Infrastructure development: Vienna Vienna Int. Airport Bruck/Leitha state border near Nickelsdorf ( airport link )

Similar documents
OPEN ACCESS PASSENGER RAIL COMPETITION THE CASE STUDY OF AUSTRIA

The strategic importance of the Danube for a sustainable development of the region. Transnational pilot-workshop Cross-programme ETC Danube projects

Statement by Minister of Foreign Affairs of the Slovak Republic Mr. Miroslav Lajčák on

A Master Plan is one of the most important documents that can be prepared by an Airport.

SIMULATION OF BOSNIA AND HERZEGOVINA AIRSPACE

As part of our transport vision, Leeds City Council, working with the West Yorkshire Combined Authority and Leeds Bradford Airport Company, is

The Government s Aviation Strategy Transport for the North (TfN) response

Framework for a Plan of Action for Aviation Infrastructure Development in Africa Draft Framework for a Plan of Action for African States ( )

CHRISTCHURCH MOTORWAYS. Project Summary Statement February 2010

Credit No IN. National Project Director 9,Institutional Area, Lodhi Road, New Delhi Tel:

OBERWART CONVENTION CENTRE OBERWART

Dialogue Forum at VIE

PLANNING THE SUNBURY GROWTH CORRIDOR

Optimizing the Benefits of Regional Tourism Cooperation

Corridor Forum organisations list 23/01/2017

Mobility and transport

FRAMEWORK LAW ON THE PROTECTION AND RESCUE OF PEOPLE AND PROPERTY IN THE EVENT OF NATURAL OR OTHER DISASTERS IN BOSNIA AND HERZEGOVINA

TRANSDANUBE. Sustainable Transport & Tourism along the Danube. Project Information, Nov. 2012

November 11, 2009 BY . Planning and Growth Management Department 110 Laurier Avenue West, 4 th Floor Ottawa, Ontario K1P 1J1. Dear Mr.

EAST WEST RAIL EASTERN SECTION. prospectus for growth

STATUS QUO ANALYSIS / STATE OF THE ART EXECUTIVE SUMMARY GYŐR-MOSON-SOPRON COUNTY

DRAFT. Master Plan RESPONSIBLY GROWING to support our region. Summary

High-speed rail and European transport policy

Introduction of the EU Strategy for the Danube Region and the Hungarian Presidency in 2017

Phase 1 opening July 2009 Phase 2 opening Summer 2010 ARAD ROMANIA

Cooperation with the Region

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES

OBERWART CENTRE OBERWART

Report to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub

1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET

4 VIVA PHASE 2 YONGE STREET - Y2, AND HIGHWAY 7 - H3 CORRIDORS PRELIMINARY ENGINEERING UPDATE

Clyde Waterfront and Renfrew Riverside Project Glasgow Airport Investment Area Project

INVITATION FOR EXPRESSION OF INTEREST

Aviation Road Map Updated Measures Catalogue

N4 Carrick-on-Shannon to Dromod Road Project. 2.1 Introduction

TORONTO TRANSIT COMMISSION REPORT NO.

Establishes a fare structure for Tacoma Link light rail, to be implemented in September 2014.

THE DANUBE CORRIDOR A DEVELEOPMENT GENERATOR. a company of

DaHar Danube Inland Harbour Development

TORONTO TRANSIT COMMISSION REPORT NO.

hotels our business & passion

Item 1. Leadership Board. On: 1 April Report by: Director of Development and Housing Services. Heading: Update on City Deal. 1.

ATFM Implementation Thailand and Southeast Asia. 55 th DGCA Conference October 2018 Nadi, Fiji

PROJECT: EUR/SAM CORRIDOR AIRSPACE CONCEPT

MASSACHUSETTS PORT AUTHORITY REQUEST FOR LETTERS OF INTEREST DEVELOPMENT OF THE MASSPORT MARINE TERMINAL

Tourism and Wetlands

PEMBERTON VALLEY RECREATIONAL TRAILS MASTER PLAN UPDATE Community Open House. April 2018

Airport Market Power Assessments Presentation to the Thessaloniki Forum

EU Strategy for the Danube Region framework for development of inland navigation

Yonge Street / Highway 401 Improvements Update. Public Works and Infrastructure Committee. General Manager, Transportation Services

Verkehrsverbund Ost-Region (VOR) GmbH Public Transport Authority Eastern Region

Egnatia Odos: An axis for development and co-operation

Slow Down! Reducing Downtown Bloomington s Progression Speed

NR is also currently conducting two other studies, those for the Cambridgeshire Corridor and for Ely Area Capacity Enhancements.

Transport of Biomass on the Danube River. Bettina Matzner, viadonau 24 June 2014, JRC Danube Bioenergy Nexus Workshop

Memorandum of Understanding with ACT Government

Barents Euro Arctic Council 11 th Session Rovaniemi, Finland November 2007

Connecting Europe and Asia

Opportunity for up to 2 million sq ft for Offices, Research & Development, Warehousing, Production and sustainable uses

In your area. Pinxton to Newton and Huthwaite LA08. June Introduction

Strategic Transport Forum

FAST Future Airport STrategies

1. To inform members of the views of the West of England Joint Scrutiny Committee (JSC) following a meeting held on Wednesday 5 th March 2014

Local Development Scheme

The Austrian Federal Economic Chamber. Representing the Interests of Business

Safe, Timely & Comfortable Move for Better Future ~Japan-India Cooperation on Railway Sector ~

JSPA Initiative FROM AN IDEA TO THE REALITY. THE DANUBE REGION TRANSPORT DAYS Ljubljana, 21 st and 22 nd October 2014

West London Economic Prosperity Board. 21 March Summary. Title Orbital Rail in West London

Parkland County Municipal Development Plan Amendment Acheson Industrial Area Structure Plan

Children s Hospital and Regional Medical Center Preliminary Draft Master Plan

MODAIR: Measure and development of intermodality at AIRport. INO WORKSHOP EEC, December 6 h 2005

Gold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content

ACSP 57th Annual Conference Denver, Colorado, October 2017 TRACK 14 TRANSPORTATION & INFRASTRUCTURE PLANNING

In your area. Stonebroom to Clay Cross LA09. June Introduction

JOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012

PERTH-ADELAIDE CORRIDOR STRATEGY

Recommendations on Consultation and Transparency

ULDA Update Yarrabilba Project The Developers Perspective Tanya Martin Project Planner Communities Lend Lease June 2011

AirRail Africa 2016 Conference Planning for Rail Connections to CTIA and KSIA

GATEWAY TO EUROPE Cooperation of the ports on the western coast of the Black Sea and the ports on the River Danube

DRAFT PLAN & DRAFT EIR

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE

AviAlliance The Airport Management Company

Danube Commission. 70th anniversary of the. Ship waste management along the Danube. 7 th ASEM Sustainable Development Dialogue

The Danube A Stream of Energy

Toronto Pearson Master Plan Greater Toronto Airports Authority October 4, 2017

TWELFTH AIR NAVIGATION CONFERENCE

Ohrid Lake and Prespa Lake, Sub basin s on Crn Drim river basin International Workshop, Sarajevo, Bosna and Hercegovina May 2009

Study Design Outline. Background. Overview. Desired Study Outcomes. Study Approach. Goals (preliminary) Recession History

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES

FLL Master Plan Update Technical Advisory Committee (TAC) Briefing #1. September 28, 2016

Final Environmental Impact Statement for the Merced Wild and Scenic River. Comprehensive Management Plan, Yosemite National Park, Madera and Mariposa

Strategic Cross Border Planning in the West Midlands

Welcome to AVI AFRIQUE 2017

>> Improve accessibility of regions along the Danube along the river as well as from the river to the hinterland through sustainable mobility offers

In your area. Manchester Piccadilly Station MA08. June Introduction. High Speed Two (HS2) is

Union Station Queens Quay Transit Link Study

Development Cluster for the Growth of the Budapest Airport Region. Gábor Csaba Soóki-Tóth M.Sc. MRICS

I-95/395 HOV/Bus/HOT Lanes Project Overview

Transcription:

1 Infrastructure development: Vienna Vienna Int. Airport Bruck/Leitha state border near Nickelsdorf ( airport link ) Vienna Airport Josef Zitzler bmvit unit II/Infra2 Infrastructure planning Bled, 15/05/2018

2 Status quo of rail infrastructure in eastern Austria openstreetmap

3 Why a network addition, functional objectives? - Creation of a high performance long distance axis for passenger transport along the relation Vienna main station Vienna Airport Győr Budapest as well as the functional connection Vienna Vienna Airport Bratislava - Creation of a regional rail node in Bruck/Leitha for the Vienna / Bratislava / southeast Lower Austria / northern Burgenland area - Mitigation of capacity constraints of local passenger transport and freight transport along the existing Eastern rail line - In general: to guarantee the infrastructural preconditions to achieve the superior objective of an integrated clock-face timetable

4 Impacts of the network addition - Creation of the infrastructural preconditions for the establishment of an integrated clock-face timetable (according to strategy Zielnetz 2025+ ): Intersection time Vienna main st. Győr 60 (including stop at Vienna Airport) Intersection time Vienna main st. Budapest 120 (including stop at Vienna Airport) - Optimized connectivity on rail of Vienna Airport, embedding it in international long distance relations, especially towards East (expansion of catchment area) - Improvement of accessability of Vienna Airport from districts Bruck/Leitha, Neusiedl/See and Eisenstadt via direct rail connections (the airport is a major employer in eastern Austria) - Capacity: creation of infrastructural preconditions and capacity needs to accomplish the forecasted transport volumes

5 The project in detail - Phase I (creation of the missing network link) Double-track high speed rail line between Vienna Airport and the existing East line near Bruck/Leitha Travel time Vienna main st. Győr keeps unchanged including an additional stop at Vienna Airport (ca. 70min) - Phase II (creation of an cross-border integrated clock-face timetable) Further travel time reductions through additional measures (which have to be identified and analysed first) along the corridor Vienna Vienna Airport Hegyeshalom Long term travel time objectives according to Zielnetz 2025+ : Intersection time Vienna main st. Győr 60 (including stop at Vienna Airport) Intersection time Vienna main st. Budapest 120 (including stop at Vienna Airport) Upward compatibility is ensured via serial stages of phase I and II!

6 Phase I and II put into graphs Possible phase II? Phase I Possible phase II? ÖBB Infrastruktur

7 Opportunities and chances during operation - Fast and direct passenger rail connections to/from Vienna Airport on local and regional scale (even to/from Bratislava) - Fast international long distance relations via Vienna Airport (coming from West/South-) Vienna Budapest/Bratislava: expansion of the airport s catchment area (from terminus to station on the line) - Strengthening of business location Airport : doubling of passenger volumes along East line and beyond is forecasted - Changes in modal split when travelling to/from the airport - Operational relief of existing East line due to additional capacity

8 Expected improvements of travel times (dependent on actual operational concepts then, phase I+II) Long distance trains Local / regional trains ÖBB Infrastruktur

9 Project process and preliminary schedule: legal aspects - Network change in context with high speed lines requires a Strategic Assessment for transport matters in order to be basically able to achieve the regulation for high speed lines as necessary basis for further steps. - The environmental report represents the formal completion of the Strategic Assessment; it was published for public consultation in January 2017. Having incorporated the public comments as well as the statements of the neighbouring states Slovakia and Hungary, the draft regulation and summarizing declaration were published on the bmvit s website in June 2017. These achievements marked the accomplishment of the Strategic Assessment. - In March 2018, the regulation for high speed lines was adopted by the Austrian ministers council, which highlights another important milestone. - By having adopted the regulation, the formal and legal requirements for starting the actual planning phase precisely the line selection process are now existent.

10 Project process and preliminary schedule: financial aspects - Having achieved the regulation as legal background, the financing of the projects has still to be discussed between bmvit, Ministry of Finance and ÖBB Infrastruktur. - The goal is to include the project in the multi-annual financial framework of Austrian rail infrastructure projects, the Rahmenplan. Subject to financial planning reliability, the preliminary project schedule for phase I is set as follows: Starting this year until ~2026: planning phase and approval processes ~2027 to ~2035: construction phase

11 Thank you very much for your attention! Josef Zitzler II/Infra2 Infrastructure planning josef.zitzler@bmvit.gv.at 01 711 62 65 1109