STIRLING TO KINCARDINE RE-OPENING OF LINE

Similar documents
Module TW8. Level crossings - drivers instructions. GE/RT8000/TW8 Rule Book. Issue 7. September 2015

Issue 8. Module TW8. Level crossings - drivers instructions. GERT8000-TW8 Rule Book

Module TS9. Level crossings - signallers regulations. GE/RT8000/TS9 Rule Book. Issue 3. March 2014

Level Crossing Interface Requirements

GK/GN0692. Guidance on Level Crossing Interface Requirements. Rail Industry Guidance Note for GK/RT0192. Published by

Level Crossing Risk Assessment Polegate MCB

Document Control Identification. Document History. Authorisation. Rail Safety Manager Brookfield Rail

Signalling Record Society - Archive Index BR(M) S and T Plans - ex Birmingham S and T (Box 515)

Harcourt - Golden Square

Network Safeworking Rules and Procedures

Bacchus Marsh BACCHUS MARSH WORKS SIDING (31 M) BACCHUS MARSH (31 MILES 61 CHAINS 15 LINKS)

LEVEL CROSSING ATTENDANT (AOD LXA)

Near miss at Ballymurray level crossing on the 14 th of June between Athlone and Westport. Report (issued 11 th of May 2009)

Transport Assessment Appendix M: Avonmouth Impacts

STIRLING-ALLOA-KINCARDINE RAILWAY AND LINKED IMPROVEMENTS BILL

Felixstowe Branch Line FAQ

M&EE Stabling Point Safety Survey

Hazardous Cattle Crossing: Use of Flashing Amber Lamps

Chapter 8 Route Window NE7 Chadwell Heath station. Transport for London

WELCOME TO PROJECT EVERGREEN 3 CHILTERN S PROPOSED NEW OXFORD TO LONDON ROUTE

Heathrow Airport Ltd Rail Engineering Access Statement Sunday 10 th December 2017 to Saturday 8 th December 2018

Saighton Camp, Chester. Technical Note: Impact of Boughton Heath S278 Works upon the operation of the Local Highway Network

There are no planned or apparent developments near the crossing which may lead to a change or increase in use or risk.

The environment surrounding Gipsy Lane FPG level crossing consists of town or village etc on one side of the line.

Airdrie - Bathgate Railway and Linked Improvements Bill. Environmental Statement Page 1

Simplilicalion of layoul and Signalling Cenlral Wales line

The Evergreen 3 Project

Train Operating Data NA_NSP_02.01 R

Gheringhap GHERINGHAP 51 MILES 57 CHAINS 18 LINKS, 83 KM

Handbook 18. Handbook 18. Duties of a level crossing attendant. GE/RT8000/HB18 Rule Book

Queen s Circus Roundabout

UNLOCKING THE BRIGHTON MAINLINE

ScotRail Performance Improvement Plan Making Things Better, Every Single Day.

The Edinburgh Glasgow Improvement Programme. Strategic Environmental Assessment (SEA) Consultation Document. October 2013

Castlemaine CASTLEMAINE (77 MILE 77 CHAINS 78 LINKS)

Grade Crossings in High Speed Rail Corridors

AIRWORTHINESS DIRECTIVE

LOCATION AND COMMENTS LINES AND FEATURES MILEAGE GRID. REF. UP DOWN GREATER U/BRIDGE A107 UPPER CLAPTON LONDON ROAD

Multi-storey station car park opens in New Year

Requirements for Level Crossings

Document Control Identification. Document History. Authorisation. Rail Safety Manager Brookfield Rail

INDIANA HARBOR BELT RAILROAD COMPANY. BULLETIN ORDER NO. S-28 May 4, 2018

Ermine Street Environmental Enhancements

Improving Safety at Level Crossings - JR East Developments

Chapter 14 Route Window C12 Mile End Park and Eleanor Street shafts. Transport for London

Document Control Identification. Document History. Authorisation. Rail Safety Manager Brookfield Rail

Llandudno Junction. Regeneration Proposals for the Future. December 2009

ROAD TRAFFIC (PEDESTRIAN CROSSINGS) (JERSEY) ORDER 1982

Delivering a better railway for a better Britain Route Specifications 2016 Wessex

WELSH GOVERNMENT RESPONSE P Ensure Disabled People can Access Public Transport As and When They Need it

Kirkcaldy Sea Wall Improvements. Non-technical Summary. For illustration purposes only to give an indicative representation of the scheme.

STAG - Part 1 Appraisal Summary Table

TRAIN DERAILMENT AT UFTON LEVEL CROSSING, NEAR UFTON NERVET, BERKSHIRE SATURDAY 6 NOVEMBER 2004

HIGHWAY RAIL GRADE CROSSING 4 QUAD GATES. William H. Watson. Amtrak

Short-Haul Operations Route Support Scheme (RSS)

Open Report on behalf of Richard Wills, Executive Director for Environment and Economy

Provincial Railway Technical Standards

Smart Motorways Programme

Come on board. An introduction to accessible transport in London MAYOR OF LONDON. Transport for London

HIGH SPEED RAIL CROSSING WITH FLANGE-BEARING CROSS TRAFFIC. UPRR/TPW Crossing in Chenoa, IL

Highland Mainline Journey Time Improvements Phase 2

Model Crosspoint Matrix

CAMBRIAN LINES FRANCHISE 2018 FINAL DRAFT FOR COMMENT

M4 Junctions 3 to 12 Smart motorway

Licence Application Decision ICB Simplified Process

Appendix 6 Fulbourn Greenway Review

CASE STUDY. Dubai International Airport. HDL Brings Automated Efficiency to the World s Busiest Airport

AERODROME METEOROLOGICAL OBSERVATION AND FORECAST STUDY GROUP (AMOFSG)

c2c s timetable consultation Passenger Focus report

Chapter 6 Route Window NE5 Seven Kings station. Transport for London

11 Kellywood Crescent, Kincardine, FK10 4PD

What do they mean to you?

B.C. MINISTRY OF TRANSPORTATION. SA17 Local Area Specification #2 SMALL AIRPORT WINTER MAINTENANCE

Summary Delivery Plan Control Period 4 Delivery Plan More trains, more seats. Better journeys

1. To inform members of the views of the West of England Joint Scrutiny Committee (JSC) following a meeting held on Wednesday 5 th March 2014

Dufferin Truck Monitoring Station Maple Ave, Georgetown. Frequently Asked Questions. July 2017

KVNY HIGH. Van Nuys Airport Van Nuys, California, United States

STATUTORY INSTRUMENTS. S.I. No. 855 of 2004 IRISH AVIATION AUTHORITY (AIR TRAFFIC SERVICE SYSTEMS) ORDER, 2004

VATUSA PHOENIX TRACON and VATUSA PHOENIX ATCT LETTER OF AGREEMENT. SUBJECT: Interfacility Coordination Procedures

Signaling System and Communication System on Shinkansen of JR-EAST

NOTE: For the main document, The Traffic Signs Regulations and General Directions 2016 and subsequent amendments visit:

Hugo Klingenberg Senior Manager Network Development ElectraNet Adelaide, South Australia Lodged via

AWNING CONTROL KIT 98GCK-33B

Speed control humps - Scotland, England and Wales

Human Powered Flight THE KREMER HUMAN-POWERED AIRCRAFT FOR SPORT

Department for Transport

SUPPLEMENTARY NO?ICE OP SIGNALLING.lLTBUTIONS lfl'c, SECTIONS 'C' AND 'D' OF THE X2/ 46/73 SPIZD OD DODEBRDIJ IOl'Itm EXETER ST. DAVIDS.

Vodafone UK Travel to Work Policy

Wessex Route and South Western Railway Transport Focus Meeting. Tuesday 9 January 2018

Harts Drove UWCM level crossing provides Access to worksite / leisure area from facility.

OVER 75% LET RG7 4PN. Brand new warehouse development 1,119 sq ft to 9,264 sq ft TO LET

MEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM

VENUE PARKING HOW TO USE OUR CAR PARKS. N8 from Oxford Street to Hainault N86 from Stratford to Harold Hill car

Monitoring and data acquisition for the safety related traffic information services

PCH Hotels and Resorts Delivers State-of-the-Art Guest Experience

Administration Policies & Procedures Section Commercial Ground Transportation Regulation

Sainsburys Store, Mere Green Road, Sutton Coldfield, Birmingham, B75 5BT

CAMBRIAN LINES FRANCHISE 2018

_210 Refurbished offices TO LET 9,154 sq ft

FRAMEWORK TRACK ACCESS AGREEMENT FOR PASSENGER SERVICES. Dated August Between HS1 LIMITED. and EUROSTAR (U.K.) LIMITED

Transcription:

PRIVATE and not for publication Notice No. NR/SC/17 NETWORK RAIL SUPPLEMENTARY NOTICE OF SIGNALLING AND PERMANENT WAY ALTERATIONS STIRLING TO KINCARDINE RE-OPENING OF LINE Operative from: Tuesday 25 th MARCH 2008 GLASGOW February 2008 By order of Director 1 of 13

Opening Arrangements The signalling and permanent way arrangements described within this notice and shown in the accompanying diagram will be commissioned on Tuesday 25th March 2008. Description of Scheme The Stirling Alloa Railway and Linked Improvements project consists of the re-opening of approximately 13 miles of line, which currently are out of use between Causewayhead and. The re-opening of the line will accommodate coal trains travelling to and from the Longannet West and East triangle into Longannet Power Station and will also introduce a new passenger service between Stirling and Alloa Town. The scheme consists of a single line ( Up/Down Line) between Stirling and Longannet with passing loops at Cambus and Alloa. Cambus Loop will have standage of 697 yards and Alloa Loop standage of 685 yards. A new station, designated ALLOA TOWN, will be opened, located on a spur off the single line and comprised of a single platform with a standage of 155 yards. A friction type buffer stop will be provided. The line will be freight only between the connection to the new station at Alloa and Longannet. The line will be controlled from a new panel located in Stirling Middle signal box (signal prefix SK). At Stirling, the existing Up and Down S&D lines through platforms 6 and 9 will be renamed the Up and Down Lines. Under the new arrangements platform 6 Line) will become bi-directional. The Up and Down lines through the station will continue over the Forth Viaduct to converge into a single line at a new junction location designated CAUSEWAYHEAD JN. on the Alloa side of the viaduct with single line throughout from there to Longannet. A number of level crossings are presently out of use on the existing infrastructure. Several of these level crossings will be upgraded and reinstated to current standards and expected traffic flows. Other level crossings will close as part of this project. Method of Working Absolute Block (AB) regulations will continue to apply between Stirling Middle SB and Stirling North SB, and also between Stirling Middle SB and Plean Junction SB, on the Up and Down main lines. Track Circuit Block (TCB) regulations will apply as follows: on the Up and Down lines through Stirling station and between the north end of Stirling station ( lines) and Stirling North signal box. on the Up and Down lines (double and single) between the north end of Stirling station and Longannet signal box 2 of 13

ling Arrangements Signals prefixed by the letters SK are controlled from Stirling- panel at Stirling Middle SB. Signals prefixed by the letters SM are controlled from Stirling Middle SB. Signals prefixed by the letters LG are controlled from Longannet SB. All signals are to the left of the driver, unless otherwise stated. All signal mileage is referenced from Stirling Middle 0MP( lines) unless otherwise stated. All new main signals will be LED single lens searchlight type. All new shunt signals will be 3-aperture LED Red/Red White/White type. The following signals will be commissioned under this scheme: Signal SK6504 Down 654yds Platform 9 SM27/38 PLS Miniature Platform 6 SM64/65 PLS Miniature 9 6 A new LED PLS, with LED miniature route indicator with 2 route indications, where indicator displays 6 = platform 6 9 = Platform 9 3 of 13

SK6507 Up 443yds Down Main SN37 PLS Miniature Down SK6519 PLS Miniature D K A new LED PLS with LED miniature route indicator with 2 route indications, where indicator displays D = Down Main, K = Down SK6515 SK6516 SK6518 SK6519 Down Up Down Down 412yds 934yds 934yds 922yds Down Main SN37 Main (R,Y,G) Junction Position 1 Down SK6519 Main (R,Y,G) - - signal with a Position 1 LED Junction above the Down Main. Associated OFF indicator provided on platform 6 suspended from station canopy, 122yds from Platform 9 SM27/38 Main (R,Y,G) - - Platform 9 SM27/38 Main (R,Y,G) Junction Position 1 signal with a Position 1 LED Platform 6 SM64/65 Main (R,Y,G) - - Junction above the Platform 9. Down SK6521 Main (R,Y,G) - - 4 of 13

SK6521 Down SK6522 SK6523 SK6524 SK6525 SK6526 1483yds 1m + 471yds 1m + 790yds 1m + 1668yds 2m + 707yds 2m + 1396yds SK6523 Main (R,Y,G) - - Up SK6516 Main (R,Y,G) - - Down SK6518 Main (R,Y,G) Junction Position 4 signal with a Position 4 LED Junction above the Down. SK6525 Main (R,Y,G) - - SK6522 Main (R,Y,G) - - SK6527 Main (R,Y,G) - - The signal is provided with an automatic signal identification plate (Rule Book, Module S1, Section 1.2 refers). SK6524 Main (R,Y,G) - - The signal is provided with an automatic signal identification plate (Rule Book, Module S1, Section 1.2 refers). 5 of 13

SK6527 SK6528 SK6531 SK6532 SK6533 SK6534 Cambus Loop 3m + 412yds 3m + 1282yds 3m + 1601yds 4m + 823yds 4m + 1064yds 5m + 31yds Cambus Loop SK6531 Main (R,Y,G) - - SK6526 Main (R,Y,G) - - SK6533 Main (R,Y,G) - - SK6528 Main (Y,G) - - New 2 aspect LED searchlight The signal is provided with a distant signal identification plate (Rule Book, Module S1, Section 1.2 refers). SK6537 Main (R,Y,G) Junction SK6535 Main (R,Y,G) Position 1 signal with a Position 1 LED Junction above the Down Cambus Loop. SK6528 Main (R,G) - - New 2 aspect LED searchlight signal positioned on the RHS of line. 6 of 13

SK6535 SK6536 SK6537 Cambus Loop SK6538 SK6541 SK6542 5m + 527yds 5m + 31yds 5m + 527yds 5m + 1245yds 6m + 212yds 6m + 934yds Cambus Loop SK6541 Main (R,Y,G) - - SK6528 Main (R,G) - - New 2 aspect LED searchlight SK6541 Main (R,Y,G) - - SK6536 Main (R,Y,G) - - SK6534 Main (R,Y,G) Junction Position 4 signal with a Position 4 LED Junction above the Up/Down Cambus Loop. SK6543 Main (R,Y,G) - - SK6538 Main (R,Y,G) - - 7 of 13

SK6543 SK6544 Alloa Town Station SK6546 SK6547 SK6548 6m + 1382yds 6m + 1586yds 7m + 75yds 7m + 684yds 7m + 1078yds Alloa Town Station Alloa Town Station Alloa Loop SK6547 Main (R,Y,G) Standard - Main (R,Y,G) Standard - PLS - - M B Standard Fibre Optic above the main aspect which displays M = Main, B = Bay Platform. A position light signal below main aspect for permissive move into Alloa Station. SK6542 Main (R,Y,G) - - SK6542 Main (R,Y,G) - - SK6553 Main (R,Y,G) Junction LG2/ LG7 Main (R,Y,G) (signal can only display R or G for this route) Position 1 - - signal with a Position 1 LED Junction above the Up/Down Alloa Loop. SK6546 Main (R,Y,G) - - 8 of 13

SK6552 Alloa Loop SK6553 Alloa Loop SK6554 SK6556 LG1 7m + 1078yds 7m + 1587yds 8m + 221yds 677yds #1 4m + 1044yds #1 Alloa Loop direction) SK6546 Main (R,Y,G) - - LG2/ LG7 Main (R,G) - - New 2 aspect LED searchlight NOTE: This signal is only lit when a train is signalled to approach. SK6548 Main (R,Y,G) - - SK6552 Main (R,Y,G) Junction Position 4 signal with a Position 4 LED Junction above the Up/Down Alloa Loop. SK6554 Main (Y,G) - - New 2 aspect LED searchlight The signal is provided with a distant signal identification plate (Rule Book, Module S1, Section 1.2 refers). LG2/ LG7 Main (Y,G) - - New 2 aspect LED searchlight The signal is provided with a distant signal identification plate (Rule Book, Module S1, Section 1.2 refers). 9 of 13

LG2 LG7 LG27 4m + 1536yds #1 4m + 1740yds #1 LG3 Main (R,Y,G) West Arrival LG9 PLS - - A position light signal below main aspect for shunt move towards signal LG9. SK6554 Main (R,G) - - New 2 aspect LED searchlight # 1 Denotes signal mileage referenced from former Junction. 10 of 13

Permanent Speed Restrictions (PSRs) The existing PSR of 25mph in both directions on the Up and Down lines (Platforms 6 and 9) will be extended to 0m 28ch. A new differential PSR of 30mph / 35mph will apply in the Down direction on the Down line between 0m 28ch and 0m 47ch. A new differential PSR of 40mph / 60mph will apply in the Down direction on the Down line between 0m 47ch and 0m 70ch. A new PSR of 35mph will apply in the Up direction on both the Up and Down lines between 0m 49ch and 0m 28ch. A new Permissible Speed Warning will be provided for these PSRs on the Up and Down single line at 1m 37ch. A new PSR of 60mph will apply in the Down direction on the Down line and the Up and Down single line between 0m 70ch and 1m 60ch (MP 1¾). A new PSR of 60mph will apply in the Up direction from 1m 60ch (MP 1¾) on the Up and Down single line to 0m 49ch on the Up line and to 0m 49ch on the Down line. A new differential PSR of 60mph / 70mph will apply in the both directions on the Up and Down single line between 1m 60ch (MP 1¾) and 6m 52ch. 60mph / 70mph reminder Permissible Speed s will be provided at the exits from the Up and Down Cambus Loop line. A new PSR of 30mph will apply at Cambus loop, in both directions, entering, over, and leaving the loop. A new PSR of 30mph will apply in both directions on the Up and Down single line between 6m 52ch and Level Crossing, including the Up and Down Alloa Loop line. A new reminder Permissible Speed will be provided for trains departing from Alloa Town Station. A new Permissible Speed Warning will be provided for this PSR in the Down direction on the Up and Down single line at 5m 69ch. In the down direction, this new PSR of 30mph will continue from Level Crossing (3m 77ch) to Longannet Signal Box (5m 62ch). These mileages are referenced from the former Junction. The existing PSR of 35mph will continue to apply from Longannet Signal Box to Charlestown Junction. In the up direction, the existing PSR of 35mph from Charlestown Junction to Longannet Signal Box will be extended such that it will apply from Charlestown Junction to Level Crossing. A new PSR of 15mph will be provided in both directions on the Up and Down single line at Alloa Station Junction applying to trains proceeding to and from Alloa Town Station. 11 of 13

Buffer Stop Due to its proximity to the Up and Down single line, the new buffer stop at the end of Alloa Town Station will be fitted with white lamps. Reflectorised strips will also be provided. Signs A new reflectorised National Radio Network (NRN) Radio Channel Change Marker exhibiting channel 068 will be provided in the Down direction on the Up & Down line at L.C. A new reflectorised National Radio Network (NRN) Radio Channel Change Marker exhibiting channel 092 will be provided in the Up direction on the Up & Down line at L.C. New 6 car platform stop marker boards will be provided on Platforms 6 and 9 in the Up direction approximately 100 yards on the approach to the platform starting signals and on platform 6 in the Down direction approximately 50 yards on the approach to signal SK6515. A new HST platform stop marker board will be provided in the Down direction on platform 6 approximately 20 yards on the approach to signal SK6515. AWS AWS track equipment will be provided as outlined on the accompanying diagram. The following AWS equipment is positioned less than the standard distance of 196 yards; SK6516 - AWS positioned at 137 yards on approach to SK6518 - AWS positioned at 137 yards on approach to A new Commencement of AWS Gap indicator will be provided in the Down direction on the Up and Down line at LG8 points. A new Termination of AWS Gap indicator will be provided in the Up direction on the Up and Down line at LG8 points. TPWS TPWS track equipment will be provided as outlined on the accompanying diagram and in accordance with the standard arrangements. Ground Frame A new ground frame associated with Siding will be provided. This will control a connection from the Up and Down single line to the former Power Station Sidings. The ground frame will be out of use until further notice. 12 of 13

Telephones Telephones will be provided at all new signals capable of displaying a red aspect. Point Zone telephones connected to Stirling Middle SB will be provided at the following: Stirling Station north, Up cess. Causewayhead Junction, down cess. West end of Cambus Loop, down cess. East end of Cambus Loop, down cess. Alloa Town Station points, down cess. West end of Alloa Loop, down cess. East end of Alloa Loop, up cess. New telephones connected to Stirling Middle SB will be provided at the following user worked crossings: Manor Neuk L.C. Manor Powis L.C. Level Crossings Waterside L.C., previously an Automatic Open Crossing Locally Monitored (AOCL), will be renewed as a CCTV monitored, Manually Controlled, Barrier Crossing (MCB-CCTV). Manor Neuk L.C. (2m 59ch, not currently mentioned in the Sectional Appendix) will be refurbished and retained as a user worked crossing (UWC). Manor Powis L.C., previously a Traincrew Operated Barrier Crossing (TOB), will be renewed as a User Worked Crossing (UWC). Blackgrange L.C., previously an Automatic Open Crossing Locally Monitored (AOCL), will be renewed as a CCTV monitored, Manually Controlled, Barrier Crossing (MCB- CCTV). Cambus L.C. (4m 59ch), previously a Remote Manned Barrier Crossing, but not currently mentioned in the Sectional Appendix, will be renewed as a CCTV monitored, Manually Controlled, Barrier Crossing (MCB-CCTV). UWC (3m 77ch from the former Junction, not currently mentioned in the Sectional Appendix) will be refurbished and provided with Miniature Stop Lights (MSL). The following level crossings have been closed as part of this scheme: Causewayhead L.C. Abbeycraig L.C. New Mills L.C. (4m 39ch, not mentioned in the Sectional Appendix) Alloa West Grange Road L.C. (6m 22ch, not mentioned in the Sectional Appendix) Balfour Road L.C. (7m 18ch, not mentioned in the Sectional Appendix) Hilton Road L.C. (7m 32ch, not mentioned in the Sectional Appendix) Hilton Farm L.C. (7m 72ch, not mentioned in the Sectional Appendix) 13 of 13