Report by Finance Committee (B) Washington Metropolitan Area Transit Authority Board Action/Information Summary

Similar documents
EXHIBIT 1. BOARD AUTHORIZATION FOR PUBLIC HEARING AND SUBSEQUENT ISSUANCE OF A JOINT DEVELOPMENT SOLICITATION

Huntington Metro Station Joint Development

Approval to Conduct Public Hearings to Increase Metrobus Charter Fee Schedule

Silver Line Operating Plan

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of February 22, 2014

Shared Use by Marriott of WMATA s Parking Garage at Prince George s Plaza Metrorail Station

Follow-up to Proposed Fare Changes for FY2013

METROBUS SERVICE GUIDELINES

APPENDIX B. Arlington Transit Peer Review Technical Memorandum

Figure 2: Public Transit Systems Operating in Northern Virginia Operating Statistics and Performance Indicators, FY 2004

Operational Performance

RULES AND REGULATIONS

Establishes a fare structure for Tacoma Link light rail, to be implemented in September 2014.

Washington Metropolitan Area Transit Authority Services Utilization Study

P D E C. Establishment of Opening Dates for New Carrollton Yard and College Park and New Carrollton Parking Garages

Metro s Transit Police Crime Statistics and Upcoming Events Information

METRO Orange Line Update Metro Transit, BRT/Small Starts Projects Christina Morrison & Natalie Westberg Transportation Committee July 10, 2017

Memorandum. DATE: May 9, Board of Directors. Jim Derwinski, CEO/Executive Director. Fare Structure Study Fare Pilot Program

Mount Pleasant (42, 43) and Connecticut Avenue (L1, L2) Lines Service Evaluation Study Open House Welcome! wmata.com/bus

Date: 11/6/15. Total Passengers

All Door Boarding Title VI Service Fare Analysis. Appendix P.3

REPORT TO THE DULLES CORRIDOR COMMITTEE

2018 Transit Summit. Board Room, First Floor, Government Center June 25, :00 PM

LOS ANGELES COUNTY CONGESTION REDUCTION DEMONSTRATION INITIATIVE

Appendix A: Regional Fare Policy, SANDAG

Quarterly Report Transit Bureau, Local Transit Operations. First Quarter, Fiscal Year 2015 (July 2014 September 2014) ART & STAR

Table of Contents. List of Tables

Att. A, AI 46, 11/9/17

MANASSAS. From Manassas To Pentagon and Downtown Washington. Potomac River E ST. EXPWY I-66. Theodore Roosevelt Memorial Bridge I-66.

1 SUBWAY EXTENSION TO VAUGHAN CORPORATE CENTRE - OPERATING AGREEMENT UPDATE

CHAPTER 5: Operations Plan

COMMUNICATIONS DEPARTMENT (Lisa Belsanti, Director) (Joshua Schare, Public Information Officer)

Regional Fare Change Overview. Nick Eull Senior Manager of Revenue Operations Metro Transit

SECTION 106 ACTIVITIES ANNUAL REPORT

GREENBELT-BWI THURGOOD MARSHALL AIRPORT EXPRESS LINE ROUTE B30

Bristol Virginia Transit

ACI LEGAL COMMITTEE MEETING

I-95/395 HOV/Bus/HOT Lanes Project Overview

MONTHLY REPORT SEPTEMBER 2017

8 CROSS-BOUNDARY AGREEMENT WITH BRAMPTON TRANSIT

Metrobus Service Evaluations

Manual vs. Automatic Operation and Operational Restrictions

DC Circulator Service Changes. Implementation Plan for June 24, 2018

Report to the Dulles Corridor Advisory Committee

McLean Citizens Association Transportation Committee Project Briefing

Report to the Strategic Development Committee

Metropolitan Washington Airports Authority (MWAA)

AGENDA GUEMES ISLAND FERRY OPERATIONS PUBLIC FORUM

APPENDIX B COMMUTER BUS FAREBOX POLICY PEER REVIEW

Metro. Board Report. File #: , File Type: Informational Report Agenda Number: 25

SECTION 106 ACTIVITIES ANNUAL REPORT

Public Information Meetings. October 5, 6, 7, and 15, 2015

Fiscal Management and Control Board. Fare Policy October 16, Draft for Discussion & Policy Purposes Only

Resolution of Support for the Ettrick Site as the Future Location of the Tri-Cities Multimodal Station

Welcome. Sign in Pick up comment form Visit stations to learn more Submit your comment form

WESTERN EL DORADO COUNTY SHORT AND LONG-RANGE TRANSIT PLAN Executive Summary

To: Mary Beth Avedesian B.F. Saul Company

Riders Advisory Council. May 2, 2012

Form I-924, Application for Regional Center under the Immigrant Investor Pilot Program. EB5 Capital DC Regional Center RCW / ID

Administration and Projects Committee Meeting STAFF REPORT July 3, 2014 Page 2 of 2 Agreement Consultant Project General Scope CT 107 URS Corporation

2 YORK REGION TRANSIT VEOLIA AGREEMENT AMENDMENT 91 CALDARI ROAD

DRAFT Service Implementation Plan

Dulles Corridor Metrorail Project Update Dulles Area Transportation Association August 25, 2009

Bus Operations Report

4 YORK REGION TRANSIT DON MILLS SUBWAY STATION ACCESS AGREEMENT

Form I-924, Application for Regional Center under the Immigrant Investor Pilot Program. EB5 Capital California Regional Center

Fare Policy Discussion Background and History

Arlington County Board Meeting Project Briefing. October 20, 2015

DEVELOPMENT PERMIT STAFF COMMITTEE REPORT JUNE 19, 2013 CITY OF VANCOUVER PLANNING AND DEVELOPMENT SERVICES

Peer Performance Measurement February 2019 Prepared by the Division of Planning & Market Development

CHERRIOTS 2018 SERVICE PLAN 1

7272 WISCONSIN AVENUE LOCAL AREA TRANSPORTATION REVIEW

The following items were handed out at the January 4, 2018 NVTC Meeting.

Authorization for Public Hearings on FY2016 Budget and CIP

NAIOP. Marcia McAllister Metropolitan Washington Airports Authority

EXECUTIVE DIRECTOR. The Potomac Rappahannock Transportation Commission is seeking an ABOUT THE ORGANIZATION

Ozaukee County Transit Development Plan

2018 Service Implementation Plan Executive Summary

Jamie Cepler Washington Metropolitan Area Transit Authority, Bus Operations Specialist Washington, DC

TransAction Overview. Introduction. Vision. NVTA Jurisdictions

SAMTRANS TITLE VI STANDARDS AND POLICIES

Los Angeles County Metropolitan Transportation Authority

Terrace Regional Transit System CITY OF TERRACE COMMITTEE OF THE WHOLE SEPTEMBER 13, 2017

Transportation Supporting Dulles Airport

Providing public transportation since 1999 between Washington and Milwaukee Counties

Potomac River Commuter Ferry Feasibility Study & RPE Results

Transportation Management Program Office Newsletter J A N U A R Y

Service Cost Estimate for Route 10 only

Silver Line Rail Project Update

Greater Portland Transit District

Elected Officials and Media Briefing I-395 Express Lanes Northern Extension

SKAGIT COUNTY PUBLIC WORKS DEPARTMENT Ferry Operations Division Ferry Fare Revenue Target Report

Sound Transit Operations December 2014 Service Performance Report. Ridership

LA Metro Rapid - Considerations in Identifying BRT Corridors. Martha Butler LACMTA, Transportation Planning Manager Los Angeles, California

SAMTRANS SERVICE PLAN

City of Jacksonville Beach

Public Meeting. December 19 th, 2018

A retrospective look at work program counting activities since 2001 is found in Table 8, on the last page of this document. Hours of Operation

2010 MTA Financial Plan & Proposed LIRR Service Reductions Supplemental Information. MTA Long Island Rail Road

Jefferson Area Regional Transit Partnership (RTP)

Transcription:

Report by Finance Committee (B) 07-28-2016 Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD Number: 201753 Resolution: Yes No TITLE: National Harbor Pilot Metrobus Service PRESENTATION SUMMARY: The Board will be presented with information about a new pilot bus service connecting National Harbor, Maryland, with Virginia across the Woodrow Wilson Bridge. PURPOSE: Seeking Board approval to establish a reimbursable operating project for FY2017 to support the implementation of pilot bus service between National Harbor, Maryland, and Virginia across the Woodrow Wilson Bridge. DESCRIPTION: Key Highlights: Demand for a cross-potomac connection between Virginia and the National Harbor area in Maryland will increase this fall with the opening of the MGM Casino. The State of Maryland, Prince George's County, the City of Alexandria, and Fairfax County have all expressed support for the new NH2 Metrobus service across the Woodrow Wilson Bridge. A pilot program for the NH2 in FY2017 will allow Metro to evaluate ridership demand, conduct ridership surveys, and complete an FTA-required Title VI equity analysis. If the NH2 pilot is successful and the Board determines that it should continue as a permanent service, the NH2 will be incorporated into the FY2018 operating budget as a regular regional route. Background and History: Metrobus operated a route across the Woodrow Wilson Bridge in the late 1990s, before much of the extensive development on both sides of the Potomac River took place. This route was discontinued after several years due to low ridership and the need to reduce expenses. However, at the time of the creation of the NH1 Metrobus service in 2008, which connects the National Harbor development in Prince George s County with Southern Avenue Metrorail station, Metro anticipated a future extension of Metrobus service

across the reconstructed bridge to connect National Harbor with Alexandria and King Street station. Since that time, development and job growth in that area of Prince George s County has continued, including the opening of Tanger Outlets in 2013 and the scheduled opening of the new MGM Casino in November 2016. The 2014 Oxon Hill Area Metrobus Service Evaluation study also confirmed the need for connecting bus service across the Potomac. Discussion: As the National Harbor area adds the MGM Casino and several hotels, generating both employee and visitor trips, and as the Eisenhower Valley/King Street area of Virginia continues to develop, the demand for a transit connection across the Woodrow Wilson Bridge has grown. Prince George's County and the Maryland Department of Transportation, as well as the City of Alexandria and Fairfax County, have all expressed their support for the establishment of this bus connection. In addition, the National Harbor developer (the Peterson Group) has proposed to contribute $500,000 annually to offset Metro's operating costs. The proposed NH2 service would operate from 6:00 am to 1:00 am on both weekdays and weekends. Buses would run in each direction every 30 minutes, connecting Huntington and King Street stations in Virginia with the Oxon Hill Park-and-Ride, MGM Casino, and downtown National Harbor in Maryland. The projected annual operating cost of the service is approximately $2.9 million. Estimated initial annual ridership is 230,000 trips, so the annual subsidy required for the service (before any developer contribution) is approximately $2.6 million. The service will require three buses. If the NH2 is approved, service would be operated as a pilot from October 2016 to June 2017 (nine months), and a reimbursable project in the amount of $2,175,000 will be created to support the service in FY2017. The participating jurisdictions noted above would be responsible for any NH2 expenses not covered by farebox revenues or the proposed developer contribution. Metro staff would then conduct a service evaluation by the spring of 2017 to assess ridership, cost recovery, future demand, and the demographics of riders (including a Title VI equity analysis, as required by FTA). If the route is successful and the Board approves the pilot service to become permanent, the NH2 service would be incorporated as a regular regional route in the FY2018 budget. FUNDING IMPACT: No impact on FY2017 subsidized operating budget -- project will be funded through separate reimbursable operating project budget in FY2017. The new reimbursable project budget will be $2,175,000, to be funded through a combination of fare revenues, developer contribution, and jurisdictional support. If approved as a permanent route in FY2018, the expected annual operating costs for the route are approximately $3.0 million, with an ongoing requirement of three buses for the service. The route would be included as a regional route and the jurisdictional subsidy would be allocated accordingly. Project Manager: Jim Hamre

Project Department/Office: BPLN TIMELINE: Previous Actions Anticipated actions after presentation N/A August 2016 - Execution of Memorandum of Understanding (MOU) and reimbursable project agreement among WMATA and participating jurisdictions for pilot NH2 service October 2016 - Start of pilot NH2 service Spring 2017 - Evaluation of NH2 service and decision on inclusion of NH2 as permanent regional route in FY2018 operating budget RECOMMENDATION: Recommend Board approval to establish a reimbursable operating project for FY2017 to support the implementation of pilot bus service between National Harbor, Maryland, and Virginia across the Woodrow Wilson Bridge.

PRESENTED AND ADOPTED: July 28, 2016 SUBJECT: CREATION OF NEW BUS SERVICE CONNECTING NATIONAL HARBOR, MARYLAND, AND VIRGINIA AND APPROVAL TO ENTER INTO A REIMBURSABLE PROJECT AGREEMENT 2016-31 RESOLUTION OF THE BOARD OF DIRECTORS OF THE WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY WHEREAS, When the NH1 Metrobus service started in 2008, to connect the National Harbor development in Prince George's County with Southern Avenue Metrorail station, the Washington Metropolitan Area Transit Authority (WMATA) Board of Directors anticipated a future extension of Metrobus service across the reconstructed Woodrow Wilson Bridge to connect National Harbor with the City of Alexandria and King Street Metrorail station; and WHEREAS, Development and job growth in that area of Prince George's County has continued since 2008, including the opening of Tanger Outlets in 2013 and the scheduled opening of the new MGM Casino in November 2016; and WHEREAS, Expanded public transportation is needed to link this new development with Virginia, particularly to connect workers with job opportunities; and WHEREAS, The 2014 Oxon Hill Area Metrobus Service Evaluation study also confirmed the need for connecting bus service across the Woodrow Wilson Bridge; and WHEREAS, The Maryland Department of Transportation, Prince George's County, the City of Alexandria, and Fairfax County (''the NH2 Jurisdictions'') have requested a new NH2 Metrobus service to operate between Huntington and King Street-Old Town stations in Virginia and the Oxon Hill Park-and-Ride Lot, MGM Casino, and downtown National Harbor in Maryland on weekdays, Saturdays, and Sundays between 6:00 A.M. and 1:00 A.M. daily, with service every 30 minutes; and WHEREAS, The NH2 Jurisdictions have requested that the new service commence in October 2016, ahead of the planned opening of the MGM Casino; and WHEREAS, The projected 12-month operating cost of this service is approximately $2.9 million; and WHEREAS, The developer of National Harbor, the Peterson Group, has proposed to provide $500,000 annually to help offset the operating costs of the NH2 service; and Motioned by Mr. Goldman, seconded by Mr. Price Ayes: 8 - Mr. Bulger, Ms. Harley, Mr. Corcoran, Mr. Costa, Mr. Price, Mr. Goldman, Mrs. Hudgins and Ms. Carmody

WHEREAS, Introducing the proposed NH2 service on a pilot basis is appropriate in order to confirm ridership demand, conduct ridership surveys, and complete an Ff A-required Title VI equity analysis; and WHEREAS, The NH2 Jurisdictions have proposed to fund the pilot service in FY2017 as an operating reimbursable project, with the NH2 Jurisdictions jointly providing funding for all expenses not covered by fare revenues or by the developer contribution; and WHEREAS, If the pilot service is successful and the Board approves the continuation of the NH2 as a permanent service, it is expected that the NH2 would be included in the FY2018 operating budget as a regional route, given that the route crosses jurisdictional boundaries and connects regional activity centers; now therefore be it RESOLVED, That the Board of Directors approves amending and increasing the FY2017 Operating Reimbursable Budget by $2,175,000 for nine months of NH2 pilot service; and be it further RESOLVED, That the General Manager/Chief Executive Officer is authorized to negotiate and execute a Memorandum of Understanding (MOU) and reimbursable project agreement for the pilot service among WMATA, the NH2 Jurisdictions, and private stakeholders; and be it further RESOLVED, That the Board of Directors directs staff to plan, implement, and operate the new Metrobus NH2 service as a pilot program for up to nine months to connect locations in and around National Harbor in Prince George's County, Maryland, with the Huntington and King Street-Old Town Metrorail stations in Virginia; and be it further RESOLVED, That the NH2 pilot service shall begin on or about October 1, 2016, or within 30 days of the final execution of the MOU and reimbursable project agreement, whichever is later, to allow for customer notification, operator training, signage, and other start-up activities; and be it further RESOLVED, That staff will provide the Board of Directors with a Title VI equity analysis and recommendation to continue or discontinue the pilot service prior to the adoption of the FY2018 operating budget; and be it finally 2

RESOLVED, That this Resolution shall be effective 30 days after adoption in accordance with 8(b) of the WMATA Compact. Reviewed as to form and legal sufficiency, atricia Y. Lee General Counsel WMATA File Structure Nos.: 4.3.3 Reimbursable Agreements 6.6.4 Bus Route and Seivice Planning 3