Plans and Design Calculations for the Alder Creek Diversion Fish Screen

Similar documents
Planning and Resource Management for Our Communities and the Environment

Permit Application Requirements For Temporary Tents, and Membrane Structures

Hydro-Electric Schemes Compliance Report June June 2013

Wilderness Areas Designated by the White Pine County bill

(i) Adopted or adapted airworthiness and environmental standards;

Appalachian Power Company Smith Mountain Hydroelectric Project FERC No Debris Management Plan

City of Redding Airports

TIMBER BOLLARDS TYPE I. TYPE ll TS mm Radius 150 x 100 white painted Timber post dia Timber Post. Ground Level NOTES:

Advisory Circular. 1.1 Purpose Applicability Description of Changes... 2

[Docket No SW-25-AD; Amendment ; AD R1]

FOAM PROPORTIONING EQUIPMENT

[Docket No. FAA ; Product Identifier 2017-CE-022-AD] AGENCY: Federal Aviation Administration (FAA), Department of Transportation

Seven-eighths-spacing Rackmount Kit/Chassis Rackmount Kit. Techmar enclosure designs include interchangeable modular components,

[Docket No. FAA ; Product Identifier 2016-NE-32-AD] Airworthiness Directives; Honeywell International Inc.

[Docket No. FAA ; Product Identifier 2018-NM-046-AD; Amendment ; AD ]

FRAMELESS GLASS SLIDING FOLDING SYSTEM Sliding Folding System SPECIALISED SLIDING SYSTEMS

Product Cut Sheet Z4-SERIES SEISMICFRAME CABINET SYSTEM SERVICE PARTS

Section 32 TABLE OF CONTENTS Airfield and Aircraft Operations. 32.A General B Aircraft

VILLAGE OF WINNETKA, ILLINOIS DEPARTMENT OF COMMUNITY DEVELOPMENT

8" 9000, " x 25" How to Specify NH-24

Architectural Review Commission

[Docket No. FAA ; Product Identifier 2017-NE-23-AD] Airworthiness Directives; Zodiac Seats France, Cabin Attendant Seats

SECTION 32. Airfield and Aircraft Operations

[Docket No. FAA ; Product Identifier 2018-CE-012-AD; Amendment. AGENCY: Federal Aviation Administration (FAA), DOT.

[Docket No. FAA ; Product Identifier 2018-NE-06-AD; Amendment 39- Airworthiness Directives; Hoffmann GmbH & Co.

[Docket No. FAA ; Directorate Identifier 2015-NM-101-AD] Airworthiness Directives; The Boeing Company Airplanes

TUCSON PATIO AWNING INSTALLATION MANUAL

[Docket No. FAA ; Product Identifier 2018-NE-19-AD; Amendment ; AD ]

DATE: 23 March, 2011 TO: Communities FROM: BlazeSports America. RE: Accessible Trails Checklist 1

AVIAT AIRCRAFT INC. P.O. Box South Washington Afton, WY USA Tel: Fax:

International Osoyoos Lake Board of Control Annual Report to the International Joint Commission

Advisory Circular. Aircraft Certification Authority Based on Foreign Qualifications

airplanes; Fuselage In-Flight Fire Safety and Flammability Resistance.

VARIOUS RESTRICTED CATEGORY HELICOPTERS

Appendix A Appendix A (Project Specifications) Auk Auk / Black Diamond (Trail 44) Reroute

[Docket No. FAA ; Directorate Identifier 2017-NM-008-AD] AGENCY: Federal Aviation Administration (FAA), DOT.

OWNER S MANUAL: G5000 SLIDE-OUT AWNING SYSTEM

[Docket No. FAA ; Product Identifier 2014-NM-144-AD; Amendment ; AD ]

ADDENDUM NO. TWO AB

ASTM E 1886 and ASTM E 1996 TEST REPORT. Report No.: A Rendered to: CORAL ARCHITECTURAL PRODUCTS Tuscaloosa, Alabama

ARTICLE 7 MOBILE HOME AND RECREATIONAL VEHICLE PARKS AND CAMPGROUNDS

SUPERSEDED. [Docket No. FAA ; Directorate Identifier 2009-SW-01-AD; Amendment ; AD ]

APPROVAL REPORT. Project No: Supplements Project No.: N/A. Class: 2510 Product Name:

BXUV.N619 - Fire Resistance Ratings - ANSI/UL 263. Design/System/Construction/Assembly Usage Disclaimer. Fire Resistance Ratings - ANSI/UL 263

[Docket No. FAA ; Product Identifier 2018-CE-012-AD; Amendment ; AD ]

AMS MU800 Mullion Drained Curtain Walling

SECTION SPECIFICATIONS PART 1 GENERAL

Civil Aviation Directive

[Docket No. FAA ; Product Identifier 2017-NE-28-AD] Airworthiness Directives; General Electric Company Turbofan Engines

COMMERCIAL GRILLE DOORS

[Docket No. FAA ; Special Conditions No SC]

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /2010

White Mountain National Forest Saco Ranger District

[Docket No. FAA ; Product Identifier 2017-CE-030-AD] Airworthiness Directives; Textron Aviation Inc. Airplanes

Dinoot Trailer Building Overview Revision /30/16

Susitna-Watana Hydroelectric Project (FERC No ) Recreation Resources Study Study Plan Section Study Implementation Report

ICAO SUMMARY REPORT AUDIT OF THE DEPARTMENT OF CIVIL AVIATION OF THE LAO PEOPLE S DEMOCRATIC REPUBLIC

50906 Federal Register / Vol. 66, No. 194 / Friday, October 5, 2001 / Proposed Rules

J1000. Supreme MEADRAIN. Material: Polymer concrete

[Docket No. FAA ; Directorate Identifier 2011-NM-039-AD; Amendment

at: Accessed May 4, 2011.

[Docket No. FAA ; Product Identifier 2014-SW-042-AD] Airworthiness Directives; Sikorsky Aircraft Corporation Helicopters

Technical Arrangement on Aircraft Maintenance between the Transport Canada Civil Aviation Directorate and the Civil Aviation Authority of New Zealand

Section 11 Workstation Components

Alternatives. Introduction. Range of Alternatives

Subpart H. 2042/2003

NIAGARA MOHAWK POWER CORPORATION. Procedural Requirements

Page 92

Porter Fk. #1. All unauthorized items removed as per FS & Rec Res guidelines. Footbridge may be needed for wheel chair access and for safety

SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE DIRECTORATE GENERAL OF CIVIL AVIATION OF KUWAIT

BF Goodrich Avionics Systems, Inc. SKYWATCH SKY497

SUBMITTAL PACKAGE FLEXIBLE SPRINKLER DROP

[Docket No. FAA ; Product Identifier 2018-NM-077-AD; Amendment ; AD ]

TORONTO TRANSIT COMMISSION REPORT NO.

SUPERSEDED [ U] DEPARTMENT OF TRANSPORTATION. Federal Aviation Administration. 14 CFR Part 39 [66 FR /5/2001]

[Docket No. FAA ; Product Identifier 2017-NE-39-AD] Airworthiness Directives; Rolls-Royce Deutschland Ltd & Co KG Turbofan

INSTALLATION INSTRUCTIONS for folding arm awnings

THE CESSNA AIRCRAFT COMPANY

TWO PERSON WALL MOUNT

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES

WAIPU COVE RESERVE BOARD POLICY DOCUMENT ANNUAL SITE DEVELOPMENT REGULATIONS

COVER SHEET. Reduced Vertical Separation Minimum (RVSM) Information Sheet Part 91 RVSM Letter of Authorization

Tents & Membrane Structures Information Packet

FEASIBILITY CRITERIA

[Federal Register: April 23, 1999 (Volume 64, Number 78)] SUPERSEDED. Docket No. 98-NM-337-AD; Amendment ; AD

[Docket No. FAA ; Product Identifier 2017-CE-033-AD; Amendment 39- Airworthiness Directives; American Champion Aircraft Corp.

TIFFANY TOP HUNG SLIDERS

FIRE CRAFT PROFICIENCY PROGRAM

SUPERSEDED. [Docket No NM-148-AD; Amendment ; AD ]

[Docket No. FAA ; Product Identifier 2017-NM-086-AD; AGENCY: Federal Aviation Administration (FAA), Department of Transportation

SUPERSEDED. [Docket No NM-217-AD; Amendment ; AD ]

ROAD AND TRAIL PROJECT APPROVAL

Rule Governing the Designation and Establishment of All-Terrain Vehicle Use Trails on State Land

13401 Brooks Drive Baldwin Park, CA p f shademakerusa.com

Mathey Dearman's revolutionary MagnaCut XM enables

SECTION TOILET ACCESSORIES

Kontrol Kube Advanced Owners Manual

AIRWORTHINESS ADVISORY CIRCULAR

Advanced Customization Type 1. White Paper

CASE NO. 2019CW10 (REF NO. 12CW118).

Transcription:

TECHNICAL MEMORANDUM Plans and Design Calculations for the Alder Creek Diversion Fish Screen El Dorado Irrigation District 2890 Mosquito Road Placerville, CA 95667 Alder Creek Diversion Fish Screen Plans and Design Calculations El Dorado Irrigation District February 2010

Introduction The Federal Energy Regulatory Commission (FERC) license for the El Dorado Hydroelectric Project (Project 184) requires the El Dorado Irrigation District (District) to install a fish screen on the diversion structure at the Alder Creek Diversion Dam. Pursuant to this requirement, the District developed the Project 184 Alder Creek Diversion Fish Screen Conceptual Plan (Conceptual Plan) in collaboration with the California Department of Fish and Game (DFG), United States Forest Service (FS), State Water Resources Control Board (SWRCB), and Project 184 Ecological Resources Committee (ERC) in 2007. EID submitted the Conceptual Plan to FERC on October 12, 2007 and FERC issued an Order Modifying and Approving the Conceptual Plan on February 1, 2008. The Conceptual Plan and FERC Order are included in Appendix A. Consistent with the requirements of the Conceptual Plan and DFG Fish Screen Criteria, this document provides the 90% plans and design calculations necessary to facilitate DFG review and approval of the Alder Creek Diversion Fish Screen (Fish Screen). The Conceptual Plan Regulatory Considerations (pg 7) states: The DFG Fisheries Engineering Program will be involved regularly throughout the design process. Following approval of this 30 percent design by all regulatory agencies identified in the FERC license, EID will prepare and provide for approval plans and design calculations for the fish screen as specified by Section 5.C. of the DFG Fish Screen Criteria [outlined in Appendix A]. EID will construct the fish screen to the satisfaction of DFG consistent with Section 5931 of the California Fish and Game Code. Following construction EID will provide access to the facility during operation for DFG to inspect and verify compliance with Fish Screen Criteria. Section 5.C of the DFG Fish Screen Criteria (DFG, 2000) states: Project Review and Approval: Plans and design calculations, which show that all the applicable screening criteria have been met, shall be provided to the Department before written approval can be granted by the appropriate Regional Manager. The approval shall be documented in writing to the project sponsor, with copies to both the Deputy Director, Habitat Conservation Division and the Deputy Director, Wildlife and Inland Fisheries Division. Such approval may include a requirement for postconstruction evaluation, monitoring and reporting. Fish Screen Criteria and Concepts Considered The Fish Screen must be constructed to accommodate a diversion rate between 5 and 15 cfs while meeting the design guidelines established by the DFG. The Fish Screen will protect trout fry and other fish species from entrainment and impingement at the diversion. The Fish Screen will be designed and sited to minimize the intake footprint and to minimize debris collection, damage potential, and sedimentation issues. Alder Creek Diversion Fish Screen Plans and DesignCalculations El Dorado Irrigation District February 2010

Table 1 summarizes the design criteria used in the evaluation of the various screen types being considered for this project. Screen specific design specifications are included in Appendix B. Table 1. Fish Screen Design Criteria for Evaluation Design Criteria Opening Size: 1.75 mm for slotted profile bar screens or 2.38 mm (measured diagonally) for woven wire mesh or perforated plate openings. (Note: Wedgewire screens are preferred.) Maximum Screen Approach Velocity: 0.33 feet per second uniformly distributed across the screen surface. (Note: To meet these criteria, a minimum wetted screen area of 45 square feet is necessary.) Minimum Open Area: 27% (Note: 50 percent open area is preferred to reduce slot velocity.) Screen Material: stainless steel, type 304. Automated Cleaning System: capable of being continuously cleaned as necessary. Preferred Fish Screen Description - Cone Screen A Cone Screen design was selected as the preferred design concept in the Conceptual Plan. The design of this screen system includes the following key elements: 1. Fish screen unit 2. Concrete fish screen base with formed intake channel 3. Adapter plate on existing intake 4. Propeller-Drive Operated Brush Cleaning System 5. Cathodic Protection System Each of the elements on the preferred system is described in more detail below. The 90% design plans for the entire project are included in Appendix C. Fish Screen Unit An ISI 96-24 brush cleaned cone screen will be used to screen the existing diversion. This unit has a maximum capacity of 18 cfs at an approach velocity of.33 fps and is designed to meet the fish screen criteria (maximum diversion rate will be 15 cfs in compliance with water right). A type 304 stainless steel wedgewire screen covers 54.8 square feet of the cone surface. The continuous slot screen will have 0.069-inch width wires (#69SV wire) and a slot opening of 0.069-inch (50% net open area). The screen s frame will also be fabricated of type 304 stainless steel. The interior of the cone structure shall be braced to insure roundness and concentricity to within 1/8-inch. The frame with wedgewire covering shall be designed to support a dead load equivalent to 8 feet of water. Alder Creek Diversion Fish Screen Plans and DesignCalculations El Dorado Irrigation District February 2010

Flow uniformity through the screen surface is managed using an internal cone baffle system to prevent high velocity areas. This system has been field tested at similar sites and with acceptable velocity uniformity. Oversizing the screen unit will also minimize approach velocity hot spots on the screen and allow for some non-uniform intake flows across the screen unit. Three double-hinged brush arms will be attached to a centrally located rotating hub. The brush arms are designed to rotate about the screen whenever there is flow through the intake. A propeller-drive system that connects to a 1000:1 gear reducer and drive plate assembly is used to power the brush cleaning system. The brushes will clean any material that may collect on the wedgewire during diversion operations. Concrete Fish Screen Base with Formed Intake Channel The new screen requires a concrete base with an intake formed into the concrete. The intake beneath the screen will transition to the existing intake area on the dam face. The new base will slightly elevate the bottom of the cone screen base to ensure that most bed load materials will settle near the adjacent, and lower, existing low level outlet rather on the screen material. The existing intake grate and its concrete foundation must be removed prior to placement of the concrete base. A survey of the ponded area immediately in front of the existing intake indicates that the rock foundation under the concrete area is of sufficient depth and quality for placement of the base without additional excavation or reinforcement. To prepare this area for the concrete, the area must first be dewatered. Following dewatering, rebar dowels should be drilled into the base rock to ensure a secure bonding of the lightly reinforced concrete. Forms for the concrete can also be secured to the rebar to ease placement. Adapter Plate on Existing Intake Once the existing intake grate and concrete base are removed, a steel plate over the existing dam face opening will need to be fit on the vertical face and bolted in place. The formed channel in the concrete base will pass through (or under) this plate. This plate will force all diverted flows to pass through the fish screen and enable the existing sluice gate to regulate diversion flows in the same manner as it did in the past. Propeller-Drive Cleaning System The intake is located in a remote area about 4000 feet from available power. The proposed cleaning system will not require an external electrical power source, but instead will operate using a propeller drive system. Basically, the screen cleaner will operate whenever there is flow into the pipeline. The flow moves a propeller connected to a driveshaft attached to a 1000:1 gear reducer. The gear reducer is mounted to the screen frame and has a drive plate attached to the three brush arms. As long as the propeller turns, the screen cleaner will operate. At 200 rpm on the propeller, the brush cleaner will make one complete revolution every five minutes. Alder Creek Diversion Fish Screen Plans and DesignCalculations El Dorado Irrigation District February 2010

Cathodic Protection System All major components subject to corrosion including the screen, gear reducer and its components, and brush cleaning assembly shall be electrically isolated and cathodically protected using a sacrificial anode system. Non-stainless steel structural parts will be blasted, primed, and coated with an epoxy coating. Alder Creek Diversion Fish Screen Plans and DesignCalculations El Dorado Irrigation District February 2010

Appendix A Project 184 Alder Creek Diversion Fish Screen Conceptual Plan And FERC Order Modifying and Approving the Plan Alder Creek Diversion Fish Screen Plans and DesignCalculations El Dorado Irrigation District February 2010

Submission Contents Compliance Submittal Pursuant to P-184 License Appendix A Condition 39 Alder Fish Screen Plan HLC1007-068ss-cj-nm.pdf 1-31

20080201-3062 Issued by FERC OSEC 02/01/2008 in Docket#: P-184-136 122 FERC 62,109 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION EL DORADO IRRIGATION DISTRICT PROJECT NO. 184 136 ORDER MODIFYING AND APPROVING ALDER CREEK FISH SCREEN PLAN UNDER ARTICLE 401 (Issued February 01, 2008) The El Dorado Irrigation District (licensee) filed on October 17, 2007, a plan to install a fish screen at the Alder Creek Diversion Dam pursuant to Article 401of the license 1. The project is located on the South Fork American River (SFAR) and its tributaries in El Dorado, Alpine, and Amador Counties, California, and occupies Federal lands administered by the U.S. Forest Service (USFS). LICENSE REQUIREMENTS AND BACKGROUND Article 401(a) requires the licensee to file for Commission approval, the plans or reports required by various conditions found in the California State Water Resources Control Board (State Board) water quality certification (WQC) and the USFS final Section 4 (e) conditions. WQC Condition 12 states that the licensee shall develop a plan for screening Carpenter and Alder Creeks for all life stages of trout. The plan shall be approved by the USFS and the California Department of Fish and Game (CDFG) after consultation with the State Board and the Environmental Resources Committee (ERC; required by USFS Condition 38) prior to the licensee implementing the plan. The screening of Carpenter and Alder Creeks shall be implemented as soon as practicable after approval by the USFS and the CDFG. USFS Condition 39 states that the licensee shall develop a plan for screening Carpenter and Alder Creeks for all life stages of trout. The plan shall be approved by the USFS and the CDFG after consultation with the State Board and the ERC, and prior to the licensee implementing the plan. LICENSEE'S PLAN 1 117 FERC 62, 044 (2006)

20080201-3062 Issued by FERC OSEC 02/01/2008 in Docket#: P-184-136 Project No. 184-136 2 The licensee proposes to construct a cone-shaped, wedgewire fish screen at the Alder Creek Diversion. The screen will be deigned to meet CDFG screening criteria for opening size, maximum approach velocity, and minimum open area. The construction will include a concrete base and formed intake channel, an adapter plate on the existing intake, debris and cathodic protection, a solar-charged battery power supply, a cleaning system, and a control panel. The licensee described the fish screen plan as conceptual, and included a brief description of the various elements of the screening system, and of the construction process. The licensee also included several design drawings at the 30 per cent level of completion. AGENCY COMMENTS The USFS letter to the licensee dated August 3, 2007, approved the Alder Creek Fish Screen Conceptual Plan. The CDFG letter dated August 20, 2007, also approved the Alder Creek Fish Screen Plan. The State Board letter dated October 16, 2007, approved the plan, but noted that the licensee had proposed to discontinue the use of the Carpenter Creek Diversion in a May 11, 2007, letter to the Commission. The State Board also noted that our June 6, 2007, letter advised the licensee to consult with the agencies and file a request to delete the diversion from the project. The State Board stated the licensee would need a WQC for the removal of the diversion and associated structures. DISCUSSION AND COMMENTS The licensee s conceptual design for a cone-shaped fish screen at the Alder Creek Diversion is an excellent first step, but additional design work is needed. The licensee should continue to consult with the CDFG, the USFS, the State Board, and the ERC to advance the design process. Any significant changes to the conceptual design should be filed for Commission approval. The licensee is required by Part 12 of the Commission s regulations to coordinate all construction activities at the project with the Regional Engineer in our San Francisco Regional Office. The licensee should file the final design drawings and specifications and the construction plans with the Regional Engineer no later than 60 days before the start of construction. Copies of all required construction permits, clearances, and agreements must also be filed with the Regional Engineer as soon as they are available. No physical work can occur without written authorization from the Regional Engineer.

20080201-3062 Issued by FERC OSEC 02/01/2008 in Docket#: P-184-136 Project No. 184-136 3 Article 2 requires the licensee to file revised exhibits for Commission approval whenever changes approved by the Commission have been completed. The licensee should file within 60 days of the completion of the fish screen, an as-built drawing depicting the modified Alder Creek Diversion. Lastly, WQC Condition 12 and USFS Condition 39 required a plan for a fish screen at the Carpenter Creek Diversion. The licensee filed notice on May 11, 2007, that they would discontinue diverting water from Carpenter Creek. They reported they would work with the USFS and the State Board to modify Condition 12 and Condition 39, and would file a formal request to do so with the Commission in 2008. The Director Orders: (A) The Alder Creek Fish Screen Plan filed October 17, 2007, as modified by paragraphs (B) through (D), is approved. If significant changes occur to the conceptual design of the Alder Creek Fish Screen during design development, the licensee shall file a revised plan for Commission approval. (B) The licensee shall file the final design drawings and specifications, and the construction plans for the Alder Creek Fish Screen with the Regional Engineer, San Francisco Regional Office, no later than 60 days before the start of construction. The licensee shall include in the filing copies of any required construction permits, clearances, and agreements it has received; and shall report on the progress of acquiring any other required authorizations not yet received. The licensee shall not perform any physical work on the Alder Creek Fish Screen without written authorization from the Regional Engineer. (C) The licensee shall file for approval within 60 days of the completion of construction, a revised F-7 drawing depicting the modified Alder Creek Diversion. (D) This order constitutes final agency action. Request for rehearing by the Commission may be filed within 30 days from the date of the issuance of this order, pursuant to 18 CFR ' 385.713. George H. Taylor Chief, Biological Resources Branch Division of Hydropower Administration and Compliance

20080201-3062 Issued by FERC OSEC 02/01/2008 in Docket#: P-184-136 Project No. 184-136 4

Appendix B ISI Screen Design Specifications Alder Creek Diversion Fish Screen Plans and DesignCalculations El Dorado Irrigation District February 2010

Appendix C Alder Creek Diversion Dam 90% Design Plans Alder Creek Diversion Fish Screen Plans and DesignCalculations El Dorado Irrigation District February 2010