International Civil Aviation Organization. Aerodrome Certification Implementation Task Force (ADCI TF/1)

Similar documents
International Civil Aviation Organization. First Meeting of the RASG-MID Steering Committee (RSC/1) Global Developments related to Aviation Safety

International Civil Aviation Organization. Aerodrome Certification Implementation Task Force (ADCI TF)

International Civil Aviation Organization. Regional Aviation Safety Group - Middle East AERODROME CERTIFICATION AND RUNWAY SAFETY ISSUES

International Civil Aviation Organization. MIDANPIRG Air Traffic Management Sub-Group. Fourth Meeting (ATM SG/4) (Amman, Jordan, 29 April 3 May 2018)

NPF/SIP/2011 NPF/SIP/2011--WP/20 WP/20

Global ATM System. ~ Performance framework ~ H.V. SUDARSHAN, Technical Officer International Civil Aviation Organization

WORKING TOGETHER TO ENHANCE AIRPORT OPERATIONAL SAFETY. Ermenando Silva APEX, in Safety Manager ACI, World

Aerodrome Safety. H.V. SUDARSHAN International Civil Aviation Organization

Andres Lainoja Eesti Lennuakadeemia

AERODROME SAFETY COORDINATION

International Civil Aviation Organization. Fourth Meeting (MID-SST/4) (Cairo, Egypt, 6 8 February 2018)

International Civil Aviation Organization. Runway and Ground Safety Working Group

International Civil Aviation Organization. Regional Aviation Safety Group - Middle East

WORLDWIDE SYMPOSIUM ON ENABLING THE NET-CENTRIC INFORMATION ENVIRONMENT:

International Civil Aviation Organization. Runway and Ground Safety Working Group. Third Meeting (RGS WG/3) (Cairo, Egypt, September 2016)

International Civil Aviation Organization. Fourth Meeting (RSC/4) (Cairo, Egypt, December 2015) RUNWAY SAFETY RELATED ISSUES

ICAO Aerodrome s Manual. AERODROME S INSPECTOR WORKSHOP St. Maarten, MAHO June 2012

SAFETY. Global Safety Network (GSN) Diploma Programme

Participant Presentations (Topics of Interest to the Meeting) GASP SAFETY PERFORMANCE INDICATORS. (Presented by the Secretariat) EXECUTIVE SUMMARY

ICAO Annex 14 Standards and Aerodrome Certification

2012 Performance Framework AFI

COMMISSION IMPLEMENTING REGULATION (EU)

COMPREHENSIVE REGIONAL IMPLEMENTATION PLAN FOR AVIATION SAFETY IN AFRICA (AFI PLAN) NINETEENTH AFI PLAN STEERING COMMITTEE MEETING

AFI PLANNING AND IMPLEMENTATION REGIONAL GROUP TWENTY FIRST MEETING (APIRG/21) (Nairobi, Kenya (9 to 11 October 2017)

Packaging Tomorrow s Aviation System

ASSEMBLY 39TH SESSION

AN-Conf/12-WP/162 TWELFTH THE CONFERENCE. The attached report

TWELFTH AIR NAVIGATION CONFERENCE

Procedures for Air Navigation Services Aerodromes (PANS-AGA) ICAO Doc. 9981

International Civil Aviation Organization

International Civil Aviation Organization. Performance Framework for AIM implementation in the MID Region

AFI Plan Aerodromes Certification Project Workshop for ESAF Region (Nairobi, Kenya, August 2016)

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /2010

Implementation of the Performance-Based Air Navigation Systems for the CAR Region ICAO Regional TC Project RLA/09/801 Agenda Item 6 WP/14

FINAL REPORT OF THE USOAP CMA AUDIT OF THE CIVIL AVIATION SYSTEM OF THE KINGDOM OF NORWAY

ATFM/CDM ICAO s Perspective

INTERNATIONAL CIVIL AVIATION ORGANIZATION

ICAO Performance Based Approach

ICAO Universal Security Audit Programme (USAP) ICAO Regional Aviation Security Audit Seminar

Aerodrome Certification Applicable provisions

Work Programme 01/ /2012

Sample Regulations for Water Aerodromes

SAMPLE TEMPLATE APPENDIX 3.5C-1

International Civil Aviation Organization. ICAO Updates. 13 th COSCAP-NA Steering Committee Meeting

Measurement of environmental benefits by ICAO Secretariat

Workshop Exercise, EGYPT Air Navigation Plan 10 /12/2010

TWELFTH AIR NAVIGATION CONFERENCE

This working. Action by the - AIS/MAP. TF/6 Report Report changes as. monopoly 1.3. The establishment SUMMARY REFERENCES.

RUNWAY SAFETY AN ANNEX 14 PERSPECTIVE. Joseph K W CHEONG, P.E. Dubai, UAE - 2 to 4 June 2014

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE

INTERNATIONAL CIVIL AVIATION ORGANIZATION

International Civil Aviation Organization. Second Meeting (AIM SG/2) (Kish Island, Iran, 31 August-2 September 2015)

30 SEP - 02 OCT, 2014

ACI North America Operations and Technical Affairs Committee, San Jose, California. ACI World Update September 21, 2013

1.0 PURPOSE 2.0 REFERENCES 3.0 BACKGROUND

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit

Air navigation deficiencies in the CAR/SAM Regions with high risk ( U priority) (Presented by the Secretariat)

MET/SG/12-WP/05 REV2-23/11/14

International Civil Aviation Organization SECRETARIAT ADMINISTRATIVE INSTRUCTIONS ON THE IMPLEMENTATION OF THE ICAO CIVIL AVIATION TRAINING POLICY

4.6 Other Aviation Safety Matters FLAGS OF CONVENIENCE. (Presented by the Secretariat)

ICAO Universal Safety

RUNWAY SAFETY GO-TEAM METHODOLOGY

Guidance material for land use at or near aerodromes

International Civil Aviation Organization. Second Meeting of the RASG-MID Steering Committee (RSC/2) (Amman, Jordan, October 2013)

ICAO GANP Requirements and Evolution

Second MID Regional Runway Safety Seminar (MID-RRSS/2) 2-4 June 2014 Dubai, UAE

Cranfield Safety Management and Investigation Course

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT

Work Programme of ICAO Panels and Study Groups

TWELFTH AIR NAVIGATION CONFERENCE DRAFT REPORT OF THE COMMITTEE ON AGENDA ITEM 4

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE

Quality Management System (QMS)

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES

International Civil Aviation Organization. Third Meeting of the Middle East Regional Aviation Safety Group (RASG-MID/3)

Regional Bird/Wildlife Strike Prevention Conference Conferencia de Prevención del Peligro Aviario y Fauna

Russian Federation ATM modernization program

Second ICAO Global Runway Safety Symposium, Lima, Peru, November 2017 Panel 3 - Root causes of runway accidents and incidents David Gamper,

MID Region Air Navigation Strategy

HIGH-LEVEL SAFETY CONFERENCE

Aerodrome Certification - Setting the scene

MET/SG REPORT FOR THE PREPARATION OF THE MET RELATED AFI REGIONAL AIR NAVIGATION IMPLEMENTATION ACTION PLAN

EASA experience in SSP/SMS. Presented by Juan MORALES Intl. Cooperation Officer Prepared by Rodrigo PRIEGO Safety Mangement Team Leader

CRITICAL IMPLEMENTATION REQUIREMENTS FOR PBN, AIM QMS, MET QMS AND AERODROME CERTIFICATION. (Presented by the Secretariat)

INTERNATIONAL CIVIL AVIATION ORGANIZATION EASTERN AND SOUTHERN AFRICAN OFFICE

TWELFTH AIR NAVIGATION CONFERENCE

Overview of the Aviation System Block Upgrades (ASBUs) Concept and PBN

ICAO Assembly achieves historic consensus on sustainable future for global civil aviation

APPENDIX L PRIORITY SAFETY TARGETS AND ASSOCIATED METRICS FOR THE ICAO EUR REGION

WORLD INTERNATIONAL CIVIL AVIATION ORGANIZATION 18/7/14 REPORT ON. Fifteenth Session. the

SAMPLE TEMPLATE. Regional and National planning for ASBU Modules

Context of the Certification

Global Aviation Safety Plan

CONFERENCE ON THE ECONOMICS OF AIRPORTS AND AIR NAVIGATION SERVICES

OVERVIEW OF ICAO S ACTIVITIES IN AIR TRANSPORT

Aeronautical Studies (Safety Risk Assessment)

SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE DIRECTORATE GENERAL OF CIVIL AVIATION OF KUWAIT

Seminar/Workshop on USOAP Continuous Monitoring Approach (CMA) and State Aviation Safety Tools (SAST)

Status of Safety Indicators and Targets

Transcription:

ADCI TF/1-WP/7 8/9/2012 International Civil Aviation Organization Aerodrome Certification Implementation Task Force (ADCI TF/1) First Meeting (Cairo, Egypt, 15-17 October 2012) Agenda Item 4: Certification Process and Implementation Issues REVIEW AND UPDATE THE MID REGION PERFORMANCE OBJECTIVES RELEVANT TO THE AERODROMES CERTIFICATION (Presented by the Secretariat) SUMMARY This paper presents an update on the monitoring of the MID Region Performance Metrics and associated global developments in the aerodrome Operation field. The paper calls also for the review and update of the MID Region Regional Performance Framework Forms (PFFs) related to the aerodrome certification. Action by the meeting is at paragraph 3. - /8 - MIDANPIRG/13 REFERENCES 1. INTRODUCTION 1.1 The Performance-Based Approach (PBA) adheres to strong focus on results through adoption of performance objectives and targets; collaborative decision making driven by the results; and reliance on facts and data for decision making. The assessment of achievements is periodically checked through a performance review, which in turn requires adequate performance measurement and data collection capabilities. In this regard, one of the key aspects of the performance based approach to air navigation planning is the development of performance objectives with related measurable indicators and metrics. 1.2 The State or Region that has adopted a PBA, must acknowledge the following requirements: commitment (at the top); agreement on goals (desired results); responsibility (who is accountable); human resources and know-how (culture and skills); data collection, processing, storage and reporting; collaboration and coordination (with other partners) and cost implication (what does it cost).

ADCI TF/1-WP/7-2- 1.3 Following the adoption of performance-based approach by all PIRGs in 2008, the next step is performance monitoring through an established measurement strategy. While PIRGs are progressively identifying a set of regional performance metrics, States in the meantime have recognized that data collection, processing, storage and reporting for the identified regional performance metrics are fundamental to the success of performance based approach. 1.4 Transition to a Performance Based Air Navigation Planning: - Basis: The notion of a performance based air navigation system emanated from good industry practices that have emerged over many years. As the aviation industry evolved into a less regulated and more corporatized environment with greater accountabilities, the advantages of transitioning from systems based to performance-based planning are apparent. - Principles: The Performance-based Approach (PBA) adheres to the following principles: strong focus on results through adoption of performance objectives and targets; collaborative decision making driven by the results; and reliance on facts and data for decision making. In PBA methodology, the assessment of achievements is periodically checked through a performance review, which in turn requires adequate performance measurement and data collection capabilities. - Advantages: The advantages of PBA methodology include: result oriented, transparent and promotes accountability; shift from prescribing solutions to specifying desired performance; employs quantitative and qualitative methods; avoids a technology driven approach; helps decision makers to set priorities, makes the most appropriate trade-offs, and allows optimum resource allocation. - Guidance: To facilitate the realization of a performance based Global system, ICAO has made significant progress in the development of relevant guidance material. 2. DISCUSSION 2.1 The meeting may wish to recall that, ICAO in 2008 completed the development of relevant guidance material so as to facilitate the realization of a performance based global air navigation system. Following the adoption of the performance-based approach to air navigation planning and implementation, all PIRGs in different regions have been working on the performance monitoring through an established measurement strategy. In this respect, it was noted that PIRGs have identified different sets of regional performance metrics, and recognized that data collection, processing, storage and reporting for the identified regional performance metrics are fundamental to the success of performance based approach. 2.2 In connection with the above, the meeting recalled that 8 performance Metrics have been endorsed by MIDANPIRG/12, through Conclusion 12/47, for performance monitoring of the air navigation systems in the MID Region as follows: CONCLUSION 12/47: MID REGION PERFORMANCE METRICS That, a) the following MID Region Metrics be adopted for performance monitoring of the air navigation systems: MID Metric 1: Number of accidents per 1,000 000 departures;

-3- ADCI TF/1-WP/7 MID Metric 2: MID Metric 3: MID Metric 4: MID Metric 5: MID Metric 6: MID Metric 7: MID Metric 8: Percentage of certified international aerodromes; Number of Runway incursions and excursions per year; Number of States reporting necessary data to the MIDRMA on regular basis and in a timely manner; The overall collision risk in MID RVSM airspace; Percentage of air navigation deficiencies priority U eliminated; Percentage of instrument Runway ends with RNP/RNAV approach procedure; and Percentage of en-route PBN routes implemented in accordance with the regional PBN plan. b) the MIDANPIRG subsidiary bodies monitor the Metrics related to their work programmes; develop associated performance targets and provide feed-back to MIDANPIRG. 2.3 The Thirteenth Meeting of Air Navigation Planning and Implementation Regional Group (MIDANPIRG/13) held in Abu Dhabi, UAE, 22-26 April 2012 reviewed the eight (8) MID Region Performance Metrics and agreed to the following: - MID Metric 1 (Number of accidents per 1,000 000 departures) should be the responsibility of the MID Region Aviation Safety Group (RASG-MID); - MID Metric 2 (Percentage of certified international aerodromes) and Metric 3 (Number of Runway incursions and excursions per year) are to be monitored by the AOP Sub-Group giving that States provide the ICAO MID Regional Office necessary data on the certified international aerodromes and number of runway incursions and excursions; - MID Metric 4 (Number of States reporting necessary data to the MIDRMA on regular basis and in a timely manner) and Metric 5 (The overall collision risk in MID RVSM airspace) are to be monitored by the MIDRMA Board and the /AIM/SAR Sub-Group, giving that States provide the MIDRMA with the necessary data on a regular basis and in a timely manner; - MID Metric 6 (Percentage of air navigation deficiencies priority U eliminated) is to be processed by the ICAO MID Regional Office, using the MID Air Navigation Deficiency Database (MANDD) and the outcome of all the MIDANPIRG Subsidiary bodies related to air navigation deficiencies; and - MID Metric 7 (Percentage of instrument Runway ends with RNP/RNAV approach procedure) and Metric 8 (Percentage of en-route PBN routes implemented in accordance with the regional PBN plan) are to be monitored by the PBN/GNSS Task Force, giving that States provide the ICAO MID Regional Office necessary data.

ADCI TF/1-WP/7-4- 2.4 In accordance with MIDANPIRG/11 Conclusion 11/71 National Performance Framework and MIDANPIRG/12 Conclusion 12/48, the meeting urged States to develop/update their National Performance Framework. It was clarified that the National Performance Framework, includes, inter-alia, the following: - identification of the national objectives with measurable indicators and metrics, which support the regional objectives identified in the Regional PFFs; - allocation of resources for the achievement of the agreed objectives, based on cost-benefit analysis; - development of the National PFFs; and - development of necessary procedures related to the collection and reporting of necessary data, performance measurement, human resources (training), coordination (internally and with neighbouring States, as appropriate), etc. 2.5 The MIDANPIRG/13 meeting reviewed the Regional PFFs related to AGA, as at Appendix A to this working paper as developed and updated by the /8 meeting. Aerodromes Certification represents the major part of the Aerodromes Performance Objectives. It was underlined that the Regional PFFs should be further reviewed to evolve to the newly designed Air Navigation Report Forms (ANRF), taking into consideration the global developments and the users needs and expectations. 2.6 The meeting may wish to recall that with regard to the development of performance targets, the MIDANPIRG/13 meeting agreed to the following: - Performance Target associated with MID Metric 2: Minimum 50% of the international aerodromes should be certified; - Performance Target associated with MID Metric 3: number of Runway incursions-related accident or serious incident: max 1 per year; and number of Runway excursions-related accident or serious incident: max 2 per year. - Performance Target associated with the MID Metric 6: elimination of 10% of the deficiencies priority U ; 2.7 Based on the above, MIDANPIRG/13 Meeting agreed to the following Conclusion to replace and supersede the MIDANPIRG/12 Conclusion 12/48: CONCLUSION 13/30: NATIONAL PERFORMANCE FRAMEWORK That, States be urged to: a) develop, update and/or complete their National Performance Framework, including the National Performance Framework Forms (PFFs), ensuring the alignment with and support to the regional performance objectives; b) incorporate the agreed MID Region Performance Metrics into their National performance monitoring process; and

-5- ADCI TF/1-WP/7 c) report relevant data necessary for performance monitoring of the air navigation systems to the ICAO MID Regional Office, on a regular basis, with a view to update the Regional PFFs and monitor the MID Region Performance Metrics. 2.8 Based on the above; the meeting is invited to review, amend, update as appropriate the proposal of MID Regional Performance Objectives prepared for the meeting as contained in Appendix A to this working paper in particular the first objective relating to the Implementation of Aerodrome Certification. 3. ACTION BY THE MEETING 3.1 The meeting is invited to: a) take note of MIDANPIRG Conclusions regarding Performance Metrics and targets as indicated above; b) review the PFF related to Aerodromes Performance Objectives as contained in Appendix A to this working paper and suggest necessary amendment and updates taking into consideration the global developments and the users needs and expectations; and c) encourage MID States to establish a performance based approach for their aerodrome certification implementation and develop performance objectives with measurable indicators and metrics. -----------------

ADCI TF/1-WP/7 APPENDIX A APPENDIX A MIDANPIRG/13 Appendix 4.5A to the Report on Agenda Item 4.5 MID REGIONAL PERFORMANCE OBJECTIVES AERODROMES PERFORMANCE OBJECTIVES MIDANPIRG/13-REPORT AERODROME CERTIFICATION Benefits Safety Environment Capacity Efficiency Performance Metrics: Improved safety of aerodromes operation Reduced number of incident/accident. Safety level improved Reduced emissions through effective aerodrome operation. Increased capacity through better planning and operation Improved aerodrome capacity and level of service. Performance Measurement Number of States having fully implemented certification of aerodromes. Number of certified aerodromes Number of deficiency related to the aerodromes field Number of States having implemented QMS Number of runway incursion/excursion. Number for adequate aerodromes for NLA operation. AO (Aerodrome operations), CM (Conflict management) DCB (Demand and capacity balancing) AUO (Airspace user operation) Establish a regulatory framework specifying the requirement for aerodrome Certification. B0-65 2013 States Establish a regulatory authority B0-65 2014 States Develop and maintain aerodrome certification regulations & standards Facilitate the implementation of aerodrome certification by conducting courses and technical support. B0-65 ongoing States B0-30 2013 AOP monitor the implementation of aerodrome certification by all MID States B0-80 Ongoing AOP

MIDANPIRG/13- REPORT 4.5A-2 review and update the deficiencies in the aerodrome field and provide necessary guidance for their elimination ensure promulgation of information on status of certification of aerodromes in the State AIP SMS AT CERTIFIED AERODROMES Facilitate the implementation of SMS by conduct of courses and guidance materials. establishment of a requirement for SMS to be part of aerodrome certification implementation of SMS B0-75 B1-80 B0-80 Ongoing AOP B0-30 Ongoing States B0-75 Ongoing AOP B0-75 2013 States Ongoing States Develop action plan on safety targets and hazard reporting B0-75 2011-2016 States Surveillance, internal audit and Safety Oversight Programmes implementation of digital data exchange with originators foster the integrated improvement of AIS/AIM through proper training and qualification of the AIS/AIM personnel in the MID Region and certification of the AIM Services B0-75 Ongoing States B0-30 2013-2018 States B0-30 2011-2016 AIM TF & States

4.5A-3 MIDANPIRG/13- REPORT AERODROME PLANNING EMERGENCY conduct a survey to assess the level of implementation on aerodrome emergency planning B0-80 2011-2012 ICAO Establish a requirement of aerodrome emergency planning B0-80 2013 States development of aerodrome emergency planning document B0-80 2013 States Conduct full scale aerodrome emergency exercise at intervals not exceeding two years Conduct partial emergency exercise in the intervening year to ensure that deficiencies found during the full scale exercise have been corrected. Facilitate the implementation of aerodrome emergency planning by conduct of courses and guidance materials B0-75 B0-80 B0-75 B0-80 B0-80 2012-2016 Ongoing States Ongoing States GPIs GPI-5: Performance-based navigation GPI-13: Aerodrome design and management GPI-14: Runway operations GPI-18: Aeronautical Information

MIDANPIRG/13- REPORT 4.5A-4 MID REGIONAL PERFORMANCE OBJECTIVES AERODROMES PERFORMANCE OBJECTIVES RUNWAY SAFETY PROGRAMME Benefits Safety Environment Capacity Efficiency Performance Metrics: Improved safety of runway operation Reduced number of incident/accident. Safety level improved Reduced emissions through effective aerodrome operation. Increased capacity through better planning and operation Improved aerodrome capacity and level of service. Number of runway incursions per year. Number of runway excursions per year. Number of accident per 100,00 departures. Performance Measurement AO (Aerodrome operations), CM (Conflict management) DCB (Demand and capacity balancing) AUO (Airspace user operation) Facilitate the implementation of runway safety programme by conducting seminars and workshops.. Establish a Runway safety Team Runway Incursion Prevention establish Runway Incursion Prevention programme, identify its goals as part of the national Runway Safety programme and monitor implementation plan implement, where warranted, precise surface movement guidance to and from a runway to improve capacity, safety and efficiency develop, at aerodromes a positioning system for all vehicles and aircrafts operating on the movement area on a cost-benefit basis B0-75 2013 Partners B0-75 2014 Sates B0-75 2014 Sates B0-75 2015 B0-75 2013 2016 States

4.5A-5 MIDANPIRG/13- REPORT implement procedures and technologies to enhance the performance of runway operations and optimize runway capacity Runway Excursion Prevention establish collaborative bodies with, aircraft operators and aerodrome operators for implementing plans aimed at prevention of runway excursions harmonize, coordinate and support the Runway Excursion Prevention measures and implementation activities on a regional basis develop and implement an integrated maintenance programme at aerodromes that includes pavement and visual aids implement and monitor Runway End Safety Area (RESA) requirements at aerodromes B0-75 B0-75 2013 2016 B0-75 2012 2016 States B0-75 2012 2017 B0-75 2010-2016 Ongoing monitor and ensure meeting Runway strip characteristics. B0-75 Ongoing ICAO, States & ICAO, States & AOP SG develop measures and ensure inspection of the movement area including control of Foreign Object Debris (FOD) provision of enhanced visual aids and markings on runway and movement area. monitor and ensure meeting Runway strip frangibility requirements B0-75 Ongoing B0-75 2014 States B0-75 Ongoing

MIDANPIRG/13- REPORT 4.5A-6 GPIs Runway Pavement Maintenance promote the awareness about the requirements for the provision of Pavement Maintenance in the movement area develop and implement a runway maintenance programme harmonize, coordinate and support the Runway pavement maintenance guidance for implementation activities on a regional basis Seminar on runway surface friction measurement measurement and reporting of friction characteristics of wet paved runways. B0-75 ongoing B0-75 2012-2014 B0-75 201-2015 B0-75 Availability of a friction measurement equipment B0-75 establishment of maintenance friction level below which corrective action should be initiated. identify minimum friction level below which information that a runway may be slippery when wet should be made available monitor the removal of runway contaminants in particular; rubber deposits and accumulated sand monitor implementation of the requirements for measurement and reporting of the friction characteristics and carrying out appropriate corrective maintenance in accordance with defined maintenance performance level GPI/6 Air traffic flow management GPI/9 Situational awareness GPI/13 Aerodrome design and management GPI/14 Runway operations GPI/15 Match IMC and VMC operating capacity GPI/18 Aeronautical information 2014 ICAO B0-75 201-2015 Sates B0-75 B0-75 2012-2014 States 2012-2014 2012-2014 B0-75 Ongoing B0-75 Ongoing ICAO,

4.5A-7 MIDANPIRG/13- REPORT MID REGIONAL PERFORMANCE OBJECTIVES AERODROMES PERFORMANCE OBJECTIVES AERODROME SAFETY Benefits Safety Environment Capacity Efficiency Performance Metrics: Improved safety of aerodromes operation Reduced number of incident/accident. Safety level improved Reduced emissions through effective aerodrome operation. Reduced aircraft noise impact on residential and commercial areas around the aerodrome Increased capacity through better planning and operation Improved aerodrome capacity and level of service. Performance Measurement Number of obstacles penetrating obstacle limitation surface. Number of certified aerodromes Number of deficiency related to the aerodromes field Number of runway incursion/excursion. AO (Aerodrome operations), CM (Conflict management) DCB (Demand and capacity balancing) AUO (Airspace user operation) OBSTACLE LIMILTATION Establish a regulatory framework on Obstacle Limitation Surfaces (OLS) around the aerodrome Monitor the height of buildings or structures within the boundaries of OLS WILDLIFE HAZARD CONTROL survey and collect information on state s practice with respect to airport wild life control establishment of national bird control committee. organize a seminar on wildlife hazard reporting, assessment and reduction. landuse management inside and in the vicinity of aerodrome. establishment of a national procedure for recording and reporting wildlife strikes to aircraft. B0-65 2014 States B0-65 ongoing States B0-80 2013 ICAO B0-80 2013 States B0-80 2013 AOP B0-30 Ongoing States B0-75 2013 States

MIDANPIRG/13- REPORT 4.5A-8 collect wildlife strike reports and forward to ICAO for inclusion in the ICAO IBIS database. B0-75 Ongoing States GPIs GPI-5: Performance-based navigation GPI-13: Aerodrome design and management GPI-14: Runway operations GPI-18: Aeronautical Information -END-