Marine Transportation Safety Investigation Report M17P0406

Similar documents
Air Transportation Safety Investigation Brief A16W0094

Air Transportation Safety Investigation Report A18O0002

MARINE OCCURRENCE REPORT

AVIATION INVESTIGATION REPORT A02P0290 GEAR-UP LANDING

AVIATION INVESTIGATION REPORT A04Q0041 CONTROL DIFFICULTY

AVIATION INVESTIGATION REPORT A00Q0116 RISK OF COLLISION

CPP failure caused heavy contact with lock

AVIATION OCCURRENCE REPORT A98W0216 LOSS OF SEPARATION

MARINE SAFETY INVESTIGATION REPORT

AVIATION INVESTIGATION REPORT A03O0213 LOSS OF SEPARATION

AVIATION OCCURRENCE REPORT

AVIATION INVESTIGATION REPORT A06Q0181 FLIGHT IN WEATHER CONDITIONS UNFAVOURABLE FOR VISUAL FLIGHT AND COLLISION WITH TERRAIN

AVIATION INVESTIGATION REPORT A17P0007

Casualty Incident Report

ATLANTIC / ARNGAST Collision in the DW route east of Langeland, Denmark, 4 August 2005

AVIATION INVESTIGATION REPORT A04O0237 FLIGHT CONTROL DIFFICULTIES

Corroded pipe causing oil spill

AVIATION INVESTIGATION REPORT A01Q0165 LOSS OF CONTROL AND STALL

Dredging in Fowey Chapter 3 Post departure of the Lantic Bay

Aratere Briefing BACKGROUND THE INTERISLANDER FLEET 2011 ARATERE EXTENSION PROPELLER FAILURE

DRY- DOCK HULL INSPECTION OF NILE CRUISERS

SUMMARY of Final report RS 2011:01es

MARINE INVESTIGATION REPORT M98C0066 GROUNDING

AVIATION INVESTIGATION REPORT A99W0234 ENGINE FIRE

MARINE ACCIDENT INVESTIGATION REPORT

REPORT General Cargo Vessel MEG - UBFH - Grounding on October 15th, 2002

CONSTRUCTION Motor Yacht with flying bridge Planning hull design GRP construction Teak laid decks

Collision between the tug Arafura

TABLE OF CONTENTS 1.0 INTRODUCTION...

AVIATION INVESTIGATION REPORT A02P0136 AIRCRAFT STALL ON TAKE-OFF

AVIATION OCCURRENCE REPORT FLIGHT INTO TERRAIN PIPER COMANCHE PA N6541P (USA) PELICAN NARROWS, SASKATCHEWAN 15 JUNE 1996 REPORT NUMBER A96C0092

AVIATION INVESTIGATION REPORT A09O0159 TREE STRIKE DURING CLIMB-OUT

MV Vemaoil XXIII (IMO ) into the anchored vessel MV Duzgit Integrity (IMO )

WÄRTSILÄ HY. Wärtsilä 29 May 2018 WÄRTSILÄ HY

Class Entry for Existing Ships

AVIATION INVESTIGATION REPORT A01P0203 STRUCTURAL FAILURE

AVIATION OCCURRENCE REPORT

Sunken Barge ARTHUR J & Tug MADISON Case Study. LCDR Chico Knight, DBA, M.S.

MARITIME. Protect Your Assets. Lay-up seminar MOU - CEFOR. Dec. 2016, Oslo, Ungraded SAFER, SMARTER, GREENER

AVIATION INVESTIGATION REPORT A05P0032 SETTLING WITH POWER ROLL-OVER

FPMC INMARSAT number (Bridge), (Cabin) 1.16 Ship's address

AVIATION INVESTIGATION REPORT A06Q0180 LOSS OF ELECTRICAL POWER

AVIATION OCCURRENCE REPORT A97Q0250 MID-AIR COLLISION BETWEEN CESSNA 172M C-GEYG OF CARGAIR LTD. AND CESSNA 150H C-FNLD MASCOUCHE AIRPORT, QUEBEC

PRESS RELEASE WRECK REMOVAL OPERATION OF M/V GOODFAITH, ANDROS ISL. GREECE

OUR SERVICES SHIP REPAIR & SHIPBUILDING METAL CONSTRUCTIONS

Fairline Phantom 43 (2001)

WÄRTSILÄ HY GENERAL PRODUCT PRESENTATION NICOLA SPIGA, 10/05/2017. Wärtsilä. 15 December 2017 WÄRTSILÄ HY

VFR Module 2. G1000 Transition VFR Module 2

Annual Summary of Marine Safety Reports

National Transportation Safety Board

AVIATION INVESTIGATION REPORT A09C0114 IN-FLIGHT COLLISION

Fountain Exp Cruiser LLC OWNED

CASUALTY-RELATED MATTERS 1 REPORTS ON MARINE CASUALTIES AND INCIDENTS

Integrating Life-Cycle Solutions for Maximum Return on Investment

AVIATION INVESTIGATION REPORT A00Q0046 IN-FLIGHT BREAK-UP

4Q2012. Near Miss Report Summary

AVIATION INVESTIGATION REPORT A16O0066

TUGS TOWING & OFFSHORE NEWS SPECIAL

AVIATION OCCURRENCE REPORT

Kadey Krogen Manatee Happy Clamz

Post Marine Convertible CAROLINA GENTLEMAN

Spindrift Aft Cockpit Motor Yacht

AVIATION INVESTIGATION REPORT A01P0165 OVERTURNED ON WATER LANDING

gentleman s cruiser and is ideal as a charter boat on the stunning waters and islands that surround Phuket.

FINAL REPORT BOEING B777, REGISTRATION 9V-SWH LOSS OF SEPARATION EVENT 3 JULY 2014

Cantiere delle Marche Darwin Expedition Yacht STELLA DEL NORD. DEL NORD Yacht. Denison Yacht Sales

Grounding. of the CMV HANNI off Mühlenberger Loch. in Hamburg on 4 December 2016

Make Model Length Price Year Condition. Azimut 62 Flybridge 62 ft $ 579, Used. Boat Name Hull Material Number of Engines Fuel Type

TUGS TOWING & OFFSHORE NEWS SPECIAL

AVIATION INVESTIGATION REPORT A00P0101 CABIN DEPRESSURIZATION

Bluewater Coastal Cruiser Kristannalee

Dredging 101. Why, Who, How and So What! 2015 WAMSI Research Conference. 30 March 2015

AVIATION INVESTIGATION REPORT A01P0111 AIR PROXIMITY SAFETY NOT ASSURED

8.4 Critical Equipment Analysis - TANKERS

Full Steam Ahead. Vectis Eagle. New Game GREEN MACHINE WASTE HEAT RECOVERY STANDARD HOPPERS. SBI 2012 volume 6 ISSue 1

The Last Years of Sun Ship

Elling E3 Nautibelle

SOLD - 404mt dwt Cargo Vessel Listing ID:

EX USS SHADWELL Disposal Wreck in Place

REPORT INTO THE FIRE AND SUBSEQUENT GROUNDING OF THE MV "PATRIARCH" ON 1ST SEPTEMBER, 2004

Dedicated to Electric & Hybrid Propulsion. A Future-Oriented Automation Platform. Scaldis Fully Self-Propelled Crane Vessel

Report. Serious Incident on 11 January 2010 At Lagos Aerodrome (Nigeria) To the Boeing ER Registered F-GSQI Operated by Air France

DAILY COLLECTION OF MARITIME PRESS CLIPPINGS SPECIAL REPORT *** COLLECTION OF MARITIME PRESS CLIPPINGS *** SPECIAL REPORT. Text / Photo s : Piet Sinke

Cement Carrier. Cristina Masaveu. new buildings

Carver 56 Voyager Flowergirl

Custom Huckins Convertible

Document Control Identification. Document History. Authorisation. Rail Safety Manager Brookfield Rail

REPORT OF THE INVESTIGATION INTO THE GROUNDING OF THE MV "LOCATOR" OFF SAINT MACDARA S ISLAND, OFF THE COAST OF GALWAY ON 31st MARCH 2007

Marquis 55' LS Flybridge "MARCIA"

TUGS TOWING & OFFSHORE NEWS SPECIAL

Summary Report. Contact with Wharf General Villa. 5 March 2006

Design of the Chilean Antarctic Vessel. Arctic Passion Seminar, Mar 2018 By Dan McGreer, Vard Marine

Flight Evaluation Schedule For GPS IFR Approval Primary Means Enroute, Terminal and Non-Precision Approach

56m Multipurpose Vessel / Icebreaker Listing ID:

U. S. S. CLEVELAND (LPD-7) FLEET POST OFFICE SAN FRANCISCO 96601

SPECIFICATIONS. Length 55m (180' 4) Beam 10m (32' 8) Draft 3m (9' 10) Year 2008 (0) Gross tonnage 736t

Falcon 115 (GRP) Number: Yachts Invest - Jean Lacombe. Prestige Yachts Investment, La Croisette, Port Canto, Cannes 06400, France

REPORT OF INVESTIGATION INTO THE COLLISION OF M/V STENA EUROPE AND M/V OSCAR WILDE AT ROSSLARE HARBOUR ON 26th OCTOBER 2012

AVIATION INVESTIGATION REPORT A02F0069 TAIL STRIKE ON TAKE-OFF AND AIRCRAFT PITCH-UP ON FINAL APPROACH

Craig Trans /IMO#

Transcription:

Marine Transportation Safety Investigation Report M17P0406 COLLISION Dredger FRPD 309 Fraser River, British Columbia 05 December 2017 About the investigation The Transportation Safety Board of Canada (TSB) conducted a limited-scope, fact-gathering investigation into this occurrence to advance transportation safety through greater awareness of potential safety issues. It is not the function of the Board to assign fault or determine civil or criminal liability. The occurrence On 04 December 2017, at 1908, 1 the dredger FRPD 309, owned by Fraser River Pile and Dredge (GP) Inc., departed a shipyard in Delta, BC, to begin dredging in the Fraser River. The vessel is a conventional trailing arm suction dredger, with the bridge and accommodation located forward and machinery space located aft (Figure 1). Prior to departure, the crew had carried out pre-departure checks, a safety meeting, and emergency drills. After arriving at the designated dredging location, the vessel began dredging sand and sediment from the river bed into the hopper using the 2 trailing arms and a dredging pump. When the hopper was filled, the sand and sediment was pumped ashore via a pipeline. The master left the bridge at approximately 2100, handing over the command of the vessel to the officer of the watch (OOW). Two engineers, 2 deckhands, and a pipe operator 2 were also on duty. 1 All times are Pacific Standard Time (Coordinated Universal Time minus 8 hours). 2 The pipe operator oversees dredging operations under direction of the OOW.

2 TRANSPORTATION SAFETY BOARD OF CANADA Figure 1. FRPD 309 (Source: Fraser River Pile and Dredge, with TSB annotations) By 0347 on 05 December, the vessel had completed 2 discharges of the hopper and was dredging using 2 dragheads attached to the end of the trailing arms while stemming the river s current. The visibility was clear, with a rippled sea and light winds. By approximately 0420, the hopper was full again, so the pipe operator began to raise the dragheads using the winches. Shortly after the pipe operator confirmed that the dragheads were off the bottom, the OOW used both thrusters in conjunction with the engines to turn the vessel around to proceed to the discharge pipeline location. Moments later, at 04:23:45, as the vessel was turning and the pipe operator was raising the trailing arms to the deck level, the vessel experienced a blackout. 3 Approximately 2 to 5 seconds elapsed before the power management system restored electrical power to the vessel. Because the power management system was in semi-automatic mode, 4 the second engineer was able to quickly start the third generator (port) and bring it online so that load could be increased to operational levels. Once power returned, the bridge team was able to quickly reset the electronic equipment that had tripped as a result of the blackout. Approximately 2 minutes after the blackout, the OOW resumed the turn to port and the vessel continued towards the discharge pipeline location. However, at this time, the 2 engineers in the engine room were still resetting numerous alarms and both essential and non-essential circuit breakers 5 that had tripped, including some located in the fore part of the vessel, and they did not have enough time to restore the vessel to normal status before it resumed the voyage. During this 3 A blackout is a complete failure of electrical power on a vessel caused by failure of power generation or distribution equipment. 4 In semi-automatic mode, the operator starts, stops, and connects generators by commands. Provided the generator is on standby, when the operator selects the START command, the generator automatically starts, synchronizes, and connects to the main switchboard. The on-load generators then automatically load share. To stop the generator, the operator selects STOP, and the generator automatically unloads, disconnects, and stops. 5 A circuit breaker is an electrical switch designed to automatically cut the flow of current in order to protect an electrical circuit from damage caused by overload or short circuit.

MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M17P0406 3 time, the bridge team contacted the engine room to request resetting the shaft generators, hydraulic pumps, and the winches. During the blackout, the control air compressor and service air compressor had tripped and had to be reset locally. Each compressor supplies air to an independent air receiver, which is maintained at a constant operating pressure and supplies compressed air to various machinery. The control air receiver, which supplies compressed air to keep the main engine clutches engaged, is maintained at 7.5 bar. The system is fitted with 2 alarms: a low pressure alarm (which activates at 6 bar) and a failure alarm (which activates at 5 bar). At some point following the blackout, both the low pressure and the failure alarms for the control air receiver activated. However, these alarms went unnoticed by the engineers, who continued to be occupied with resetting tripped breakers and alarms. At 0430:45, the vessel was proceeding to the discharge pipeline location at a speed of approximately 7.2 knots when propulsion was lost; the main engine clutches had automatically become disengaged after the control air pressure fell below 5 bar. The loss of propulsion alarm activated on the bridge and in the engine room. As well, on the bridge, the indicators for the shaft generators and the propeller pitch went to zero. 6 One of the thrusters, which was powered by the shaft generators, also became unavailable. The OOW attempted to clutch in the propulsion, but there was no response. At 0431:48, the OOW called the master and informed him that the vessel had lost propulsion. Meanwhile, the FRPD 309 continued proceeding ahead under its own momentum and was now on a collision course with the tug Storm Wave, which was towing the loaded barge Evco 60 in the vicinity. The OOW on the FRPD 309 applied the rudder to starboard in an attempt to steer the dredger away from the tug and tow. At 0431:58, the OOW notified the Storm Wave that the FRPD 309 had lost propulsion and requested that the tug keep out of the way. At 0432:14, the general alarm was sounded, and the deckhand on the bridge was instructed to go forward and let go the anchor. Moments later, the OOW made an announcement on the PA system warning the crew of the imminent collision. Because the main engines were still running, the engineers were not aware of the propulsion failure until the general alarm was sounded and the OOW made the announcement. One of the engineers had restarted both air compressors, but this was done too late to prevent the main engine clutches from disengaging. At 0432:54, the dredger collided with the Evco 60 while making way at approximately 4.5 knots. The OOW reported the collision to Marine Communications and Traffic Services and informed the master, who arrived on the bridge shortly afterwards. The vessel then anchored and communicated with the Storm Wave, which continued on its voyage after assessing the damage to the barge. Approximately 1.5 hours later, the dredger weighed anchor after regaining propulsion. It then proceeded to the discharge pipeline location before returning to the shipyard for repairs at 0730. At the time of the blackout, 2 of the 3 diesel generators (starboard and inboard) were in operation. The vessel s power management system had preferential tripping: in an overload situation, this will automatically disconnect non-essential loads from the switchboard, retaining power to essential equipment. The investigation could not determine the cause of the blackout. 6 The main engines must be clutched in to the propulsion for the shaft generators to be operational.

4 TRANSPORTATION SAFETY BOARD OF CANADA Damage As a result of the collision, the FRPD 309 sustained damage to the shell plating (Figure 2) and forepeak tank forward of the collision bulkhead (Figure 3). Additionally, the port anchor was disconnected from its housing and became wedged in the Evco 60 s hull. The Evco 60 also sustained structural damage due to the impact of the collision (Figure 4). Figure 2. Damage to the hull of the FRPD 309 Safety action taken Following the occurrence, the company revised the safety management system documentation related to emergency checklists and loss of propulsion; revised familiarization and training and briefed the crew on these changes; implemented training for all deck and engine room crew concerning safe parameters for air clutches and air telegraph; conducted emergency drills related to failure and maintenance of the control air systems; and fitted a control air compressor with auto-start capability. Figure 3. Damage to the forepeak tank In addition, the company is working on enhancing its training as well as developing a competency evaluation program. Safety messages Recovery from a blackout In this occurrence, once power was restored to the bridge following the blackout, the vessel resumed manoeuvring towards the discharge pipeline location almost immediately, without allowing the engine room crew time to reset all the alarms and breakers and verify the operational status of the vessel s systems and equipment. The bridge team did not confirm with the engine room that they had completed restoring the vessel s systems, nor did the Figure 4. Port anchor of the FRPD 309 (circled in yellow) wedged in the hull of the barge Evco 60 engine room communicate to the bridge team that more time was needed to do so.

MARINE TRANSPORTATION SAFETY INVESTIGATION REPORT M17P0406 5 This occurrence highlights the importance of taking the time to ensure a vessel is fully restored to operational status following a blackout. Using comprehensive blackout recovery checklists and conducting meaningful drills are tools that can help make a crew s response to a blackout more effective. This concludes the TSB s limited-scope investigation into this occurrence. The Board authorized the release of this investigation report on 20 June 2018. It was officially released on 26 June 2018. Transportation Safety Board of Canada Place du Centre 200 Promenade du Portage, 4th floor Gatineau QC K1A 1K8 819-994-3741 1-800-387-3557 www.tsb.gc.ca communications@tsb.gc.ca Her Majesty the Queen in Right of Canada, as represented by the Transportation Safety Board of Canada, 2018 Marine transportation safety investigation report M17P0406 Cat. No. TU3-12/17-0406E-PDF ISBN 978-0-660-26920-7 This report is available on the website of the Transportation Safety Board of Canada at www.tsb.gc.ca Le présent rapport est également disponible en français.