Phase 1 Experience Barnsley External Works Phase 1 Town Hall Open Space Lancaster Gate side of Town Hall Shambles Street Footway and Kerbing North Side (St Mary s Place to Church street) St Mary s Place Footway and Kerbing East Side (Shambles Street to Westgate) Church Street Footway and Kerbing West Side (Shambles Street to Royal Street) Westgate Puffin Crossing Note: Highway works to Public Places Strategy specification (black granite kerbing and York stone flags) and include new lighting and signing 2,010k 1,410k BMBC Capital 480k S106 Funding 120k Local Roads Programme 13/14 Completed July 2013 Phase 2 Experience Barnsley External Works Phase 2 Lancaster Gate (Road in front of Town Hall) Sadler Gate Footways, Kerbing and Carriageway St Mary s Place Footway and Kerbing East Side (Westgate to Sadler Gate) Church Street Footway and Kerbing West Side (Royal Street to Sadler Gate) (black granite kerbing and York stone flags) and include lighting and signing Phase 3 400k ERDF Completed July 2013 Outer Town Hall Square Church Street Carriageway (Sadler Gate to Market Hill) Shambles Street Carriageway (St Mary s Place to Church Street (part)) St Mary s Place Carriageway (Westgate to Sadler Gate) Cenotaph Paving Church Street Footway and Kerbing West Side (Sadler Gate to Market Hill) Shambles Street Footway & Kerbing South Side (St Mary s Place to Church Street) 825k 170k Local Roads Programme 15/16 300k BMBC Capital (s106 swap) 277k Local Roads Programme 13/14 150k LTP IT Block June 2014 (September 2013 start for signals ducting; 13 th January 2014 start
St Mary s Place Kerbing and Footway West Side (Westgate to Sadler Gate) Town Hall Square linked Traffic Signals replacements (advanced works for St Mary s Place/Shambles Street only) Pedestrian Crossing Build-out and permanent Permit Only Parking Bay (signals) 200k BMBC Capital (s106 swap) (signals) ( 102k set aside for future works) (Developer Works) for main works; 1. Highway works to Public Places Strategy specification (black granite kerbing and York stone flags) and include lighting, signing and traffic signals replacements around Town Hall 2. St Mary s Place between Shambles Street and Westgate omitted due to conflict with Sixth Form College works Phase 3A Wellington Street Wellington Street Footways (Pitt Street to Pall Mall (incl. part Pall Mall) Wellington Street Carriageway (Pitt Street to Pall Mall) 1. Highway works to Public Places Strategy specification (black granite kerbing and granite flags and blacktop carriageway) and include lighting, signing and traffic signals replacement at Lower Castlereagh Street Junction 2. Connected to new Phase 5A 3. Increase of cost due to Public Spaces Strategy specification no longer being available 574k Prudential Borrowing July 2015 start, complete by March 2015 Phase 3B County Way & Shambles Street Resurfacing of County Way (as identified) Resurfacing of Court House Car Park (part - as identified) Shambles Street Parking Bays (adj. to John Rideal House) 1. Shambles Street Parking Bays suspended due to need for working space for Sixth Form College 20k 25k 50k BMBC Capital (s106 swap) Car Park Maintenance Budget Local Roads programme 15/16 Complete Complete Suspended Phase 3C A61 Wakefield Road
Resurfacing of A61 Wakefield Road Old Mill Lane Burton Road to Smithies Lane New Lodge 100k 250k 100k LTP Maintenance Block PRN Future LTP Maintenance Block PRN Complete 2013/14
Phase 3D Mandela Gardens Landscaping of Mandela Gardens northern square adjacent to Regent Street South (design to be agreed) To be estimated following design 50k Prudential Borrowing (plus DEC Underspends as required?) March 2016 Phase 4 Town Centre Urban Centre Infrastructure Eastgate Regent Street Hanson Street Regent Street South Royal Street Eldon Street Market Hill including service road and parking area* Church Street Footway East Side (Regent Street to Eastgate) Highway works to Public Places Strategy specification and include lighting and signing 3,500k 1,200k ERDF 2,300k BMBC Capital May 2015 (March 2014 start) Phase 5 (Incorporated into Phase 4) Market Hill Kerbing and Footway East Side (Arcade to Church Street) Carriageway Kerbing and Footway West Side (Eldon Street to Shambles Street) Remodelled parking area (reversed flow with access at lower end) Phase 5A Incorporated into Phase 4 following CLG formal approval May 2015 (March 2014 start) Wellington House Works
Pall Mall Carriageway (Wellington Street to New Street) Pall Mall Footway north side (part) New Street Carriageway (Westway Splitter Island to Blocked Paved Area) resurfacing and includes lighting and signing as continuation of Phase 3A treatment around to Wellington House entrance Upgraded Refurbishment: Pall Mall/New Street to Cheapside Pedestrian Zone Carriageway Block Paved Area Pall Mall/New Street to Cheapside Pedestrian Zone Footways Both Sides Note: Highway works to refurbish existing- cleaning of surfaces; levelling; replacement of area of block paving in Pall Mall/New Street Junction with tarmac and flagging; decluttering signing; renewal of road markings etc 202k 72k To be identified Completed May 2014 Phase 5B Shambles Street Town End Roundabout to Peel Parade Carriageway Resurfacing 67k DfT severe weather March 2015 Phase 5C Dodworth Road Town End Roundabout to Alma Street Carriageway Resurfacing 100k DfT severe weather March 2015
Phase 6 Graham s Orchard and Peel Square/Street/Parade Graham s Orchard Kerbing and Footways (modular 400 paving) Graham s Orchard Carriageway Graham s Orchard to Shambles Street Cut Through (Yorkstone paving and bollards) Peel Square Footway West Side (modular 400 paving) Peel Square Carriageway (including stubs) Peel Parade Carriageway Peel Parade footway repairs (approx 25%) Peel Street Carriageway (including tables and parking areas in block paving) Peel Street Footways (modular 400 paving) Peel Square area linked Traffic Signals replacements Note: Highway works to reduced Public Places Strategy specification (secondary retail areas) and to include lighting and signing etc 640k 2015/16 LRP Provisionally: 490k Local Roads Programme 15/16 170k Local Roads Programme 16/17 120k LTP IT Block (signals) 15/16 Provisionally March 2017 Phase 7 Town Hall North to College Square St Mary s Place /Church Lane Footways (Sadler Gate to College Square) St Mary s Place /Church Lane Carriageway (Sadler Gate to College Square) Church Street Footways (Sadler Gate to College Square - west side) St Mary s Gate Footways St Mary s Gate Carriageway and include lighting and signing 279k To be identified (local roads) Subject to Phase 8 Shambles Street Footways (KFC Signalised crossing to St Mary s Place) (modular 400 paving) Carriageway (Peel Parade to St Mary s Place) Note that a lesser scheme may be appropriate ( eg resurfacing only) depending on whether proposed developments on Shambles Street are imminent or not 255k To be identified (local roads) Subject to
Phase 9 Wellington Street Carriageway(Pall Mall to New Street) Footways (Pall Mall to New Street) (granite setts, granite kerbs and flags and include lighting and signing Superseded by Phase 5 Phase 10 St Mary s Place Kerbing & Footway West Side (Shambles Street to Westgate) Carriageway(Shambles Street to Westgate) (granite setts, granite kerbs and flags and include lighting and signing To be identified Developer funded To be completed as part of the Sixth Form College off- site works On completion of College (end 2015?) Phase 11 Shambles Street Shambles Street Parking Bays (adj John Rideal House) 50k To be identified On completion of College (end 2015?)