Abellio ScotRail Arriva Rail London Alliance Rail Arriva Trains Wales c2c Chiltern Railways Colas Rail CrossCountry DB Cargo (UK) Limited Devon & Cornwall Railway Direct Rail Services East Midlands Trains Eurostar (UK) First East Coast GTR GTR Southern Great Western Railway Hull Trains Freightliner Group GB Railfreight Grand Central Greater Anglia Heathrow Connect Heathrow Express Island Line Locomotive Services Limited London Underground MTR Crossrail Merseyrail North Yorkshire Moors Railway Northern Rail Operations Group Serco Caledonian Sleeper Sheffield Supertram South Western Railway Southeastern TransPennine Express Tyne & Wear Metro Virgin Trains East Coast Virgin Trains West Coast West Coast Railway Co. West Midlands Trains Anglia London North Eastern & East Midlands London North Western Scotland South East Wales Wessex Western TIMETABLE PARTICIPANTS NETWORK RAIL Calendar of Events Expected Event Type of Event ESG ESG No. May 2019 change to reflect reduced platforms at Euston / Infrastructure West Coast 2 December 2019 May 2020 Great Western Route Modernisation Configuration State C: Crossrail Full Service West - including services to Reading Full Crossrail Service East, including services to Shenfield, Liverpool Street & Abbey Wood. Greater Anglia timetable recast and the introduction of new rolling North of England - TransPennine Express and Northern franchise commitments. New rolling and TransPennine Express services on the East Coast Main Line also introduction of Northern Connect services Thameslink Programme Key Output 2 - up to 24 trains per hour between Blackfriars & St Pancras International and reconstructed London Bridge and Redhill capacity enhancement Enhanced Infrastructure Western & South Wales 5 Enhanced Infrastructure, & Rolling / Infrastructure Anglia 11 North of England 4 Enhanced Infrastructure Thameslink 9 Southampton - West Midlands Freight train lengthening Enhanced Infrastructure Southampton - West Midlands 6 December 2020 Introduction of 6th hourly Long Distance High Speed train service on the Midland Main Line. Electric trains between London and Kettering / Corby. Capacity schemes Bedford to Kettering & Corby / Infrastructure East Midlands 12 May 2021 New East Coast Main Line timetable / Infrastructure East Coast 3 s from Draft May 2019 version are shown in red Participants included are indicative
s which are not Events Expected Type of End Reason for not being an Event May 2019 Rolling Programme of Electrification: Midcalder to Holytown (Shotts) route Enhanced Infrastructure May-19 Not expected to drive significant timetable change East Midlands franchise New franchise Aug-19 Extent and timing of timetable change(s) not currently known East Anglia Franchise. TS2 of East Anglia ITT including 2tph shuttle between Angel Road and May-19 changes expected - insufficient to qualify as an Event Stratford, journey time improvements on GEML and increased off peak service between Ipswich and Norwich. Rolling Programme of Electrification (Shotts) Enhanced infrastructure May-19 changes expected - insufficient to qualify as an Event Highland Mainline Enhanced infrastructure May-19 changes expected - insufficient to qualify as an Event Stirling, Dunblane Alloa: Rolling Programme of Electrification: Enhanced infrastructure May-19 changes expected - insufficient to qualify as an Event Phase B: Larbert to Stirling North Phase C: Stirling North to Dunblane Phase D: Stirling to Alloa West Coast Partnership Franchise Apr-19 Extent and timing of timetable change(s) not currently known Elizabeth Line operating between Paddington Low Level & Shenfield May-19 changes expected - insufficient to qualify as an Event Additional services operated by GTR through the Thameslink core May-19 changes expected - insufficient to qualify as an Event December 2019 A2I, Aberdeen to Inverurie ½ hourly service introduced Enhanced service from Dec-19 changes expected - insufficient to qualify as an Event infrastructure introduced Sept '19 Leeds Station Capacity Improvements Enhanced Infrastructure Dec-19 changes expected - insufficient to qualify as an Event New Rolling & TT s New Dunbar down platform Enhanced infrastructure Dec-19 changes expected - insufficient to qualify as an Event EGIP Key Output 4 - Completion of Glasgow Queen Street work to enable 8 car trains Enhanced infrastructure Dec-19 changes expected - insufficient to qualify as an Event Cross Country franchise New franchise Dec-19 Extent and timing of timetable change(s) not currently known Felixstowe Branch enhancement Enhanced Infrastructure Dec-19 changes expected - insufficient to qualify as an Event Gatwick Airport Station Upgrade - Platform 7 and Down Platform Loop out of use Restricted Infrastructure Dec-19 change expected - insufficient to qualify as an Event May 2020 South Western Railway new rolling and timetable change & Rolling May-20 changes expected - insufficient to qualify as an Event Great Western Franchise New franchise May-20 Extent and timing of timetable change(s) not currently known Kings Cross area S&C / re-modelling Enhanced Infrastructure May-20 Not expected to drive significant timetable change Gatwick Airport Station Upgrade - Platforms 5 & 6, Down Fast and Reversible Loop out of use for 12 months Restricted Infrastructure Dec-21 change expected - insufficient to qualify as an Event December 2020 Extension of Gospel Oak Barking services to Barking Riverside Enhanced infrastructure Dec-20 Extent and timing of timetable change(s) not currently known Watford Junction-Croxley Link. Improved connectivity between LU Metropolitan line and main New Line Dec-20 changes expected - insufficient to qualify as an Event line services
Expected s which are not Events Type of End Reason for not being an Event Brighton Main Line Upgrade - Commencement of Disruptive Access Restricted infrastructure Dec-28 Extent and timing of timetable change(s) not currently known Intercity East Coast Partnership New franchise Dec-20 Extent and timing of timetable change(s) not currently known c2c timetable recast and Beam Park station opening Dec-20 Extent and timing of timetable change(s) not currently known South Western Railway new rolling & Rolling Dec-20 Extent and timing of timetable change(s) not currently known The introduction of 1tph between Avonmouth and Bristol TM and 1tph between Severn Beach and Bath Spa as part of MetroWest Enhanced infrastructure Dec-20 Extent and timing of timetable change(s) not currently known May 2021 Thameslink, Southern & Great Northern Franchise New franchise Sep-21 Extent and timing of timetable change(s) not currently known West Midlands franchise increased service level including Sundays May-21 Extent and timing of timetable change(s) not currently known The introduction of 1tph between Portishead and Bristol TM, 1tph Yate to Bristol TM and 1tph Henbury to Weston-Super-Mare (this replaces the current Weston-Super-Mare to Bristol Parkway service) as part of MetroWest Enhanced infrastructure, New Line, rolling and & TT changes May-21 Extent and timing of timetable change(s) not currently known December 2021 Chiltern Franchise New franchise Dec-21 Extent and timing of timetable change(s) not currently known East London Line enhanced frequency to Crystal Palace, Enhanced infrastructure & Rolling Dec-21 Extent and timing of timetable change(s) not currently known May 2022 December 2022 Transpennine Route Upgrade Enhanced infrastructure Dec-22 Extent and timing of timetable change(s) not currently known and Rolling Stock s East West Rail, Bicester Village Bedford operation New and enhanced Dec-22 Extent and timing of timetable change(s) not currently known infrastructure South Eastern Franchise - new timetable Dec-22 Extent and timing of timetable change(s) not currently known East London Line enhanced frequency to Clapham Junction, Enhanced Dec-22 Extent and timing of timetable change(s) not currently known infrastructure & Rolling Transpennine Express Franchise New franchise Apr-23 Extent and timing of timetable change(s) not currently known May 2023 December 2023 Western Rail Link to Heathrow New infrastructure Dec-23 Extent and timing of timetable change(s) not currently known s from Draft May 2019 version are shown in red
Completed Event Steering Groups No ESG Completion date 1 Chat Moss 2012 December 2013 / May 2014 2 West Coast May 2019 3 East Coast May 2021 4 North of England December 2017 / December 2019 5 Western & South Wales May 2017 to December 2019 6 Southampton - West Midlands December 2019 7 not used 8 not used 9 Thameslink May 18 / December 2019 10 not used 11 Anglia December 2019 12 East Midlands December 2020
MINUTES OF EVENT SUBMISSION REVIEW GROUP MEETINGS (Groups purpose is to review changes to the Calendar of Events and supporting information prior to the publication of each Draft and Final version) Final May 2019 version Attendees: David Fletcher (CrossCountry, Mike Hoptroff (Virgin Trains West Coast), Ian Kapur (GBRf), Chris Hanks (Alliance Rail) and Andrew Relf (Network Rail). Apologies: David Smith (Abellio ScotRail) Events sheet Agreed to add Tyne & Wear Metro as a participant to the December 2019 North of England Event, as requested in response to the Draft Calendar of Events Reviewed other participants given the above prompt and updated d name of NR Route to South East Proposed combining the two Anglia ESG entries into one for December 2019. made post meeting Andrew to ask NYMR whether they wish to be shown as a participant in the East Coast or North of England ESG s s sheet Added 2 changes to May 2019 for Crossrail and GTR ESG s completed sheet Agreed with changes proposed to aid reading of entries Misc Ian asked to if the anyone had a copy of the Terms of Reference for the Group Chris Hanks agreed to look This will answer if the group is quorate Agree to publish agreed minutes of group going forward, as extra tab to sheets Next version is Draft December 2019, published by D64 on 21 September. Next ESRG meeting to be held prior to this date, in mid August.