seasonally using latest available actual data. 4.5.2 Airlines must inform the Coordinator of any operational changes likely to affect Predicted Use (eg, a change in flight routing) as soon as possible. Where appropriate, the airline should also request a change to its slot time. Version 3 2 September 2007

4.6 NIGHT QUOTA POOL 4.6.1 After the allocation of Night Quota to historic night flights, a Pool is created consisting of any unallocated Available Night Quota. 4.6.2 Available Night Quota in the Pool may be allocated to new series or ad hoc night flights, or changes to historic night flights, subject to maintaining the Minimum Pool Size of the Available Night Quota for the season or, during the season, of the Available Night Quota remaining. 4.6.3 The Minimum Pool Size may be varied by agreement of the Heathrow Slot Performance Committee and the Coordinator. 4.6.4 The priorities for the allocation of Available Night Quota from the Pool are as follows: i. Unchanged historic night flights requiring additional Night Quota based on the most recent calculation of Predicted Use. ii. Changes to historic night flights requiring additional Night Quota, eg, changing to a larger aircraft type that requires additional Noise Quota, or a retime within the Night Planning Period resulting in higher Predicted Use. iii. Retimes of historic flights from outside of the Night Planning Period. iv. New requests for flights within the Night Planning Period. Within priorities ii to iv, priority will be given to year-round continuations from the previous season. 4.6.5 All night movements of airlines with an allocation of Night Quota will count against the airline s allocation of Movements and Noise Quota. Night movements of airlines without an allocation of Night Quota will count against the Pool. 4.7 NEW NIGHT FLIGHTS 4.7.1 Newly allocated night flights will receive a Night Quota allocation equivalent to the Predicted Use in the forthcoming season. Where actual data for the airline/route is not available, the nearest comparable data may be used. Such allocations will be reviewed seasonally using latest available actual data. 4.8 NIGHT SHOULDER PERIOD FLIGHTS 4.8.1 Airlines with flights scheduled within the Night Shoulder Period may receive a Night Quota allocation for a proportion of the planned flights based on Predicted Use. Such allocations are on a non-historic basis and will be reviewed seasonally using latest available actual data. 4.8.2 Requests for new slots within the Night Shoulder Period may be refused where there is not a sufficient Night Quota allocation available to meet the Predicted Use. Version 3 3 September 2007

5. END OF SEASON FLEXIBILITY 5.1 The Department for Transport Night Restrictions permits unused Night Quota of up to 10% of the airport s seasonal limit to be carried forward into the next season, and the anticipation of up to 10% of the airport s Night Quota for the next season in the event of an overrun. 5.2 A season s Available Night Quota may be set at a level to protect carry over into the next season or assuming carry over from the previous season. Normally the Available Night Quota will be set based on a 5% carry over from a Summer season to the following Winter season. The planned use of end of season flexibility may be varied by agreement of the Heathrow Slot Performance Committee and the Coordinator. 6. EXHAUSTION OF THE POOL 6.1 If at any point during the season the use of Night Quota is predicted to exceed the Available Night Quota by the end of the season, appropriate corrective procedures will be implemented from the options detailed below. The Slot Performance Committee may advise HAL and ACL on the appropriate procedures to adopt. These procedures will be lifted once Predicted Use of Night Quota is within the Available Night Quota for the season. HAL and ACL will notify operators of the implementation and lifting of any corrective procedures. 6.2 The allocation of new ad hoc night flights that do not qualify for dispensation and are not exempt aircraft types may be suspended. 6.3 Any operator either: a) without an allocation of Night Quota that has used a significant amount from the Pool; or b) with an allocation of Night Quota that has used in excess of its allocation on a pro rata basis may be required to take whatever corrective action necessary to prevent continued excessive use of Night Quota, including the cancellation and/or rescheduling of flights. The operator may also be required to appear before the Slot Performance Committee. 6.4 ACL may identify any airlines that are forecast to have surplus Night Quota allocation in that season and seek its return to the Pool. The voluntary return of Night Quota will not automatically affect an airline s Night Quota allocation in future seasons. 6.5 HAL may invoke procedures to prevent night movements without a Night Quota allocation that do not qualify for dispensation and are not exempt aircraft types. Version 3 4 September 2007

7. SEASONAL OVERRUN 7.1 A seasonal overrun occurs when the total use of Night Quota at the airport exceeds the seasonal Available Night Quota, resulting in a reduction in the Available Night Quota in the following season. All parties must make every effort to avoid such an overrun occurring. 7.2 If an overrun occurs and results in less Available Night Quota in the following season than the allocated Night Quota plus the Minimum Pool Size, then any airline with a Night Quota allocation which overused its allocation will be required to appear before the Slot Performance Committee. If its overuse cannot be justified on the basis of reasons outside the airline s control, then the airline will be required to reduce Predicted Use of Night Quota in the immediate following season by an amount equivalent to its overrun. 7.3 If a shortfall remains then the Night Quota allocation will be reduced by the same proportion across all airlines with an allocation and the Pool. 8. TRANSFER OF NIGHT QUOTA 8.1 Airlines are free to transfer Night Quota allocation from one route or type of service to another. 8.2 If an airline exchanges slots with another airline where only one set of slots is within the Night Planning Period then the associated Night Quota allocation will transfer to the airline holding the slots within the Night Planning Period after the exchange. 8.3 All transfers or exchanges are subject to confirmation of feasibility by the Coordinator. The test of feasibility will include whether a sufficient Night Quota allocation is available to meet any revised Predicted Use after the transfer or exchange. Version 3 5 September 2007