BUILDING ENERGY EFFICIENCY CERTIFICATE

Similar documents
QUARTERLY UPDATE 31 MARCH 2017

Dexus Property Group INVESTOR PORTFOLIO

Centuria Property Funds Limited CENTURIA METROPOLITAN REIT

GARDEN OFFICE PARK THE GARDEN OFFICE PARK INFORMATION MEMORANDUM

Operating lease of 50 new MC aircraft. Annual General Meeting of Shareholders Moscow 25 June 2018

Table of Contents. Adoption and use of AS

information memorandum Business and Technology Precinct Westlink Green Darra

Combined ASIOACG and INSPIRE Working Group Meeting, 2013 Dubai, UAE, 11 th to 14 th December 2013

Office Market Report July 2014

THE CHARLECOTE PHEASANT HOTEL, CHARLECOTE STRATFORD-UPON-AVON CV35 9EW FREEHOLD INVESTMENT FOR SALE: LEASED TO SHEARINGS HOTELS LTD

U-Park Wyatt Street Temporary Event Space

Performance Based Navigation Literature Review

NEW RULES FOR LODGING RESERVATIONS UNDER 2010 ADA TITLE III REGULATIONS TAKE EFFECT MARCH 15, April 22, 2011

AN EXCITING OPPORTUNITY TO ACQUIRE. The Henley Hotel Tanworth Lane Henley-in-Arden B95 5RA

GATWICK AIRPORT LIMITED

DEXUS Property Group (ASX: DXS) ASX release

4.6 Other Aviation Safety Matters FLAGS OF CONVENIENCE. (Presented by the Secretariat)

July 2018 RV PRODUCTION. Overview of towable and motorised recreational vehicles manufactured in Australia. Data Provided by nemaustralasia

C A P E T O W N C O N V E N T I O N N O W L A W I N A U S T R A L I A - 6 M O N T H S O N

AS/NZS :2015. Lighting for roads and public spaces AS/NZS :2015. Part 4: Lighting of pedestrian crossings. Australian/New Zealand Standard

17-21 Oxenham Street. Dudley Park SA 5008 INFORMATION MEMORANDUM FOR SALE BY EXPRESSIONS OF INTEREST CLOSING WEDNESDAY 12 JULY 2017 AT 12:00PM (ACST)

Economic Impact Analysis. Tourism on Tasmania s King Island

GOING PLACES MACARTHURCOOK OFFICE PROPERTY TRUST

Request for quotation

Program Manual. January 1, EarthCraft House Single Family Program. Viridiant 1431 West Main Street Richmond, VA

For personal use only

Aircraft Leasing. United Kingdom Overseas Territories Aviation Circular OTAC Issue 1 7 October Effective: on issue

VIEWPOINT JANUARY Japan Hotel Market Outlook

Q3 FY18 Business Highlights

OFFICE LEASING GUIDE SPRING For the most up to date market knowledge on office leasing, contact the commercial property specialists

Training and licensing of flight information service officers

For personal use only

NZQA unit standard version 3 Page 1 of 5. Apply knowledge of air law to the certification of aeronautical maintenance

AIR SAFETY SUPPORT INTERNATIONAL

Economic Impact Assessment of the Cruise Shipping Industry in Australia, Cruise Down Under. Final Report September, 2010

ANNUAL GENERAL MEETING OF SHAREHOLDERS OF JSC AEROFLOT to be held on June 22, 2015

Independent Auditor s Report

Office Market Report January 2013 Presented by Adrian Harrington Head of Funds Management - Folkestone

UNITS 1-9 CENTRE COURT

ACCESS NEW POTENTIAL. 140 St Georges Terrace is an iconic A Grade building providing 28 levels of highly efficient office accommodation.

For personal use only Mirvac property trust nsw investor tour. 1 May 2012

A Conversation With Folkestone. November 2017

BUSINESS PARK. 8 Parkview Drive, Sydney Olympic Park FOR LEASE

Half Year F1 Results. November 4, 2015

Monash University Procedure. Cooling Tower Management Procedure. PROCEDURE STATEMENT

5 TH Floor: THE PINNACLE 170 Midsummer Boulevard CENTRAL MILTON KEYNES MK9 1FE

jenics CENTRALLY LOCATED Travelodge Bradford Central Valley Road Bradford BD1 4AF

Revenue Recognition Implementation Issue 2.11 NOTICE

Aircraft Maintenance Organisations - Certification. Contents

COMMISSION IMPLEMENTING REGULATION (EU)

For additional information about this benefit, call Platinum Travel Service.

STRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003

Traffic Note 32. Use of fluorescent material on traffic signs - guidelines. Date: September Authorisation: Peter Croft, Manager Safer Roads

OFFICE AVAILABILITY REPORT JANUARY 2019

m3commentary MELBOURNE CBD OFFICE

Freehold Car Dealership Investment FORD, VICARAGE LANE, BLACKPOOL, FY4 4ES

Australian Standard. Amusement rides and devices. Part 4.1: Specific requirements Land-borne inflatable devices AS

Ship Registration Act 1992

New Distribution Capability

Frasers Commercial Trust. Portfolio details as at 31 March 2018

27-35 Victoria Road West Cleveleys, Lancs, FY5 1BS HIGH YIELDING, FREEHOLD, PRIME RETAIL INVESTMENT OPPORTUNITY

darwininnovationhub.com.au

Better Commercial Buildings Research

Service Cost Estimate for Route 10 only

Attachment 1. Case 3:15-cv RBL Document 41-1 Filed 07/31/15 Page 1 of 23

INTERNAL AUDIT REPORT

CoreLogic Property Market Indicator Summary All data to week ending 11 November 2018

PERTH AND KINROSS COUNCIL. Housing and Health Committee. 25 May Perth and Kinross Local Housing Strategy

30 April The Manager Company Announcements Office ASX Limited Level 4, Exchange Centre 20 Bridge Street SYDNEY NSW 2000.

Wizz Air aims to increase market share with F17 capacity growth of 20% Q3 passenger growth of 20%, Load Factor of 88% (+2.3ppt)

Safety Regulatory Oversight of Commercial Operations Conducted Offshore

Indicative AS3959 Bushfire Attack Level Assessment Report

COVER SHEET. Reduced Vertical Separation Minimum (RVSM) Information Sheet Part 91 RVSM Letter of Authorization

United Global Performance Commitment 2017

Making bookings for travellers with accessibility considerations

REPORT 2014/111 INTERNAL AUDIT DIVISION. Audit of air operations in the United Nations Operation in Côte d Ivoire

Economic Impact Assessment of the Cruise Shipping Industry in Australia, Executive Summary Cruise Down Under

QUALITY ASSURANCE PROTOCOLS. Competency Based Assessment in Architecture. Architectural Practice Examination (APE) for the AACA

State of the States October 2017 State & territory economic performance report. Executive Summary

HIGH STREET AYR

NZQA registered unit standard version 2 Page 1 of 8. Demonstrate flying skills for a commercial pilot licence (aeroplane)

Sunshine Coast and Caloundra Airports Aircraft Noise Information Report

Leases Implementation NOTICE

Property Flipping Report. Prepared by CoreLogic

The Strategic Commercial and Procurement Manager

AERODROME METEOROLOGICAL OBSERVATION AND FORECAST STUDY GROUP (AMOFSG)

TRANSPORT AFFORDABILITY INDEX

PERSONNEL PROFILE DAVID BREADMORE

CoreLogic Property Market Indicator Summary All data to week ending 21 May 2017

The Manager Company Announcements Australian Stock Exchange Limited Sydney NSW Dear Sir. Demerger of BHP Steel

HIGH QUALITY ENTERTAINMENT VENUE IN THE HEART OF CROYDON CROYDON, LONDON LEISURE SPACE AVAILABLE WITHIN LARGE MIXED USE DEVELOPMENT

EXPRESSION OF INTEREST INFORMATION MEMORANDUM

LEASING OPPORTUNITIES AUSTRALIAFAIR.COM.AU

For personal use only

SAMPLE. SITTGDE002A Provide arrival and departure assistance. Learner guide. SIT07 Tourism and Hospitality Training Package.

CoreLogic Property Market Indicator Summary All data to week ending 24 June 2018

An advisory circular may also include technical information that is relevant to the rule standards or requirements.

Darwin Airport Aircraft Noise Information Report

1. Material terms of the major related-party transaction (a series of interrelated transactions).

September 1, Re: Project No. 3-24P. Dear Director of Research and Technical Activities:

Transcription:

BUILDING ENERGY EFFICIENCY CERTIFICATE BUILDING DETAILS Building name Melbourne Central Tower Certificate no. Owner's name GPT FUNDS MANAGEMENT 2 PTY LIMITED Building address 360 Elizabeth Street, Melbourne, VIC, 3000 Net Lettable Area of the building 65,637.2 m² Current from 28 Jan 2017 Current to 27 Jan 2018 CBD assessor name CBD assessor no. Dammika Weerakkody CBDA0214 PART 1 - NABERS ENERGY RATING This building has achieved 4.5 STAR NABERS ENERGY RATING (excluding GreenPower) HOW DOES YOUR BUILDING COMPARE? The highlighted building on the adjacent graph compares the NABERS Star rating of your building to other buildings that were issued a BEEC nationally in 2015. PART 2 TENANCY LIGHTING ENERGY EFFICIENCY ASSESSMENT An assessment of the buildings lighting energy efficiency is contained in part 2 of this certificate. ENERGY EFFICIENCY GUIDANCE Guidance on how building energy efficiency might be improved for building owners and tenants may be found at /get-and-use-a-rating/what-is-a-beec Issued under the Building Energy Efficiency Disclosure Act 2010 to disseminate information and encourage energy efficiency in large commercial office buildings in Australia. Page 1 of 5

BUILDING DETAILS PART 1 NABERS* ENERGY RATING Building address 360 Elizabeth Street, MELBOURNE, VIC, 3000 NABERS rating no. N47486 Certified date 28 Jan 2017 Current to 27 Jan 2018 NABERS ENERGY RATING This building has achieved 4.5 STAR NABERS ENERGY RATING** (excluding GreenPower) Rating scope Base Building Rated area 63,016.8 m² Rated hours 52.6 BUILDING CONSUMPTION & EMISSION DETAILS Annual emissions Annual emissions intensity Annual consumption 5,052,361 kg CO²-e per year 80.2 kg CO²-e/m² per year 18,337,889 MJ per year NABERS ASSESSOR DETAILS Assessor name Dammika Weerakkody Assessor number 50014 ABOUT NABERS ENERGY RATINGS 0... Very poor 1... Poor 2... Below average 2.5 to 3... Average 4... Good 5... Excellent 6... Market leading * National Australian Built Environment Rating System is a joint initiative of the Australian, State and Territory governments. ** This rating must be used in all advertising. Page 2 of 5

PART 2 TENANCY LIGHTING ENERGY EFFICIENCY ASSESSMENT ASSESSMENT SUMMARY Building address 360 Elizabeth Street, Melbourne, VIC, 3000 Assessment scope All Office Space Assessed NLA 65,370.7 m² Assessor name Assessor no. Assessment no. Version no. Space ID Certified date Current to Dammika Weerakkody CBDA0214 LA5369 V.3 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 47, 48, 49, 50, 51, 52, 53, 54, 55 Space ID Functional space name NLA (m²) NLPD (W/m²) NLPD Performance comparison Lighting System Existing/Proposed Control Capacity 1 Part Level 2 - South 146.0 5.5 Excellent Existing Moderate 2 Part Level 2 - West 533.5 5.5 Excellent Existing Poor 3 Level 3 - Whole Floor 1,452.9 5.5 Excellent Existing Poor 4 Level 4 - Whole Floor 1,452.6 5.5 Excellent Existing Poor 5 Level 5 - Whole Floor 1,452.4 5.5 Excellent Existing Poor 6 Level 6 - Whole Floor 1,452.4 5.5 Excellent Existing Poor 7 Level 7 - Whole Floor 1,452.3 5.5 Excellent Existing Poor 8 Level 8 - Whole Floor 1,453.4 11.0 Median Existing Poor 9 Part Level 9 - Tenancy A 790.3 5.5 Excellent Existing Poor 10 Part Level 9 - Tenancy B 622.7 5.5 Excellent Existing Poor 28 Jan 2017 28 Jan 2022 11 Part Level 10 - Tenant A 730.4 n/a n/a Existing n/a Not assessable 12 Part Level 10 - Tenant B 697.8 5.5 Excellent Existing Good 13 Level 11 - Whole Floor 1,451.9 5.5 Excellent Existing Good 14 Level 12 - Whole Floor 1,426.0 15.7 Poor Existing Poor 15 Level 13 - Whole Floor 1,473.0 15.7 Poor Existing Poor 16 Level 14 - Whole Floor 1,481.0 15.7 Poor Existing Poor 17 Level 15 - Whole Floor 1,484.0 15.7 Poor Existing Poor 18 Level 16 - Whole Floor 1,481.0 15.7 Poor Existing Poor 19 Part Level 17 - Tenancy A 741.7 15.7 Poor Existing Poor 20 Part Level 17 - Tenancy B 742.8 5.5 Excellent Existing Poor 21 Level 18 - Whole Floor 1,481.7 11.0 Median Existing Poor 22 Level 19 - Whole Floor 1,483.5 11.0 Median Existing Poor 23 Level 20 - Whole Floor 1,483.9 14.7 Median Existing Poor 24 Level 21 - Whole Floor 1,484.3 5.5 Excellent Existing Poor 25 Level 24 - Whole Floor 1,518.7 5.5 Excellent Existing Poor 26 Level 25 - Whole Floor 1,520.1 5.5 Excellent Existing Poor 27 Level 26 - Whole Floor 1,520.1 5.5 Excellent Existing Poor 28 Level 27 - Whole Floor 1,527.0 5.5 Excellent Existing Poor 29 Level 28 - Whole Floor 1,528.0 5.5 Excellent Existing Poor 30 Level 29 - Whole Floor 1,528.3 5.5 Excellent Existing Poor 31 Level 30 - Whole Floor 1,527.9 5.5 Excellent Existing Poor 32 Level 31 - Whole Floor 1,527.5 5.5 Excellent Existing Poor Page 3 of 5

Space ID Functional space name NLA (m²) NLPD (W/m²) NLPD Performance comparison Lighting System Existing/Proposed 55 Level 51 - Whole Floor 420.4 5.5 Excellent Existing Poor Disclaimer: The Australian/New Zealand Standards 1680 series makes recommendations for the lighting of interiors and workplaces. This assessment makes no judgment about the performance of the installed lighting system against the recommendations of those standards. Prospective tenants or owners should check that the lighting system is fit for their requirements. # Definitions and other information on how to interpret the lighting assessments are at Attachment A. Control Capacity 33 Level 32 - Whole Floor 1,522.2 5.5 Excellent Existing Good 34 Level 33 - Whole Floor 1,521.0 7.3 Good Existing Good 35 Level 34 - Whole Floor 1,476.0 8.8 Good Existing Poor 36 Level 35 - Whole Floor 1,532.0 6.6 Excellent Existing Poor 37 Level 36 - Whole Floor 1,509.0 6.6 Excellent Existing Poor 38 Level 37 - Whole Floor 1,504.0 6.6 Excellent Existing Moderate 39 Level 38 - Whole Floor 1,504.0 6.6 Excellent Existing Moderate 40 Level 39 - Whole Floor 1,555.6 5.5 Excellent Existing Poor 41 Level 40 - Whole Floor 1,554.2 15.7 Poor Existing Poor 42 Level 41 - Whole Floor 1,554.5 15.7 Poor Existing Poor 43 Level 42 - Whole Floor 1,556.0 5.5 Excellent Existing Poor 44 Level 43 - Whole Floor 1,556.0 5.5 Excellent Existing Poor 45 Level 44 - Whole Floor 1,548.8 5.5 Excellent Existing Poor 46 Level 45 - Whole Floor 1,494.7 5.5 Excellent Existing Poor 47 Part Level 46-46.01 502.0 15.7 Poor Existing Poor 48 Part Level 46-46.02 428.9 15.7 Poor Existing Poor 49 Part Level 46-46.03 403.1 5.5 Excellent Existing Poor 50 Part Level 49 - Tenant A 215.0 5.5 Excellent Existing Moderate 51 Part Level 49 - Tenant B 682.0 5.5 Excellent Existing Poor 52 Part Level 50 - Tenant A 341.1 4.9 Excellent Existing Poor 53 Part Level 50 - Tenant B 270.0 6.3 Excellent Existing Poor 54 Part Level 50 - Tenant C 71.1 4.9 Excellent Existing Moderate Page 4 of 5

ATTACHMENT A DEFINITIONS Definitions and other information on how to interpret the tenancy lighting energy efficiency assessments are in accordance with the CBD Tenancy Lighting Assessment for Offices Rules, available from the CBD website at. Nominal Lighting Power Density (NLPD) The NLPD is calculated and reported for each assessed functional space. It is based on dividing the total power of the base lighting system in the assessed space by the Net Lettable Area (NLA) of that space. NLPD performance comparison is divided into the following categories; Excellent performance is where the NLPD is equal to or less than 7.0 W/m² Good performance is where the NLPD is between 7.1-10.0 W/m² Median performance is where the NLPD is between 10.1-15.0 W/m² Poor performance is where the NLPD is between 15.1-18.0 W/m² Very Poor performance is where the NLPD is greater than 18.1 W/m² Existing Lighting System The existing lighting system, in an owner occupied functional space, refers to the lighting that might reasonably be expected to remain immediately prior to any subsequent lease or sublease. In a leased space, it refers to the lighting that might reasonably be expected to remain at the conclusion of the lease or sublease, disregarding the impact of any make good clause or any negotiations that may occur between the landlord and the tenant. It does not include desk mounted task lighting nor architectural or feature lighting installed by the owner, lessee or sublessee. All other lighting will generally be included. In an unoccupied functional space, it refers to the lighting that exists at the time the assessment is conducted. Control capacity Poor Moderate OR OR Good Most of the lighting within the functional space relies on manual switching to turn the lights on and off where switching zones are greater than 250m². At least 50% by area of the lighting within the functional space is managed by a timer/ supervisory control system that ensures that lights are turned off outside normal working hours. At least 50% by area of the lighting within the functional space is managed by a occupancy control system that ensures that lights only operate when the space is occupied, rooms are individually controlled and a general switching zones are more than 100m². Most of the lighting within the functional space relies on manual switching to turn the lights on and off where switching zones are less than 250m². At least 50% by area of lighting within the functional space is managed by a occupancy control system that ensures that lights only operate when the space is occupied, rooms are individually controlled and general switching zones are less than 100m². Fully functioning lighting control systems may reduce the energy consumption of the installed lighting system by reducing the amount of time the lights are on or by reducing the operating power through dimming strategies. This assessment has identified the level of sophistication of the installed lighting controls but has not verified their functionality. Prospective tenants or owners should check the ongoing functionality of the installed lighting control system, its ability to be modified if required and whether it is fit for their requirements. The performance comment describes any additional features of the lighting system that may affect its energy or functional performance. Proposed lighting system Proposed lighting refers to the lighting system as it may exist following either an owner/lessor proposed upgrade or resulting from a make good provision in an existing lease/sublease where the relevant work is expected to be completed within three months of the lighting assessment. Prospective buyers, lessees and sublessees should assume that the existing lighting remains in place in the absence of specific assurances from the seller or lessor that the work to install the proposed lighting has in fact been carried out. Reason for assessment Scheduled upgrade - Scheduled upgrade refers to works that, at the time of the assessment, were to be carried out within three months on the lighting system in the relevant functional space by the owner. Make good - Make good refers to works that, at the time of the assessment, were to be carried out within three months on the lighting system in the relevant functional space by the outgoing lessee or sublessee. DISCLAIMER The Australian and New South Wales governments do not guarantee the accuracy, reliability, or completeness of the materials and assumes no legal liability whatsoever arising from or in connection with the information contained in Part One and Part Two of this certificate. The Australian and NSW governments recommend that users exercise their own skill and care with respect to the use of the information contained in this certificate and that users carefully evaluate the accuracy, reliability, currency, completeness and relevance of the certificate for their purposes, including seeking professional advice, as appropriate. ISSUING AUTHORITY Issued by the Australian Government, under the Building Energy Efficiency Disclosure Act 2010. Page 5 of 5