MIDANPIRG ATM SG/4 Meeting Amman, Jordan, 29 April 3 May 2018

Similar documents
Second Meeting of the Air Navigation System Implementation Group (ANSIG/2)

MANAGING THE CHANGES AS A STATE CASE STUDY UAE Airspace Restructuring Project

DIRECTORS GENERAL OF CIVIL AVIATION-MIDDLE EAST REGION. First Meeting (DGCA-MID/1) (Abu Dhabi, UAE, March 2011)

MID Region Air Navigation Strategy

SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT

International Civil Aviation Organization. MIDANPIRG Air Traffic Management Sub-Group. Fourth Meeting (ATM SG/4) (Amman, Jordan, 29 April 3 May 2018)

Why ANSP Management Needs to Drive ATFM Implementation Stuart Ratcliffe, Co-Chair CANSO ATFM Workgroup Metron Aviation

UK Implementation of PBN

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN

USE AND APPLICATION OF GNSS IN THE IMPLEMENTATION OF NAVIGATION BASED ON PERFORMANCE IN ECUADOR

Bits to Blocks Aviation System Block Upgrades (ASBU)

PBN Airspace Concept. ATS requirements

Atlantic Interoperability Initiative to Reduce Emissions AIRE

IATA User Requirements for Air Traffic Services (URATS) NAVIGATION. MIDANPIRG PBN SG/3 Meeting Cairo, Egypt, February 2018

ATM STRATEGIC PLAN VOLUME I. Optimising Safety, Capacity, Efficiency and Environment AIRPORTS AUTHORITY OF INDIA DIRECTORATE OF AIR TRAFFIC MANAGEMENT

MIDANPIRG ATM SG/4 Meeting Amman, Jordan, 29 April 3 May 2018

REPORTS FROM REGIONS

European Joint Industry CDA Action Plan

Indian Ocean Strategic Partnership to Reduce Emissions (INSPIRE) Strategic Plan

2012 Performance Framework AFI

Preparation for ASBU B1 (PBN)

ICAO EUR Region Civil/Military Cooperation Seminar/Workshop

Trajectory Based Operations (TBO)

Air Navigation Bureau ICAO Headquarters, Montreal

PBN Implementation. Phil Rakena. PBN Implementation Programme Manager

Towards a Global ATFM Manual. Brian Flynn Head Network Operations

34 th Airline/ATS Safety Forum

Workshop on the Performance Enhancement of the ANS through the ICAO ASBU framework. Dakar, Senegal, September 2017 presented by Emeric Osmont

International Civil Aviation Organization. (Presented by the Arab Civil Aviation Commission- ACAC)

Performance Based Navigation (PBN) Implementation Plan. The Gambia

Modernising UK Airspace 2025 Vision for Airspace Tools and Procedures. Controller Pilot Symposium 24 October 2018

MIDANPIRG ATM SG/4 Meeting Amman, Jordan, 29 April 3 May 2018

Presented by: Trinidad and Tobago

From local to regional to global ATFM

Enhancing capacity beyond infrastrucutre

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez

The Third ATS Coordination Meeting of Bay of Bengal, Arabian Sea and Indian Ocean (BOBASIO) Region Hyderabad, India, 22 nd to 24 th October 2013.

ICAO SMxP Course MID RMA Board/15 PBN SG/3 AIM SG/4 & MIDAD TF/5 CNS SG/8 AVSEC Training FAL Implementation Seminar ACAC/ICAO Civil/Military Workshop

PBN AIRSPACE CONCEPT WORKSHOP. SIDs/STARs/HOLDS. Continuous Descent Operations (CDO) ICAO Doc 9931

ICAO International Aviation and Environment Seminar OPERATIONAL IMPROVEMENTS. Presented by ICAO APAC RSO

Overview of Worldwide Data Link Equipage Mandates

The Single European Sky and SESAR, the European ATM modernisation programme. Patrick Ky, Executive Director 26 May 2010

Civil and military integration in the same workspace

European ATM Development The Big Idea

ATFM IMPLEMENATION IN INDIA PROGRESS THROUGH COLLABORATION PRESENTED BY- AIRPORTS AUTHORITY OF INDIA

SEAMLESS SKY IN EUROPE. Carlo Maria Borghini Director Administration and Finance Muscat, OMAN October 2009

ATFM/CDM ICAO s Perspective

Asia/Pacific Air Traffic Management Perspectives

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit

Third Meeting of the Air Navigation System Implementation Group (ANSIG/3) Cairo, Egypt, 3 5 July Saudi Arabia

Overview of ICAO APAC FPP

ATFM IMPLEMENATION IN INDIA PROGRESS THROUGH COLLABORATION PRESENTED BY- AIRPORTS AUTHORITY OF INDIA

SESAR RPAS Definition Phase Results & Way Forward. Denis Koehl Senior Advisor SESAR Joint Undertaking

4.1 This document outlines when a proposal for a SID Truncation may be submitted and details the submission requirements.

NATS. SAIP AD3 Jersey Interface Change Stage 1 Assessment Meeting. Friday 2 nd February x NATS presenters.

Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation

Considerations for. RNP to xls. Operations. Juergen Ruppert. Regional Director Air Traffic Optimisation Services GE Aviation

Air Traffic Management

TWELFTH AIR NAVIGATION CONFERENCE

Managing Aeronautical Data

From AIS to AIM. Paul Bosman, Head of Aviation Cooperation and Strategies, EUROCONTROL

Introducing Free Route Airspace: Summary Paper from NEFAB Customer Consultation Days Helsinki, October 21, 2014 and Oslo, October 23, 2014

ENVIRONMENTAL BENEFITS FROM IMPROVED OPERATIONAL MEASURES. Guido Kerkhofs Director ATM Programmes EUROCONTROL

PBN Performance. Based Navigation. Days 1, 2 & 3. ICAO PBN Seminar Seminar Case Studies Days 1,2,3. Seminar Case Studies

CANSO Middle East Conference

Next Generation Airspace Developments: Key Operational Trends and Enablers

International Civil Aviation Organization. Performance Based Navigation Sub-Group (PBN SG) MEASURES TO FOSTER THE PBN IMPLEMENTATION IN THE MID REGION

-2- IFAIMA Global AIM 2013 & ICAO EUR/MID AIM/SWIM Seminar SUMMARY OF DISCUSSIONS

Air traffic services (ATS) datalink using Iris Precursor. Contextual note SESAR Solution description form for deployment planning

TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22)

LAMP 2 - FASI(S) Network

Follow up to the implementation of safety and air navigation regional priorities XMAN: A CONCEPT TAKING ADVANTAGE OF ATFCM CROSS-BORDER EXCHANGES

FASI(N) IoM/Antrim Systemisation Airspace Change Decision

THIS BULLETIN REPLACES BULLETIN WHICH IS NO LONGER CURRENT AND HAS BEEN WITHDRAWN.

Peter Sorensen Director, Europe Safety, Operations & Infrastructure To represent, lead and serve the airline industry

Combined ASIOACG and INSPIRE Working Group Meeting, 2013 Dubai, UAE, 11 th to 14 th December 2013

Future Airspace Strategy Deployment Plan

International Civil Aviation Organization. Runway and Ground Safety Working Group

Standard Operating Procedures (SOPs) for UAE Centre (OMAE)

Air Traffic Management Services Plan

Operations Control Centre perspective. Future of airline operations

Home LIST OF ACRONYMS

Hosted by General Civil Aviation Authority (GCAA)

Electronic visibility via ADS-B for small aircraft. John Korna, NATS

International Civil Aviation Organization. Runway and Ground Safety Working Group. Fourth Meeting (RGS WG/4) (Cairo, Egypt, November 2017)

The Fourth ATS Coordination meeting of Bay of Bengal, Arabian Sea and Indian Ocean Region (BOBASIO/4) Kolkata, India, September, 2014.

Saint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis

French DSNA approach to CNS rationalization & evolution

Continuous Improvement of the Global Air Traffic Management System

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES

B0 FRTO, B0-NOPS, B0-ASUR and B0-ACAS Implementation in the AFI and MID Regions

Overview of Continental En-route Navigation Specifications RNAV 5, RNAV 2 and RNAV 1

Singapore s Journey to Implement ASBU B-0 & B-1 Modules in PIA-2

State Aviation Administration of Ukraine

Proposed Changes to Inverness Airport s Airspace The Introduction of Controlled Airspace and Optimisation of Instrument Flight Procedures

RECOMMENDED GUIDANCE FOR FPL AND RELATED ATS MESSAGES

Boeing Air Traffic Management Overview and Status

Asia Pacific Seamless ATM Plan and Implementation of ATFM in Asia Pacific

AERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point: Gen

On Time. Total Airspace Management. 8 th Global ATFM Conference Cancun - Mexico. 12/30/2014 Commercial-in-Confidence 1

Transcription:

MIDANPIRG ATM SG/4 Meeting Amman, Jordan, 29 April 3 May 2018 United Arab Emirates ATM SG/4, Amman, Jordan 29 April-3 May 2018 1

Presentation Outline ATS Route improvements implemented ATS Routes planned for implementation Enhancements enabled through UAE Airspace Restructuring Project Phase 3 AIDC/OLDI implementation Status ATM Projects/Initiatives Lessons Learned for Success Thoughts/Recommendations ATM SG/4, Amman, Jordan 29 April-3 May 2018 2

ATS Route improvements implemented UAE Airspace Restructuring Project Phase 3 Increase UAE Airspace capacity to meet the forecasted air traffic demand for 2020-2035. Increased access to all UAE airports. Improved efficiency for both airspace users and Air Navigation Service Providers. Reduction in the environmental impact of the increasing traffic through the provision of more effective ATM operations. ATM SG/4, Amman, Jordan 29 April-3 May 2018 3

ATS Route improvements implemented UAE Airspace Restructuring Project Phase 3 Project Implementation Period 18 months Number of Project Deliverables 50 deliverables Number of Workshops/Meetings over 200 Actual Man hours for design development over 120,000 hours (6 * 8) Number of aviation stakeholders involved 26 Number of UAE ANSPs involved 6 Number of Project Representatives over 150 Number of ATCOs Trained - 250 ATM SG/4, Amman, Jordan 29 April-3 May 2018 4

ATS Route improvements implemented UAE Airspace Restructuring Project Phase 3 Full PBN with RNAV 1 (GNSS). Introduction of 30 new Routes. Allocation of 407 new 5LNC and Alphanumeric Waypoints. Incorporation of over 200 Instrument Flight Procedures (IFPs). 1000+ changes related to 312 new/modified route segments. Upload of 1741 route segments related to 115 new SIDs and 111 new STARs. Fast Time Simulation results highlighted fuel savings of over 15m USD within the first year after implementation & 100,000 Mt of CO² saving. ATM SG/4, Amman, Jordan 29 April-3 May 2018 5

ATS Routes planned for implementation UAE Airspace Restructuring Project Phase 3 Post Implementation project support of 6 months to identify any required optimisations of the network. Post Implementation activity: Implementation of RNP-AR at Abu Dhabi International (OMAA) 24 th May 2018. UAE Integrated Airspace Master Plan (IAMP). Development of an industry driven, strategically harmonised IAMP to support the needs of the ATM Community to 2035. IAMP forms a key deliverable within UAE Airspace Restructuring Project Phase 3 and will continue to be developed through the UAE National Airspace Advisory Committee (NASAC) Working Group 16. ATM SG/4, Amman, Jordan 29 April-3 May 2018 6

Enhancements enabled through UAE Airspace Restructuring Project Phase 3 Greater Civil/Military Coordination & Cooperation. Enablement of Continuous Climb & Descent Operations. Dynamic ATC Sectorisation. Multi-stakeholder collaborative decision making towards project deliverables. Improved ATM community feedback. ATM SG/4, Amman, Jordan 29 April-3 May 2018 7

Lessons Learned for Success UAE Airspace Restructuring Project Phase 3 Stringent and challenging time milestone respected by all parties Effective Aviation Stakeholder Engagement Work ethic & Capability of UAE Staff unfolded Scale of important changes vs. minimal corrective actions required post implementation Regional Coordination and Collaboration Aviation Industry Communications and Teamwork strengthened Effective collaborative Transition Plan & Execution Project Governance Structure and Representatives Collaborative teamwork requirement for unique projects ATM SG/4, Amman, Jordan 29 April-3 May 2018 8

AIDC/OLDI implementation Status No ATSU Airspace/Airports Included Status Date 01 Abu Dhabi APP OMAA, OMAD, OMAL, OMAM, OMAW In Operation April 2009 02 Doha APP OTHH, OTBH, OTBD In Operation January 2010 03 Sharjah TWR OMSJ In Operation February 2011 04 Ras Al Khaima TWR OMRK In Operation March 2011 05 Dubai APP OMDB, OMDM, OMDW In Operation (SZC To Dubai) June 2012 06 Bahrain ACC Traffic to/from Bahrain FIR In Operation July 2017 07 Muscat ACC Traffic to/from Muscat FIR In Operation March 2018 08 Fujairah APP OMFJ Planned Q2 2019 ATM SG/4, Amman, Jordan 29 April-3 May 2018 9

MINI GLOBAL I SESAR SWIM Global Demo ATM Projects/Initiatives MINI GLOBAL II UAE SWIMGW PHASE 1 Next Gen ATM System UAE Network Collaboration Unit UAE SWIMGW PHASE 2 Daily Flight Initiative 2011 2015 2016 2017 2018 2019 2020 FIXM: Flight Information Exchange Model document Copyright (c) 2017 Airservices Australia, DSNA, EUROCONTROL, GCAA, IATA, ICCAIA, JCAB, NATS Limited, NAV CANADA, SESAR Joint Undertaking & US FAA All rights reserved. ATM SG/4, Amman, Jordan 29 April-3 May 2018 10

ICAO is invited to promote: Thoughts/Recommendations Enhancement of stakeholder collaboration for key strategic planning & execution to ensure success. Prioritise and develop mechanisms to promote and support joint regional investments. Commitment to joint regional common priorities. Adaptability and openness to support regional ATM dynamic changes. Encourage States to develop regulatory framework for the standardisation of information sharing platforms that should subsequently complement regional and global framework. Lessons Learned from the UAE Airspace Restructuring Project. ATM SG/4, Amman, Jordan 29 April-3 May 2018 11

Thank you ATM SG/4, Amman, Jordan 29 April-3 May 2018 12