DARWIN LUXURY HOTEL CONNECTIVITY AND PUBLIC REALM Our concept includes:

Similar documents
WESTIN DARWIN HOTEL OUR VISION

CANNING CITY CENTRE. the new energy of the southeast

places Mooloolaba s heart five

A summary report on what the community told us

Smart Cities Plan IMPLEMENTATION. Townsville City Deal. April 2017

WORKING DRAFT (DECEMBER 2016) - FOR COMMUNITY REVIEW BY

PARTNERING FOR SUCCESS

IN 2017 Investor confidence is soaring in the Cairns & Great Barrier Reef region on the back of record visitor numbers and infrastructure upgrades in

PARTNERING FOR SUCCESS

NTCA 33 rd AGM & INDUSTRY CONFERENCE ACCOMMODATION OPTIONS

AUCKLAND WATERFRONT VISION 2040

LYNDHURST NEW URBAN DEVELOPMENT AREA STRUCTURE PLAN. Lyndhurst New Urban Development Area Structure Plan OUTCOMES AND PERFORMANCE STANDARDS

NSW PRE-BUDGET STATEMENT FUTURE ECONOMY FUTURE JOBS

Australia s Northern Territory

Greenwich Peninsula Investor and Analyst Day 12 March 2013 Quintain Estates and Development PLC

Reimagining Central Station Precinct

Australia s. The Northern Territory is experiencing solid growth in visitor numbers driven by a strong economy. Northern Territory

July/August 2017 Background document to initiate further discussions and prioritise developments for tourism infrastructure investment.

Request for quotation

Glen Innes Strategic Plan

Inland Queensland Roads Action Plan

Strategic Transport Forum

Northern Beaches Transport Action Plan

The Government s Aviation Strategy Transport for the North (TfN) response

Part 005 Implementation Strategy _

Funding Priorities 2014

Business Case Approved. Under Construction. Business Case Approved. Under Construction

9.1 INTRODUCTION 9.2 EXISTING DEVELOPMENT. Southern Cross University

Part four. In this part you will find: The next steps to deliver the master plan

EDEN PARK REDEVELOPMENT COMPLETED STADIUM DESIGN

NEW RETAIL OPPORTUNITIES

Please see the full job description and specification on page 4 for further details.

LUXURY BEACHFRONT LIVING ON PALM JUMEIRAH

Here the city begins

Magnetic Heart of Queensland

Schedule of Planning Applications Committee Date: 23 May Reference: 06/18/0064/F Great Yarmouth Officer: Mr J Beck Expiry Date:

Regenerating Coastal Communities Seminar 27 th January 2017

COMMITTEE OF THE WHOLE (WORKING SESSION) APRIL 19, 2011 YORK REGION RAPID TRANSIT HIGHWAY 7 BUS RAPID TRANSIT- VMC STATION WARD 4.

Department of Infrastructure, Planning and Logistics

Mackay Region. Destination Tourism Strategy

Draft Marine and Harbour Facilities Strategy

Llandudno Junction. Regeneration Proposals for the Future. December 2009

The Coalition s Policy

Urban Design Meets Economic Regeneration. Weston Civic Pride Initiative. Weston Civic Pride Initiative. Weston Civic Pride Initiative

STRONGER CHRISTCHURCH INFRASTRUCTURE REBUILD TEAM (SCIRT) REAAA

FEDERATION SQUARE MELBOURNE, AUSTRALIA CORPORATE PLAN

Directions. for a Greater Sydney

Draft City Centre Transport Proposals

Gold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content

Sustainable Procurement Policy for Heathrow Airport Limited

Next Generation Cycleway Design. Improving connectivity and cycling behaviours through design

MELBOURNE METRO RAIL PROJECT EXPANDING MELBOURNE S UNDERGROUND RAIL NETWORK UPDATE FOR RESIDENTS OF THE DOMAIN PRECINCT APRIL 2016

Lafourche Parish Government REQUEST FOR QUALIFICATIONS. Landscape Architectural Services

Draft Executive Summary

Townsville Portlandia 2020

City of Fort Lauderdale. Frequently Asked Questions. Proposed Sea Wall Ordinance

HARBOUR EDGE STITCH. Uniting the Waterfront with the City Centre

CITY RAIL LINK. New Public Transport Stations and Development Opportunities at Karangahape Road, Newton and Aotea Quarter

West of England. Priority Places Requiring Public Investment

FERRY TERMINAL ST LUCIA

Economic Development and Tourism

Task Force on Harbourfront Developments on Hong Kong Island

1. To provide an update on the Tauranga Marine Precinct project for the period to 30* June 2016.

Improving quality of life in. Singapore

SANDY BAY RETAIL PRECINCT STREETSCAPE REVITALISATION - PALM TREES AND BANNER POLES - RESPONSE TO PETITION

Sport Capital Improvement Plan. Paul Borci Manager, Campus Planning Property & Campus Services

Neo, by the multi award winning team of Cru Collective represents convenience, balance and luxury beachside living in the most prestigious location

Creating a High Quality Business District

Community Sports Hub

It s Time to Facilitate Growth. Global Eco Asia-Pacific Conference Ms Karla Way-McPhail Director, NAIF

Feasibility Study for a New Sport, Entertainment and Convention Facility in Townsville (September 2013) Information Abstract

PERTH CITY SWAN PERTH AIRPORT CURTIN UNIVERSITY WESTFIELD CAROUSEL TANGNEY CITY OF CANNING JANDAKOT AIRPORT SWAN TANGNEY

Research Briefing Flood and Coastal Erosion Risk Management in Wales

AIRFIELD ACCESSIBILITY AND SAFETY INITIATIVE FAQs

F6. Coastal Ferry Terminal Zone

Arts and Cultural Precinct Masterplan. July 2017

CORPORATE ACCOMMODATION SOLUTIONS

Gold Coast. Rapid Transit. Chapter content. Chapter four Route selection and staging

WELCOME. Members of the development team are on hand to answer questions and feedback forms are available for your comments.

SHAPING REGIONAL INFRASTRUCTURE

URBAN DESIGN REPORT. Proposed Residential Development, Old Church Road, Caledon East

The implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands.

REINVIGORATING GLENELG JETTY AND FORESHORE REDEVELOPMENT

3 Pilbara ports provide gateways

Connecting Sydney Olympic Park and GPOP with Greater Sydney. Final Summary Report 29 May 2017

Proposed Development Scheme. January 2014

INDUSTRIAL LAND FOR SALE. Summit Business Park Thompsons Road, Clyde North

For personal use only

CROWN SYDNEY HOTEL RESORT - UNSOLICITED PROPOSAL

SKYCITY ENTERTAINMENT GROUP LIMITED (SKC) INVESTOR PRESENTATION FOR UBS INVESTOR CONFERENCE

DOVER WESTERN DOCKS REVIVAL (DWDR) NEWSLETTER. The single biggest investment ever undertaken in Dover

V&A Waterfront Economic Contribution. HEADLINE FINDINGS: January 2015 for the period April 2012 to March 2014

Overview. Draft North District Plan. November Local Government Areas: Hornsby Hunter s Hill Ku-ring-gai. Lane Cove Mosman Northern Beaches

Draft Greater Sydney Region Plan

Blackburn Road Blackburn Level Crossing Removal. Frequently Asked Questions August 2014 GENERAL

CREATIVE. A city of authentic and internationally renowned experiences. Creative City of Adelaide Strategic Plan

Ports. Water and Environment Solutions

June TEQ Marketing Strategy 2025 Executive Summary

Newcastle Transport Program Newcastle Light Rail Determination Report

MISSING PIECES. PCEC Expansion DESTINATION PERTH. Developing Perth s Visitor Economy MAY Image courtesy Perth Convention & Exhibition Centre

Transcription:

OUR VISION Our shared vision We are creating an iconic tropical hotel. A hotel that is uniquely Darwin. A hotel that embodies the rich natural and cultural heritage of the Top End. A gateway to the natural wonders that draw visitors to the Territory. Engaging and contemporary architecture will respond to the Top End climate, reflecting Darwin s historic tradition of buildings placed in lush garden settings and in a unique waterfront location. The Hotel will help connect the city to the water, completing the Waterfront as a premier destination for leisure, lifestyle and connection to nature. A place to visit. A place to live. A place to play. Today we invite you to: View the information on display Ask us questions about the early works and subdivision applications Give us your ideas for an iconic Darwin destination.

SITE STRATEGY POTENTIAL REDEVELOPMENT SITES Completing the Waterfront Our strategy proposes to connect important civic, cultural and historical sites along the Darwin Harbour; from Lameroo beach, Goyder camp, Hughes Ave, Fort Hill and Lovers Walk, through to Stokes Hill and the significant Larrakeyah sites. This expands and enhances Darwin's civic, tourism and lifestyle hubs. NEW CITY SQUARE LAMEROO BEACH CIVIC/PUBLIC/GOVERNMENT STOKES HILL POTENTIAL LARRAKEYAH CULTURAL CENTRE SITE HOTEL THE ESPLANADE TOURISM/LEISURE HUB EAST CIVIC, ART AND TOURISM PRECINCT Our site strategy Creating an active mixed use development that supports the existing and proposed uses and activities WAVE PARK CONVENTION CENTRE ADMINISTRATORS NEW PEDESTRIAN BRIDGE RESIDENCE WATERFRONT GARDENS JERVIOIS PARK Improving the existing public realm The creation of an iconic tourism destination including restaurant and dining experiences, event and function spaces MIXED USE/RESIDENTIAL Providing an iconic, Top End inspired design that adds to the identity of Darwin while maintaining important view corridors and effectively linking with the CBD GOYDER PARK HUB TOURISM/LEISURE/RESIDENTIAL HUB WEST STOKES HILL WHARF PROPOSED HOTEL LOCATION CRUISE SHIP TERMINAL Connecting Public & Civic Spaces The site strategy creates and enhances the network of connected public and civic spaces along Darwin Harbour. The site strategy also enhances the links and exposure to the existing Jervois Park Deckchair Cinema The creation of a western tourism hub will add to the existing precinct complementing the eastern end of the Waterfront. The design creates connections within the Waterfront to enable the precinct to function as an integrated whole, anchored by The Darwin Convention Centre and potential Stokes Hill development at the east and the Luxury Hotel and Cruise Terminal to the west. We aim to produce a high-quality arrival experience from the Cruise Ship Terminal and the surrounding areas NEW CITY SQUARE Tell us your ideas: What is important to you about the design of the hotel? THE ESPLANADE WATERFRONT GARDENS NEW PEDESTRIAN BRIDGE JERVIOIS PARK GOYDER PARK HUB AL TROPIC CRUISE SHIP TERMINAL E AVENU

CONNECTIVITY AND PUBLIC REALM Our concept includes: POTENTIAL REDEVELOPMENT SITES A pedestrian connection from The Esplanade to Goyder Park and to the Hotel Public access to the hotel rooftop bar and restaurant STOKES HILL POTENTIAL LARRAKEYAH CULTURAL CENTRE SITE NEW CITY SQUARE LAMEROO BEACH New and enhanced footpaths and cycleways throughout the proposed road network Connections from the Darwin Luxury Hotel to the surrounding area and Cruise Ship Terminal THE ESPLANADE CIVIC, ART AND TOURISM PRECINCT CONVENTION CENTRE ADMINISTRATORS NEW PEDESTRIAN BRIDGE RESIDENCE WATERFRONT GARDENS JERVIOIS PARK GOYDER PARK HUB PROPOSED HOTEL LOCATION CRUISE SHIP TERMINAL STOKES HILL WHARF Introduction of a shared pedestrian and vehicle zone in the Hughes Avenue, Kitchener Drive and Deckchair Cinema access roads.

SITE RESILIENCE Extreme Storm Surge Level 7.6M Secondary Storm Surge Level 6.5M Primary Storm Surge Level 5.6M HAT 4M Wave Height 3M AHD 0M KEY Estimated HAT (Highest Astronomical Tide) RL 4.0M Primary Storm Surge Zone (100 Year ARI) RL 5.6M Secondary Storm Surge Zone (1,000 Year ARI) RL 6.5M EXTREME STORM SURGE EXTENT (10,000 YEAR ARI) RL 7.6M This landmark location is currently at risk of flooding in significant storm events in its current configuration. The increasing frequency and severity of weather events, including cyclones and storm surges, puts additional pressure on existing structures. ASTRONOMICAL HIGH TIDE 4.0m AHD The works at the Darwin Luxury Hotel site will assist in protecting the Waterfront. Any development of this site needs to address the Northern Territory Government Storm Tide Inundation Mapping locating any habitable areas above the 1000year inundation level. This needs to include protection against cycloninc wave action The current seawall is not compliant with modern-day engineering standards and will be unable to prevent the damage or loss of amenity and infrastructure on site 100yr STORM SURGE 5.6m AHD Extensive research and the application of innovative modelling and engineering techniques has been used to develop a solution requiring a new seawall height of only 7.5m AHD reducing its visual impact Without this innovative approach, the seawall would need to be approximately 11m high or an additional 5.6m over the existing 5.4m height seawall The design requirements of the seawall results in a configuration where it is unsafe to provide pedestrian access on the seaward side 1000yr STORM SURGE 6.5m AHD The proposed seawall design reduces the destructive power of any sea water coming over the seawall This approach is based on achieving a best-practice design for long-term asset and infrastructure protection Landbridge is committed to the investment for the construction of this new seawall.

DELIVERY STAGE 1 - SUBDIVISION AND EARLY WORKS Delivering the Darwin Luxury Hotel will be a multi-staged process including development applications and environmental approvals. The first stage includes two applications: A subdivision application required to create the lot on which the hotel will be constructed with the remainder prepared for future development. An early works application required to allow site remediation and preparation works to commence while the design for the hotel is finalised. The next stage of the approvals process will see a further development application lodged. This future application will provide the detail of the proposed development. Further community consultation is planned for this stage. The Subdivision Application The proposed development is for the subdivision of Lot 10177 and a boundary realignment with Lot 10176 and Lot 10178. The result will be six individual lots. The subdivision will allow the necessary Infrastructure to be constructed, including power, water, sewer, communications, drainage and road infrastructure. Early Works Application Early works are required to prepare the site for development. This will include features to protect the site and broader waterfront from storm surge. As part of the preparation work the following studies and reports have been produced: Construction Staging Plan Seawall Basis of Design Report Comparative Environmental Impact and Mitigation Analysis Site Services Report Stormwater Management Plan Land Geotechnical Report Marine Geotechnical Report Pedestrian Circulation Plan Traffic Impact Assessment Storm Surge Plan Survey Plans Site Plan Location and Zoning Plan Landscape Plan Delivery Stage 2 Following the submission of the Subdivision and Early Works Applications, a Development Application will be submitted containing the proposal for the new Darwin Luxury Hotel and associated buildings including car parking.

ENVIRONMENT AND SUSTAINABILITY Existing environmental conditions The current environmental conditions of the site does not allow any development or use to take place without first addressing the extensive site contamination issues. These relate to the past uses and activities undertaken at the point. Current studies indicate the presence of a variety of contaminants and hazardous substances that require an extensive remediation process. Adding to this complexity there is a low potential for unexploded ordinances from WWII. The remediation will be managed using the strict protocols required under government regulation. What we are doing Our first step will be to implement a series of site remediation and containment measures of any uncontrolled pollutant or hazardous material on the site. This is in line with the current statutory requirements of the NT Government. This will improve the overall environmental conditions both on the site and in the harbour. What will follow As an integral part of the design and operation of the new Darwin Luxury Hotel we will be incorporating the following sustainability strategies: Tropical weather design The use of passive strategies to reduce energy use Incorporation of active strategies for the optimisation and use of existing natural resources Extensive use of landscaping and greenery Implementation of Crime Prevention Through Environmental Design (CPTED). Tell us your ideas: What innovative technology should we consider? How can we improve our approach?

THE OPPORTUNITY FOR DARWIN From inception, through construction and operation, the Darwin Luxury Hotel will create opportunities for Territorians. Unlocking Tourism Potential The Darwin Luxury Hotel will assist in attracting high-end tourists to The Top End This will provide new opportunities for a wide range of businesses associated with the tourism industry, from tours to cultural experiences The Darwin Luxury Hotel will promote more overnight and tour exchange associated with the growing cruise ship industry The economic flow-on effects will create more jobs for Territorians in this sector, both directly employed at the Darwin Luxury Hotel, and through supporting businesses. Enhancing Connectivity between the Darwin CBD and the Darwin Waterfront Landbridge is committed to maximising the connectivity of the Hotel to the CBD, ensuring the economic benefits flow throughout Darwin Safeguarding the connectivity between the Hotel and the wider Darwin Waterfront, will ensure that the economic opportunities are maximised. Unique Residential Opportunity We will also be introducing a limited number of high quality waterfront residential units under the same design and quality parameters. Hospitality and Hotel Operations (suppliers) Businesses servicing the hotel industry will also be able to benefit from the new hotel The operators of the Hotel will have a firm commitment to sourcing as many products and services locally. Unique and luxury good market The high-end tourism market creates significant demand in unique locally-produced and luxury goods As the Northern Territory offers interesting and worldclass products, the new Luxury Hotel will be able to grow the demand and the business opportunities associated. Construction The process of construction of the Darwin Luxury Hotel will provide significant opportunities for Darwin residents Landbridge is committed to sourcing local contractors and suppliers wherever possible Landbridge will be maintaining a database of local contractors and suppliers to maximise the economic benefits to The Top End during the construction process. We invite you to register your interest and be kept up-to-date on the Darwin Luxury Hotel. To register your interest today, please complete a form available from one of our project team. You can also register at www.landbridgedarwinhotel.com.au

WHAT HAPPENS NEXT? The Subdivision and Early Works Development Applications are currently on public exhibition. Q1 Where can I view a copy of the applications? Copies of the full applications are available here today. The applications can also be: Q2 downloaded from the Department s website at: https://www.ntlis.nt.gov.au/planning/lta.dar.list hardcopies can be viewed at the Development Assessment Services offi ce located at: 2nd Floor, Energy House, 18-20 Cavenagh Street, Darwin City TENDER/PROCUREMENT 2017 Q3 TENDER / PROCUREMENT CONSTRUCTION How do I make a written submission, and what is the deadline? If you wish to make a written submission, these can be lodged: Q4 Electronically through the link to the application at www.ntlis.nt.gov.au/planning By email to das.dlpe@nt.gov.au By mail to GPO Box 1680, Darwin NT 0801 By Hand to: 2nd Floor, Energy House 18-20 Cavenagh Street, Darwin City Your submission needs to be lodged before midnight, Friday 12 May 2017. 2018 Q1 Q2 Q3 CONSTRUCTION Q4 Q1 Q2 SERVICES 2019 Q3 BASE BUILD / FIT OUT Q4 HOTEL OPERATIONAL SOFT OPENING Q1 2020 Q2 Early Works Main Works Commissioning