HOT 291: Chief Scientist Report Chief Scientist: Tara M. Clemente R/V Ka'Imikai-O-Kanaloa March 27-31, 2017

Similar documents
HOT 292: Chief Scientist Report Chief Scientist: Dan Sadler Chief Scientist At-Sea: Tara Clemente R/V Ka'Imikai-O-Kanaloa April 24-28, 2017

HOT 293: Chief Scientist Report Chief Scientist: Dan Sadler R/V Ka'Imikai-O-Kanaloa May 22-26, 2017

HOT 294: Chief Scientist Report Chief Scientist: Dan Sadler R/V Kilo Moana June 19-23, 2017

HOT-297 Chief Scientist Report

HOT 305: Chief Scientist Report Chief Scientist: Tara M. Clemente R/V Kilo Moana September 9-13, 2018

HOT-283 Chief Scientist Report

HOT-288 Chief Scientist Report

HOT-306 Chief Scientist Report

HOT-242 Chief Scientist Report

HOT 310: Chief Scientist Report Chief Scientist: Tara M. Clemente R/V Kilo Moana February 18-22, 2019

HOT-119: Chief Scientist Report. Chief Scientist: D. HEBEL

R. Weller December 10, 2014 Version 1.3

Mechanisms Controlling Hypoxia: Integrated Coastal Modeling Field Year 2010

Hawaii Ocean Time-series HOT-206 General Cruise Plan KM 0822

Cruise Plan Coastal Pioneer 7 Deployment

C. Area of operation: Columbia River and Columbia River Estuary between mouth of estuary and Portland, Oregon.

Project: Profiling Float Observations in the Aegean Sea

Hawaii Ocean Time-series HOT-200 General Cruise Plan Created on 2/21/2008 3:25 PM

Cruise Report HE-425, 23. May 07. June 2014

L-DEO Office of Marine Operations: UNOLS Council and FIC Meetings June 5-7,2012 Boston, MA

NOTIFICATION OF PROPOSED RESEARCH CRUISE

Pre-Cruise Meeting 1400 Eastern Time (1100 Pacific), July 1, 2015

CRUISE REPORT (C.M. Young, January 8, 2014)

CORALFISH 2010 Cruise Report: CF0910-ROV. Eastern Ionian, Cephalonia Island

Cruise Plan Coastal Pioneer 2 Deployment R/V Knorr Cruise KN April 2014

The field program has two main components: Underway Geophysics and On-site Sample collection and detailed mapping.

R/V «Dr. Fridtjof Nansen» - Fishery and oceanographic research vessel

R/V Maurice Ewing Replacement

DF-99 ANTARCTIC PENINSULA SEDIMENT TRAP DEPLOYMENT AND WATER CHEMISTRY CRUISE R/V N.B. PALMER (MAR 28, 1999 to APR. 12, 1999) David A.

A project funded by the International Joint Ventures Fund of the Canada Foundation. for Innovation

Cruise Report. FDS Submarine Channels RV Koca Piri Reis. 9 th -26 th May 2010

Cruise Plan Coastal Pioneer 6 Deployment

Cruise Report YK10-E02

Cruise Report for NSF OCE : R/V Endeavor Cruise 531

Cruise Report R/V "ALKOR" Cruise- No. HE-365 ( 06AK1101 ) 01 February - 13 February This report is based on preliminary data!

Cruise Report R/V "HEINCKE" Cruise- No. HE-316 ( 06HK1001 ) 27 January - 05 February This report is based on preliminary data!

Cruise Plan Coastal Pioneer 3 Deployment Leg 2: R/V Knorr Cruise KN December 2014

Fleet Improvement Committee 7/12/2012

ITOP Cold Wake Cruise Plan.

Monitoring the marine environment

BERING STRAIT NORSEMAN II 2017 MOORING CRUISE REPORT

CRUISE REPORT. R/V Seward Johnson Cruise No. SJ RAPID/MOCHA Program September 25 October 12, 2006 Ft. Pierce to Ft. PIerce, Florida, USA

R/V NEW HORIZON Scripps Institution of Oceanography CRUISE PLAN 1 (Draft = 29 August 2004)

CRUISE REPORT. R/V Knorr Cruise No. KN RAPID/MOCHA Program May 2-26, 2005 St. George, Bermuda - Miami, Florida, USA

Deepwater Horizon Oil Spill Principal Investigator One Year Update Workshop

ANTARCTIC CROSSROAD OF SLOPE STREAMS expedition aboard B.O. HESPERIDES in the southwest Atlantic Ocean January-February, 2010

CORALFISH 2009 Cruise Report: CF0609. Eastern Ionian, Cephalonia and Zakynthos

Ocean Gliders and the Argo float program Breck Owens WHOI. for INMARTECH Conference, Oct 06

Nature of MATE Internships in 2011 thru May UNOLS/USCG Interns

Summary THE FRAM STRAIT TOMOGRAPHY EXPERIMENT 2008

Short Cruise Report Schiff und Fahrt - Nr. MSM 79-2

SOCCOM Technical Report Series.

U.S. Navy Global Class AGOR Mid-Life Refits Managed by the Office of Naval Research (ONR) UNOLS Annual Meeting November 1, 2018

Coordination Center German Research Vessels

GREEK ARGO PROGRAMME PRESENT STATUS AND FUTURE PLANS. G. Korres and D. Kassis HCMR March, 2015

RED SEA OUTFLOW EXPERIMENT REDSOX 2

Captain Will Whatley RRS Sir David Attenborough A new ship for the British Antarctic Survey

Marine Transportation Safety Investigation Report M17P0406

Short Cruise Report RV Maria S. Merian Cruise MSM 21/1A

Profiling Float Observations in the Aegean Sea

LAKE TITICACA, BOLIVIA/PERU HIGH RESOLUTION SINGLE CHANNEL SEISMIC SURVEY CRUISE ON LAKE TITICACA ON THE M/V YAKUZA 15 APRIL TO 29 APRIL 1996

HIMIOFoTS - Hellenic Integrated Marine Inland water Observing, Forecasting and offshore Technology System

Your Global Emergency Response Partner

USCGC MUNRO 8 BOARDINGS 53 DAYS 2 HOURS. PACAREA Visits THE BERING SEA CUTTER KODIAK, ALASKA FALL ALPAT 2015

Gliders and Autonomous Underwater and Surface Vehicles

Summary Report. Contact with Wharf General Villa. 5 March 2006

The Past, Present, and Future of Nortek and Glider Measurements

R/V Revelle, Alford Cruise Cruise Plan, 6/1/2010

PBVO. For Fish. Research) survey for herring and sprat

1. Enclosure (1) i s forwarded to accordance with referance (a).

N. S. Savannah History and Decommissioning Status

PACKING & USER INSTRUCTIONS

Annual Summary of Marine Safety Reports

The ship s keel has a diver-installed Multi-Beam Sonar mounting carriage located 1/3 length from the bow.

DEPARTMENTOFTHENAVY. (c) 3rd Battalion, 4th Marines (d) TACRON ONE. (f) Elements of 4th Marines (g) 3rd Marine Division

INCIDENTS INVOLVING THE IOPC FUNDS 1992 FUND

Using Victor 6000 on board R/ V Sarmiento de Gamboa

Alfred-Wegener-Institut für Polar- und Meeresforschung in der Helmholtz-Gemeinschaft. Fieskeridirektoratet Strandgaten Bergen

Mollusk Restoration around Wastewater Treatment Plant (NY) # Progress Report: August 26, 2011

Application for a Research Cruise within Waters under Ireland s Jurisdiction

U. S. Coast Guard Sector Boston. November 2016 April 2017

FINAL REPORT West Coast Naval Training Range Demonstration of Glider-Based Passive Acoustic Monitoring

Dilution of Wastewater Discharges from Moving Cruise Ships

ESS Glaciers and Global Change

MAINTENANCE AND INSPECTION OF LIFE SAVING APPLIANCES

HARD. Preventing. Nosegear Touchdowns

/ Tool and Equipment Safety Tether System (T.E.S.T.S)

Private Pilot Checkride Oral Examination Preparation Guide

2011 Lake Minnetonka Zebra Mussel Study Summary December 8, 2011

MAIB SAFETY BULLETIN 2/2011

University Architect & VP for Facilities Policy & Procedure #30

Valley Fliers 1402 Auburn Way North, #223 Auburn WA 98002

Serving the Tampa Bay Maritime Community Since Celebrating over 125 Years of Service

Emergency Operations Plan Annex E: Helicopter Crash

replacement SONNE status report

REPORT ON THE DEPLOYMENT OF RAPID-WAVE B. O. CORNIDE DE SAAVEDRA RADPROF0910 CRUISE 2010 VIGO-SANTANDER, 30 AUGUST-1 SEPTEMBER 2010

MARINE ACCIDENT INVESTIGATION REPORT

REPORT INTO THE DROWNING OF MR MATTHEW ARMSTONG FROM THE M.V. MOON RIVER. ON THE 18th DECEMBER 2005.

Butler Personnel Parachutes

MARITIME. Protect Your Assets. Lay-up seminar MOU - CEFOR. Dec. 2016, Oslo, Ungraded SAFER, SMARTER, GREENER

Transcription:

HOT 291: Chief Scientist Report Chief Scientist: Tara M. Clemente R/V Ka'Imikai-O-Kanaloa March 27-31, 2017 Cruise ID: KOK17-05 Departed: March 27, 2017 at 0705 (HST) Returned: March 31, 2017 at 0926 (HST) Vessel: R/V Ka'Imikai-O-Kanaloa Master of the Vessel: Mike Hoshlyk OTG Marine Technicians: Sonia Brugger and Patrick A Hearn 1. SCIENTIFIC OBJECTIVES The objective of the cruise was to maintain a collection of hydrographic and biogeochemical data at the Hawaii Ocean Time-series (HOT) stations. Four stations were to be occupied during the cruise, in the following order: 1) Station 1, referred to as Station Kahe, is located at 21 20.6'N, 158 16.4'W and was to be occupied on March 27 th for about 3 hours. 2) Station 2, referred to as Station ALOHA, is defined as a circle with a 6 nautical mile radius centered at 22 45'N, 158 W. This is the main HOT station and was to be occupied March 28 th, 29 th, and 30 th. 3) Station 50, the site of WHOTS-13 Mooring (anchor position 22 47.24' N, 157 54.45' W) was to be occupied on March 30 th for about one hour. 4) Station 6, referred to as Station Kaena, is located off Kaena Point at 21 50.8'N, 158 21.8'W and was to be occupied on March 30 th for approximately 3 hours. Upon arrival to Station Kahe a ~1300 lb. weight-test cast to 500 m, one CTD cast to 1000 m, and a Hyperpro cast were to be conducted on the afternoon of March 27 th. The single CTD cast was to be conducted to collect continuous profiles of various physical and chemical parameters. Water samples were to be collected at discrete depths for biogeochemical measurements. After these operations were satisfactorily completed, the ship was to proceed to Station ALOHA. Upon arrival to Station ALOHA, two CTD casts; one 200 m cast to collect water for the Primary Productivity array and one 100m cast to collect water for the Diazotrophy Growth Rate array were to be conducted followed by the deployment of the free-drifting sediment trap array. The Sediment Trap array was to stay in the water for about 56 hours. This was to be followed by the deployment of the free-drifting Primary Productivity array to incubate in situ for 12 hours and the Diazotrophy Growth Rate array to incubate in situ for 48hrs. A full-depth (~4740 m) CTD cast was to be conducted after the deployment of the Diazotrophy Growth Rate array, and followed by 1000 m CTD casts at strict 3 hour intervals for at least 36 hours for continuous and discrete data collection, ending with another full-depth CTD cast at 2300 on March 29 th. Two additional free-drifting arrays (Net Trap array and Gas array) were to be deployed for 24 hours for incubation experiments on March 29 th. An Automated Trace Element (ATE) sampler was to be deployed to a depth of 10 m on March 29 th. A plankton net was to be towed three times between 1000-1400, and three times between 2200-0200 for 30 minute intervals on March 28 th and 29 th at Station ALOHA. The Hyperpro was to be deployed for a half-hour period near ~1400 on March 27 th, 28 th, and 30 th.

An optics package including a SeaBird Seacat with temperature, conductivity, fluorometer and pressure sensors, and a LISST particle size and distribution analyzer was to be used to profile the upper 200 m at Station ALOHA in the early morning on March 30 th. After the optics package and 36 hour burst period of CTD work at Station ALOHA was accomplished, the ship was to transit to recover the floating Net Trap array, Gas array, Diazotrophy Growth Rate array and the Sediment Trap array on the morning of March 30 th. After recovering the arrays,, the ship was to transit to Station 50 to conduct a one-hour 200 m CTD yo-yo cast. Once operations at Station 50 were complete, the ship was to re-position within Station ALOHA to conduct a Hyperpro cast. Once operations at Station ALOHA were complete, the ship was to transit to Station 6, referred to as Station Kaena where a near-bottom CTD cast (~2500 m) was to be conducted to collect salinity and chlorophyll samples for calibration. After Station Kaena operations were complete, the ship was to transit back to Pier 35. The following instruments were to collect data throughout the cruise: shipboard ADCP, thermosalinograph, the underway fluorometer, and the ship's anemometers. 2. SCIENCE PERSONNEL Participant Title Affiliation Citizenship Susan Curless Research Associate UH USA Alexa Nelson Research Associate UH USA Dan Sadler Research Associate UH USA Eric Grabowski Research Associate UH USA Blake Watkins Marine Engineer UH USA Tim Burrell Research Associate UH New Zealand Tara Clemente Research Associate UH USA Eric Shimabukuro Research Associate UH USA Ryan Tabata Research Associate UH USA Andrew King Research Associate UH USA Svetlana Naratov Graduate Student UH USA Kellen Rosburg Research Associate UH USA Jefrey Snyder Marine Technician UH USA Kelsey Maloney Undergraduate Student UH USA Eint Kyi Graduate Student UH Myanmar Gerarda Terlouw Post Graduate Trainee UH The Netherlands Kendra Turk Research Scientist UCSC USA Mary Hogan Research Scientist UCSC USA Sonia Brugger Marine Technician OTG USA Patrick A Hearn Marine Technician OTG USA 3. GENERAL SUMMARY Operations during the cruise were conducted as planned with modifications to the schedule. Departure from Pier 35 was on time and operations at Station Kahe were completed successfully. Winds from the ESE at 20-22 kts and 6-8 ft seas were present during transit to Station ALOHA after passing Kaena Point. We arrived at Station ALOHA 1.5 hours earlier than scheduled (0028 on March 28 th ).

Upon arriving at Station ALOHA on the morning of March 28 th, we conducted two CTD casts for in situ incubation arrays; one 200 m cast to collect water for the Primary Productivity array and one 100m cast to collect water for the Diazotrophy Growth Rate array. Between CTD casts we successfully deployed the Sediment Trap Array (despite 20-30 minutes of propulsion failure on the port screw, causing a delay). Following the second CTD cast to 100m we successfully deployed the Primary Production array and Diazotrophy Growth Rate array. The deep cast was conducted successfully and the 36-hour CTD period began on schedule. The daytime net tow and Hyperpro on March 28 th were conducted successfully. A twisted wire was discovered just before deployment of S2C7. I was decided to delay deployment for cable inspection. 37.5 m of cable was paid out and inspected. After the cable was inspected and determined in good condition for use it was spooled back onto the winch. However, during the re-deployment of S2C7 the cable jumped the sheave and got pinched by the squirt boom. To undo the hang up, the CTD was lowered back on deck; the cable was cut and then reterminated. 7737m of cable remains on the winch. To utilize time during re-termination the Net Trap array was deployed three hours ahead of schedule on the early morning of March 29th. After re-termination and deployment of the Net Trap array we continued with S2C7. Following S2C7 the Gas Array was deployed successfully. In order to get back on schedule The PUR CTD cast was cancelled. The remaining CTD casts were deployed successfully. On March 30 th following the 36hr burst period and optics cast, we headed to recover 4 arrays (3 arrays headed south, 1 array headed east). First we headed south towards the Gas array, Sediment trap array and Net Trap array. We experienced a few challenges during two of the four array recoveries (the Gas array and Net Trap array). The first array scheduled for recovery was the Gas array. However, during approach, the gas array was run over and the floats were wrapped around the starboard screw/shaft. The surface buoy was mangled and trapped under the fantail where it repeatedly bashed against the hull. The flag was lost and the lights were broken off (but still attached). After much discussion and analyzing GoPro footage of the screw/shaft, the surface buoy was recovered. The array line was made off between the 5m and 25m samples and a decision was made to cut the line and recover the samples from 25 m and below. The floats remained attached to the screw during recovery of samples. The samples from 25m-125m were recovered and the buoys were unwrapped from screw after several hours of deliberation, GoPro footage and manually turning the screw. Unfortunately, the 5m samples were lost. The second array scheduled for recovery was the Sediment trap array which was recovered successfully. The third array scheduled for recovery was the Net Trap array. However, during the approach, the Net Trap array got hung up on the transducer guard under the bow. The GoPro was again utilized; however we did not get usable footage. The Net trap float line was hung up on the hull and the array line was trailing off to starboard. After much discussion and deliberation on how to proceed we decided to use a weight to try and free the buoys. To do this we grappled the Net Trap line trailing off to the starboard side and tie it off to the rail. Pulled in the slack and tied a knot in the line to attach a 140lb weight. We then lowered the weight and net trap line off the starboard side with the Pitman crane. This freed the buoys from the hull and allowed the array to be recovered successfully with minimal damage. The fourth array schedule for recover was the Diazotrophy Growth Rate array, which headed off to the east in direction. It took 3 hours to steam towards the array and it was recovered successfully. After the recovery was complete we then steam towards the WHOTS mooring, (Station 50) to conduct the final CTD cast of the cruise. Due to the delays experienced during array recoveries, Station Kaena was cancelled. One 1000 m CTD cast was completed at Station Kahe. One 200 m CTD, one 100m CTD, two near bottom CTD casts and eleven 1000 m CTD casts were conducted at Station ALOHA. One 200 m yo-yo CTD cast was completed near the WHOTS mooring (Station 50) with five cycles completed.

The Primary Production, Sediment Trap, and Diazotrophy Growth Rate arrays were deployed and recovered successfully. The Net Trap array was recovered with minimal damage, however the Gas Array surface buoy and floats were damaged, the array line was cut and the samples from 5m were lost during the recovery. Six net tows for the core HOT zooplankton collection were completed successfully; three during the day, and three during the night. Two Hyperpro casts (three cycles each) were successfully conducted two times around the scheduled 1330-1430 time slot on March 27 th and 28 th. The ATE was conducted successfully on March 29 th. The optical package (Sea Bird Seacat/ Fluorometer /LISST), was deployed once in the early morning on March 30 th. The cast was conducted successfully. The ADCP, underway fluorometer, thermosalinograph and the ship s meteorological suite ran without interruption during the cruise. Winds during the cruise were mostly from the ESE with speeds of ~15-20 kts. The seas were 3-5ft from the ESE with a 6-8ft swell from the WNW. We arrived at Pier 35 for off-loading on March 31st, at 0926 (HST). The following operations were cancelled or delayed due problems with equipment: 1. One 1000m CTD casts for PUR was cancelled due to delays caused by twists in the CTD cable and the need to re-terminate the Markey.322 wire after the cable jumped the sheave and got pinched by the squirt boom. The following operations were cancelled or delayed due problems with ship and/or maneuvering: 1. Sediment trap deployment was delayed by approximately 30 mins due to propulsion failure on the port screw. 2. Gas array recovery was delayed (~2hr) due to floats getting wrapped in the starboard screw. 3. Net trap array recovery was delayed (~2hr) due to floats getting caught on the transducer guard on the bow. 4. One out of three Hyperpo casts (three cycles each) were cancelled due to delays experienced during array recoveries. 5. One 2500m CTD cast at Station Kaena was cancelled due to delays experienced during array recoveries. The following were problems experienced with ships equipment: 1. The safety alarm located on the bow of the KOK was not working. 2. Markey.322 wire had to be re-terminated on 28-29 of March due to CTD package rotational torque. 4. R/V Ka Imikai-O-Kanaloa OFFICERS AND CREW, TECHNICAL SUPPORT The R/V Ka Imikai-O-Kanaloa continues to provide good ship support for our work. Despite some ship maneuvering issues during array recoveries, Captain Mike Hoshlyk and the entire ship s crew showed enthusiasm, concern, and dedication to our scientific mission. Three items that can be bettered include: 1) a defined protocol for missing persons during safety drills, 2) The bridge phone was not answered numerous

times when trying to contact the watch officer on duty and 3) More so than in the past, the ship has a hard time holding station when a CTD cast is in the water. Technical support during this cruise was good. The OTG personnel were available at any time to assist in our work during the cruise. 5. DAILY REPORT OF ACTIVITIES (HST) March 27, 2017 0705 Depart Pier 35 0745 Fire and Abandon Ship Drills 0807 Secured from Drills 0811 Safety Briefing 1018 Arrive Station Kahe 1034 Weight cast to 500m 1056 End of weight cast 1108 Start HyperPro 1156 End of HyperPro 1230 S1C1 1000m CTD cast 1326 S1C1 End 1330 Transit to Station ALOHA March 28, 2017 0028 Arrive at Station ALOHA 0030 S2C1 200m CTD cast 0103 S2C1 End 0115 Start Sediment Trap array deployment, 0130 Sediment Trap array deployment delay due to propulsion failure on port screw. 0247 Sediment Trap array released: 22 42.28 N, 157 59.72 W 0321 S2C2 100m CTD cast 0341 S2C2 End 0417 Start Primary Production array deployment 0445 Primary Production array released: 22 44.19 N, 157 57.75 W 0525 Start Diazotrophy Growth Rate array deployment 0540 Diazotrophy Growth Rate array released: 22 44.97 N, 157 58.73 W 0600 Arrive at Station ALOHA, Center. 0610 S2C3 near bottom CTD 0811 S2C3 bottom depth 4795db 1006 S2C3 End 1140 S2C4 1000m CTD 1259 S2C4 End 1309 Hand Net Tow Start 1345 Hand Net Tow End 1348 Start HyperPro 1420 End of HyperPro 1423 S2C5 1000m CTD 1538 End S2C5 1658 S2C6 1000m CTD 1815 End S2C6 1820 Transit to recover PP array 1912 Begin PP array recovery: 22 43.03 N, 157 53.60 W 1937 PP array recovered

2008 S2C7 1000m CTD went to deploy noticed something wrong with cable. 2029 S2C7 delayed due to twists in the cable, payed out 37.5 m of cable to check cable, determined it was recoverable, spooled cable back on winch. No re-termination at this time. 2114 S2C7 1000m CTD Re-deploy 2123 S2C7 Stopped before deployment due to cable hung up on squirt boom. CTD lowered on deck, cable cut and re-terminated. 7737m of cable remaining. 2355 Start Net Trap deployment March 29, 2017 0011 Net Trap released: 22 42.62 N, 157 57.86 W 0025 S2C7 1000m CTD Re-deploy 0146 End S2C7 0303 S2C8 1000m CTD 0358 End S2C8 0500 Start Gas Array deployment 0525 Gas Array released: 22 45.78 N, 158 00.05 W 0551 S2C9 1000m CTD 0657 End S2C9 0845 S2C10 1000m CTD 0940 End S2C10 1040 Start ATE: 22 46.39 N, 157 54.97 W 1105 End ATE 1120 S2C11 1000m CTD 1213 End S2C11 1245 Net tow 1312 Net tow end 1320 Net tow 1354 Net tow end 1400 S2C12 1000m CTD 1511 End S2C12 1701 S2C13 1000m CTD 1811 End S2C13 1957 S2C14 1000m CTD 2104 End S2C14 2130 Start Net tow 2157 End Net tow 2205 Start Net tow 2232 End Net tow 2256 S2C15 near bottom CTD March 30, 2017 0058 S2C15 8m off bottom; 22 45.044 N, 157 58.422 W 0252 End S2C15 0310 Deploy Optics package, three casts 0454 Optics package recovered 0456 Transit to recover Gas array 0635 Start Gas array recovery. During approach, array was run over and floats were wrapped around the starboard screw/shaft. The surface buoy was mangled and trapped under the fantail where it repeatedly bashed against the hull. The flag was lost and lights were broken off (but still attached). 0700 After discussing and taking GoPro footage of the screw/shaft, the surface buoy was recovered. 0715 The line was made off between the 5m and 25m sample and a decision was made to cut the line and recover samples from 25 m and below. The floats remained attached to the screw during recovery of samples.

0734 Samples from 25m-125m were recovered. 0925 Buoys were unwrapped from screw after several hours of deliberation, GoPro footage and manually turning the screw. 0949 All buoys recovered and onboard. 5m samples were lost. 0951 Transit to the Sediment Trap array 1045 Begin Sediment Trap recovery: 22 32.128 N, 157 56.133 W 1107 Sediment Trap array recovered 1108 Transit to recover Net Trap array 1130 Net Trap array hung up on the bow, used GoPro to assess. 1145 Net Trap float line hung up potentially on the transducer guard, but could not get good footage with the GoPro. Floats hung up on hull and array line trailing off to starboard. Discussions and deliberations on how to proceed occurred. 1245 Decided to use weight to try and free the buoys. To do this we grapple the Net Trap line trailing off to the starboard side and tie it off to the rail. Pulled in the slack and tied a knot in the line to attach a 140lb weight. We then lowered the weight and net trap line off the starboard side with the Pitman crane. 1311 Buoys freed from the hull Extra weight worked!!! 1325 Net Trap array recovered: 22 30.887 N, 157 59.311 W 1327 Transit to recover Diazotrophy Growth Rate array 1653 Diazotrophy Growth Rate array recovered: 22 47.882 N, 157 43.879 W 1707 Transit to WHOTS-13 Buoy 1831 Arrive at Station 50 1833 S50C1 200m Yo-Yo 1951 End S50C1, 5 cycles complete 1955 Transit to Pier 35 March 31, 2017 0926 Arrive Pier 35

HOT program sub-components: Investigator Project Institution Dave Karl Core Biogeochemistry UH John Dore Biogeochemistry QA/QC MSU Roger Lukas Hydrography UH Mike Landry Zooplankton dynamics SIO Ricardo Letelier Optical measurements OSU Ancillary programs: Andrew Dickson CO 2 dynamics and intercalibration SIO Paul Quay DI 13 C UW Matthew McCarthy Sediment trap samples to look at amino acid-based UCSC Tom Guilderson paleo proxies to examine propagation of exported production into coral polyps and skeletons. Matt Church Diversity and activities of nitrogen-fixing UM/FLBS microorganisms Sam Wilson Reduced gases in the upper ocean: The cycling of UH methane, sulfide and nitrous oxide. Sara Ferrón-Smith Determination of gross primary production from the UH euphotic zone in situ, using the drifting primary production array Dave Caron SCOPE: DNA collection USC Ed DeLong SCOPE: DNA and Viral DNA collection UH Dan Repeta SCOPE: DOM collection WHOI Angelique White SCOPE: Diazotroph Microscopy, Underway C-STAR OSU Rhea Forman Total Nitrogen and Dissolved Organic Nitrogen UH Eint Kyi Investigating the microbial activity and diversity UH involved with sinking particles at Station ALOHA, Net Trap array deployment Kendra Turk SCOPE: Water collected for diazotrophy growth UCSC Mary Hogan rate experiments on array and flow cytometry population sorts to enrich UCYN-A using FACS.